Top Banner
PRIVATE AND CONFIDENTIAL Mr Niall Culleton BCF Architects Cloncannon Lower Mountmellick R32K6H9 Ireland Pre-Qualification Invitation Re: Proposed refurbishment of the Convent of Mercy, Tullamore, County Offaly. Friday, June 23, 2017 Dear Mr Niall Culleton, Please find enclosed a pre-qualification questionnaire for the proposed refurbishment of the Convent of Mercy, Tullamore, County Offaly. The works are as described as per pages 2 & 3 on the attached questionnaire. All contractors are kindly asked to return the completed questionnaire and supporting documentation on or before the 7 th July 2017 before 2p.m. The tender will issue to the successful contractors on the 13 th August 2017 with an anticipated start on-site date of the 1 st November 2017. The successful contractor as part of his fee bid will set out a program of works which will be considered 1 of 37
36

Convent of Mercy - BCF Architectsbcfarchitects.ie/resources/2017.06.28 - Prequal - Convent... · Web viewPRIVATE AND CONFIDENTIAL Mr Niall Culleton BCF Architects Cloncannon Lower

Jun 29, 2018

Download

Documents

LamPhuc
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Convent of Mercy - BCF Architectsbcfarchitects.ie/resources/2017.06.28 - Prequal - Convent... · Web viewPRIVATE AND CONFIDENTIAL Mr Niall Culleton BCF Architects Cloncannon Lower

PRIVATE AND CONFIDENTIAL

Mr Niall Culleton

BCF Architects

Cloncannon Lower

Mountmellick R32K6H9

Ireland

Pre-Qualification Invitation

Re: Proposed refurbishment of the Convent of Mercy, Tullamore, County Offaly.

Friday, June 23, 2017

Dear Mr Niall Culleton,

Please find enclosed a pre-qualification questionnaire for the proposed refurbishment

of the Convent of Mercy, Tullamore, County Offaly. The works are as described as per pages 2

& 3 on the attached questionnaire. All contractors are kindly asked to return the completed

questionnaire and supporting documentation on or before the 7th July 2017 before 2p.m.

The tender will issue to the successful contractors on the 13th August 2017 with an

anticipated start on-site date of the 1st November 2017. The successful contractor as part of his

fee bid will set out a program of works which will be considered when assessing the tender

returns. All documentation can be found on www.bcfarchitects.ie and downloaded in pdf

format.

Please note that:

- The site maybe inspected by arrangement with Niall Culleton at this office.

- Tendering procedures and contract will be in line with best practice of the RIAI and

“Agreement and Schedule of Conditions of Building Contract” (yellow form of

contract).

1 of 27

Page 2: Convent of Mercy - BCF Architectsbcfarchitects.ie/resources/2017.06.28 - Prequal - Convent... · Web viewPRIVATE AND CONFIDENTIAL Mr Niall Culleton BCF Architects Cloncannon Lower

- Any queries should be raised with Niall Culleton prior to Wednesday 5th July 2017. All

queries raised will be distributed to all contractors.

- The building owner reserves the right to accept any tender from those submitted or to

refuse all.

- All contractors are asked to use job reference 16.14, when submitting documentation

via post or e-mail. Job reference to be used throughout contract.

Please note that this project does not require compliance with the Building Control Register. All

contractors are asked to complete questionnaire as set-out to include BCAR compliance for

purpose of marking system. Should you have any further queries, please feel free to contact

me.

Trusting this meets with your satisfaction

______________

Niall Culleton

Partner in Charge

BCF Architecture and Planning.

______________

Brian Brennan

Director of Architecture

BCF Architecture and Planning.

Page 3: Convent of Mercy - BCF Architectsbcfarchitects.ie/resources/2017.06.28 - Prequal - Convent... · Web viewPRIVATE AND CONFIDENTIAL Mr Niall Culleton BCF Architects Cloncannon Lower

APPLICATION FORM FOR EXPRESSION OF INTEREST FOR INCLUSION ON TENDER LIST FOR THE REFURBISHMENT AND RELATED SITEWORKS AT THE EXISTING CONVENT OF MERCY, STORE STREET, TULLAMORE, COUNTY OFFALY.

