Basic PricesBASIC
PRICESTradeMaterialsLabourPlantDescriptionUnitBasic
PriceDescriptionUnitBasic PriceDescriptionUnitBasic
PriceEXCAVATIONDry hard earth with transport
costcube.Skilledday1,000.00TractorEXCAVATIONQuarry dust with
transport costcube.EXCAVATION1 1/2" thick plank (class 11)S. ftUn
skilledday600.00EXCAVATION2" x 4" joist (class 11)L. ftEXCAVATION2"
x 6" joist (class 11)L. ftEXCAVATIONWire
nailskg.CONCRETECementbag850.00Skilled Labourday1,200.00Concrete
MixerCONCRETESandcube.12,500.00Un Skilled
Labourday1,000.00VibratorCONCRETEMetal 3/4 "cube.Vibrator
Operatorday1,200.00CONCRETEMetal 1 "cube.Concrete Mixer
operatorday1,000.00CONCRETEMetal 2 "cube.CONCRETEWatergal.FORM
WORK1" thick plank class 11S. ftSkilled Labourday1,000.00FORM WORK2
" x 4 " class 11L. ftUn Skilled Labourday600.00FORM WORK2 " x 2 "
class 11L. ftFORM WORK2 " x 1 " class 11L. ftFORM WORKWire
nailskg.FORM WORKMould oilltrFORM WORK16mm boltNrREINFORCEMENTTor
SteelSkilled labourday700.00REINFORCEMENT25mmkg.Un skilled
labourday450.00REINFORCEMENT20mmkg.REINFORCEMENT16mmkg.REINFORCEMENT12mmkg.REINFORCEMENT10mmkg.REINFORCEMENTbinding
wirekg.REINFORCEMENTMild
steelREINFORCEMENT10mmkg.REINFORCEMENT6mmkg.RUBBLE & CEMENT
BLOCKSRubblecube.Skilled labourday1,000.00RUBBLE & CEMENT
BLOCKScementbagUn skilled labourday600.00RUBBLE & CEMENT
BLOCKSsandcube.RUBBLE & CEMENT BLOCKSwatergal.RUBBLE &
CEMENT BLOCKS8" thick cemrnt hollow blockNrRUBBLE & CEMENT
BLOCKS6" thick cemrnt hollow blockNrRUBBLE & CEMENT BLOCKS4"
hick cemrnt hollow blockNrBRICK WORKCementbagSkilled
Labourday1,000.00BRICK WORKSandcube.Un Skilled Labourday600.00BRICK
WORKWatergal.BRICK WORKBricksNrWATER PROOFINGCementbagSkilled
Labourday1,000.00WATER PROOFINGSandcube.Un Skilled
Labourday600.00WATER PROOFINGDPC tarltrDOORS & WINDOWS4" X 3"
Class 1 timberL. ft.Painterday1,000.00DOORS & WINDOWS4" X 2"
Class 1 timberL. ft.Carpenterday1,000.00DOORS & WINDOWS11/4
thick planks. ft.Skilled labourday1,000.00DOORS & WINDOWSPly
wood door sash size 3' 0" x 6' 9"NrUn skilled labourday600.00DOORS
& WINDOWS1" thick plank 6" wideL. ft.DOORS &
WINDOWS5mm.glaze sheet.s. ft.DOORS & WINDOWS4" BrushNrDOORS
& WINDOWSSand paperNrDOORS & WINDOWSWood primerltr.DOORS
& WINDOWSEnamel paintltr.DOORS & WINDOWS4" x 3" Butt
hingespair.DOORS & WINDOWS4" x 2" Butt hingespair.DOORS &
WINDOWS3/4" brass screwsNrDOORS & WINDOWS1/2" brass
screwsNrDOORS & WINDOWS6" long barrel boltNrDOORS &
WINDOWS12" long barrel boltNrDOORS & WINDOWSMortice lockNrDOORS
& WINDOWSHold fastNrDOORS & WINDOWScasement fastnerNrDOORS
& WINDOWScasement stayNrROOF1" thick Ginisapu planks.
ft.Skilled Labourday1,000.00ROOF3/4" thick Ginisapu planks. ft.Un
Skilled Labourday600.00ROOFClass 1 timberc. ft.ROOFCalicut
tileNrROOFCalicut pattern ridge tileNrROOFHalf round
tileNrROOFAsbestos roofing sheets. ft.ROOFReepers 2" x 1"l.
ft.ROOFWire nailskg.ROOFColouring
powderkg.ROOFCementbagROOFSandcubeROOFLimekg.ROOF" J "
boltNrROOFWood primerltrROOFEnamel paintltrROOFWood
preservativeltrROOF3/4" x 9" timber for valance boardS.
ft.ROOFAsbestos close fittingpairROOFRoofing screwsNrROOFBrass
screws 11/2NrFLOORLimekg.Skilled Labourper
day1,000.00FLOORCementcube.Un Skilled Labourper
day600.00FLOORSandcube.FLOORwatergall.FLOORBricksNrFLOORFloor tile
6" x 6"NrFLOORFlor tile 8" x 8"NrFLOORFloor tile 12" x
12"NrFLOORTile groutkg.WALLCementbagSkilled Labourper
day1,000.00WALLSandcubeUn Skilled Labourper
day600.00WALLLimekg.WALLwatergalWALLWall tile 6" x 6"NrWALLWall
tile 8" x 12"NrWALLWall tile 8" x 8"NrWALLTile
groutkg.CEILINGCementbagSkilled Labourper
day1,000.00CEILINGSandcubeUn Skilled Labourper
day600.00CEILINGLimekg.CEILINGwatergalCEILING4" x 2" class 1
timberl. ft.CEILING2" x 2" class 1 timberl. ft.CEILING2" x 1" class
1 timberl. ft.CEILING11/2" x 11/2" cove mouldingl. ft.CEILING1/2" x
1/2" beadingl. ft.CEILING3/4 " thick timber ceiling plank
(lunumidella )s. ft.CEILINGAsbestos ceiling sheets. ft.CEILINGWire
nailskg.CEILINGEmulsion paintltrPAINTINGEmulsion paintltrSkilled
Labourper day1,000.00PAINTINGWeathersheild paintltrUn Skilled
Labourper day600.00PAINTINGBrush 4"NrPAINTINGAcrylic
fillerltrPAINTINGSand paperNrPAINTINGWatergalPLUMBINGPVC Pipe Type
400 (12 ft Standard Length pipes)Skilled Labourper
day1,000.00PLUMBING20mm dia pipe (1/2 ")NrUn Skilled Labourper
day600.00PLUMBING25mm dia pipe (3/4")NrPLUMBING32mm dia pipe
(1")NrPLUMBING40mm dia pipe (11/4")NrPLUMBING50mm dia pipe
(11/2")NrPLUMBING63mm dia pipe (2")NrPLUMBING75mm dia pipe
(21/2")NrPLUMBING90mm dia pipe (3")NrPLUMBINGPVC Pipe Type 600 (12
ft Standard Length pipes)PLUMBING20mm dia pipe (1/2
")NrPLUMBING25mm dia pipe (3/4")NrPLUMBING32mm dia pipe
(1")NrPLUMBING40mm dia pipe (11/4")NrPLUMBING50mm dia pipe
(11/2")NrPLUMBING63mm dia pipe (2")NrPLUMBING75mm dia pipe
(21/2")NrPLUMBING90mm dia pipe (3")NrPLUMBINGPVC Pipe Type 1000 (12
ft Standard Length pipes)PLUMBING20mm dia pipe (1/2
")NrPLUMBING25mm dia pipe (3/4")NrPLUMBING32mm dia pipe
(1")NrPLUMBING40mm dia pipe (11/4")NrPLUMBING50mm dia pipe
(11/2")NrPLUMBING63mm dia pipe (2")NrPLUMBING75mm dia pipe
(21/2")NrPLUMBING90mm dia pipe (3")NrPLUMBINGPVC Pipe fitting -
TeePLUMBING20mm dia pipe (1/2 ")NrPLUMBING25mm dia pipe
(3/4")NrPLUMBING32mm dia pipe (1")NrPLUMBING40mm dia pipe
(11/4")NrPLUMBING50mm dia pipe (11/2")NrPLUMBING63mm dia pipe
(2")NrPLUMBING75mm dia pipe (21/2")NrPLUMBING90mm dia pipe
(3")NrPLUMBINGPVC Pipe fitting - BendPLUMBING20mm dia pipe (1/2
")NrPLUMBING25mm dia pipe (3/4")NrPLUMBING32mm dia pipe
(1")NrPLUMBING40mm dia pipe (11/4")NrPLUMBING50mm dia pipe
(11/2")NrPLUMBING63mm dia pipe (2")NrPLUMBING75mm dia pipe
(21/2")NrPLUMBING90mm dia pipe (3")NrPLUMBINGPVC Pipe fitting -
ElbowPLUMBING20mm dia pipe (1/2 ")NrPLUMBING25mm dia pipe
(3/4")NrPLUMBING32mm dia pipe (1")NrPLUMBING40mm dia pipe
(11/4")NrPLUMBING50mm dia pipe (11/2")NrPLUMBING63mm dia pipe
(2")NrPLUMBING75mm dia pipe (21/2")NrPLUMBING90mm dia pipe
(3")NrPLUMBINGPVC Pipe fitting - Value socketPLUMBING20mm dia pipe
(1/2 ")NrPLUMBING25mm dia pipe (3/4")NrPLUMBING32mm dia pipe
(1")NrPLUMBING40mm dia pipe (11/4")NrPLUMBING50mm dia pipe
(11/2")NrPLUMBING63mm dia pipe (2")NrPLUMBING75mm dia pipe
(21/2")NrPLUMBING90mm dia pipe (3")NrPLUMBINGPVC Pipe fitting -
Faucet SocketPLUMBING20mm dia pipe (1/2 ")NrPLUMBING25mm dia pipe
(3/4")NrPLUMBING32mm dia pipe (1")NrPLUMBING40mm dia pipe
(11/4")NrPLUMBING50mm dia pipe (11/2")NrPLUMBING63mm dia pipe
(2")NrPLUMBING75mm dia pipe (21/2")NrPLUMBING90mm dia pipe
(3")NrPLUMBINGPVC Pipe fitting - SocketPLUMBING20mm dia pipe (1/2
")NrPLUMBING25mm dia pipe (3/4")NrPLUMBING32mm dia pipe
(1")NrPLUMBING40mm dia pipe (11/4")NrPLUMBING50mm dia pipe
(11/2")NrPLUMBING63mm dia pipe (2")NrPLUMBING75mm dia pipe
(21/2")NrPLUMBING90mm dia pipe (3")NrPLUMBINGSolvent cementkg.
Basic RatesBasic PricesMATERIALSLABOURPLANTItem
No.DescriptionCode No.UnitPrice ( Rs.)Item No.DescriptionCode
No.UnitPrice ( Rs.)Item No.DescriptionCode No.UnitPrice (
Rs.)1AcidM-001Gal254.001PainterL-001Day1,200.001Hire of
MixerP-001Day1,500.002Anti Corrosive
PrimerM-002litre245.002PlumberL-002Day1,200.002Hire of
VibratorP-002Day1,000.003Asbestos Corrugated
SheetM-003Sq.ft42.003SK LabourL-003Day1,200.003Vibrating
RammerP-003Day1,000.004Barrel BoltM-004No75.004SK Labour
(Vibrator)L-004Day1,200.005Binding Wire - 16
BWM-005Lbs200.005TinkerL-005Day1,200.006BitumenM-006Gal500.006TilerL-006Day1,200.007Blasting
PowderM-007Lbs200.007U / SK
LabourerL-007Day1,000.008BlueM-008Ozs10.008CarpenterL-008Day1,200.009Boild
LimeM-009Cwt300.009MasonL-009Day1,200.0010Bolts 16mm
18"M-010No75.0010GlazierL-010Day1,200.0011Brass Fanlight
ChtchesM-011No45.0012Brass Nails - 1 1/2"M-012Lbs50.0013Brass
Pannel PinsM-013Doz1.0014Brass scews - 1"M-014No2.5015Brass Screws
1 1/2"M-015No3.7516Brass Screws - 1/2 "M-016No1.3017Brass Screws -
3/4"M-017No1.2518Brass Screws - 4"
LongM-018No7.5019BricksM-019No6.0020Brush - 3"M-020No210.0021Brush
- 6"M-021No495.0022Brush 2"M-022No165.0023Butt
HingesM-023No70.0024Casement FastenersM-024No55.0025Casement
StaysM-025No55.0026CementM-026Bag850.0027Clear Glass
panesM-027Sq.ft25.0028Clips and Nails - 1 "M-028No7.0029Clips and
Nails - 1 1/2 "M-029No10.5030Clips and Nails - 1 1/4
"M-030No8.7531Clips and Nails - 2 "M-031No10.7532Clips and Screws -
3 "M-032No34.0033Clout Nails - 1/4"M-033Lbs25.0034Coir Brush -
6"M-034No45.0035Coloured PigmentM-035Lbs175.0036Colouring
PowderM-036Lbs175.0037Cotton WasteM-037Lbs12.5038D. D. T.
