Control Building Fiber Preliminary Design Review

December 5, 2001

Page 2: Control Building Fiber Preliminary Design Review December 5, 2001.

 

IF Signal Path

Page 3: Control Building Fiber Preliminary Design Review December 5, 2001.

 

ArrayTermination

Panel

I FPatch Panel

12 WDM per FIber

LOPatch Panel

M&CPatch Panel(TX & RX)

EmergencyCommunication

Patch Panel

TelephonePatch Panel

73 Fibers 73 Fibers 146 Fibers 73 Fibers 146 Fibers

Array FO TerminationRoom

North Arm FiberEntrance

(288 Fibersincl. spares)

East Arm FiberEntrance

(288 Fibersincl. spares)

West Arm FiberEntrance

(300 Fibersincl. spares)

E Array Option(180 Fibersincl. spares)

CB Main Distribution Frame

Page 4: Control Building Fiber Preliminary Design Review December 5, 2001.

 

Cable Type Required

• Plenum Cable is required in the building

• 30-Fiber tight buffer cables will be used

Page 5: Control Building Fiber Preliminary Design Review December 5, 2001.

 

Control BuildingMain Distribution Frame

Page 6: Control Building Fiber Preliminary Design Review December 5, 2001.

 

MDF Components

Page 7: Control Building Fiber Preliminary Design Review December 5, 2001.

 

Termination Panel

• 876 fibers• Provisions for 1200

Page 8: Control Building Fiber Preliminary Design Review December 5, 2001.

 

Rack Mount EDFA

Page 9: Control Building Fiber Preliminary Design Review December 5, 2001.

 

Next Topic

Page 10: Control Building Fiber Preliminary Design Review December 5, 2001.

 

Data Quality and Format Preliminary Design Review

December 5, 2001

Page 11: Control Building Fiber Preliminary Design Review December 5, 2001.

 

Bit Error Rates

• Continuous On-Line Monitoring– Hardware and software – Part of Receiver– MCB access

• Error Flag Sent to the Correlator – Single threshold error flag

Page 12: Control Building Fiber Preliminary Design Review December 5, 2001.

 

Transmitter Power

• Automated Test– Measured at Each Laser

• Manual Test– Can be measured at the Mux output– Can be measured at the output of the De-Mux

Page 13: Control Building Fiber Preliminary Design Review December 5, 2001.

 

Optical Power

• Continuous Optical Power will be measured– 1% tap – The EDFA will measure the Optical Power– MCB access

• Total optical power is not a good indicator of BER

Page 14: Control Building Fiber Preliminary Design Review December 5, 2001.

 

Eye Pattern

• Patch Panel– Manual measurements during reconfiguration

• Complete Diagnostic– Jitter– Q Factor– Noise Margin– Rise / Fall times

Page 15: Control Building Fiber Preliminary Design Review December 5, 2001.

 

Test Patterns

• Generated at each Transmitter

• Nine Test Patterns– No Sync, alternating 1/0, all Ones, all Zeros

• MCB controlled

Page 16: Control Building Fiber Preliminary Design Review December 5, 2001.

 

Frame Format

Page 17: Control Building Fiber Preliminary Design Review December 5, 2001.

 

Frame Implementation

selector

32 bits

@

250 MHz

64 bitlatch

64 bitlatch

16 bit partioningand re-ordering

multiplexby 5

multiplexby 5

selector

multiplexby 16

16 Format bits@ 62.5 MHz

16 Format bits@ 62.5 MHz

64 bits@ 62.5 MHz

64 bits@ 62.5 MHz

80 bits@ 62.5 MHz

80 bits@ 62.5 MHz

16 bits@ 312.5 MHz

16 bits@ 312.5 MHz

16 bits@ 625 MHz

1 bit@ 10 GHz

160 bit Frames @10 GHz

Page 18: Control Building Fiber Preliminary Design Review December 5, 2001.

 

Divided Sync Word

• Required to Identify Correct 1/2 Sequence

• 10 Bits long, – 6 bit identify Start-of-Frame– Barker Sequence - equal Ones versus Zeros

• Three Stage Synchronization Process

Page 19: Control Building Fiber Preliminary Design Review December 5, 2001.

 

Three Stage Synchronization

• Stage 1 - Search bits for frame pattern

• Stage 2 – Monitor for “Correct” sync

• Stage 3 – If two “Bad” frames in a row

or 2-out-of-8 fames are “Bad”

Then Start Search Again

Page 20: Control Building Fiber Preliminary Design Review December 5, 2001.

 

Scrambling

• Frame Synchronous Scrambling– Entire frame – except sync bits– Select pattern is modulo 2 added

• Pattern results in– Equal number of Ones/Zeros providing

• Balance ac content, sufficient transitions• Minimize low frequency content

Page 21: Control Building Fiber Preliminary Design Review December 5, 2001.

 

Timing Signals

• Metaframe Index

• Metaframe count

• 1 PPS

• 1 Pulse per 10 seconds

Page 22: Control Building Fiber Preliminary Design Review December 5, 2001.

 

Data Valid Signal

• Initiated at the antenna– Toggle Switch– MCB controlled

• Passed to correlator

Page 23: Control Building Fiber Preliminary Design Review December 5, 2001.

 

Check Sum - BER

• Each 19 bits Generate a check Sum

• Only odd # of errors per 19 bits Detected

One error per frame is an

Error Rate of about 10-3

Page 24: Control Building Fiber Preliminary Design Review December 5, 2001.

 

Next Topic