Name of Contractor

Address

Main ContactTelephone NumberFax Numbere-mailContact

This document should be returned in a sealed envelope marked application form for expression of interest for inclusion on tender list for the refurbishment and extension at the Convent of Mercy, Store Street, Tullamore, County Offaly.

To:Mr. Niall CulletonBcf ArchitectsCloncannon Lower,MountmellickCounty LaoisR32K6H9Republic of Ireland

Before 2.00pm on 7th July 2017.

3 of 27

Page 4: Convent of Mercy - BCF Architectsbcfarchitects.ie/resources/2017.06.28 - Prequal - Convent... · Web viewPRIVATE AND CONFIDENTIAL Mr Niall Culleton BCF Architects Cloncannon Lower

Convent of Mercy – Brief for the Project

Refurbishment of the existing Convent Building at Store Street, Tullamore, County Offaly.

The existing Convent was originally the 4 storey residential building, church and school on the corner of Convent Road and Store Street/ Benburb Street, Tullamore. The site within the contract relates to the 4 storey block on Store Street/ Benburb Street and the 2 storey block on Convent Road. The building was constructed using concrete frame with masonary infill panels and non-structural masonary partition walls.

The main Ingredients of the above Refurbishment and Alteration Works are;

The project will be broken down into three key phases as follows:

Phase 1A – Upper Bedrooms on floors 2 and 3, Independent Living Unit on 2nd Floor and 2 no.

Independent Living Units on the Ground Floor. Bathroom upgrades as called up.

Phase 1B – Alterations to existing kitchen, dining room and cold stores.

Phase2 – Upper Bedrooms on floors 2 and 3, 2 no. Independent Living Units. Bathroom upgrades as

called up.

Above phases will require site enabling works, making good. Common areas and stairwells to be

upgraded.

Phase 1A

1 - The phase 1A element of the works will be to alter and refurbish 20 no. bedroom spaces to provide

for 9 no bedrooms with toilet facilities, kitchenette and two no. disability bathrooms on the 3rd floor.

17 No. Bedroom spaces will be altered/ refurbished on the 2nd floor to provide for 7 no. bedrooms

with toilet facilities, kitchenette, room and 2 no. disability bathrooms on the 2nd floor.

The existing archives room/ meeting room to the first floor with be altered/ refurbished to

accommodate a 1 bedroom with facilities independent living unit to include kitchen and living area.

Existing meeting room to be reduced and archives moved into this area

2 – The phase 1B element of the works will be to alter the existing dining room to include for a new

access door and screen, serving area, general refurbishment of the room.

The kitchen will be completely refurbished with new floor coverings, wall tiles, kitchen units and

cooking facilities. The existing large Aga will be removed/ sold by the Convent of Mercy.

The existing cold room will be refurbished by knocking the central wall, lining and making good.

3 – The Phase 2 element of the works will be to alter and refurbish 15 no. bedroom spaces to provide

Page 5: Convent of Mercy - BCF Architectsbcfarchitects.ie/resources/2017.06.28 - Prequal - Convent... · Web viewPRIVATE AND CONFIDENTIAL Mr Niall Culleton BCF Architects Cloncannon Lower

for 9 no bedrooms with toilet facilities, three no. disability bathrooms on the 3rd floor. Provide for 2

no. Independent Living units with bedroom, bathroom, kitchen and living room space.

10 No. Bedroom spaces will be altered/ refurbished on the 2nd floor to provide for 10 no. bedrooms

with full toilet facilities on the 2nd floor. The “Ava Maria” Suite was refurbished some years ago but

carpets etc., to be replaced. The bulk of the works on this floor is the provision of shower facilities in

each room and the modification of the current wardrobe spaces. There will be 3 no. disability

bathroom upgrades along with a new prayer room.