PowderM-038Lbs25.0039Diesel FuelM-039Ltr70.0040Door
CloserM-040No1,850.0041Draw RingsM-041No22.5042Earth Delivered at
SiteM-042Cube1,500.0043Emulsion PaintM-043litre280.0044Enamel
PaintM-044litre354.0045Fibre / Plastic PlugsM-045No1.5046Fire
WoodM-046Lbs250.0047Flannel ClothM-047Yards70.0048Flat Asbestos
Ceiling SheetsM-048Sq.ft15.0049Floor BrushM-049No210.0050Fuel
ForgeM-050Ltr100.0051Fuse wireM-051L.ft10.0052Galvanised iron
sheet(8'X4') - 18 B.W.G (1.2 mm)M-052No2,200.0053Gravel delivered
to siteM-053Cube2,000.0054Gutter BracketsM-054No55Gutter
joinerM-055No56Half Round Clay TilesM-056No5.0057Hollow Cement
Block - 8" thk.M-057No30.0058Hollow Cement Blocks - 4"
thk.M-058No27.0059Hollow Cement Blocks - 6" thk.M-059No22.0060Iron
Nails - 1 1/2M-060Kg.25.0061Iron Screws - 3/4"M-061No0.5562Jumper
SteelM-062Lbs65.0063Jute HessianM-063Sq.ft3.5064Metal - 1
"M-064Cube8,000.0065Metal - 1 1/2 "M-065Cube3,500.0066Metal - 3/4
"M-066Cube9,000.0067Mild Steel Dowels - 5/8" , 4"
Long.M-067No6.0068Mild Steel Rods including transport to
siteM-068Kg.109.0069Mineral Turpentine or
ThinnerM-069litre80.0070Mortice lock with
screwsM-070No960.0071Mould OilM-071litre35.0072Nails -
2"M-072Lbs50.0073Nails - 3/4"M-073Lbs20.0074Plywood Sash - 6' 9" X
2' 9"M-074No2,000.0075PrimerM-075litre180.0076PVC Elbows / Bent /
Socket - 3/4"M-076No15.0077PVC Sockets - 1"M-077No14.0078PVC down
pipes - 12' lengthM-078No79PVC elbow - for rainwater down
pipes.M-079No80PVC Elbows / Bent / Socket - 1 1/2"M-080No69.0081PVC
Elbows / Bent / Socket - 1 1/4"M-081No42.0082PVC Elbows / Bent /
Socket - 1"M-082No21.0083PVC Elbows / Bent / Socket -
1/2"M-083No10.5084PVC Elbows / Bent / Socket - 2
1/2"M-084No350.0085PVC Elbows / Bent / Socket -
2"M-085No110.0086PVC Elbows / Bent / Socket - 3"M-086No580.0087PVC
End capM-087No88PVC gutter - 12' lengthM-088No89PVC gutter head -
6"M-089No90PVC joiner - 3 1/2"M-090No91PVC mitre bend 6"
diaM-091No92PVC Pipes - 1 1/2"M-092L.ft46.0093PVC Pipes - 1
1/4"M-093L.ft32.0094PVC Pipes - 1"M-094L.ft21.0095PVC Pipes -
1/2"M-095L.ft7.5096PVC Pipes - 2"M-096L.ft79.0097PVC Pipes -
3"M-097L.ft185.0098PVC Pipes - 3/4"M-098L.ft14.0099PVC
ShoeM-099No100PVC Sockets - 1 1/2"M-100No29.50101PVC Sockets - 1
1/4"M-101No19.50102PVC Sockets - 2"M-102No48.00103PVC Sockets -
3"M-103No192.00104PVC StrapsM-104No105Ridge Tiles
(calicut)M-105No35.00106Ridges 3' 8" Long
(Asbestos)M-106Pair245.00107Rim Lock with
ScrewsM-107No500.00108Roof tiles - calicutM-108No16.00109Roofing
Screws and WashersM-109No3.50110Roofing Screws or
BoltsM-110No3.50111Rubble - 6" -
9"M-111Cube2,500.00112SaltM-112Lbs10.00113SandM-113Cube12,500.00114Sand
PapersM-114No3.50115Slaked LimeM-115Lbs275.00116Soldering
LeadM-116Lbs13.75117Solvent CementM-117Grms1.40118Spur
StoneM-118No15.00119TarnapM-119Gal450.00120Tee - 1 "
DiaM-120No31.25121Tee - 1 1/2 " DiaM-121No102.00122Tee - 1/2 "
DiaM-122No15.50123Tee - 2 " DiaM-123No165.50124Tee - 2 1/2"
DiaM-124No526.00125Tee - 3 " DiaM-125No875.00126Tee - 3/4 "
DiaM-126No21.50127Tee - Dia 1 1/4 "M-127No63.50128Tee
HingesM-128Pair165.00129Tiles Pressed - 12" X
12"M-129No180.00130Tiles Pressed - 8" X 8"M-130No125.00131Tiles
Terrazzo - 6" X 6"M-131No100.00132Tiles Terrazzo - 12" X
12"M-132No150.00133Timber Beading - 1/2" X
1/2"M-133L.ft1.50134Timber Beadings - 1 1/2"X1/2"
(Halmilla)M-134L.ft12.00135Timber Ceiling Plank - 6"x3/4"
(Lunumidella)M-135Sq.ft28.00136Timber Class
IM-136Cu.ft1,200.00137Timber Class I - 3" x
1'1/2"M-137L.ft45.00138Timber Class I -
4"X3"M-138Cu.ft1,300.00139Timber Class I Planks - 1
1/2"M-139Sq.ft140.00139aTimber Class I Planks -
1"M-139aSq.ft110.00140Timber Class IIM-140Cu.ft750.00141Timber
Class II - 1" ThickM-141Sq.ft65.00142Timber Class II - 2" x
1"M-142L.ft12.00143Timber Class II - 2" x 2"M-143L.ft22.00144Timber
class II - 4"X 2"M-144L.ft65.00145Timber Cove Molding - 2"X2"
(Halmilla)M-145Sq.ft35.00146Timber ceiling Joists - 4" x
2"M-146L.ft65.00147Timber Planks - 1" (Valance
board)M-147Sq.ft65.00148Timber PurlinsM-148L.ft100.00149Timber
Reepers - 2"X1"M-149L.ft12.00150Timber Strips - 2" X
1/4"M-150L.ft5.00151Timber WedgesM-151No5.00152Tor Steel Rods
including transport to siteM-152Kg.109.00153Tower / Skeleton Brass
BoltsM-153No145.00154VarnishM-154Ltr355.00155Wall Tiles Glazed 6" x
6"M-155No75.00156Wall Tiles Glazed 8" x
12"M-156No100.00157WaterM-157Gal0.30158Wax
PolishM-158Lbs150.00159White Cement/ tile groutM-159Lbs17.50160Wire
BrushM-160No65.00161Wire NailsM-161Lbs50.00162Wire Nails 2"
LongM-162Lbs25.00163Wire Nails 6" LongM-163Lbs25.00164Wirecut
BricksM-164No8.75165Wood PreservativeM-165Gal450.00166Yellow
OchreM-166Lbs15.00
ActivityActivity1Site Preparation & Excavation2Earth work
support and Filling3Anti Termite Treatment & DPC4Random Rubble
Masonry Work5Concrete Work6FormworkNote7ReinforcementRate Break
Downs of all trades are according to the Building Schedule of Rates
of the Department of Buildings except the Rate Break Downs of
Concrete Works8Block Work9Brick Work10Roof11Doors and
Windows12Plumbing &
Drainage13Plastering14Tiling15Ceiling16Painting
0101. Site Preparation & ExcavationA.Site
PreparationB.ExcavationSite Preparation01.A. 01Clearing site and
grubbing up all small trees not exceeding 500mm girth and including
bushes, scrubs, undergrowth hedges etc.Analysis for1SqrNo.Item
DescriptionItem RefUnitQuantityRateAmount1U / SK
LabourerL-007Day0.751,000.00750.001.01Allow 2.5% of Items ( 1.01 )
for Tools18.75Total for1Sqr768.75Rate for
1Sqrs768.75Rate(Say)1Sqr768.75Rate(Say)1ft27.69Rate(Say)1m282.7201.A.02Cutting
turf Sods, loading to hand carts and transporting up to 30 Yards,
laying and watering for 30 days(Royalty for Turf, pegging,
transporting beyond 30yds paid separately)Analysis for1SqrNoItem
DescriptionItem RefUnitQuantityRateAmount1.0099999905U / SK
Labourer - cutting turf sods, loading &
unloadingL-007Day2.51,000.002,500.001.0199999809U / SK Labourer -
laying turf sodsL-007Day0.51,000.00500.001.0299999714U / SK
Labourer -
wateringL-007Day1.51,000.001,500.001.0399999619WaterM-157Gal600.3018.00Total
for1Sqr4,518.00Rate for
1Sqr4,518.00Rate(Say)1Sqr4,518.00Rate(Say)1ft245.18Rate(Say)1m2486.1401.A.03Removing
top soil to a Depth not Exceeding 6" & Depositing as Directed
within SiteAnalysis for10SqrsNo.Item DescriptionItem
RefUnitQuantityRateAmount1U / SK
LabourerL-007Day101,000.0010,000.001.01Allow 2.5% of Items ( 1.01 )
for Tools250.00Total for10Sqrs10,250.00Rate for
1Sqrs1,025.00Rate(Say)1Sqr1,025.00Rate(Say)1ft210.25Rate(Say)1m2110.29Excavation01.B.01Excavation
over site to reduce level, in any material except rock requiring
blasting including depositing and levelling as directed upto a
distance not exceeding 30' 0 "Analysis for1CubeNo.Item
DescriptionItem RefUnitQuantityRateAmount1U / SK
LabourerL-007Day1.6251,000.001,625.001.0199999809Allow 2.5% of
Items ( 1.01 ) for Tools40.63Total for1Cube1,625.00Rate for
1Cube1,625.00Rate(Say)1Cube1,625.00Rate(Say)1ft316.25Rate(Say)1m3574.0001.B.02Excavation
in trenches for walls/ column pits in sort/loose soil from 0' 0" to
5' 0" deep and depositing excavated material to a distance not
exceeding 30' 0" (Earth work support to be paid Separately where
necessary)Analysis for1CubeNoItem DescriptionItem
RefUnitQuantityRateAmount1U / SK
LabourerL-007Day11,000.001,000.001.0199999809Allow 2.5% of Items (
1.01 ) for Tools25.00Total for1Cube1,000.00Rate for
1Cube1,000.00Rate(Say)1Cube1,000.00Rate(Say)1ft310.00Rate(Say)1m3353.0001.B.03Excavation
in trenches for walls column pits in ordinary soil from 0' 0" to 5'
0" deep and depositing excavated material not exceeding 30'
0"Analysis for1CubeNoItem DescriptionItem
RefUnitQuantityRateAmount1U / SK
LabourerL-007Day2.251,000.002,250.001.0199999809Allow 2.5% of Items
( 1.01 ) for Tools56.25Total for1Cube2,306.25Rate for
1Cube2,306.25Rate(Say)1Cube2,306.25Rate(Say)1ft323.06Rate(Say)1m3815.0001.B.04Excavation
in trenches for walls / column pits in hard/dense soil up to a
depth of 5' 0" and depositing excavated material to distance not
exceeding 30' 0"Analysis for1CubeNoItem DescriptionItem
RefUnitQuantityRateAmount1U / SK
LabourerL-007Day3.51,000.003,500.001.0199999809Allow 2.5% of Items
( 1.01 ) for Tools87.50Total for1Cube3,587.50Rate for
1Cube3,587.50Rate(Say)1Cube3,587.50Rate(Say)1ft335.88Rate(Say)1m31,268.0001.B.05Excavation
in trenches for walls column pits in mud/wet soil upto the depth of
5' 0" and depositing excavated material not exceeding 30'
0"Analysis for1CubeNoItem DescriptionItem
RefUnitQuantityRateAmount1U / SK
LabourerL-007Day31,000.003,000.001.0199999809Allow 2.5% of Items (
1.01 ) for Tools75.00Total for1Cube3,000.00Rate for
1Cube3,000.00Rate(Say)1Cube3,000.00Rate(Say)1ft330.00Rate(Say)1m31,060.0001.B.06Excavation
in trenches for walls column pits in soft disintegrated rock (not
requiring blasting)upto depth of 5' 0" and depositing excavated
material to a distance not exceeding 30' 0"Analysis for1CubeNoItem
DescriptionItem RefUnitQuantityRateAmount1U / SK
LabourerL-007Day2.51,000.002,500.001.0199999809Allow 2.5% of Items
( 1.01 ) for Tools62.50Total for1Cube2,562.50Rate for
1Cube2,562.50Rate(Say)1Cube2,562.50Rate(Say)1ft325.63Rate(Say)1m3905.4801.B.07Excavation
in trenches for walls column pits in Hard rock requiring Blasting
upto depth of 5' 0" and depositing excavated material to a distance
not exceeding 30' 0"Analysis for1CubeNoItem DescriptionItem
RefUnitQuantityRateAmount1Blasting
PowderM-007Lbs0.75200.00150.001.0099999905Fuse
wireM-051L.ft1010.00100.001.0199999809Jumper
SteelM-062Lbs165.0065.001.0299999714Allow 20% of Items ( 1, 1.01,
1.02 ) for Steel Fuel and Forge63.001.0399999619SK
LabourL-003Day11,200.001,200.001.0499999523U / SK
LabourerL-007Day21,000.002,000.00Total for1Cube3,578.00Rate for
1Cube3,578.00Rate(Say)1Cube3,578.00Rate(Say)1ft335.78Rate(Say)1m31,264.0001.B.08Benching
rock in foundation in 3"-6" Steps (Blasting Prohibited)Analysis
for10Sq.ftNoItem DescriptionItem RefUnitQuantityRateAmount1SK
LabourL-003Day1.51,200.001,800.001.0099999905Allow 25% of Items ( 1
) for Steel, fuel & forge450.001.0199999809U / SK
LabourerL-007Day0.51,000.00500.00Total for10Sq.ft2,750.00Rate for
1Sq.ft275.00Rate(Say)1 Sq.ft275.00Rate(Say)1m22,959.0001.B.09Rock
Requiring BlastingAnalysis for1CubeNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905Labour
SkilledL-003Day31,200.003,600.001.0299999714Allow 2.5% of Items (
1.01, 1.02 ) for Tools90.001.0399999619Fuel Forge
etc.M-050Ltr0.25100.0025.001.0499999523Blasting
powderM-007lbs0.68200.00136.001.0599999428Fuse
wireM-051L.ft3.0510.0030.501.0700000525Steel
JumperM-062lbs0.4546.0020.70Total for1Cube3,902.20Rate for
1Cube3,902.20Rate(Say)1Cube3,902.20Rate(Say)1ft339.02Rate(Say)1m31,379.00
&R&8 Page &P Of
&N&L&8SDS&R&DSite PreparationExcavation
0202. Filling and Earth Work SupportA.FillingB.Earthwork
SupportBackfilling02.A.01Backfilling to trenches with selected
earth available at site.Analysis for1CubeNoItem DescriptionItem
RefUnitQuantityRateAmount1U / SK
LabourerL-007Day11,000.001,000.001.0199999809Allow 2.5% of Items (
1 ) for Tools25.00Total for1Cube1,025.00Rate for
1Cube1,025.00Rate(Say)1Cube1,025.00Rate(Say)1
ft310.25Rate(Say)1m3362.0002.A.02Backfilling to trenches with
Imported MaterialAnalysis for1CubeNoItem DescriptionItem
RefUnitQuantityRateAmount1Earth Delivered at
SiteM-042Cube11,500.001,500.001.0099999905Allow 15% of Items ( 1 )
for Compacting225.001.0199999809U / SK
LabourerL-007Day1.251,000.001,250.00Total for1Cube2,975.00Rate for
1Cube2,975.00Rate(Say)1Cube2,975.00Rate(Say)1
ft329.75Rate(Say)1m31,051.0002.A.03Filling under floors including
levelling, watering & compacting in 3" layers with available
and selected earth at siteAnalysis for1CubeNoItem DescriptionItem
RefUnitQuantityRateAmount1.0199999809U / SK
LabourerL-007Day21,000.002,000.001.0199999809Allow 2.5% of Items (
1 ) for Tools50.00Total for1Cube2,050.00Rate for
1Cube2,050.00Rate(Say)1Cube2,050.00Rate(Say)1
ft320.50Rate(Say)1m3724.0002.A.04Filling under floors including
levelling, watering & compacting in 3" layers with imported
selected earthAnalysis for1CubeNoItem DescriptionItem
RefUnitQuantityRateAmount1.0199999809Earth Delivered at
SiteM-042Cu11,500.001,500.001.0299999714Allow 15% of Items ( 1.02 )
for Compaction225.001.0399999619U / SK
LabourerL-007Day21,000.002,000.001.0199999809Allow 2.5% of Items (
1 ) for Tools37.50Total for1Cube3,762.50Rate for
1Cube3,762.50Rate(Say)1Cube3,762.50Rate(Say)1
ft337.63Rate(Say)1m31,329.51Rate(Say),with
compaction1m31,728.3602.A.05Filling under floors including
levelling, watering & compacting in 3" layers with imported
gravelAnalysis for1CubeNoItem DescriptionItem
RefUnitQuantityRateAmount1.0199999809Gravel Delivered at
SiteM-053Cube12,000.002,000.001.0299999714Allow 15% of Items ( 1.02
) for Compaction & wastage300.001.0399999619U / SK
LabourerL-007Day21,000.002,000.001.0199999809Allow 2.5% of Items (
1 ) for Tools50.00Total for1Cube4,350.00Rate for
1Cube4,350.00Rate(Say)1Cube4,350.00Rate(Say)1
ft343.50Rate(Say)1m31,537.10Rate(Say),with
compaction1m31,998.2302.A.06Approved Soil Spread & Compacted in
150 to 225 mm Thick Layers Using Machine Rammer at Narrow Places
(Loose Volume)Analysis for7Cu.mNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905Labour Unskilled
(U/SK)L-007Day11,000.001,000.001.0199999809Allow 2.5% of Items (
1.01 ) for Tools25.001.0399999619Vibrating rammer (60kg)(Less
Operator)P-003Day0.51,000.00500.00Total for7Cu.m1,525.00Rate for
11Cu.m217.86Rate(Say)1m3217.86Rate(Say)Cube616.54Rate(Say)1
ft36.17Earth Work Support02.B.01Earth Work Support (Open Planking)
in trenches up to a depth of 5' 0"Analysis for1.5SqrNoItem
DescriptionItem RefUnitQuantityRateAmount1.0099999905Class II
Timber (17.5 ft3 for 4
uses)M-140Cu.ft4.375750.003,281.251.0199999809CarpenterL-008Day11,200.001,200.001.0299999714U
/ SK LabourerL-007Day31,000.003,000.00Total for1.5Sqr7,481.25Rate
for 1Sqr4,987.50Rate(Say)1
Sqr4,987.50Rate(Say)1m2536.6602.B.02Earth Work Support (Close
Planking) in trenches up to a depth of 5' 0"Analysis
for1.5SqrsNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905Class II Timber (30 ft3 for 4
uses)M-140Cu.ft7.5750.005,625.001.0199999809CarpenterL-008Day21,200.002,400.001.0299999714U
/ SK LabourerL-007Day61,000.006,000.00Total for1.5Sqrs14,025.00Rate
for 1Sqrs9,350.00Rate(Say)1
Sqr9,350.00Rate(Say)1m21,006.0602.B.03Earth Work Support (Close
Planking) in deep excavation in trenches up to 15 ft 0"
depthAnalysis for4.5SqrNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905Class II Timber (100 ft3 for 4
uses)M-140Cu.ft25750.0018,750.001.0199999809CarpenterL-008Day81,200.009,600.001.0299999714U
/ SK LabourerL-007Day201,000.0020,000.00Total
for4.5Sqr48,350.00Rate for
1Sqr10,744.44Rate(Say)1Sqr10,744.44Rate(Say)1ft2107.44Rate(Say)1m21,156.10
&R&8 Page &P Of
&N&L&8SDS&R&DFillingEarthwork Support
0303. Anti termite Treatment & DPCA.Anti Termite
TreatmentB.DPCAnti Termite Treatment03.A.01Anti-Termite treatment
on excavated foundation and compacted soil under floors.Analysis
for1SqrNoItem DescriptionItem RefUnitQuantityRateAmount1D. D. T.
