CONTENTS
COMPOSITION OF THE REPORT
SUMMARY REPORT (English Version, Japanese Version)
MAIN REPORT (English Version, Japanese Version)
APPENDIXES (English Version)
GUIDELINE FOR LAND CONSOLIDATION (English Version, Myanmar Version)
APPENDIX I IMPLEMENTATION ARRANGEMENT OF THE SURVEY .............. I
I.1 JICA Team Members and Counterpart Personnel. ........................................................... I-1-1
I.2 Person-Month Input for the Study. ................................................................................... I-2-1
I.3 Record of Discussions for the Project .............................................................................. I-3-1
I.4 Minutes of Meetings Concluded in the Process of the Project ......................................... I-4-1
APPENDIX II IRRIGATION AND DRAINAGE ........................................................... II
II.1 Location Map of Irrigation Systems ............................................................................... II-1-1
II.1.1 Location Map of North Nawin Irrigation System .......................................................... II-1-1
II.1.2 Location Map of South Nawin Irrigation System .......................................................... II-1-2
II.1.3 Location Map of Wegyi Irrigation System ..................................................................... II-1-3
II.1.4 Location Map of Taung Nyo Irrigation System .............................................................. II-1-4
II.2 Examination on Irrigation Water Requirement for Paddy .............................................. II-2-1
II.2.1 Crop Water Requirement and Irrigation Demand in General ......................................... II-2-1
II.2.2 Review of Irrigation Demand ......................................................................................... II-2-2
II.2.3 Irrigation Demand for Irrigation System Rehabilitation ................................................ II-2-4
II.3 Schematic Diagram of Irrigation Systems ...................................................................... II-3-1
II.3.1 Link Canal Network between North and South Nwin Irrigation Systems ..................... II-3-1
II.3.2 Schematic Diagram of North Nawin Irrigation System ................................................. II-3-2
II.3.3 Schematic Diagram of South Nawin Irrigation System ................................................. II-3-3
II.3.4 Schematic Diagram of Wegyi Irrigation System ............................................................ II-3-4
II.3.5 Schematic Diagram of Taung Nyo Irrigation System..................................................... II-3-5
II.4 Discharge Capacity of Canals ........................................................................................ II-4-1
II.4.1 Discharge Capacity of North Nawin Irrigation System .................................................. II-4-1
II.4.2 Discharge Capacity of South Nawin Irrigation System .................................................. II-4-4
II.5 Rehabilitation Plan for Canals ........................................................................................ II-5-1
II.5.1 Rehabilitation Plan for Canals of North Nawin Irrigation System ................................. II-5-1
II.5.2 Rehabilitation Plan for Canals of South Nawin Irrigation System ................................. II-5-7
II.5.3 Location Map of Rehabilitation Canals .......................................................................... II-5-8
II.6 Discharge Capacity of Link Canal ................................................................................. II-6-1
II.6.1 Rink Canal Network ....................................................................................................... II-6-1
II.6.2 Result of Site Survey for DO-9(B) Canal ....................................................................... II-6-1
II.6.3 Hydraulic Calculation for DO-9(B) Canal ..................................................................... II-6-3
APPENDIX-I
IMPLEMENTATION ARRANGEMENT OF THE SURVEY
APPENDIX I: IMPLEMENTATION ARRANGEMENT OF THE SURVEY
TABLE OF CONTENTS
I.1 JICA Team Members and Counterpart Personnel. ........................................................... I-1-1 I.2 Person-Month Input for the Study. ................................................................................... I-2-1 I.3 Record of Discussions for the Project .............................................................................. I-3-1 I.4 Minutes of Meetings Concluded in the Process of the Project ......................................... I-4-1