4- The Contractor will be responsible for all takedown works required for the project during all phases

of the project. Any Mechanical/ Electrical systems to be de-commissioned to be advised by the

Contractor at the time of the works. Contractor will be responsible for the refurbishment of all

common areas affected by the works.

5 – As part of the enabling works for the contract, the rear access from Benburb Street will be made

available to the Contractor for the duration of the works. There will be demolition required around

the access to the carpark to facilitate construction traffic. The Contractor will be responsible for the

protection where possible of the gardens and reinstatement as necessary.

6 - As part of the on-site works, a program of works may need to include an after-construction hours

fire strategy for the residents.

7 – Window upgrade to the building regarding the rooms identified on plan.

Contractors are being sought with competence in handling innovative technologies and with specific construction experience in;

a) Working with concrete framed buildings.b) Working in a sensitive environment taking into considerations the clients needs.c) Engineered alterations to masonry wallingd) Retro-fit air tightness and Insulation Systems.e) Working on a phased basis within the contract.

Additional information

1. The site contains both over ground and underground services (to be protected and in part diverted).

2. Ground conditions do not require any special treatment or ground stabilisation work

3. On-site parking required for duration of the contract is to the rear of the Convent and requiring an

agreed traffic management and street cleaning plan.

4. Construction outside normal working hours is not permitted

COMPLETING THIS QUESTIONNAIRE

5 of 27

Page 6: Convent of Mercy - BCF Architectsbcfarchitects.ie/resources/2017.06.28 - Prequal - Convent... · Web viewPRIVATE AND CONFIDENTIAL Mr Niall Culleton BCF Architects Cloncannon Lower

1.1 In order to assist the procuring entity in evaluating the extent to which a candidate meets the qualification criteria, candidates are required to provide all of the information requested in this Qualification Questionnaire.

1.2 Candidates are permitted to add additional lines to the pro-forma tables and boxes set out within the Qualification Questionnaire if required.

1.3 The information requested in the Qualification Questionnaire should be submitted in English and where copies of original documents are provided in languages other than English, a com -plete and accurate English translation should be provided or the documents will not be con-sidered during the evaluation process.

1.4 All financial information should be denominated in euro (€), except where financial information is being provided in a certified or audited supporting document such as a set of financial state -ments in which case it is sufficient for the information to remain in its original currency.

1.5 Failure to provide a sufficient level of detail or to explain adequately any relevant matters may result in such data or information not being taken into account in the assessment process.

1.6 Candidates for qualification may include individuals, partnerships, limited companies, group-ings or any combination of the foregoing with or without legal personality. However, a group-ing if successful will be required to establish legal personality in order to deliver the contract.

1.7 Candidates are reminded that they may rely on the resources of other entities on condition that they can prove that they will have these resources at their disposal when necessary in ac-cordance with Directive 2004/18/EC as transposed into Irish law by Irish Statutory Instrument SI329 of 2006.

1.8 NB. If the application is from a consortium / joint venture please provide the information re-quested below for all parties.

1.9 Candidates are expressly and strictly prohibited from discussing any aspect of their response to the Qualification Questionnaire with other candidates or otherwise exchanging information or colluding in respect of the project. Any candidate who fails to comply with this requirement may be disqualified.

1.10 The evaluation (see of completed questionnaires & requested supporting information) will de-termine a selected list of contractors who will be invited to tender for the project. The selection rules are :

A. Candidates must achieve a minimum of 75% of marks available for selection criteria where a mark is given (e.g. in selection criteria C2 this is a minimum 75% of 40 marks) and must also achieve a Pass in all selection criteria where a Pass or Fail is awarded.

B. A total of 6 candidates only with the highest marks will be selected from those who are suc -cessful in the above evaluation.

QUALIFICATION QUESTIONAIRE

If you plan to sub-contract any part of the work relevant to this project, please ensure that there is a

Page 7: Convent of Mercy - BCF Architectsbcfarchitects.ie/resources/2017.06.28 - Prequal - Convent... · Web viewPRIVATE AND CONFIDENTIAL Mr Niall Culleton BCF Architects Cloncannon Lower

questionnaire for BOTH the Main Contractor and each of the proposed Domestic Sub-Contractors.