PowderM-038Lbs1625.00400.001.0099999905WaterM-157Gal200.306.001.0199999809U
/ SK LabourerL-007Day0.51,000.00500.00Total for1Sqr906.00Rate for
1Sqr906.00Rate(Say)1Sqr906.00Rate(Say)1ft29.06Rate(Say)1m297.49DPC03.B.013/4"
thick DPC in cement sand 1:2 finished with 2 coats hot tar and
blinded with sand.Analysis for1SqrNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905CementM-026Bag2.25850.001,912.501.0199999809SandM-113Cube0.1112,500.001,375.001.0299999714BitumenM-006Gal1.5500.00750.001.0399999619Fire
WoodM-046Lbs10250.002,500.001.0499999523WaterM-157Gal100.303.001.0599999428MasonL-009Day1.251,200.001,500.001.0700000525U
/ SK LabourerL-007Day2.51,000.002,500.00Total for1Sqr10,540.50Rate
for
1Sqr10,540.50Rate(Say)1Sqr10,541.00Rate(Say)1ft2105.41Rate(Say)1m21,134.21
&R&08 Page &P Of &N&L&08Road Development
Department - North - East ProvinceAnti Termite TreatmentDPC
0404. Random Rubble Masonry Work04.01Random Rubble Masonry in
cement mortar 1:5 in foundationAnalysis for1CubeNoItem
DescriptionItem RefUnitQuantityRateAmount1.016" - 9"
RubbleM-111Cube1.32,500.003,250.001.02CementM-026Bag5850.004,250.001.03SandM-113Cube0.312,500.003,750.001.04WaterM-157Gal1000.3030.001.05MasonL-009Day41,200.004,800.001.06U
/ SK LabourerL-007Day61,000.006,000.00Total for1Cube22,080.00Rate
for
1Cube22,080.00Rate(Say)1Cube22,080.00Rate(Say)1ft3220.80Rate(Say)1m37,802.1204.02Random
Rubble Masonry in cement mortar 1:5 in SuperstructureAnalysis
for1CubeNoItem DescriptionItem RefUnitQuantityRateAmount1.016" - 9"
RubbleM-111Cu1.32,500.003,250.001.02CementM-026Bag5850.004,250.001.03SandM-113Cu0.312,500.003,750.001.04WaterM-157Gal1000.3030.001.05MasonL-009Day4.51,200.005,400.001.06U
/ SK LabourerL-007Day71,000.007,000.001.07Allow 3% of Items ( 1.05,
1.06 ) for Scaffolding----372.00Total for1Cube24,052.00Rate for
1Cube24,052.00Rate(Say)1Cube24,052.00Rate(Say)1ft3240.52Rate(Say)1m38,498.94
&R&08 Page &P Of &N
0505. Concrete WorkA.Mixing ConcreteB.ScreedC.Mass
ConcreteD.ColumnE.BeamF.SlabG.LintolMixing Concrete05.A.01Mixing
Concrete 1:1-1/2:3(3/4")Analysis for1CubeNo.Item DescriptionItem
RefUnitQuantityRateAmount1.0099999905CementM-026Bag23850.0019,550.001.0199999809SandM-113Cube0.4212,500.005,250.001.02999997143/4
" MetalM-066Cube0.829,000.007,380.001.0399999619Hire of
MixerP-001Day0.3331,500.00499.501.0499999523WaterM-157Gal1500.3045.001.0599999428SK
LabourL-003Day0.3331,200.00399.601.0700000525U / SK
LabourerL-007Day21,000.002,000.00Total for1Cube35,124.10Rate for
1Cube35,124.10Rate(Say)1Cube35,120.00Rate(Say)1m312,409.8905.A.02Mixing
Concrete 1:3:6(1 1/2")Analysis for1CubeNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905CementM-026Bag13850.0011,050.001.0199999809SandM-113Cube0.5312,500.006,625.001.02999997141
1/2 " MetalM-065Cube0.923,500.003,220.001.0399999619Hire of
MixerP-001Day0.3331,500.00499.501.0499999523WaterM-157Gal1100.3033.001.0599999428SK
LabourL-003Day0.3331,200.00399.601.0700000525U / SK
LabourerL-007Day21,000.002,000.00Total for1Cube23,827.10Rate for
1Cube23,827.10Rate(Say)1Cube23,830.00Rate(Say)1m38,420.4905.A.03Mixing
Concrete 1:2 1/2 :5 (1")Analysis for1CubeNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905CementM-026Bag14850.0011,900.001.0199999809SandM-113Cube0.612,500.007,500.001.02999997141
" MetalM-064Cube0.98,000.007,200.001.0399999619Hire of
MixerP-001Day0.3331,500.00499.501.0499999523WaterM-157Gal1000.3030.001.0599999428SK
LabourL-003Day0.3331,200.00399.601.0700000525U / SK
LabourerL-007Day21,000.002,000.00Total for1Cube29,529.10Rate for
1Cube29,529.10Rate(Say)1Cube29,530.00Rate(Say)1m310,434.6305.A.04Mixing
Concrete 1:2:4(3/4")Analysis for1CubeNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905CementM-026Bag18850.0015,300.001.0199999809SandM-113Cube0.512,500.006,250.001.02999997143/4
" MetalM-066Cube0.889,000.007,920.001.0399999619Hire of
MixerP-001Day0.3331,500.00499.501.0499999523WaterM-157Gal1200.3036.001.0599999428SK
LabourL-003Day0.3331,200.00399.601.0700000525U / SK
LabourerL-007Day21,000.002,000.00Total for1Cube32,405.10Rate for
1Cube32,405.10Rate(Say)1Cube32,410.00Rate(Say)1m311,452.3005.A.05Mixing
Concrete 1:1:2(3/4")Analysis for1CubeNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905CementM-026Bag31850.0026,350.001.0199999809SandM-113Cube0.4412,500.005,500.001.02999997143/4
" MetalM-066Cube0.969,000.008,640.001.0399999619Hire of
MixerP-001Day0.3331,500.00499.501.0499999523WaterM-157Gal2000.3060.001.0599999428SK
LabourL-003Day0.3331,200.00399.601.0700000525U / SK
LabourerL-007Day21,000.002,000.00Total for1Cube43,449.10Rate for
1Cube43,449.10Rate(Say)1Cube43,450.00Rate(Say)1m315,353.36Screed
Concrete05.B.012" thick Cement Concrete screed 1:3:6 (1 1/2) in
foundation at depth not exceed in 5' 0"Analysis for1SqrNoItem
DescriptionItem RefUnitQuantityRateAmount1.0099999905Mixing
Concrete 1:3:6(1
1/2")05.A.02Cube0.166723,830.003,972.461.0199999809SK
LabourL-003Day0.1251,200.00150.001.0299999714U / SK
LabourerL-007Day0.51,000.00500.00Total for1Sqr4,622.46Rate for
1Sqr4,622.46Rate(Say)1
Sqr4,620.00Rate(Say)1ft246.20Rate(Say)1m2497.1105.B.023" Thick
cement concrete 1:3:6(1-1/2") screed in foundation at depths not
exceeding 5' 0"Analysis for1SqrNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905Mixing Concrete 1:3:6(1
1/2")05.A.02Cube0.2523,830.005,957.501.0199999809SK
LabourL-003Day0.1251,200.00150.001.0299999714U / SK
LabourerL-007Day0.751,000.00750.00Total for1Sqr6,857.50Rate for
1Sqr6,857.50Rate(Say)1
Sqr6,860.00Rate(Say)1ft268.60Rate(Say)1m2738.14Mass
Concrete05.C.016" Thick cement concrete 1:2-1/2:5(1") in floor
(Mass concrete)Analysis for1SqrNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905Mixing Concrete 1:2 1/2 :
5(1")05.A.03Cube0.529,530.0014,765.001.0249999762WaterM-157Gal2000.3060.001.0299999714SK
LabourL-003Day0.51,200.00600.001.0399999619U / SK
LabourerL-007Day1.251,000.001,250.00Total for1Sqr16,675.00Rate for
1Sqr16,675.00Rate(Say)1
Sqr16,680.00Rate(Say)1ft2166.80Rate(Say)1m21,794.77Column
Concrete05.D.01Cement concrete 1:11/2 : 3(3/4") in 13-1/2" X
13-1/2" columns in ground floor.Analysis for0.51CubeNoItem
DescriptionItem RefUnitQuantityRateAmount1.0099999905Mixed Concrete
1:1 1/2 : 3 (3/4")05.A.01Cube0.5135,120.0017,911.20Allow 5% of
Items ( 1.01 ) for Wastage895.561.0249999762Hire of
VibratorP-002Day0.51,000.00500.001.0299999714MasonL-009Day0.51,200.00600.001.0399999619U
/ SK LabourerL-007Day1.51,000.001,500.001.0499999523SK Labourer
(Vibrator)L-004Day0.51,200.00600.001.0599999428Jute
HessianM-063Sq.ft453.50157.501.0700000525WaterM-157Gal1000.3030.001.0800000429U
/ SK Labourer (curing)L-007Day0.51,000.00500.00Total
for0.51Cube22,694.26Rate for 1Cube44,498.5540
L.ft22,694.26Rate(Say)1Cube44,499.001
L.ft567.36Rate(Say)1m315,724.031 m1,860.93Ground floor - First
Floor1m315,724.031 m1,860.93First Floor - Second Floor1m317,296.431
m2,047.02Second Floor - Third Floor1m319,026.071 m2,251.72Third
Floor - Fourth Floor1m320,928.681 m2,476.9005.D.02Cement concrete
1:2:4(3/4") in 4-1/2" X 6" columns in ground floor.Analysis
for240L.ftor0.45CubesNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905Mixed Concrete
1:2:4(3/4")05.A.04Cu0.4532,410.0014,584.50Allow 5% of Items ( 1.01
) for Wastage729.231.0249999762Hire of
VibratorP-002Day11,000.001,000.001.0299999714MasonL-009Day11,200.001,200.001.0399999619U
/ SK LabourerL-007Day31,000.003,000.001.0499999523SK Labour
(Vibrator)L-004Day11,200.001,200.001.0599999428Jute
HessianM-063Sq.ft103.5035.001.0700000525WaterM-157Gal1700.3051.001.0800000429U
/ SK Labourer (curing)L-007Day0.51,000.00500.00Total
for240L.ft22,299.730.45 Cubes22,299.73Rate for 1L.ft92.921
Cube49,554.94Rate(Say)1 ft90.001Cube49,550.00Rate(Say)1
m295.201m317,508.83Ground floor - First Floor1
m295.201m317,508.83First Floor - Second Floor1
m324.721m319,259.72Second Floor - Third Floor1
m357.191m321,185.69Third Floor - Fourth Floor1
m392.911m323,304.2605.D.03Cement concrete 1:2:4(3/4") in 6" X 6"
columns in ground floor.Analysis for180L.ftor0.45CubesNoItem
DescriptionItem RefUnitQuantityRateAmount1.0099999905Mixed Concrete
1:2:4(3/4")05.A.04Cu0.4532,410.0014,584.50Allow 5% of Items ( 1.01
) for Wastage729.231.0249999762Hire of
VibratorP-002Day11,000.001,000.001.0299999714MasonL-009Day11,200.001,200.001.0399999619U
/ SK LabourerL-007Day31,000.003,000.001.0499999523SK Labourer
(Vibrator)L-004Day11,200.001,200.001.0599999428Jute
HessianM-063Sq.ft803.50280.001.0700000525WaterM-157Gal1400.3042.001.0800000429U
/ SK Labourer (curing)L-007Day0.51,000.00500.00Total
for180L.ft22,535.730.45 Cubes22,535.73Rate for 1L.ft125.201
Cube50,079.39Rate(Say)1 ft130.001Cube50,080.00Rate(Say)1
m426.401m317,696.11Ground floor - First Floor1
m426.401m317,696.11First Floor - Second Floor1
m469.041m319,465.72Second Floor - Third Floor1
m515.941m321,412.30Third Floor - Fourth Floor1
m567.541m323,553.5305.D.04Cement concrete 1:2:4(3/4") in 9" X 9"
columns in ground floor.Analysis for80L.ftor0.45CubesNoItem
DescriptionItem RefUnitQuantityRateAmount1.0099999905Mixed Concrete
1:2:4(3/4")05.A.04Cu0.4532,410.0014,584.50Allow 5% of Items ( 1.01
) for Wastage729.231.0249999762Hire of
VibratorP-002Day11,000.001,000.001.0299999714MasonL-009Day11,200.001,200.001.0399999619U
/ SK LabourerL-007Day31,000.003,000.001.0499999523SK Labourer
(Vibrator)L-004Day11,200.001,200.001.0599999428Jute
HessianM-063Sq.ft603.50210.001.0700000525WaterM-157Gal1000.3030.001.0800000429U
/ SK Labourer (curing)L-007Day0.51,000.00500.00Total
for80L.ft22,453.730.45 Cubes22,453.73Rate for 1L.ft280.671
Cube49,897.17Rate(Say)1 ft280.001Cube49,900.00Rate(Say)1
m918.401m317,632.51Ground floor - First Floor1
m918.401m317,632.51First Floor - Second Floor1
m1,010.241m319,395.76Second Floor - Third Floor1
m1,111.261m321,335.34Third Floor - Fourth Floor1
m1,222.391m323,468.8705.D.05Cement concrete 1:2:4(3/4") in 12" X
12" columns in ground floor.Analysis for50L.ftor0.5CubesNoItem
DescriptionItem RefUnitQuantityRateAmount1.0099999905Mixing
Concrete 1:2:4(3/4")05.A.04Cu0.532,410.0016,205.00Allow 5% of Items
( 1.01 ) for Wastage810.251.0249999762Hire of
VibratorP-002Day11,000.001,000.001.0299999714MasonL-009Day11,200.001,200.001.0399999619U
/ SK LabourerL-007Day31,000.003,000.001.0499999523SK Labourer
(Vibrator)L-004Day11,200.001,200.001.0599999428Jute
HessianM-063Sq.ft403.50140.001.0700000525WaterM-157Gal1000.3030.001.0800000429U
/ SK Labourer (curing)L-007Day0.51,000.00500.00Total
for50L.ft24,085.250.5 Cubes24,085.25Rate for 1L.ft481.711
Cube48,170.50Rate(Say)1 ft480.001Cube48,170.00Rate(Say)1
m1,574.401m317,021.20Ground floor - First Floor1
m1,574.401m317,021.20First Floor - Second Floor1
m1,731.841m318,723.32Second Floor - Third Floor1
m1,905.021m320,595.65Third Floor - Fourth Floor1
m2,095.531m322,655.2205.D.06Cement concrete 1:2:4(3/4") in 13-1/2"
X 13-1/2" columns in ground floor.Analysis
for40L.ftor0.51CubesNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905Mixing Concrete
1:2:4(3/4")05.A.04Cu0.5132,410.0016,529.10Allow 5% of Items ( 1.01
