Top Banner

of 23

Contract Construction Management-130420145229-phpapp02

Jun 01, 2018

Download

Documents

Ye Phone
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • 8/9/2019 Contract Construction Management-130420145229-phpapp02

    1/23

    PRESENTED BY:

    Kapil Dev SharmaKunal Dhawan

    Naved Sami

    Pooja Babber

    Vishal Sharma

  • 8/9/2019 Contract Construction Management-130420145229-phpapp02

    2/23

    Essential Elements o !nsuran"e

    #on"ept o #laim

    $mount pa%able T%pes o #laims

    Pro"essin& o !nsuran"e #laim

    'uidelines

    Disputes in !nsuran"e #laim

    Reje"tion o #laim

    Summar%

  • 8/9/2019 Contract Construction Management-130420145229-phpapp02

    3/23

    #on"ept o !nsurable !nterest

    Do"trine o 'ood (aith

    Pro)imate #ause

  • 8/9/2019 Contract Construction Management-130420145229-phpapp02

    4/23

    #laim is a ri&ht o insured to re"eive the amount se"uredunder the poli"% o insuran"e "ontra"t promised b%!nsurer

    !nsuran"e #laim is the re*uest o the insured poli"%holder+benei"iar% rom the insurer+insuran"e issuin&"ompan% or inan"ial reimbursement whenever he+shesuers a loss o the insured propert%+lie+health+et"

    !nsurer, settle the "laim ater satis%in& himsel that allthe "onditions and re*uirements or settlement o "laimhave been "ompiled with

  • 8/9/2019 Contract Construction Management-130420145229-phpapp02

    5/23

    Should be done in a""ordan"e with the spe"ii"ationso the insuran"e poli"%+"ontra"t

    The amount insured or a"e value o poli"%

    Bonus i de"lared b% "ompan%

    Share o proit in "ase o parti"ipation poli"%

    Surrender value i poli"% lapsed

  • 8/9/2019 Contract Construction Management-130420145229-phpapp02

    6/23

  • 8/9/2019 Contract Construction Management-130420145229-phpapp02

    7/23

    Pa%able as per the terms o "ontra"t, at the end o the term !nsurers inorm the poli"%holder well in advan"e about the

    maturit% date

    !nsurers send the orm o dis"har&e whi"h is dul% si&ned- andreturned with,

    a. /ri&inal Poli"% do"ument

    b. proo o a&e, to prove the identit%

    ". Do"ument o assi&nment, i e)e"uted on a separatestamped paper

    'ross amount in"ludes basi" sum assured- bonus et" Dedu"tions in"lude loan amount- unpaid premium et"0

    #ir"umstan"es li1e settlin& the "laim on the basis oindemnit% bond re*uire more "aution 2in "ase ori&inal poli"%is not ound.

  • 8/9/2019 Contract Construction Management-130420145229-phpapp02

    8/23

    !ntimation o death b% a proper person and proo odeath

    A. Premature/early claim: insured dies within 3 years oftaking out of policy

    a. statement rom the last medi"al attendant &ivin& detailso last illness and treatment

    b. Statement rom the hospital

    ". Statement rom the emplo%er

    B. Other claim : insured dies after 3 years of taking out ofpolicy

    a. Poli"% number and Name o lie assuredb. Date and #ause o death

    ". #laimants relationship

    d. Death "ertii"ate

    e. Deeds o assi&nment

  • 8/9/2019 Contract Construction Management-130420145229-phpapp02

    9/23

    C. In case of unnatural death: accident suicide orunknown cause etc

    a0 Poli"e in*uest report

    b0 Pan"hanama

    "0 Post mortem report

    d0 #hemi"al e)amination report

    !. "nder the Indian #$idence Act a person is presumed to%e dead if he is disappeared for & years

    3pon the death o the lie insured the amount is pa%ableto the nominee &iven in the proposal orm

  • 8/9/2019 Contract Construction Management-130420145229-phpapp02

    10/23

    Some poli"ies entitled or the survival beneit beorethe e)pir% o the ull term o the poli"%