Please state the company whose information is contained in this questionnaire:

Name:

(Please submit a separate questionnaire for EACH Proposed Domestic Sub-Contractor)

A. GENERAL INFORMATION

A1. Company Details

Company NameContact Name & PositionAddressTelephoneFaxEmailWebsiteDate of establishmentVAT Registration Nr.Legal Status, if any(Company (Ltd.), Partnership, Sole Trader, etc.)

A2. Domestic Sub-Contractors Does the candidate propose to Sub-Contract any part of the works? Yes / No

If Yes, please complete:

Name of Domestic Sub-Contractors proposed for

Detail of any work element which it is proposed to sub-

Confirm that Appendix A has been completed on behalf of

7 of 27

Page 8: Convent of Mercy - BCF Architectsbcfarchitects.ie/resources/2017.06.28 - Prequal - Convent... · Web viewPRIVATE AND CONFIDENTIAL Mr Niall Culleton BCF Architects Cloncannon Lower

each work element (Attach Additional Page If Necessary)

contract EACH Domestic Subcontractor

Note: More precise information on the foregoing will be requested at tender stage.

Page 9: Convent of Mercy - BCF Architectsbcfarchitects.ie/resources/2017.06.28 - Prequal - Convent... · Web viewPRIVATE AND CONFIDENTIAL Mr Niall Culleton BCF Architects Cloncannon Lower

B. FINANCIAL AND INSURANCE

B1. BANKERS REFERENCEPlease provide a current bankers reference

Bank ReferenceTick if Enclosed

Rule: At a minimum your financial reference will name the project and will be written specifically for this project by a member of the financial institution at minimum assistant manager level, and will have been dated within the last three months

B2. TURNOVER Please provide details of total annual financial turnover for the past 3 financial years or alternatively, if the date of establishment was more recent, information on turnover available.

Evidence of TurnoverTick if attachedAppendix Number

B2 Minimum Rule: Candidates should provide evidence (by way of audited accounts, a statement

from their auditors or otherwise) that their turnover has exceeded the following figure during the

last financial year.

€3,000,000 per annum for Main Contracting Building Works

€500,000 per annum for Mechanical & Electrical Works

B3. INSURANCES Please provide evidence of current insurance levels in place:

Employers Liability Public Liability Professional Indemnity

Contractors Liability

Evidence attached? /

Appendix No

€ € € €

B3 Minimum Rule: A copy of the current insurance certificates or a letter from their brokers is re-quired.

Note: Invited tenderers will be required to confirm that, if successful, they will secure insurance cover to the levels indicated in the Tender Documents.

B4. PENSION SCHEMES Compliance with membership requirements of the CIF Pension/Sick Pay Scheme, or equivalent

Statement from Operatives’ Pension Scheme

Tick if Enclosed

B4 Minimum Rule: Evidence of Membership of an employees’ Pension Scheme will be a Pass/Fail requirement.

9 of 27

2014 2013 2012

Overall Turnover € € €

Page 10: Convent of Mercy - BCF Architectsbcfarchitects.ie/resources/2017.06.28 - Prequal - Convent... · Web viewPRIVATE AND CONFIDENTIAL Mr Niall Culleton BCF Architects Cloncannon Lower

C. TECHNICAL CAPACITY

C1. ORGANISATION DETAILS

Please provide organisational details, including year of establishment and range of services offered.

Please complete your answer without reference to other documents (i.e. brochures, etc) to facilitate evaluations.

Page 11: Convent of Mercy - BCF Architectsbcfarchitects.ie/resources/2017.06.28 - Prequal - Convent... · Web viewPRIVATE AND CONFIDENTIAL Mr Niall Culleton BCF Architects Cloncannon Lower

C1.1 Organisation Chart

Tick if attachedAppendix Number

C1.2 Human Resources Please complete your answer without reference to other documents (i.e. brochures, etc) to facilitate evaluations.Please provide details of key personnel, including summary CVs, qualifications (includ-ing safety and health qualifications) and relevant experience of personnel. It is em-phasised that, at this stage, candidates are not being asked to propose the particular personnel for the delivery of the contract – this will be requested at tender stage.