) for Wastage826.461.0249999762Hire of
VibratorP-002Day0.51,000.00500.001.0299999714MasonL-009Day0.51,200.00600.001.0399999619U
/ SK LabourerL-007Day1.51,000.001,500.001.0499999523SK Labourer
(Vibrator)L-004Day0.51,200.00600.001.0599999428Jute
HessianM-063Sq.ft453.50157.501.0700000525WaterM-157Gal1000.3030.001.0800000429U
/ SK Labourer (curing)L-007Day0.51,000.00500.00Total
for40L.ft21,243.060.51 Cubes21,243.06Rate for 1L.ft531.081
Cube41,653.05Rate(Say)1 ft530.001Cube41,650.00Rate(Say)1
m1,738.401m314,717.31Ground floor - First Floor1
m1,738.401m314,717.31First Floor - Second Floor1
m1,912.241m316,189.05Second Floor - Third Floor1
m2,103.461m317,807.95Third Floor - Fourth Floor1
m2,313.811m319,588.75Beam Concrete05.E.01Cement concrete
1:2:4(3/4") in 6" X 6" Beams Upto 1st floor levelAnalysis
for180L.ftor0.45CubesNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905Mixing Concrete
1:2:4(3/4")05.A.04Cu0.4532,410.0014,584.50Allow 5% of Items ( 1.01
) for Wastage729.231.02Hire of
VibratorP-002Day11,000.001,000.001.0299999714MasonL-009Day11,200.001,200.001.0399999619U
/ SK LabourerL-007Day41,000.004,000.001.0499999523SK Labourer
(Vibrator)L-004Day11,200.001,200.001.0599999428Jute
HessianM-063Sq.ft903.50315.001.0700000525WaterM-157Gal1800.3054.001.0800000429U
/ SK Labourer (curing)L-007Day0.51,000.00500.00Total
for180L.ft23,582.730.45 Cubes23,582.73Rate for 1L.ft131.021
Cube52,406.06Rate(Say)1 ft130.001Cube52,410.00Rate(Say)1
m426.401m318,519.43Ground floor1 m426.401m318,519.43First Floor1
m469.041m320,371.38Second Floor1 m515.941m322,408.52Third Floor1
m567.541m324,649.3705.E.02Cement concrete 1:2:4(3/4") in 9" X 6"
Beams Upto 1st floor levelAnalysis for120L.ftor0.45CubesNoItem
DescriptionItem RefUnitQuantityRateAmount1.0099999905Mixing
Concrete 1:2:4(3/4")05.A.04Cu0.4532,410.0014,584.50Allow 5% of
Items ( 1.01 ) for Wastage729.231.0249999762Hire of
VibratorP-002Day11,000.001,000.001.0299999714MasonL-009Day11,200.001,200.001.0399999619U
/ SK LabourerL-007Day41,000.004,000.001.0499999523SK Labourer
(Vibrator)L-004Day11,200.001,200.001.0599999428Jute
HessianM-063Sq.ft753.50262.501.0700000525WaterM-157Gal1500.3045.001.0800000429U
/ SK Labourer (curing)L-007Day0.51,000.00500.00Total
for120L.ft23,521.230.45 Cubes23,521.23Rate for 1L.ft196.011
Cube52,269.39Rate(Say)1 ft200.001Cube52,270.00Rate(Say)1
m656.001m318,469.96Ground floor1 m656.001m318,469.96First Floor1
m721.601m320,316.96Second Floor1 m793.761m322,348.66Third Floor1
m873.141m324,583.5205.E.03Cement concrete 1:2:4(3/4") in 9" X 9"
Beams Upto 1st floor levelAnalysis for80L.ftor0.45CubesNoItem
DescriptionItem RefUnitQuantityRateAmount1.0099999905Mixing
Concrete 1:2:4(3/4")05.A.04Cu0.4532,410.0014,584.50Allow 5% of
Items ( 1.01 ) for Wastage729.231.0249999762Hire of
VibratorP-002Day11,000.001,000.001.0299999714MasonL-009Day11,200.001,200.001.0399999619U
/ SK LabourerL-007Day41,000.004,000.001.0499999523SK Labourer
(Vibrator)L-004Day11,200.001,200.001.0599999428Jute
HessianM-063Sq.ft603.50210.001.0700000525WaterM-157Gal1200.3036.001.0800000429U
/ SK Labourer (curing)L-007Day0.51,000.00500.00Total
for80L.ft23,459.730.45 Cubes23,459.73Rate for 1L.ft293.251
Cube52,132.72Rate(Say)1 ft290.001Cube52,130.00Rate(Say)1
m951.201m318,420.49Ground floor1 m951.201m318,420.49First Floor1
m1,046.321m320,262.54Second Floor1 m1,150.951m322,288.80Third
Floor1 m1,266.051m324,517.68Slab Concrete05.F.015" Thick R.C.C
1:2:4(3/4") floor slab in 1st floorAnalysis
for120Sq.ftor0.5CubesNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905Mixing Concrete
1:2:4(3/4")05.A.04Cu0.532,410.0016,205.00Allow 5% of Items ( 1.01 )
for Wastage810.251.0249999762Hire of
VibratorP-002Day0.51,000.00500.001.0299999714MasonL-009Day0.51,200.00600.001.0399999619U
/ SK LabourerL-007Day21,000.002,000.001.0499999523SK Labourer
(Vibrator)L-004Day0.51,200.00600.001.0599999428Jute
HessianM-063Sq.ft303.50105.001.0700000525WaterM-157Gal900.3027.001.0800000429U
/ SK Labourer (curing)L-007Day0.51,000.00500.00Total
for120Sq.ft21,347.250.5 Cubes21,347.25Rate for 1Sq.ft177.891
Cube42,694.50Rate(Say)1 Sq.ft177.891Cube42,690.00Rate(Say)1
Sq17,789.381m315,084.81Rate(Say)1m21,914.141m315,084.81First
Floor1m21,914.141m316,593.29Second
Floor1m22,105.551m318,252.61Third
Floor1m22,316.111m320,077.8805.F.026" Thick R.C.C 1:2:4(3/4") floor
slab in 1st floorAnalysis for1Sqor0.5CubesNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905Mixing Concrete
1:2:4(3/4")05.A.04Cu0.532,410.0016,205.00Allow 5% of Items ( 1.01 )
for Wastage810.251.0249999762Hire of
VibratorP-002Day0.51,000.00500.001.0299999714MasonL-009Day0.51,200.00600.001.0399999619U
/ SK LabourerL-007Day21,000.002,000.001.0499999523SK Labourer
(Vibrator)L-004Day0.51,200.00600.001.0599999428Jute
HessianM-063Sq.ft253.5087.501.0700000525WaterM-157Gal900.3027.001.0800000429U
/ SK Labourer (curing)L-007Day0.51,000.00500.00Total
for1Sq21,329.750.5 Cubes21,329.75Rate for 1Sq21,329.751
Cube42,659.50Rate(Say)1 Sq21,329.751Cube42,660.00Rate(Say)1
ft2213.301m315,074.20Rate(Say)1m22,295.081m315,074.20First
Floor1m22,295.081m316,581.63Second
Floor1m22,524.591m318,239.79Third
Floor1m22,777.051m320,063.77Lintol Concrete05.G.01Cement concrete
1:2:4(3/4") in 4-1/2" X 6" lintels in ground floorAnalysis
for240L.ftNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905Mixing Concrete
1:2:4(3/4")05.A.04Cu0.4532,410.0014,584.501.0249999762Hire of
VibratorP-002Day11,000.001,000.001.0299999714MasonL-009Day11,200.001,200.001.0399999619U
/ SK LabourerL-007Day41,000.004,000.001.0499999523SK Labourer
(Vibrator)L-004Day11,200.001,200.001.0599999428Jute
HessianM-063Sq.ft1053.50367.501.0700000525WaterM-157Gal900.3027.001.0800000429U
/ SK Labourer (curing)L-007Day0.51,000.00500.00Total
for240L.ft22,879.00Rate for 1L.ft95.33Rate(Say)1 ft100.00Rate(Say)1
m328.00Ground floor1 m328.00First Floor1 m360.80Second Floor1
m396.88Third Floor1 m436.5705.G.02Cement concrete 1:2:4(3/4") in 9"
X 9" lintels in ground floorAnalysis for80L.ftNoItem
DescriptionItem RefUnitQuantityRateAmount1.0099999905Mixing
Concrete 1:2:4(3/4")05.A.04Cu0.4532,410.0014,584.501.0249999762Hire
of
VibratorP-002Day11,000.001,000.001.0299999714MasonL-009Day11,200.001,200.001.0399999619U
/ SK LabourerL-007Day41,000.004,000.001.0499999523SK Labourer
(Vibrator)L-004Day11,200.001,200.001.0599999428Jute
HessianM-063Sq.ft603.50210.001.0700000525WaterM-157Gal900.3027.001.0800000429U
/ SK Labourer (curing)L-007Day0.51,000.00500.00Total
for80L.ft22,721.50Rate for 1L.ft284.02Rate(Say)1 ft280.00Rate(Say)1
m918.40Ground floor1 m918.40First Floor1 m1,010.24Second Floor1
m1,111.26Third Floor1 m1,222.3905.G.03Cement concrete 1:2:4(3/4")
in 9" X 12" lintels in ground floorAnalysis for60L.ftNoItem
DescriptionItem RefUnitQuantityRateAmount1.0099999905Mixing
Concrete 1:2:4(3/4")05.A.04Cu0.4532,410.0014,584.501.0249999762Hire
of
VibratorP-002Day11,000.001,000.001.0299999714MasonL-009Day11,200.001,200.001.0399999619U
/ SK LabourerL-007Day41,000.004,000.001.0499999523SK Labourer
(Vibrator)L-004Day11,200.001,200.001.0599999428Jute
HessianM-063Sq.ft553.50192.501.0700000525WaterM-157Gal900.3027.001.0800000429U
/ SK Labourer (curing)L-007Day0.51,000.00500.00Total
for60L.ft22,704.00Rate for 1L.ft378.40Rate(Say)1 ft380.00Rate(Say)1
m1,246.40Ground floor1 m1,246.40First Floor1 m1,371.04Second Floor1
m1,508.14Third Floor1 m1,658.9605.G.04Cement concrete 1:2:4(3/4")
in 12" X 15" lintels in ground floorAnalysis for36L.ftNoItem
DescriptionItem RefUnitQuantityRateAmount1.0099999905Mixing
Concrete 1:2:4(3/4")05.A.04Cu0.4532,410.0014,584.501.0249999762Hire
of
VibratorP-002Day11,000.001,000.001.0299999714MasonL-009Day11,200.001,200.001.0399999619U
/ SK LabourerL-007Day41,000.004,000.001.0499999523SK Labourer
(Vibrator)L-004Day11,200.001,200.001.0599999428Jute
HessianM-063Sq.ft403.50140.001.0700000525WaterM-157Gal900.3027.001.0800000429U
/ SK Labourer (curing)L-007Day0.51,000.00500.00Total
for36L.ft22,651.50Rate for 1L.ft629.21Rate(Say)1 ft630.00Rate(Say)1
m2,066.40Ground floor1 m2,066.40First Floor1 m2,273.04Second Floor1
m2,500.34Third Floor1 m2,750.38
&R&08 Page &P Of &NMixing ConcreteScreedMass
ConcreteColumnBeamSlabLintol
0606. FormworkA.ColumnB.BeamC.SlabColumn06.A.01Sawn timber
formwork to 9" x 9" cement concrete column in ground floor.Analysis
for0.15SqNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905Sawn timber formwork to 9" x
9" cement concrete column in ground floor - Making Mould06.A.021
Use1731.00731.001.0199999809Bolts 16mm 18" (12 nos 20
uses)M-010No0.675.0045.001.0299999714Mould
OilM-071litre0.535.0017.501.0399999619Timber props 4" x
2"M-144L.ft3.565.00227.501.0499999523Carpenter -
assemblingL-008Day0.251,200.00300.001.0599999428U / SK Labourer -
assemblingL-007Day0.251,000.00250.001.0700000525Carpenter -
dismantling, cleaning &
repairingL-008Day0.251,200.00300.001.0800000429U / SK Labourer -
dismantling, cleaning &
repairingL-007Day0.251,000.00250.00Total for0.15Sq2,121.00Rate for
1Sq14,140.00Rate(Say)1Sq14,140.00Rate(Say)1ft2141.40Rate(Say)1m21,521.46Ground
floor - First Floor1m21,521.46First Floor - Second
Floor1m21,673.61Second Floor - Third Floor1m21,840.97Third Floor -
Fourth Floor1m22,025.0706.A.02Sawn timber formwork to 9" x 9"
cement concrete column in ground floor - Making MouldAnalysis
for4UsesNoItem DescriptionItem
RefUnitQuantityRateAmount1.00999999051" Thick Class II
TimberM-141Sq.ft18.1565.001,179.751.01999998092" x 2" Class II
Timber In YokesM-143L.ft17.122.00376.201.02999997142" x 1" Class II
Timber Battens.M-142L.ft16.1212.00193.441.0399999619Wire
NailsM-161Lbs1.550.0075.001.0499999523CarpenterL-008Day0.51,200.00600.001.0599999428U
/ SK LabourerL-007Day0.51,000.00500.00Total for4Uses2,924.39Rate
for 1Uses731.10Rate(Say)1 Use731.00Beam06.B.01Sawn timber formwork
for concrete beams in ground floorAnalysis for0.55SqNoItem
DescriptionItem RefUnitQuantityRateAmount1.0099999905Sawn timber
formwork for 9" x 12" concrete beams in ground floor - Making the
mould06.B.021 Use12,757.002,757.001.0199999809Sawn timber formwork
for concrete beams in ground floor-Assembling06.B.031
Use11,568.001,568.001.0299999714Allow 10% of Items ( 1.02 ) for
Repairs----156.801.0399999619Carpenter -
AssemblingL-008Day11,200.001,200.001.0499999523U / SK Labourer -
AssemblingL-007Day21,000.002,000.001.0599999428Mould
OilM-071litre0.535.0017.501.0700000525Wire
NailsM-161Lbs0.565.0032.501.0800000429Carpenter - dismantling,
cleaning & repairingL-008Day0.51,200.00600.001.0900000334U / SK
Labourer - dismantling, cleaning &
repairingL-007Day21,000.002,000.00Total for0.55Sq10,331.80Rate for
1Sq18,785.09Rate(Say)1Sq18,785.00Rate(Say)1ft2187.85Rate(Say)1m22,021.27Ground
floor1m22,021.27First Floor1m22,223.39Second Floor1m22,445.73Third
Floor1m22,690.3106.B.02Sawn timber formwork for 9" x 12" concrete
beams in ground floor - Making the mouldAnalysis for4UsesNoItem
DescriptionItem RefUnitQuantityRateAmount1.00999999051" Thick Class
II TimberM-141Sq.ft6065.003,900.001.01999998092" x 1" Class II
