The Agnico‐Eagle Exploration Show and Tell 145 King Street East, Suite 400 January 6 th and 7 th Featuring core and geologists from key projects: Suuri‐Roura Deep (Kittila), Tiriganiaq‐F Zone (Meliadine), Westwood (Ellison), D Zone (Goldex), Zone 5 (Bousquet), Cubiro (Pinos Altos) CORE IN THE CORNER OFFICE
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
The Agnico‐Eagle Exploration Show and Tell
145 King Street East, Suite 400January 6th and 7th
Featuring core and geologists from key projects: Suuri‐Roura Deep (Kittila),
Tiriganiaq‐F Zone (Meliadine), Westwood (Ellison), D Zone (Goldex), Zone 5 (Bousquet),
Cubiro (Pinos Altos)
CORE IN THE CORNER OFFICE
Pinos Altos – Mexico
2011 Estimated production of 168,000oz Au at cash costs of $400/oz Mascota: 31,000oz Au at cash costs of $439/oz
2012-2015 Estimated average annual production of 175,000oz Au at cash
costs of $345/oz Underground to account for majority of production Mascota: 55,000oz Au at cash costs of $299/oz
Exploration Focus Potential to develop satellite deposits (Cubiro, Sinter, San Eligio) Focus on resource conversion, expansion of
Pinos Altos zones, Reyna de Plata, Creston Mascota
Gold reserves (m oz) 3.4
Average reserve grade (g/t) 2.5
Measured & Indicated resource (m oz) 0.5
Inferred resource (m oz) 0.7
Est. LOM (years) 18
Estimated average production (k oz/yr) 170
2011 exploration budget $2M
Exploration Success Adding to Growth Opportunities
Mexico
Cubiro & Colorada Areas
Cubiro Vein – Geology Map
View Looking north-northeast (+/- 1.0 g/Au t grade shell over 2m width)
Cubiro Vein – Mineralization 3D Model
Cubiro Vein LongsectionContoured Au Intercepts (Approx. >2m @ + 0.3 g Au/t)
View Looking Northeast
Looking NortheastDecember, 2010
Cubiro Vein – Mineralization 3D Model Longsection View
Drillhole CB-09-015 Assay Summary
Cross Section-16(Showing Loc. of CB-09-015)200 meter Grid View Looking northeast December, 2010
Cubiro Vein – Mineralization 3D ModelCross Section View
Kittila Mine
2011 Estimated production of 150,000oz Au at cash costs
of $548/oz Expansion study to be reviewed Q3 2011
2012-2015 Estimated average annual production of 173,000oz
Au at cash costs of $501/oz
Exploration Focus Resource conversion, expansion below Suuri and
Roura, and along strike
Optimization Phase Bearing Significant Results
Gold reserves (m oz) 4.0
Average reserve grade (g/t) 4.8
Measured & Indicated resource (m oz) 1.4
Inferred resource (m oz) 0.6
Est. LOM (years) 22
Estimated average production (k oz/yr) 150
2011 exploration budget $16M
Kittila Mine - Longitudinal Section
ROU-100292.68 g/t / 2.3 m
ROU-10-024B3.85 g/t Au / 10.1 m
ROU-10-0246.42 g/t Au / 4.9 m
ROU-10-0263.98 g/t Au / 17.2 m
ROU-10-026B7.25 g/t Au / 10.0 m6.46 g/t Au / 12.8 m