Name Position in the company

Qualification(please enter full details here, i.e. no acronyms)

Qualifications Awarding Body

CV attached / Appendix No.

Name Position in the company

Qualification(please enter full details here, i.e. no acronyms)

Qualifications Awarding Body

CV attached / Appendix No.

PSCS Role

Overall Manpower 2014 2013 2012PermanentManagement: OperativesTechnical DesignersTemporaryManagement: OperativesTechnical Designers

11 of 27

Page 12: Convent of Mercy - BCF Architectsbcfarchitects.ie/resources/2017.06.28 - Prequal - Convent... · Web viewPRIVATE AND CONFIDENTIAL Mr Niall Culleton BCF Architects Cloncannon Lower

C1.3 Technical Resources Please complete your answer without reference to other documents (i.e. brochures, etc) to facilitate evaluations.Please outline the organisation’s technical resources, plant and equipment. It is em-phasised that, at this stage, candidates are not being asked to propose any particular plant and equipment for the delivery of the contract – this will be requested at tender stage.

Resource – please specify Quantity

C1, C1.1, C1.2 and C1.3 Minimum Rule: Candidates must demonstrate in each case that their organisation potentially has adequate resources to deliver the relevant works.

Page 13: Convent of Mercy - BCF Architectsbcfarchitects.ie/resources/2017.06.28 - Prequal - Convent... · Web viewPRIVATE AND CONFIDENTIAL Mr Niall Culleton BCF Architects Cloncannon Lower

C2. PREVIOUS EXPERIENCEPlease complete your answer in table format below, without reference to other documents (i.e. brochures, etc) to facilitate evaluations.

Please provide details of all experience on completed and on-going projects, to the satisfaction of the project clients, on both specialist residential refurbishment and new build construction and siteworks, with either Private or Public clients, undertaken in the past 3 years, demonstrating skills, quality, efficiency, experience and reliability.

A. Public Sector Projects:PREVIOUS EXPERIENCE

Name of employer representative, if any, for this project.

Project name and type & location Client & Architect’s Name & Contact Details

Tender Value & Final Account Value (€)

Start Date Finish Date

Please indicate the relevance to the proposed new Embassy project

Brief description of the role and services performed by your organisation

13 of 27

Page 14: Convent of Mercy - BCF Architectsbcfarchitects.ie/resources/2017.06.28 - Prequal - Convent... · Web viewPRIVATE AND CONFIDENTIAL Mr Niall Culleton BCF Architects Cloncannon Lower

PREVIOUS EXPERIENCE

Name of employer representative, if any, for this project.

Project name and type & location Client & Architect’s Name & Contact Details

Tender Value & Final Account Value (€)

Start Date Finish Date

Please indicate the relevance to the proposed new Embassy project

Brief description of the role and services performed by your organisation

Page 15: Convent of Mercy - BCF Architectsbcfarchitects.ie/resources/2017.06.28 - Prequal - Convent... · Web viewPRIVATE AND CONFIDENTIAL Mr Niall Culleton BCF Architects Cloncannon Lower

B. Private Sector Projects:

PREVIOUS EXPERIENCE

Name of employer representative, if any, for this project.

Project name and type & location Client & Architect’s Name & Contact Details

Tender Value & Final Account Value (€)

Start Date Finish Date

Please indicate the relevance to the proposed new Embassy project

Brief description of the role and services performed by your organisation

PREVIOUS EXPERIENCE

15 of 27

Page 16: Convent of Mercy - BCF Architectsbcfarchitects.ie/resources/2017.06.28 - Prequal - Convent... · Web viewPRIVATE AND CONFIDENTIAL Mr Niall Culleton BCF Architects Cloncannon Lower

Name of employer representative, if any, for this project.