Timber Battens.M-142L.ft2412.00288.001.02999997142" x 2" Class II
Timber In YokesM-143L.ft4522.00990.001.03999996194"X2" Timber
bearersM-144L.ft3065.001,950.001.05Wire
NailsM-161Lbs250.00100.001.06CarpenterL-008Day1.51,200.001,800.001.07U
/ SK LabourerL-007Day21,000.002,000.00Total for4Uses11,028.00Rate
for 1Uses2,757.00Rate(Say)1 Use2,757.0006.B.03Sawn timber formwork
for concrete beams in ground floor-Assembling - MaterialsAnalysis
for6UsesNoItem DescriptionItem RefUnitQuantityRateAmount1.01Timber
props 4" x 2"M-144L.ft11065.007,150.001.022" x 2" Class II Timber
for bracingsM-143L.ft8022.001,760.001.031" Thick Class II Timber
base plateM-141Sq.ft665.00390.001.04Timber
WedgesM-151No225.00110.00Total for6Uses9,410.00Rate for
1Uses1,568.33Rate(Say)1 Use1,568.00Slab06.C.01Sawn timber formwork
for underside of first floor slabAnalysis for2SqNoItem
DescriptionItem RefUnitQuantityRateAmount1.01Sawn timber formwork
for 20" x 10" concrete slab in ground floor - Making panels06.C.021
Use17,241.007,241.001.02Allow 20% of Items ( 1.01 ) for
Repairs----1,448.201.03Sawn timber formwork for underside of first
floor slab - assembling06.C.03Sq18,176.008,176.001.04Allow 20% of
Items ( 1.03 ) for Wastage----1,635.201.0399999619Carpenter -
AssemblingL-008Day11,200.001,200.001.0499999523U / SK Labourer -
AssemblingL-007Day41,000.004,000.001.0599999428Mould
OilM-071litre4.5435.00158.901.0700000525Wire
NailsM-161Lbs250.00100.001.0800000429Carpenter - dismantling,
cleaning & repairingL-008Day0.51,200.00600.001.0900000334U / SK
Labourer - dismantling, cleaning &
repairingL-007Day21,000.002,000.00Total for2Sq26,559.30Rate for
1Sq13,279.65Rate(Say)1Sq13,280.00Rate(Say)1ft2132.80Rate(Say)1m21,428.93Ground
floor1m21,428.93First Floor1m21,571.82Second Floor1m21,729.00Third
Floor1m21,901.9006.C.02Sawn timber formwork for 20" x 10" concrete
slab in ground floor - Making panelsAnalysis for4UsesNoItem
DescriptionItem RefUnitQuantityRateAmount1.00999999051" Thick Class
II TimberM-141Sq.ft22065.0014,300.001.0199999809Timber props 4" x
2"M-144L.ft12165.007,865.001.0299999714Wire
NailsM-161Lbs450.00200.001.0399999619CarpenterL-008Day31,200.003,600.001.0499999523U
/ SK LabourerL-007Day31,000.003,000.00Total for4Uses28,965.00Rate
for 1Uses7,241.25Rate(Say)7,241.0006.C.03Sawn timber formwork for
underside of first floor slab - AssemblingAnalysis for6UsesNoItem
DescriptionItem RefUnitQuantityRateAmount1.01Timber props 4" x
2"M-144L.ft69065.0044,850.001.022" x 2" Class II Timber In
YokesM-143L.ft6622.001,452.001.03Timber
WedgesM-151No1225.00610.001.041" Thick Class II
TimberM-141Sq.ft3365.002,145.00Total for6Uses49,057.00Rate for
1Uses8,176.17Rate(Say)8,176.00
&R&08 Page &P Of
&N&LSDS&R&DColumnBeamSlab
0707. Reinforcement7.01Tor steel reinforcement to lintels,
slabs, beams or columns bent to shape, laid in position and tied
with G.I. Wire as directed.Analysis for1Cwt.NoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905M.S./Tor Steel Rods including
transport to siteM-152kg50109.005,450.001.0199999809Allow 15% of
Items ( 1.01 ) for Wastage----817.501.029999971416 BWG Binding
WireM-005Lbs1.5200.00300.001.0399999619Allow 1.5% of Items ( 1.01 )
for spaces or chairs----81.751.0499999523SK
LabourL-003Day11,200.001,200.001.0599999428U / SK
LabourerL-007Day11,000.001,000.00Total for1Cwt.8,849.25Rate for
1Cwt.8,849.25Rate(Say)1Cwt8,849.00Rate(Say)1Kg176.987.02Mild Steel
reinforcement to lintels, slabs, beams or columns bent to shape,
laid in position and tied with G.I. Wire as directed.Analysis
for1Cwt.NoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905M.S./Tor Steel Rods including
transport to siteM-068kg50109.005,450.001.0199999809Allow 15% of
Items ( 1.01 ) for Wastage----817.501.029999971416 BWG Binding
WireM-005Lbs1.5200.00300.001.0399999619SK
LabourL-003Day11,200.001,200.001.0499999523U / SK
LabourerL-007Day11,000.001,000.00Total for1Cwt.8,767.50Rate for
1Cwt.8,767.50Rate(Say)1Cwt8,768.00Rate(Say)1Kg175.36
&R&08 Page &P Of &N
0808. Block Work08.018" Thick hollow block work in cement and
sand mortar 1:5 in ground floor (Cavities unfilled)Analysis
for1SqrNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905Hollow Cement Block (16"x 8"x
8")M-057No11230.003,360.001.0199999809Allow 5% of Items ( 1.01 )
for
Wastage----168.001.0299999714CementM-026Bag0.75850.00637.501.0399999619SandM-113Cube0.0612,500.00750.001.0499999523MasonL-009Day1.51,200.001,800.001.0599999428U
/ SK LabourerL-007Day2.51,000.002,500.001.0700000525Allow 3% of
Items ( 1.05, 1.06 ) for Scaffolding----129.00Total
for1Sqr9,344.50Rate for 1Sqr9,344.50Rate(Say)1
Sq9,345.00Rate(Say)1ft293.45Rate(Say)1m21,005.52Ground
floor1m21,005.52First Floor1m21,106.07Second Floor1m21,216.683rd
floor1m21,338.3508.026" Thick hollow block work in cement and sand
mortar 1:5 with cavities unfilled.Analysis for1SqrNoItem
DescriptionItem RefUnitQuantityRateAmount1.0099999905Hollow Cement
Blocks (16"x 8"x 6")M-059No11222.002,464.001.0199999809Allow 5% of
Items ( 1.01 ) for
Wastage----123.201.0299999714CementM-026Bag0.65850.00552.501.0399999619SandM-113Cube0.0712,500.0051.001.0499999523MasonL-009Day1.51,200.001,800.001.0599999428U
/ SK LabourerL-007Day21,000.002,000.001.0700000525Allow 3% of Items
( 1.05, 1.06 ) for Scaffolding----114.00Total for1Sqr7,104.70Rate
for 1Sqr7,104.70Rate(Say)1
Sq7,104.70Rate(Say)1ft271.05Rate(Say)1m2764.47Ground
floor1m2764.47First Floor1m2840.91Second Floor1m2925.00Third
Floor1m21,017.5008.034" Thick hollow block work in cement and sand
mortar 1:5 with cavities unfilled.Analysis for1SqrNoItem
DescriptionItem RefUnitQuantityRateAmount1.0099999905Hollow Cement
Blocks (16"x 8"x 4")M-058No11227.003,024.001.0199999809Allow 5% of
Items ( 1.01 ) for
Wastage----151.201.0299999714CementM-026Bag0.4850.00340.001.0399999619SandM-113Cube0.0312,500.0051.001.0499999523MasonL-009Day11,200.001,200.001.0599999428U
/ SK LabourerL-007Day21,000.002,000.001.0700000525Allow 5% of Items
( 1.05, 1.06 ) for Scaffolding----160.00Total for1Sqr6,926.20Rate
for 1Sqr6,926.20Rate(Say)1
Sq6,926.20Rate(Say)1ft269.26Rate(Say)1m2745.26Ground
floor1m2745.26First Floor1m2819.79Second Floor1m2901.76Third
Floor1m2991.94
&R&08 Page &P Of &N
0909. Brick Work09.01Brick Work in cement sand 1:5 in 4-1/2"
thick walls in ground floorAnalysis for1SqrNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905BricksM-019No5506.003,300.001.0199999809Allow
5% of Items ( 1.01 ) for
Wastage----165.001.0299999714CementM-026Bag1.3850.001,105.001.04SandM-113Cu0.112,500.001,250.001.05WaterM-157Gal500.3015.001.06MasonL-009Day1.51,200.001,800.001.07U
/ SK LabourerL-007Day21,000.002,000.001.08Allow 5% of Items (1.06,
1.07 ) for Scaffolding----190.00Total for1Sqr9,825.00Rate for
1Sqr9,825.00Rate(Say)1
Sq9,825.00Rate(Say)1ft298.25Rate(Say)1m21,057.17Ground
floor1m21,057.17First Floor1m21,110.03Second Floor1m21,165.53Third
Floor1m21,223.8109.029" thick brick wall cement sand 1:5 in ground
floorAnalysis for1SqrNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905BricksM-019No10906.006,540.001.0199999809Allow
5% of Items ( 1.01 ) for
Wastage----327.001.0299999714CementM-026Bag3850.002,550.001.04SandM-113Cu0.212,500.002,500.001.05WaterM-157Gal1150.3034.501.06MasonL-009Day2.251,200.002,700.001.07U
/ SK LabourL-007Day3.751,000.003,750.001.08Allow 3% of Items (1.06,
1.07 ) for Scaffolding----193.50Total for1Sqr18,595.00Rate for
1Sqr18,595.00Rate(Say)1
Sq18,595.00Rate(Say)1ft2185.95Rate(Say)1m22,000.82Ground
floor1m22,000.82First Floor1m22,100.86Second Floor1m22,205.91Third
Floor1m22,316.2009.03Brick work in cement sand 1:5 in foundation
upto D. P. CAnalysis for1CubeNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905BricksM-019No14506.008,700.001.0199999809Allow
5% of Items ( 1.01 ) for
Wastage----435.001.0299999714CementM-026Bag4850.003,400.001.04SandM-113Cu0.2512,500.003,125.001.05WaterM-157Gal1500.3045.001.06MasonL-009Day31,200.003,600.001.07U
/ SK LabourerL-007Day41,000.004,000.00Total for1Cube23,305.00Rate
for 1Cube23,305.00Rate(Say)1
Cu23,305.00Rate(Say)1ft3233.05Rate(Say)1m38,234.9809.04Brick Work
in cement sand 1:8 in foundation upto D. P. CAnalysis
for1CubeNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905BricksM-019No14506.008,700.001.0199999809Allow
5% of Items ( 1.01 ) for
Wastage----435.001.0299999714CementM-026Bag2.333850.001,983.051.04SandM-113Cu0.37512,500.004,687.501.05WaterM-157Gal1500.3045.001.06MasonL-009Day31,200.003,600.001.07U
/ SK LabourerL-007Day41,000.004,000.00Total for1Cube23,450.55Rate
for 1Cube23,450.55Rate(Say)1
Cu23,451.00Rate(Say)1ft3234.51Rate(Say)1m38,286.5709.05Brick Work
13 1/2" thick in cement sand 1:5 in superstructure in ground
floorAnalysis for1SqrNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905BricksM-019No16306.009,780.001.0199999809Allow
5% of Items ( 1.01 ) for
wastage----489.001.0299999714CementM-026Bag4.5850.003,825.001.04SandM-113Cu0.312,500.003,750.001.05WaterM-157Gal1700.3051.001.06MasonL-009Day3.51,200.004,200.001.07U
/ SK LabourerL-007Day5.51,000.005,500.001.08Allow 2% of Items
(1.06, 1.07 ) for Scaffolding----194.00Total for1Sqr27,789.00Rate
for 1Sqr27,789.00Rate(Say)1
Sq27,789.00Rate(Say)1ft2277.89Rate(Say)1m22,990.10Ground
floor1m22,990.10First Floor1m23,289.11Second Floor1m23,618.02Third
Floor1m23,979.8209.069" Brick Walls in cement sand 1:8 in
superstructure in ground floorAnalysis for1SqrNoItem
DescriptionItem
RefUnitQuantityRateAmount1.0099999905BricksM-019No10906.006,540.001.0199999809Allow
5% of Items ( 1.01 ) for
Wastage----327.001.0299999714CementM-026Bag1.75850.001,487.501.04SandM-113Cu0.312,500.003,750.001.05WaterM-157Gal1150.3034.501.06MasonL-009Day2.251,200.002,700.001.07U
/ SK LabourerL-007Day31,000.003,000.001.08Allow 3% of Items ( 1.06,
1.07 ) for Scaffolding----171.00Total for1Sqr18,010.00Rate for
1Sqr18,010.00Rate(Say)1
Sq18,010.00Rate(Say)1ft2180.10Rate(Say)1m21,937.88Ground
floor1m21,937.88First Floor1m22,131.66Second Floor1m22,344.83Third
Floor1m22,579.3109.074 1/2" Thick Brick Walls (wire cut) in cement
sand 1:5 in superstructure in ground floor (facing to brickwork
measured separately)Analysis for1SqrNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905Wire cut
BricksM-164No5508.754,812.501.0199999809Allow 2% of Items ( 1.01 )
for
Wastage----96.251.0299999714CementM-026Bag1.2850.001,020.001.04SandM-113Cu0.0812,500.001,000.001.05WaterM-157Gal300.309.001.06MasonL-009Day1.51,200.001,800.001.07U
/ SK LabourerL-007Day21,000.002,000.001.08Allow 3% of Items (1.06,
1.07 ) for Scaffolding----114.00Total for1Sqr10,851.75Rate for
1Sqr10,851.75Rate(Say)1
Sq10,852.00Rate(Say)1ft2108.52Rate(Say)1m21,167.68Ground
floor1m21,167.68First Floor1m21,284.44Second Floor1m21,412.89Third
Floor1m21,554.1809.089" Thick in Cement and Sand 1:5 with wire cut
Bricks (Facing to brickwork measured separately)Analysis
for1SqNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905Wire cut
BricksM-164No10608.759,275.001.0199999809Allow 4% of Items ( 1.01 )
for