    Settlement is easier than maturit% "laim

    !nsurer sends advan"e intimation and the dis"har&evou"her whi"h is returned with ne"essar% do"uments

    a. Proo o identit%

    b. /ri&inal poli"%". Do"ument o assi&nment

  • 8/9/2019 Contract Construction Management-130420145229-phpapp02

    11/23

    4. The poli"% holder or the benei"iar% "alls up the insurer

    "laimin& the insuran"e as1in& about all the minute detailso the pro"ess o "laimin& the same alon& with thedo"uments re*uired

    5. The insuran"e "ompan% as1s or the details o the loss andthe relevant do"uments in support o the #laim

    6. $ noti"e has to be issued b% the poli"% holder or "laimin&the same with utmost ur&en"% mentionin& all the possibledetails 2namel%- name o the poli"% holder- names o thepersons asso"iated with the a""ident- witness parti"ulars-their addresses- et".0

  • 8/9/2019 Contract Construction Management-130420145229-phpapp02

    12/23

    7. The insuran"e "ompan% would ma1e all the possible *ueriesand inspe"tions b% the "ompan% representatives or "onsultants

    8. The% have the ri&ht to inspe"t all the relevant propertiesrelated with the loss alon& with poli"e verii"ations anddetermination o the poli"% holder9s liabilit% stru"ture

    . The pro"essin& period is mentioned in the "ontra"t do"ument-whi"h is the appro)imate time re*uired or verii"ation o the&enuineness o the !nsuran"e #laim

    ;. /n a&reement o "laim amount between the insured and the

    insurer- the "laim is settled

    #laim orm

  • 8/9/2019 Contract Construction Management-130420145229-phpapp02

    13/23

    $s per !RD$- !nsuran"e "ompan% is re*uired to settle a "laim within 6a. Survival up to end o the poli"% term, maturit% "laim

    b. Survival up to a spe"iied period durin& the term >survival beneits "laim

    ". Death o the lie assured durin& the term > death"laims

    !nsuran"e "laim mana&ement is a "ore issue or theprote"tion o insuran"e poli"%holders

  • 8/9/2019 Contract Construction Management-130420145229-phpapp02

    18/23

    #ompleted proposal orm pla%s an important role asit ae"ts the "laims under poli"%

    !t has been observed that all the !nsuran"e #laimsare not &enuine and are raudulent in nature0 So-

    ever% !nsuran"e #laim is needed to be pro"essed b%the insurer beore approval in order to avoid

    insuran"e raud

    Need or enhan"ed ei"ien"%- transparen"% anddis"losure o inormation to poli"%holders durin& the

    "laim mana&ement pro"ess

  • 8/9/2019 Contract Construction Management-130420145229-phpapp02

    19/23

  • 8/9/2019 Contract Construction Management-130420145229-phpapp02

    20/23

    ?r0 Devinderpal Sin&h- a resident o @amalpur- had ta1en a ?edi"laimpoli"% rom the "ompan% or his 4

  • 8/9/2019 Contract Construction Management-130420145229-phpapp02

    21/23

    The "ompan% urther stated that Dr Tarsem al 'upta who wasreerred the "ase or the medi"al opinion- said Raja was suerin&rom pre,e)istin& disease at the time o ta1in& the insuran"e poli"%

    and as the "laim ell within the exclusion clause No. 401 o thepoli"%0 The "ompan% maintained that the "laim was ri&htl%repudiated

    The orum observed- !t appears as i the ather o Raja had1nowled&e o the disease and as su"h he too1 the poli"% to meet the

    e)penses o the treatment0 The orum stated that the disease waspre-existingandwas not covered under the policy0 The orumurther added that the "ompan% had intimated the "omplainant thatthe "laim lod&ed was "onsidered as 9no "laim9 as per the rules o thepoli"%0 The orum held that there was a "lear dei"ien"% on the part othe "ompan% or not intimatin& the "omplainant

    The Distri"t #onsumer Disputes and Redressal (orum in udhianadire"ted National !nsuran"e #ompan% to pa% Rs 8-

  • 8/9/2019 Contract Construction Management-130420145229-phpapp02

    22/23

  • 8/9/2019 Contract Construction Management-130420145229-phpapp02

    23/23