Project name and type & location Client & Architect’s Name & Contact Details

Tender Value & Final Account Value (€)

Start Date Finish Date

Please indicate the relevance to the proposed new Embassy project

Brief description of the role and services performed by your organisation

Repeat table format above as required on separate sheets.

C2 Minimum Rule: Experience satisfactory to the Employer in all projects, consisting of full main contractor’s duties must be demonstrated including capacity to deliver full compliance with defined contractor duties under BC(A)R SI.9 2014..

Page 17: Convent of Mercy - BCF Architectsbcfarchitects.ie/resources/2017.06.28 - Prequal - Convent... · Web viewPRIVATE AND CONFIDENTIAL Mr Niall Culleton BCF Architects Cloncannon Lower

C3. Quality Assurance & AwardsPlease describe your internal policy, if any, on quality assurance.

If 3rd party accredited please provide details of:

Date of accreditation

Name of accreditation body

Scope of accreditation

Name of person responsible for quality management

CertificateTick if attached

Additional Awards Delivered by the Applicant on Previous Projects in the Past 5 Years (Please state award received with brief description of the project)

(i) ……………………………………………………………………………………………………………………………………………………………………………………………………… ……………………………………………………………………………………………………

(ii) …………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………

(iii) ………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………

C3 Minimum rule: Description of Quality Assurance and awards provided.

17 of 27

Page 18: Convent of Mercy - BCF Architectsbcfarchitects.ie/resources/2017.06.28 - Prequal - Convent... · Web viewPRIVATE AND CONFIDENTIAL Mr Niall Culleton BCF Architects Cloncannon Lower

D. HEALTH & SAFETY (as part of the provision of the service of Project Supervisor for the Construction Stage)

The Employer views safety as a top priority on all projects and has the following hierarchy of delivery:

1. A safe project for all operatives and visitors.2. A project delivered to the proper quality 3. A project delivered within the allowable budget 4. A project delivered within the allowable time.

Most importantly Safety

D1 Copy of up to date Safety Policy

D2 Copy of up to date Safety Statement

D3 Details of Company Safety Plan for this Project may be requested at a later date (Not to be included at this point)

D4 Details of use of site-specific risk assessments

Please complete your answer without reference to other documents to facilitate evaluations. If the information is available on your safety statement/management system, please copy relevant text here. (MAXIMUM OF 250 WORDS PERMITTED)

H&S Policy Tick if attached

H&S Statement Tick if attached

Safety Plan for the ProjectTick if attached

Page 19: Convent of Mercy - BCF Architectsbcfarchitects.ie/resources/2017.06.28 - Prequal - Convent... · Web viewPRIVATE AND CONFIDENTIAL Mr Niall Culleton BCF Architects Cloncannon Lower

D5 Names and qualifications of personnel identified with responsibility for safety and health

D6 Details of any enforcement and other notices (or equivalent) recieved from safety and health authorities

19 of 27

Please complete your answer without reference to other documents to facilitate evaluations. If the information is available on your safety statement/management system, please copy relevant text here. (MAXIMUM OF 250 WORDS PERMITTED)

Please complete your answer without reference to other documents to facilitate evaluations. If the information is available on your safety statement/management system, please copy relevant text here. (MAXIMUM OF 250 WORDS PERMITTED)

Page 20: Convent of Mercy - BCF Architectsbcfarchitects.ie/resources/2017.06.28 - Prequal - Convent... · Web viewPRIVATE AND CONFIDENTIAL Mr Niall Culleton BCF Architects Cloncannon Lower

D7 Experience and proof of competency, if any, in performing the role of Project Supervisor for the Construction Stage (PSCS) on similar projects comparable in size and complexity.

D8 Do you have system for communicating to employees’ information on hazards and pro-tective and preventative measures, for example the Health and Safety Authority’s Safe System of Work Plan

Yes [ ] No [ ]

D9 Do you have procedures in place for working with both Site Safety Representatives and HSA’s representatives.