Myanmar Project for Rehabilitation of Irrigation Systems
JICA I-1-1 ID
I.1 JICA TEAM MEMBERS AND COUNTERPART PERSONNEL
I.1.1 JICA TEAM MEMBERS
Mr. Kosei HASHIGUCHI Team Leader / Irrigation Project Planning
Mr. Motoyoshi HIKASA Co-leader / Irrigation Facilities Design1
Mr. Tsutomu SENDA Irrigation Facilities Design2
Mr. Yoji SAWADA Irrigation Facilities Design3
Mr. Itsuo KIHARA Irrigation Facilities Design4
Mr. Yoji SAWADA Construction Planning / Procurement
Mr. Mamoru SASA Small Hydroelectric Generation
Mr. Shin-ichi ARAI Equipment
Mr. Hironori TAKAHASHI Farmland Consolidation (Design)
Mr. Nobutoshi EGUCHI Farmland Consolidation (Monitoring)
Mr. Yoshinao ADACHI Farming System
Mr. Ken KOZAI Project Economic Analysis
Mr. Hideki ISHIKAWA Environment and Social Consideration1
Mr. Yoji SAWADA Project Cost Estimation
Mr. Nobutoshi EGUCHI Farmers’ Organization / Env. and Social Consideration2
I.1.2 COUNTERPART PERSONNEL
Irrigation Department (Head Office –Nay Pyi Taw-)
Mr. Kyaw Myint Hlaing Director General
Mr. Tint Zaw Deputy Director General
Mr. Tint Lwin Director of Procurement Branch
Mr..Tun Kyaw Soe Director of Mechanical Section
Mr. Soe Naing Deputy Director of Mechanical Section
Irrigation Department (Nay Pyi Taw Office)
Mr. Soe Tint Director
Mr. Saw Thet Khine Win Assistant Director
Irrigation Department (Yangon Office)
Mr. Zaw Win Chit Director of Inspection Branch
Mr. Minn Aung Than Director of Design Branch (1)
Mr. Hla Phone Maw Staff Officer of Design Branch (1)
Irrigation Department (Pyay Office)
Mr. Myint Htun Latt Director of Construction (2)
Mr. Ko Ko Htay Deputy Director of Construction (2)
Mr. Hla Win Myint Assistant Director (1) of Construction (2)
Mr. Aung Moe Win Assistant Director (3) of Construction (2)
Project for Rehabilitation of Irrigation Systems Myanmar
ID I-1-2 JICA
Mr. Soe Aung Deputy Director of Maintenance Division
Mr. Myint Thaung Assistant Director (Pyay District) of Maintenance Division
Mr. Tin Maung Wai Staff Officer of Construction (2)
Mr. Aung Kyaw Oo Staff Officer of Construction (2)
AMD (Head Office -Nay Pyi Taw-)
Mr. Soe Hlaing Director General
Mr. Aung Win Deputy Director of Research and Technology Section ion
(Project Manager)
Mr. Way Phyo Assistant Director of Director General Office
Mr. Zaw Zaw Htet Project Officer for PRIS
Ms. Ei Ei Khin Project Officer for 2KR Project
AMD (Bago West Region Office -Pyay-)
Mr. Wan Maung Deputy Director
Mr. Khin Mg Kyaw Assistance Director (Pyay District)
Mr. Aung Myo Lwin Oo Township Officer (Pyay Township),
Manager of No.30 Agricultural Mechanization Station)
Mr. Tin Ko Township Officer (Paukkhaung Township),
Manager of No. 58 Agricultural Mechanization Station)
Mr. Win Shwe Township Officer ( Nattalin Township),
Manager of No. 45 Agricultural Mechanization Station)
Mr. Kyaw Kyaw Soe Township Officer (Thegone Township)
Manager of No. 94 Agricultural Mechanization Station)
AMD (Nay Pyi Taw Office)
Mr. Kyaw Soe Deputy Director
Mr. Than Tun Aung Assistant Director
SLRD (Nay Pyi Taw Office)
Mr. Zaw Min Aung Deputy Director
Mr. Win Myint Oo Assistant Director
DOA (Nay Pyi Taw Office)
Mr. Saw Sein Win Deputy Director
Mr. Win Oo Assistant Director
Cooperative Department
Mr. Khin Mg Win Deputy Director
Nay Pyi Taw Council
Mr. Thein Nyunt Chairman (Minister)
Mr. Myint Swe Member (Deputer Minister)
Myanmar Project for Rehabilitation of Irrigation Systems
JICA I-1-3 ID
Irrigation Technology Center (ITC) (Head Office –Bago-)
Mr. Zaw Min Htut Director
Mr. Maung Maung Naing Assistant Director
Irrigation Technology Center (ITC) (Pyay Office)
Ms. Myint Myint Sein Staff Officer of Laboratory
Myanm
ar
P
roject for Rehabilitation of Irrigation System
s
JICA
I-2-1
ID
I.2 P
ER
SO
N-M
ON
TH
INP
UT
FO
R T
HE
PR
OJE
CT
Person-month Schedule: The Project for Rehabilitation of Irrigation Systems (PRIS)
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Myanmar Japan
Team Leader/Irrigation Project Planning
Kosei HASHIGUCHI Sanyu Consultants Inc.(15) (30) (9) (9)
2.10
Co-leader/Irrigation Facilities Design 1
Motoyoshi HIKASA Sanyu Consultants Inc.(97) (30) (38) (9)
5.80
Irrigation Facilities Design 2 Tsutomu SENDA Sanyu Consultants Inc.(30) (15) (30) (15)
3.00
Irrigation Facilities Design 3 Yoji SAWADA Sanyu Consultants Inc.(27) (33)