Wastage----371.001.0299999714CementM-026Bag2.5850.002,125.001.04SandM-113Cu0.1812,500.002,250.001.05WaterM-157Gal1000.3030.001.06MasonL-009Day2.251,200.002,700.001.07U
/ SK LabourerL-007Day3.751,000.003,750.001.08Allow 3% of Items (
1.06, 1.07 ) for Scaffolding----193.50Total for1Sq20,694.50Rate for
1Sq20,694.50Rate(Say)1
Sq20,695.00Rate(Say)1ft2206.95Rate(Say)1m22,226.78Ground
floor1m22,226.78First Floor1m22,449.46Second Floor1m22,694.41Third
Floor1m22,963.8509.1013 1/2" Thick Brick wall (wire cut) in cement
and sand 1:5 in ground floor (Facing to brickwork measured
separately)Analysis for1SqrNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905Wire cut
BricksM-164No16308.7514,262.501.0199999809Allow 2% of Items ( 1.01
) for
Wastage----285.251.0299999714CementM-026Bag4.5850.003,825.001.04SandM-113Cu0.312,500.003,750.001.05WaterM-157Gal500.3015.001.06MasonL-009Day3.751,200.004,500.001.07U
/ SK LabourerL-007Day5.51,000.005,500.001.08Allow 2% of Items
(1.06, 1.07 ) for Scaffolding----200.00Total for1Sqr32,337.75Rate
for 1Sqr32,337.75Rate(Say)1
Sq32,338.00Rate(Say)1ft2323.38Rate(Say)1m23,479.57Ground
floor1m23,479.57First Floor1m23,827.53Second Floor1m24,210.28Third
Floor1m24,631.3109.11Extra over for facing including raised
pointing 1/8" thick in cement and sand 1:1 mixture in ground
floorAnalysis for1SqrNoItem DescriptionItem
RefUnitQuantityRateAmount1.01CementM-026Bag0.5850.00425.001.02SandM-113Cu0.0112,500.00125.001.03AcidM-001Gal0.1254.0025.401.04WaterM-157Gal100.303.001.05MasonL-009Day51,200.006,000.001.06U
/ SK LabourerL-007Day3.51,000.003,500.00Total for1Sqr10,078.40Rate
for 1Sqr10,078.40Rate(Say)1
Sq10,078.00Rate(Say)1ft2100.78Rate(Say)1m21,084.3909.123" Thick
floor paved in lime mortar 2:5 in ground floorAnalysis
for1SqrNoItem DescriptionItem
RefUnitQuantityRateAmount1.01BricksM-019No3506.002,100.001.02Slaked
LimeM-115Lbs1.2275.00330.001.03SandM-113Cu0.1112,500.001,375.001.04WaterM-157Gal450.3013.501.05MasonL-009Day1.251,200.001,500.001.06U
/ SK LabourerL-007Day2.51,000.002,500.00Total for1Sqr7,818.50Rate
for 1Sqr7,818.50Rate(Say)1
Sq7,819.00Rate(Say)1ft278.19Rate(Say)1m2841.3209.13Steps 1' -1 1/2"
x 0' 6" in brick in cement and sand 1:5 with 1/2" thick cement and
sand 1:2 rendering including necessary excavation.Analysis
for10L.ftNoItem DescriptionItem
RefUnitQuantityRateAmount1.01BricksM-019No1206.00720.001.02CementM-026Bag0.5850.00425.001.03SandM-113Cu0.0512,500.00625.001.04WaterM-157Gal150.304.501.05MasonL-009Day0.51,200.00600.001.06U
/ SK LabourerL-007Day0.51,000.00500.00Total for10L.ft2,874.50Rate
for 1L.ft287.45Rate(Say)1 ft287.45Rate(Say)1m942.8409.14Brick Drain
in cement and sand 1:5 mix, 9" wide and 6"-9" average depth
including cement rendering 1/2" thick 1:2 to exposed faces with 1'
6" ramp including necessary excavation.Analysis for10L.ftNoItem
DescriptionItem
RefUnitQuantityRateAmount1.01BricksM-019No1406.00840.001.02CementM-026Bag0.8850.00680.001.03SandM-113Cu0.0512,500.00625.001.04WaterM-157Gal200.306.001.05MasonL-009Day1.251,200.001,500.001.06U
/ SK LabourerL-007Day1.251,000.001,250.00Total
for10L.ft4,901.00Rate for 1L.ft490.10Rate(Say)1
ft490.10Rate(Say)1m1,607.5309.15Brick Drain in cement and sand 1:5
mix, 9" wide and 6"-9" average depth including cement rendering
1/2" thick 1:2 to exposed faces without ramp including necessary
excavation.Analysis for10L.ftNoItem DescriptionItem
RefUnitQuantityRateAmount1.01BricksM-019No1106.00660.001.02CementM-026Bag0.7850.00595.001.03SandM-113Cu0.0412,500.00500.001.04WaterM-157Gal150.304.501.05MasonL-009Day11,200.001,200.001.06U
/ SK LabourerL-007Day1.251,000.001,250.00Total
for10L.ft4,209.50Rate for 1L.ft420.95Rate(Say)1
ft420.95Rate(Say)1m1,380.72
&R&08 Page &P Of &N
1010. Roof Covering and CeilingA.Roof Frame & Roof
CoveringB.Roof PlumbingRoof frame & Roof Covering10.A.01Timber
framework for culicut pattern tile hip roof in single storey
building consisting of wall plate , beam, ridge plate, rafters
etc.(Preservative treatment to be measured separately)Analysis
for6SqrsNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905Timber Class
IM-136Cu.ft341,200.0040,800.001.0199999809Allow 10% of Items ( 1.01
) for Wastage----4,080.001.02999997142"X1"
ReepersM-149L.ft66012.007,920.001.0399999619Allow 5% of Items (
1.03 ) for Wastage----396.001.0499999523Wire Nails 6"
LongM-163Lbs825.00200.001.0599999428Wire Nails 2"
LongM-162Lbs225.0050.001.0700000525CarpenterL-008Day71,200.008,400.001.0800000429U
/ SK LabourerL-007Day81,000.008,000.00Total for6Sqrs69,846.00Rate
for 1Sqrs11,641.00Rate(Say)11,641.0010.A.02Roof Covering With
calicut pattern clay tiles in single storeyed buildingAnalysis
for6SqrsNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905TilesM-108No75016.0012,000.001.0199999905CarpenterL-008Day31,200.003,600.001.0299999905U
/ SK LabourerL-007Day31,000.003,000.00Total for6Sqrs18,600.00Rate
for 1Sqrs3,100.00Rate(Say)3,100.0010.A.03Timber framework for
corrugated asbestos sheet roof in single storeyed buildingAnalysis
for3.6SqrsNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905Timber Class
IM-136Cu.ft13.251,200.0015,900.001.0199999809Allow 10% of Items (
1.01 ) for
Wastage----1,590.001.0299999714CarpenterL-008Day2.51,200.003,000.001.0399999619U
/ SK LabourerL-007Day31,000.003,000.00Total for3.6Sqrs23,490.00Rate
for 1Sqrs6,525.00Rate(Say)6,525.0010.A.04Roof covering with
corrugated asbestos sheets (Timber frame work and ridge covering
measured separately)Analysis for3.6SqrsNoItem DescriptionItem
RefUnitQuantityRateAmount1.01Asbestos
CorrugatedM-003Sq.ft42042.0017,640.001.02Roofing Screws and
WashersM109No723.50252.001.03CarpenterL-008Day11,200.001,200.001.04U
/ SK LabourerL-007Day21,000.002,000.00Total for3.6Sqrs21,092.00Rate
for 1Sqrs5,858.89Rate(Say)5,859.0010.A.05One layer half round clay
tiles over corrugated asbestos roof coveringAnalysis for1SqrNoItem
DescriptionItem RefUnitQuantityRateAmount1.0099999905Half Round
Clay TilesM-056No6505.003,250.001.0199999809U / SK
LabourerL-007Day21,000.002,000.00Total for1Sqr5,250.00Rate for
1Sqr5,250.00Rate(Say)1 Sqr5,250.0010.A.06Asbestos close fittings
ridging fixed complete with roofing screws or bolts (hook)Analysis
for13.33L.ft.NoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905Ridges 3' 8" Long -
AsbestosM-106Pair4245.00980.001.0199999809Roofing Screws or
BoltsM-110No163.5056.001.0299999714CarpenterL-008Day0.251,200.00300.001.0399999619U
/ SK LabourerL-007Day0.251,000.00250.00Total
for13.33L.ft.1,586.00Rate for 1L.ft.118.98Rate(Say)1
L.ft119.0010.A.07Ridging covering with calicut pattern ridge tiles
bedded in cement lime mortar 1:1:4Analysis for12L.ft.NoItem
DescriptionItem RefUnitQuantityRateAmount1.0099999905Ridge
TilesM-105No935.00315.001.0199999809CementM-o26Bag0.333850.00283.051.0299999714SandM-113Cu0.0212,500.00250.001.0399999619Slaked
LimeM-115Lbs15275.004,125.001.0499999523Colouring
PowderM-036Lbs0.5175.0087.501.0599999428MasonL-009Day0.251,200.00300.001.0700000525U
/ SK LabourerL-007Day0.251,000.00250.00Total for12L.ft.5,610.55Rate
for 1L.ft.467.55Rate(Say)468.0010.A.083/4" X 9" high valance board
fixed with brass screws to ends of rafters (For tile
roofing)valance boardAnalysis for100L.ft.NoItem DescriptionItem
RefUnitQuantityRateAmount1.00999999051"
PlanksM-147Sq.ft7565.004,875.001.0199999809Allow 5% of Items ( 1.01
) for Wastage----243.751.0299999714Brass Screws 1
1/2"M-015No1003.75375.001.0399999619CarpenterL-008Day31,200.003,600.001.0499999523U
/ SK LabourerL-007Day31,000.003,000.001.0599999428Allow 5% of Items
( 1.04, 1.05 ) for Wastage----330.00Total for100L.ft.12,423.75Rate
for 1L.ft.124.24Rate(Say)124.0010.A.093/4" X 9" high barge board
fixed with brass screws at 2 ft. 0"centres to side of raftersbarge
boardAnalysis for100L.ft.NoItem DescriptionItem
RefUnitQuantityRateAmount1.00999999051"
PlanksM-147Sq.ft7565.004,875.001.0199999809Allow 5% of Items ( 1.01
) for Wastage----243.751.0299999714Brass Screws 1
1/2"M-015No503.75187.501.0399999619CarpenterL-008Day31,200.003,600.001.0499999523U
/ SK LabourerL-007Day31,000.003,000.001.0599999428Allow 5% of Items
( 1.04, 1.05 ) for Scaffolding----330.00Total
for100L.ft.12,236.25Rate for 1L.ft.122.36Rate(Say)122.00Roof
Plumbing10.B.0118 B.W.G (1.2 mm) galvanised iron sheet valley
gutter 3' 0" girth over all once bent with end laps not less than
9" width including 3/4" tongued and grooved planks laid to slope
and profile on timber members.Analysis for15L.ft.NoItem
DescriptionItem RefUnitQuantityRateAmount1.0099999905Sheet
(8'X4')M-052Sheet22,200.004,400.001.0199999809Wood
PreservativeM-165Gal0.25450.00112.501.0299999714CementM-026Bag0.1850.0085.001.0399999619Slaked
LimeM-115Lbs0.05275.0013.751.0499999523SandM-113Cu0.0112,500.00125.001.05999994281"
Thick Class II TimberM-141Sq.ft5065.003,250.001.07000005252"
NailsM-072Lbs250.00100.001.0800000429CarpenterL-008Day11,200.001,200.001.0900000334U
/ SK
LabourerL-007Day11,000.001,000.001.10TinkerL-005Day0.51,200.00600.001.1100000143U
/ SK
LabourerL-007Day0.51,000.00500.001.1200000048MasonL-009Day0.251,200.00300.001.1299999952U
/ SK LabourerL-007Day0.251,000.00250.00Total
for15L.ft.11,936.25Rate for 1L.ft.795.75Rate(Say)796.0010.B.0218
B.W.G (1.2 mm) GI Flashing 1' 6" girth overall 3 thies bent with
end laps not less than 6", soldered, turned and tucked up to not
less than 6" into chase cut in wall and pointed in 1:2 mortar,
lower end dressed over roof covering not less than 1' 0"
wideAnalysis for15L.ft.NoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905Sheet
(8'X4')M-052Sheet12,200.002,200.001.0199999809CementM-026Bag0.05850.0042.501.0299999714SandM-113Cu0.0112,500.00125.001.0399999619Soldering
LeadM-116Lbs113.7513.751.0499999523TinkerL-005Day0.51,200.00600.001.0599999428MasonL-009Day0.1251,200.00150.001.0700000525U
/ SK LabourerL-007Day0.751,000.00750.00Total for15L.ft.3,881.25Rate
for 1L.ft.258.75Rate(Say)259.0010.B.036" half round PVC eave gutter
fixed to timber valance board including gutter joiner and brackets
fixed at 18" centres (other specials paid seperately)Analysis
for24L.ft.NoItem DescriptionItem
RefUnitQuantityRateAmount1.00999999056" eave gutter lengths (12'
each)M-088No20.000.01.0199999809JoinerM-055No10.000.01.0299999714gutter
bracketsM-054No170.000.01.03999996193/4" brass
screwsM-017No341.2542.501.0499999523Solvent
cementM-117grms201.4028.001.0599999428PlumberL-002Day0.51,200.00600.001.0700000525U
/ SK LabourerL-007Day0.51,000.00500.001.0800001621Allow 5% of Items
( 1.06, 1.07) for Scaffolding55.00Total for24L.ft.1,225.50Rate for
1L.ft.51.06Rate(Say)1 L.ft.51.0010.B.046" dia PVC gutter
headAnalysis for1No.NoItem DescriptionItem
RefUnitQuantityRateAmount1.00999999056" dia PVC gutter
headM-089No10.000.01.0199999809Gutter
JoinerM-055No20.000.01.0299999714gutter
bracketsM-054No20.000.01.03999996193/4" brass
screwsM-017No41.255.001.0499999523Solvent
cementM-117grms121.4016.801.0599999428PlumberL-002Day0.1251,200.00150.001.0700000525U
/ SK LabourerL-007Day0.1251,000.00125.001.0800001621Allow 5% of