Yes [ ] No [ ]

Please complete your answer without reference to other documents to facilitate evaluations. If the information is available on your safety statement/management system, please copy relevant text here. (MAXIMUM OF 250 WORDS PERMITTED)

Page 21: Convent of Mercy - BCF Architectsbcfarchitects.ie/resources/2017.06.28 - Prequal - Convent... · Web viewPRIVATE AND CONFIDENTIAL Mr Niall Culleton BCF Architects Cloncannon Lower

D10 Do you have procedures in place for checking plant & equipment, e.g. scaffolding, lift-ing equipment, excavation inspections and/or audits

Yes [ ] No [ ]

D11 Do you have Safety Management System, e.g. Safe T Cert or equivalent

Yes [ ] No [ ]

D12 Do you have 3rd party accredited Safety Management System,

Yes [ ] No [ ]

If 3rd party accredited please provide evidence.

D13 Details of the number of notifiable accidents and electrical strick (per 100,000 hours worked) reported to the Health and Safety Authority and other relevant authorities for each of the last 5 years

D14 Do you have experience of working and co-ordinating a) the activities of different con-tractors and b) acting as a liaison between the construction phase and the design func-tion,

Yes [ ] No [ ]

D Minimum Rule: Candidates must satisfy the Employer under this Section as a whole. Also, the PSCS must have adequate previous experience in performing this role (or equiva -lent) (D7).

21 of 27

2012 20152013 20162014

Certified H&S Management System

Tick if attached

Page 22: Convent of Mercy - BCF Architectsbcfarchitects.ie/resources/2017.06.28 - Prequal - Convent... · Web viewPRIVATE AND CONFIDENTIAL Mr Niall Culleton BCF Architects Cloncannon Lower

E DECLARATION OF BONA FIDES

THIS DECLARATION, DULY COMPLETED, MUST BE SUBMITTED BY ALL CANDIDATES

Name of Applicant:

Address:

Please tick Yes or No as appropriate to the following statements relating to the current status of your organisation.

1. The Applicant is bankrupt or is being wound up or its affairs are being administered by the court or has entered into an arrangement with creditors or has suspended business activities or is in any analogous situation arising from a similar procedure under national laws and regulations.

Yes [ ] No [ ]2. The Applicant is the subject of proceedings for a declaration of bankruptcy, for an order for compulsory winding up or

administration by the court or for an arrangement with creditors or of any other similar proceedings under national laws and regulations.

Yes [ ] No [ ]3. The Applicant, a Director or Partner, has been convicted of an offence concerning his professional conduct by a judge-

ment which has the force of res judicata or been guilty of grave professional misconduct in the course of their busi-ness. Yes [ ] No [ ]

4. The Applicant has not fulfilled its obligations relating to the payment of taxes or social security contributions in Ire-land or any other State in which the tenderer is located. Yes [ ] No [ ]

5. The Applicant, a Director or Partner has been found guilty of fraud. Yes [ ] No [ ]

6. The Applicant, a Director or Partner has been found guilty of money laundering. Yes [ ] No [ ]

7. The Applicant, a Director or Partner has been found guilty of corruption. Yes [ ] No [ ]

8. The Applicant, a Director or Partner has been convicted of being a member of a criminal organisation. Yes [ ] No [ ]

9. The Applicant has been guilty of serious misrepresentation in providing information to a public buying agency. Yes [ ] No [ ]

10. The Applicant has contrived to misrepresent its Health & Safety information, Quality Assurance information, or any other information relevant to this application. Yes [ ] No [ ]

11. The Applicant must fully comply with Section C2. Previous Experience. Yes [ ] No [ ]

THIS FORM MUST BE COMPLETED AND SIGNED BY A DULY AUTHORISED OFFICER OF THE CANDIDATE’S ORGANISATION

I certify that the information provided above is accurate and complete to the best of my knowledge and belief. I under-stand that the provision of inaccurate or misleading information in this declaration may lead to my organisation being ex-cluded from participation in this and future tenders.