2.00
Irrigation Facilities Design 4 Itsuo KIHARA Sanyu Consultants Inc.(27) (15)
1.40
Construction Planning/Procurement
Yoji SAWADA Sanyu Consultants Inc.(60)
2.00
Small HydroelectricGeneration
Mamoru SASA Sanyu Consultants Inc.*1
(27) (33)2.00
Equipment Shin-ichi ARAI Sanyu Consultants Inc.(60) (30) (30)
4.00
Farmland Consolidation(Design)
Hironori TAKAHASHI Sanyu Consultants Inc.(45) (36)
2.70
Farmland Consolidation(Monitoring)
Nobutoshi EGUCHI Sanyu Consultants Inc.(30) (29)
1.97
Farming System Yoshinao ADACHI Sanyu Consultants Inc.(45)
1.50
Project Economic Analysis Ken KOZAI Sanyu Consultants Inc.(45)
1.50
Environment and SocialConsideration 1
Hideki ISHIKAWA Sanyu Consultants Inc.(60)
2.00
Project Cost Estimation Yoji SAWADA Sanyu Consultants Inc.(30) (45)
2.50
Farmers' Organization / Env.and Social Consideration 2
Nobutoshi EGUCHI Sanyu Consultants Inc.(30) (45) (46)
4.03
38.50
Team Leader/ IrrigationProject Planning
Kosei HASHIGUCHI Sanyu Consultants Inc.(3) (9)
0.40
Irrigation Facilities Design 1 Motoyoshi HIKASA Sanyu Consultants Inc.(6) (6) (18) (9)
1.30
Irrigation Facilities Design 2 Tsutomu SENDA Sanyu Consultants Inc.(15) (15) (30)
2.00
Equipment Shin-ichi ARAI Sanyu Consultants Inc.(15) (15)
1.00
Total 4.70
Total 38.50 4.70
Grand Total
in Myanmar *1: Associate (J-power)
in Japan
43.20
in M
yanm
arin
Jap
an
Reports
Major Activities
Expertise Name OrganizationPerson-month20142013
ICR
Preparatory WorkFirst Field Investigation
First Home Work in JapanDraft Project Plan & Implementation
Arrangement
Second Field InvestigationSecond Home Work in Japan
Draft Final Report Preparation & Presentation
Final Project Plan & Implementation Arrangement
PR DFRDraft Land
Consolidation Manual FR
Third Field InvestigationImplementation of Farmland Consolidation Preparation of Procurement for Machineries
Review of Design of NN and SN Irrigation Facilities
Myanmar Project for Rehabilitation of Irrigation Systems
JICA I-3-1 ID
I.3 RECORD OF DISCUSSIONS FOR THE PROJECT
Project for Rehabilitation of Irrigation Systems Myanmar
ID I-3-2 JICA
Myanmar Project for Rehabilitation of Irrigation Systems
JICA I-3-3 ID
Project for Rehabilitation of Irrigation Systems Myanmar
ID I-3-4 JICA
Myanmar Project for Rehabilitation of Irrigation Systems
JICA I-3-5 ID
Project for Rehabilitation of Irrigation Systems Myanmar
ID I-3-6 JICA
Myanmar Project for Rehabilitation of Irrigation Systems
JICA I-3-7 ID
Project for Rehabilitation of Irrigation Systems Myanmar
ID I-3-8 JICA
Myanmar Project for Rehabilitation of Irrigation Systems
JICA I-4-1 ID
I.4 MINUTES OF MEETINGS CONCLUDED IN THE PROCESS OF THE PROJECT
No. Title Page
1 Minutes of Meeting on Inception Report I-4-2
2 Minutes of Meeting on Progress Report I-4-9
3 Minutes of Meeting on Draft Final Report I-4-15
4 Minutes of Meeting on Draft Guidelines for Land Consolidation I-4-19
Project for Rehabilitation of Irrigation Systems Myanmar
ID I-4-2 JICA
Myanmar Project for Rehabilitation of Irrigation Systems
JICA I-4-3 ID
Project for Rehabilitation of Irrigation Systems Myanmar
ID I-4-4 JICA
Myanmar Project for Rehabilitation of Irrigation Systems
JICA I-4-5 ID
Project for Rehabilitation of Irrigation Systems Myanmar
ID I-4-6 JICA
Myanmar Project for Rehabilitation of Irrigation Systems
JICA I-4-7 ID
Project for Rehabilitation of Irrigation Systems Myanmar
ID I-4-8 JICA
Myanmar Project for Rehabilitation of Irrigation Systems
JICA I-4-9 ID
Project for Rehabilitation of Irrigation Systems Myanmar
ID I-4-10 JICA
Myanmar Project for Rehabilitation of Irrigation Systems
JICA I-4-11 ID
Project for Rehabilitation of Irrigation Systems Myanmar
ID I-4-12 JICA
Myanmar Project for Rehabilitation of Irrigation Systems
JICA I-4-13 ID
Project for Rehabilitation of Irrigation Systems Myanmar
ID I-4-14 JICA
Myanmar Project for Rehabilitation of Irrigation Systems
JICA I-4-15 ID
Project for Rehabilitation of Irrigation Systems Myanmar
ID I-4-16 JICA
Myanmar Project for Rehabilitation of Irrigation Systems
JICA I-4-17 ID
Project for Rehabilitation of Irrigation Systems Myanmar
ID I-4-18 JICA
Myanmar Project for Rehabilitation of Irrigation Systems
JICA I-4-19 ID
Project for Rehabilitation of Irrigation Systems Myanmar
ID I-4-20 JICA
Myanmar Project for Rehabilitation of Irrigation Systems
JICA I-4-21 ID
Project for Rehabilitation of Irrigation Systems Myanmar
ID I-4-22 JICA
Myanmar Project for Rehabilitation of Irrigation Systems
JICA I-4-23 ID