Items ( 1.06, 1.07) for Scaffolding13.75Total for1No.310.55Rate for
1No.310.55Rate(Say)1 No.311.0010.B.056" dia PVC mitresAnalysis
for1No.NoItem DescriptionItem
RefUnitQuantityRateAmount1.00999999056" dia PVC mitre
bendM-091No10.000.01.0199999809Gutter
JoinerM-055No20.000.01.0299999714gutter
bracketsM-054No20.000.01.03999996193/4" brass
screwsM-017No41.255.001.0499999523Solvent
cementM-117grms121.4016.801.0599999428PlumberL-002Day0.1251,200.00150.001.0700000525U
/ SK LabourerL-007Day0.1251,000.00125.001.0800001621Allow 5% of
Items ( 1.06, 1.07) for Scaffolding13.75Total for1No.310.55Rate for
1No.310.55Rate(Say)1 No.311.0010.B.066" dia PVC end capsAnalysis
for1No.NoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905end
capM-087No10.000.01.0499999523Solvent
cementM-117grms121.4016.801.0599999428PlumberL-002Day0.06251,200.0075.001.0700000525U
/ SK LabourerL-007Day0.06251,000.0062.501.0800001621Allow 5% of
Items ( 1.06, 1.07) for Scaffolding6.88Total for1No.161.18Rate for
1No.161.18Rate(Say)1 No.161.0010.B.073 1/2" PVC rain water down
pipes fixed to brick wall with wooden plugs buried in wall (other
specials paid seperately)Analysis for24L.ft.NoItem DescriptionItem
RefUnitQuantityRateAmount1.00999999053 1/2" down pipe lengths (12'
each)M-078No20.000.01.01999998093 1/2"
JoinerM-090No10.000.01.0299999714PVC
strapsM-104No40.000.01.03999996191" brass
screwsM-014No82.5020.001.0499999523Solvent
cementM-117grms301.4042.001.0599999428PlumberL-002Day0.331,200.00400.001.0700000525U
/ SK LabourerL-007Day0.331,000.00333.331.0800001621Allow 5% of
Items ( 1.06, 1.07) for Scaffolding36.67Total for24L.ft.832.00Rate
for 1L.ft.34.67Rate(Say)1 L.ft.35.0010.B.083 1/2" dia PVC
elbowAnalysis for1No.NoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905elbowM-079No10.000.01.0499999523Solvent
cementM-117grms321.4044.801.0599999428PlumberL-002Day0.06251,200.0075.001.0700000525U
/ SK LabourerL-007Day0.06251,000.0062.501.0800001621Allow 5% of
Items ( 1.06, 1.07) for Scaffolding6.88Total for1No.189.18Rate for
1No.189.18Rate(Say)1 No.189.0010.B.093 1/2" dia PVC ShoeAnalysis
for1No.NoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905ShoeM-099No10.000.01.0499999523Solvent
cementM-117grms151.4021.001.0599999428PlumberL-002Day0.06251,200.0075.001.0700000525U
/ SK LabourerL-007Day0.06251,000.0062.501.0800001621Allow 5% of
Items ( 1.06, 1.07) for Scaffolding6.88Total for1No.165.38Rate for
1No.165.38Rate(Say)1 No.165.00
&R&08 Page &P Of &NRoof Frame & Roof
CoveringRoof Plumbing
1111. Doors & WindowsA.Doors & WindowsB.IronmongeryDoors
& Windows11.A.01Door Single Hung 3' 3" X7' 0" high overall with
frame having 1 1/4" thick sash and 3 1/4" X 2 1/4 ft. timber
frame(glazing, ironmongery & painting measured
separately)Analysis for22.75Sq.ftNoItem DescriptionItem
RefUnitQuantityRateAmount1.00999999054"X3"
TimberM-138Cu.ft1.51,300.001,950.001.0199999809Spur
StoneM-118No215.0030.001.0299999714Fibre / Plastic
PlugsM-045No61.509.001.03999996194" Long Brass
ScrewsM-018No67.5045.001.04999995235/8" Mild Steel Dowels 4"
Long.M-067No26.0012.001.05999994281 1/2"
PlanksM-139Sq.ft14140.001,960.001.07000005251"
PlanksM-139aSq.ft5110.00550.001.0800000429CarpenterL-008Day51,200.006,000.001.0900000334U
/ SK LabourerL-007Day1.51,000.001,500.00Total
for22.75Sq.ft12,056.00Rate for
1Sq.ft529.93Rate(Say)530.0011.A.02Door glazed and paneled double
hung 4' 0" x 7' 0" high overall with frame including 1 1/4" thick
sash and 3 1/4 x 2 1/4" frame (Glazing, Ironmongory and painting
measured separately)Analysis for28Sq.ftNoItem DescriptionItem
RefUnitQuantityRateAmount1.00999999054"X3"
TimberM-138Cu.ft1.661,300.002,158.001.0199999809Spur
StoneM-118No215.0030.001.0299999714Fibre / Plastic
PlugsM-045No61.509.001.03999996194" Long Brass
ScrewsM-018No67.5045.001.04999995235/8" Mild Steel Dowels 4"
Long.M-067No26.0012.001.05999994281 1/2"
PlanksM-139Sq.ft16140.002,240.001.07000005251"
PlanksM-139aSq.ft7110.00770.001.0800000429CarpenterL-008Day61,200.007,200.001.0900000334U
/ SK LabourerL-007Day21,000.002,000.00Total for28Sq.ft14,464.00Rate
for 1Sq.ft516.57Rate(Say)517.0011.A.03Plywood door single hung 3'
1-1/2" x 6' 11-1/2" overall with frame having 1-1/4" thick sash and
3 1/4" x 2 1/4" frame (Glazing, Ironmongory and painting measured
separately)Analysis for21.75Sq.ftNoItem DescriptionItem
RefUnitQuantityRateAmount1.00999999054"X3"
TimberM-138Cu.ft1.81,300.002,340.001.0199999809Spur
StoneM-118No215.0030.001.0299999714Fibre / Plastic
PlugsM-045No61.509.001.03999996194" Long Brass
ScrewsM-018No67.5045.001.04999995236' 9" X 2' 9" Plywood
SashM-074No12,000.002,000.001.0599999428CarpenterL-008Day0.751,200.00900.001.0700000525U
/ SK LabourerL-007Day0.3751,000.00375.001.0800000429Mason - fixing
frameL-009Day0.251,200.00300.001.0900000334U / SK Labourer - fixing
frameL-007Day0.251,000.00250.00Total for21.75Sq.ft6,249.00Rate for
1Sq.ft287.31Rate(Say)287.0011.A.04Door Ledged, braced and battened
single hung 2' 6" x 6' 6" overall,with frame having 7/8" thick
tongued & Grooved planks and 3-1/4" x 2-3/4"frame (Glazing,
Ironmongory and painting measured separately)Analysis
for16.25Sq.ftNoItem DescriptionItem
RefUnitQuantityRateAmount1.00999999054"X3"
TimberM-138Cu.ft1.71,300.002,210.001.0199999809Spur
StoneM-118No215.0030.001.0299999714Fibre / Plastic
PlugsM-045No61.509.001.03999996194" Long Brass
ScrewsM-018No67.5045.001.04999995235/8" Mild Steel Dowels 4"
Long.M-067No26.0012.001.05999994281"
PlanksM-139aSq.ft21110.002,310.001.0700000525Brass Screws 1
1/2"M-015No363.75135.001.0800000429CarpenterL-008Day2.251,200.002,700.001.0900000334U
/ SK LabourerL-007Day11,000.001,000.001.10Mason - fixing
frameL-009Day0.251,200.00300.001.1100000143U / SK Labourer - fixing
frameL-007Day0.251,000.00250.00Total for16.25Sq.ft9,001.00Rate for
1Sq.ft553.91Rate(Say)554.0011.A.05window, Glazed 7'. 0" x 4' 0"
High overall with frame comprising 3 No openable sashes and 3 1/4"
x 2 1/4" frame and mullions (Glazing, Ironmongory and painting
measured separately)Analysis for28Sq.ftNoItem DescriptionItem
RefUnitQuantityRateAmount1.00999999054"X3"
TimberM-138Cu.ft3.21,300.004,160.001.01999999054" Long Brass
ScrewsM-018No47.5030.001.0299999905Fibre / Plastic
PlugsM-045No41.506.001.03999999051 1/2"
PlanksM-139Sq.ft9.25140.001,295.001.0499999905CarpenterL-008Day61,200.007,200.001.0599999905U
/ SK LabourerL-007Day2.51,000.002,500.001.0699999905Mason - fixing
frameL-009Day0.51,200.00600.001.0799999905U / SK Labourer - fixing
frameL-007Day0.51,000.00500.00Total for28Sq.ft16,291.00Rate for
1Sq.ft581.82Rate(Say)582.0011.A.061/8" clear sheet glass panes
exceeding 1' 0" but not exceeding 4 squere feet cut and fixed with
timber beadings to doors and windows.Analysis for9Sq.ftNoItem
DescriptionItem RefUnitQuantityRateAmount1.0099999905Glass
panesM-027Sq.ft925.00225.001.01999999051/2" X 1/2"
BeadingM-133L.ft301.5045.001.0299999905Brass Pannel
PinsM-013Doz41.004.001.0399999905GlazierL-010Day0.51,200.00600.001.0499999905U
/ SK LabourerL-007Day0.51,000.00500.00Total for9Sq.ft1,374.00Rate
for 1Sq.ft152.67Rate(Say)153.00Ironmongery11.B.01Butt Hinges 5" X 2
1/2" BrassAnalysis for1.5PairNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905Butt Hinges (pairs 1
1/2)M-023No370.00210.001.01999998093/4" Brass
ScrewsM-017No241.2530.001.0299999714CarpenterL-008Day0.251,200.00300.001.0399999619U
/ SK LabourerL-007Day0.251,000.00250.00Total for1.5Pair790.00Rate
for 1Pair526.67Rate(Say)527.0011.B.02Tee Hinges 6" X 1/2"
BrassAnalysis for1.5PairNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905Tee
HingesM-128Pair1165.00165.001.01999998093/4" Iron
ScrewsM-061No180.559.901.0299999714CarpenterL-008Day0.251,200.00300.001.0399999619U
/ SK LabourerL-007Day0.251,000.00250.00Total for1.5Pair724.90Rate
for 1Pair483.27Rate(Say)483.0011.B.03Mortice LockAnalysis
for1NoNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905Mortice lock with
screwsM-070No1960.00960.001.0199999905CarpenterL-008Day0.51,200.00600.001.0299999905U
/ SK LabourerL-007Day0.51,000.00500.00Total for1No2,060.00Rate for
1No2,060.00Rate(Say)2,060.0011.B.04Casement StaysAnalysis
for4NoNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905Casement
StaysM-025No455.00220.001.01999998091/2 " Brass
ScrewsM-016No161.3020.801.0299999714CarpenterL-008Day0.251,200.00300.001.0399999619U
/ SK LabourerL-007Day0.251,000.00250.00Total for4No790.80Rate for
1No197.70Rate(Say)198.0011.B.05Door Closer (Hydraulic)Analysis
for1NoNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905Door
CloserM-040No11,850.001,850.001.01999998093/4" Brass
ScrewsM-017No81.2510.001.0299999714CarpenterL-008Day0.251,200.00300.001.0399999619U
/ SK LabourerL-007Day0.251,000.00250.00Total for1No2,410.00Rate for
1No2,410.00Rate(Say)2,410.0011.B.06Tower / Skeleton Brass Bolts
12"Analysis for1NoNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905Tower / Skeleton Brass
BoltsM-153No1145.00145.001.01999998091/2 " Brass
ScrewsM-016No101.3013.001.0299999714CarpenterL-008Day0.0631,200.0075.601.0399999619U
/ SK LabourerL-007Day0.0631,000.0063.00Total for1No296.60Rate for
1No296.60Rate(Say)297.0011.B.07Barrel Bolt 4"Analysis for1NoNoItem
DescriptionItem RefUnitQuantityRateAmount1.0099999905Barrel
BoltM-004No175.0075.001.01999998091/2 " Brass
ScrewsM-016No81.3010.401.0299999714CarpenterL-008Day0.0631,200.0075.601.0399999619U
/ SK LabourerL-007Day0.0631,000.0063.00Total for1No224.00Rate for
1No224.00Rate(Say)224.0011.B.08Casement FastenersAnalysis
for6NoNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905Casement
FastenersM-024No655.00330.001.01999998091/2 " Brass
ScrewsM-016No241.3031.201.0299999714CarpenterL-008Day0.51,200.00600.001.0399999619U
/ SK LabourerL-007Day0.51,000.00500.00Total for6No1,461.20Rate for
1No243.53Rate(Say)244.0011.B.09Check this itemAnalysis for6NoNoItem
DescriptionItem RefUnitQuantityRateAmount1.0099999905Brass Fanlight
ChtchesM-011No645.00270.001.01999998091/2 " Brass
ScrewsM-016No241.3031.201.0299999714CarpenterL-008Day0.51,200.00600.001.0399999619U
/ SK LabourerL-007Day0.51,000.00500.00Total for6No1,401.20Rate for
1No233.53Rate(Say)234.0011.B.10Draw RingsAnalysis for6NoNoItem
DescriptionItem RefUnitQuantityRateAmount1.0099999905Draw
RingsM-041No622.50135.001.01999998091/2 " Brass
ScrewsM-016No121.3015.601.0299999714CarpenterL-008Day0.1251,200.00150.001.0399999619U
/ SK LabourerL-007Day0.1251,000.00125.00Total for6No425.60Rate for
1No70.93Rate(Say)71.00
&R&08 Page &P Of &NDoors &
WindowsIronmongery
1212. Plumbing & Drainage12.011/2 " Diameter PVC pipes fixed
to walls (Specials paid separately)Analysis for10L.ftNoItem
DescriptionItem RefUnitQuantityRateAmount1.00999999051/2" PVC
PipesM-095L.ft137.5097.501/2 "20mm dia pipe1.01999998091 " Clips
and NailsM-028No37.0021.003/4"25mm dia pipe1.0299999714Solvent
CementM-117Grms21.402.801"32mm dia
pipe1.0399999619PlumberL-002Day0.1251,200.00150.0011/4"40mm dia
pipe1.0499999523U / SK LabourerL-007Day0.1251,000.00125.0011/2"50mm