SIGNATURE DATE:

NAME TEL:

POSITION FAX:

E Minimum Rule :Candidates Must be compliant

Page 23: Convent of Mercy - BCF Architectsbcfarchitects.ie/resources/2017.06.28 - Prequal - Convent... · Web viewPRIVATE AND CONFIDENTIAL Mr Niall Culleton BCF Architects Cloncannon Lower

APPENDIX A

QUALIFICATION QUESTIONNAIRE ON BEHALF OF EACH DOMESTIC SUBCONTRACTOR PROPOSED

1. Name of Firm

Name of FirmContact Name & PositionAddressTelephoneFaxEmailWebsiteDate of establishmentCopy of C2 CertificateVAT Registration Nr.Legal Status, if any(e.g. Company (Ltd.), Partnership, Sole Trader, etc.)

2. List of recent similar projects where the domestic subcontractor provided a similar service, and whether previously associated with the Candidate (please describe).

Page 24: Convent of Mercy - BCF Architectsbcfarchitects.ie/resources/2017.06.28 - Prequal - Convent... · Web viewPRIVATE AND CONFIDENTIAL Mr Niall Culleton BCF Architects Cloncannon Lower

SELECTION CRITERIAQuestionnaires will be evaluated using the following selection criteria, rules and weightings: The evaluation (see of completed questionnaires & requested supporting information) will determine a selected list of con-tractors who will be invited to tender for the project. The selection rules are:

A. Candidates must achieve a minimum of 75% of marks available for selection criteria where a mark is given (e.g. in selection criteria C2 this is a minimum 75% of 40 marks) and must also achieve a Pass in all selection criteria where a Pass or Fail is awarded.

B. A total of 6 candidates only with the highest marks will be selected from those who are successful in the above evaluation.

REF SELECTION CRITERIA MINIMUM RULE / ELIMINATOR Pass/Fail Marks

A2 Subcontractors

The Candidate must answer this question. If in the affirmative, then Appendix A must be completed.All responses must demonstrate adequate previous experience.

Pass / Fail

B1 Bankers Reference

At a minimum your financial reference will name the India House project and will be written specifically for this project by a member of the financial institution at minimum assistant manager level, and will have been dated within the last three months

5marks

B2 Turnover

Candidates should provide evidence (by way of audited accounts, a statement from their auditors or otherwise) that their turnover has exceeded the following figures during the last financial year .

€3,000,000 per annum.(Building Works)€500,000 per annum.(M&E)

Pass / Fail

B3 Insurances A copy of the current insurance certificates or a letter from their brokers is required. 5marks

B4 Pension Scheme Evidence of Membership of an employees’ Pension Scheme will be a Pass/Fail requirement. Pass / Fail

C1 Organisation Details

Candidates must demonstrate in each case that their organ-isation potentially has adequate resources to deliver the rel-evant works.

25marksC1.1 Organisation Chart

C1.2 Human Resources

C1.3 Technical Resources

C2 Previous Experience

Appropriate satisfactory experience in last 3 years of specialist refurbishment projects of similar nature and scale must be demonstrated. 40marks

C3 Quality Assurance Description of quality assurance and awards provided 5marks

D Health and Safety Candidates must satisfy the Employer under this Section as 20marks

Page 25: Convent of Mercy - BCF Architectsbcfarchitects.ie/resources/2017.06.28 - Prequal - Convent... · Web viewPRIVATE AND CONFIDENTIAL Mr Niall Culleton BCF Architects Cloncannon Lower

a whole (D1 – D14). Also, the PSCS must have adequate previous experience in performing this role (or equivalent) (D15).

E Declaration of Bona Fides Must be compliant Pass/Fail

TOTAL Marks 100 Marks

Page 26: Convent of Mercy - BCF Architectsbcfarchitects.ie/resources/2017.06.28 - Prequal - Convent... · Web viewPRIVATE AND CONFIDENTIAL Mr Niall Culleton BCF Architects Cloncannon Lower