dia pipeTotal for10L.ft396.302"63mm dia pipeRate for
1L.ft39.6321/2"75mm dia pipeRate(Say)1 L.ft40.003"90mm dia
pipe12.023/4 " Diameter PVC pipes fixed to walls (Specials paid
separately)Analysis for10L.ftNoItem DescriptionItem
RefUnitQuantityRateAmount1.00999999053/4" PVC
PipesM-098L.ft1314.00182.001.01999998091 " Clips and
NailsM-028No37.0021.001.0299999714Solvent
CementM-117Grms31.404.201.0399999619PlumberL-002Day0.1251,200.00150.001.0499999523U
/ SK LabourerL-007Day0.1251,000.00125.00Total for10L.ft482.20Rate
for 1L.ft48.22Rate(Say)1 L.ft48.0012.031 " Diameter PVC pipes fixed
to walls (Specials paid separately)Analysis for100L.ftNoItem
DescriptionItem RefUnitQuantityRateAmount1.00999999051" PVC
PipesM-094L.ft10021.002,100.001.0199999809Allow 5% of Items ( 1.01
) for Wastage----105.001.02999997141" PVC
SocketsM-077No814.00112.001.0399999619Solvent
CementM-117Grms321.4044.801.04999995231 " Clips and
NailsM-028No357.00245.001.0599999428PlumberL-002Day0.51,200.00600.001.0700000525U
/ SK LabourerL-007Day0.51,000.00500.00Total for100L.ft3,706.80Rate
for 1L.ft37.07Rate(Say)1 L.ft37.0012.041 1/4"Diameter PVC pipes
fixed to walls (Specials paid separately)Analysis for100L.ftNoItem
DescriptionItem RefUnitQuantityRateAmount1.00999999051 1/4" PVC
PipesM-093L.ft10032.003,200.001.0199999809Allow 5% of Items ( 1.01
) for Wastage----160.001.02999997141 1/4" PVC
SocketsM-101No819.50156.001.0399999619Solvent
CementM-117Grms481.4067.201.04999995231 1/4 " Clips and
NailsM-030No358.75306.251.0599999428PlumberL-002Day0.751,200.00900.001.0700000525U
/ SK LabourerL-007Day0.751,000.00750.00Total for100L.ft5,539.45Rate
for 1L.ft55.39Rate(Say)1 L.ft55.0012.051 1/2" Diameter PVC pipes
fixed to walls (Specials paid separately)Analysis for100L.ftNoItem
DescriptionItem RefUnitQuantityRateAmount1.00999999051 1/2" PVC
PipesM-092L.ft10046.004,600.001.0199999809Allow 5% of Items ( 1.01
) for Wastage----230.001.02999997141 1/2" PVC
SocketsM-100No829.50236.001.0399999619Solvent
CementM-117Grms641.4089.601.04999995231 1/2 " Clips and
NailsM-029No3510.50367.501.0599999428PlumberL-002Day0.751,200.00900.001.0700000525U
/ SK LabourerL-007Day0.751,000.00750.00Total for100L.ft7,173.10Rate
for 1L.ft71.73Rate(Say)1 L.ft72.0012.062" Diameter PVC pipes fixed
to walls (Specials paid separately)Analysis for100L.ftNoItem
DescriptionItem RefUnitQuantityRateAmount1.00999999052" PVC
PipesM-096L.ft10079.007,900.001.0199999809Allow 5% of Items ( 1.01
) for Wastage----395.001.02999997142" PVC
SocketsM-102No848.00384.001.0399999619Solvent
CementM-117Grms1121.40156.801.04999995232 " Clips and
NailsM-031No3510.75376.251.0599999428PlumberL-002Day0.751,200.00900.001.0700000525U
/ SK LabourerL-007Day0.751,000.00750.00Total
for100L.ft10,862.05Rate for 1L.ft108.62Rate(Say)1 L.ft109.0012.073"
Diameter PVC pipes fixed to walls (Specials paid separately) Type
1000Analysis for100L.ft.NoItem DescriptionItem
RefUnitQuantityRateAmount1.00999999053" PVC
PipesM-097L.ft100185.0018,500.001.0199999809Allow 5% of Items (
1.01 ) for Compaction----925.001.02999997143" PVC
SocketsM-103No8192.001,536.001.0399999619Solvent
CementM-117Grms2001.40280.001.04999995233 " Clips and
ScrewsM-032No3534.001,190.001.0599999428PlumberL-002Day11,200.001,200.001.0700000525U
/ SK LabourerL-007Day11,000.001,000.00Total
for100L.ft.24,631.00Rate for 1L.ft.246.31Rate(Say)1
L.ft246.0012.08Excavation for laying 1/2 " to 3" dia meter PVC
pipes in ground not less than 1' 6" Deep, Backfilling &
CompactingAnalysis for100L.ftNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905U / SK
LabourerL-007Day2.251,000.002,250.00Total for100L.ft2,250.00Rate
for 1L.ft22.50Rate(Say)1 L.ft23.0012.09Chasing brickwork for laying
1/2" to 1 1/2 " dia PVC pipes and making good average depth 2"
(Pipes and specials paid separately)Analysis for100L.ftNoItem
DescriptionItem
RefUnitQuantityRateAmount1.0099999905CementM-026Bag0.1850.0085.001.0199999809SandM-113Cu0.0112,500.00125.001.0599999428MasonL-009Day31,200.003,600.001.0700000525U
/ SK LabourerL-007Day31,000.003,000.00Total for100L.ft6,810.00Rate
for 1L.ft68.10Rate(Say)1 L.ft68.0012.10Chasing brickwork for laying
1 1/2" to 3 " dia PVC pipes in ground and floor and making good.
average depth 3" (Pipes and specials measured paid
separately)Analysis for100L.ftNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905CementM-026Bag0.2850.00170.001.0199999809SandM-113Cu0.0312,500.00375.001.0599999428MasonL-009Day3.51,200.004,200.001.0700000525U
/ SK LabourerL-007Day3.51,000.003,500.00Total
for100L.ft8,245.00Rate for 1L.ft82.45Rate(Say)1 L.ft82.0012.111/2"
dia PVC specials viz-elbow / Bends / Sockets.Analysis for10NoNoItem
DescriptionItem RefUnitQuantityRateAmount1.00999999051/2" PVC
Elbows / Bent / SocketM-083No1010.50105.001.0199999809Solvent
CementM-117Grms201.4028.001.0599999428PlumberL-002Day0.251,200.00300.00Total
for10No433.00Rate for 1No43.30Rate(Say)No43.0012.123/4" dia PVC
specials viz-elbow / Bends / Sockets.Analysis for10NoNoItem
DescriptionItem RefUnitQuantityRateAmount1.00999999053/4" PVC
Elbows / Bent / SocketM-076No1015.00150.001.0199999809Solvent
CementM-117Grms301.4042.001.0599999428PlumberL-002Day0.251,200.00300.00Total
for10No492.00Rate for 1No49.20Rate(Say)No49.0012.131" dia PVC
specials viz-elbo / Bends / Sockets.Analysis for10NoNoItem
DescriptionItem RefUnitQuantityRateAmount1.00999999051" PVC Elbows
/ Bent / SocketM-082No1021.00210.001.0199999809Solvent
CementM-117Grms401.4056.001.0599999428PlumberL-002Day0.251,200.00300.00Total
for10No566.00Rate for 1No56.60Rate(Say)No57.0012.141 1/4" dia PVC
specials viz-elbo / Bends / Sockets.Analysis for10NoNoItem
DescriptionItem RefUnitQuantityRateAmount1.00999999051 1/4" PVC
Elbows / Bent / SocketM-081No1042.00420.001.0199999809Solvent
CementM-117Grms601.4084.001.0599999428PlumberL-002Day0.251,200.00300.00Total
for10No804.00Rate for 1No80.40Rate(Say)No80.0012.151 1/2" dia PVC
specials viz-elbo / Bends / Sockets.Analysis for10NoNoItem
DescriptionItem RefUnitQuantityRateAmount1.00999999051 1/2" PVC
Elbows / Bent / SocketM-080No1069.00690.001.0199999809Solvent
CementM-117Grms801.40112.001.0599999428PlumberL-002Day0.51,200.00600.00Total
for10No1,402.00Rate for 1No140.20Rate(Say)No140.0012.162" dia PVC
specials viz-elbo / Bends / Sockets.Analysis for10NoNoItem
DescriptionItem RefUnitQuantityRateAmount1.00999999052" PVC Elbows
/ Bent / SocketM-085No10110.001,100.001.0199999809Solvent
CementM-117Grms1401.40196.001.0599999428PlumberL-002Day0.51,200.00600.00Total
for10No1,896.00Rate for 1No189.60Rate(Say)No190.0012.172 1/2" dia
PVC specials viz-elbo / Bends / Sockets.Analysis for10NoNoItem
DescriptionItem RefUnitQuantityRateAmount1.00999999052 1/2" PVC
Elbows / Bent / SocketM-084No10350.003,500.001.0199999809Solvent
CementM-117Grms2001.40280.001.0599999428PlumberL-002Day0.51,200.00600.00Total
for10No4,380.00Rate for 1No438.00Rate(Say)No438.0012.183" dia PVC
specials viz-elbo / Bends / Sockets.Analysis for10NoNoItem
DescriptionItem RefUnitQuantityRateAmount1.00999999053" PVC Elbows
/ Bent / SocketM-086No10580.005,800.001.0199999809Solvent
CementM-117Grms2401.40336.001.0599999428PlumberL-002Day0.51,200.00600.00Total
for10No6,736.00Rate for 1No673.60Rate(Say)No674.0012.191/2" dia PVC
TeeAnalysis for10NoNoItem DescriptionItem
RefUnitQuantityRateAmount1.00999999051/2 " Dia
TeeM-122No1015.50155.001.0199999809Solvent
CementM-117Grms301.4042.001.0599999428PlumberL-002Day0.51,200.00600.00Total
for10No797.00Rate for 1No79.70Rate(Say)No80.0012.203/4 " dia PVC
TeeAnalysis for10NoNoItem DescriptionItem
RefUnitQuantityRateAmount1.00999999053/4 " Dia
TeeM-126No1021.50215.001.0199999809Solvent
CementM-117Grms451.4063.001.0599999428PlumberL-002Day0.51,200.00600.00Total
for10No878.00Rate for 1No87.80Rate(Say)No88.0012.211" dia PVC
TeeAnalysis for10NoNoItem DescriptionItem
RefUnitQuantityRateAmount1.00999999051 " Dia
TeeM-120No1031.25312.501.0199999809Solvent
CementM-117Grms601.4084.001.0599999428PlumberL-002Day0.51,200.00600.00Total
for10No996.50Rate for 1No99.65Rate(Say)No100.0012.221 1/4 " dia PVC
TeeAnalysis for10NoNoItem DescriptionItem
RefUnitQuantityRateAmount1.00999999051 1/4 " Dia
TeeM-127No1063.50635.001.0199999809Solvent
CementM-117Grms901.40126.001.0599999428PlumberL-002Day0.51,200.00600.00Total
for10No1,361.00Rate for 1No136.10Rate(Say)No136.0012.231 1/2 " dia
PVC TeeAnalysis for10NoNoItem DescriptionItem
RefUnitQuantityRateAmount1.00999999051 1/2 " Dia
TeeM-121No10102.001,020.001.0199999809Solvent
CementM-117Grms1201.40168.001.0599999428PlumberL-002Day11,200.001,200.00Total
for10No2,388.00Rate for 1No238.80Rate(Say)No239.0012.242 " dia PVC
TeeAnalysis for10NoNoItem DescriptionItem
RefUnitQuantityRateAmount1.00999999052 " Dia
TeeM-123No10165.501,655.001.0199999809Solvent
CementM-117Grms2101.40294.001.0599999428PlumberL-002Day11,200.001,200.00Total
for10No3,149.00Rate for 1No314.90Rate(Say)No315.0012.252 1/2 " dia
PVC TeeAnalysis for10NoNoItem DescriptionItem
RefUnitQuantityRateAmount1.00999999052 1/2" Dia
TeeM-124No10526.005,260.001.0199999809Solvent
CementM-117Grms3001.40420.001.0599999428PlumberL-002Day1.51,200.001,800.00Total
for10No7,480.00Rate for 1No748.00Rate(Say)No748.0012.263 " dia PVC
TeeAnalysis for10NoNoItem DescriptionItem
RefUnitQuantityRateAmount1.00999999053 " Dia
TeeM-125No10875.008,750.001.0199999809Solvent
CementM-117Grms3601.40504.001.0599999428PlumberL-002Day1.51,200.001,800.00Total
for10No11,054.00Rate for 1No1,105.40Rate(Say)No1,105.00
&R&08 Page &P Of &N
1313. PlasteringA.Wall PlasteringB.RenderingC.Sofit
PlasteringD.SkirtingWall Plastering13.A.015/8" thick plastering to
wall in Cement and sand 1:3 including Cement floatingAnalysis
for1SqrNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905CementM-026Bag1.4850.001,190.001.0199999809SandM-113Cu0.0612,500.00750.001.0299999714WaterM-157Gal100.303.001.0399999619MasonL-009Day11,200.001,200.001.0499999523U
/ SK LabourerL-007Day1.51,000.001,500.001.0599999428Allow 3% of
Items ( 1.04, 1.05 ) for Scaffolding----81.00Total
for1Sqr4,724.00Rate for
1Sqr4,724.00Rate(Say)1Sq4,724.00Rate(Say)1ft247.24Rate(Say)1m2508.3013.A.025/8"
thick to wall in cement and sand 1:5 finished semi-rough with
wooden float.Analysis for1SqrNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905CementM-026Bag0.8850.00680.000.07434944241.0299999714SandM-113Cu0.0712,500.00875.001.0399999619WaterM-157Gal100.303.001.0499999523MasonL-009Day11,200.001,200.001.0599999428U
/ SK LabourerL-007Day1.251,000.001,250.00Total for1Sqr4,008.00Rate
for
1Sqr4,008.00Rate(Say)1Sq4,008.00Rate(Say)1ft240.08Rate(Say)1m2431.26Ground
floor - First Floor1m2431.26First Floor - Second
Floor1m2474.39Second Floor - Third Floor1m2521.83Third Floor -
Fourth Floor1m2574.0113.A.035/8" thick to wall in lime cement and
sand 1:1:5 finished semi-rough with wooden float.Analysis
for1SqNoItem DescriptionItem
RefUnitQuantityRateAmount1.0099999905CementM-026Bag0.8850.00680.001.0199999809Slaked
LimeM-115Lbs44275.0012,100.001.0299999714SandM-113Cu0.07