Dec 15, 2015
Contents1. Who are Actionair?
2. Fire Dampers
3. Smoke/Fire Dampers
4. Damper Standards & DW145
5. BS Codes of Practice, BRE Report & Approved Doc B
6. Why do we need to control & monitor dampers
7. What is an addressable System
8. Why use the Actionpac LNS3 System
9. Some reference sites
10. Recommendation
11. Conclusion
• Established in 1974
• Largest damper manufacturer in the UK
• Export to over 30 countries worldwide
• 1st intelligent system used in UK in 1986
Who are Actionair?
• “Curtain type” fire dampers do not prevent the spread of cold smoke due to their inability to trigger at < 72ºC
• When closed they are ineffective at stopping smoke
• Once installed these “Life Safety” devices are never tested
• Manual testing of even a small number of fire dampers is a prodigious task
• Future EU legislation will make testing mandatory
FACT: 75% of fire related fatalities are due to smoke inhalation
Fire Dampers
• Stop the spread of smoke and fire
• Can be used to extract smoke at 300 degrees C for 1 hour
• Many EU countries only permit smoke/fire dampers
• In Sweden they must be tested every 48 hours
Smoke/Fire Dampers
• Irish & UK practice has been to use fire dampers to BS476 Part 20 – Adhoc fire test not designed for dampers
• From 1st July 2011 only EN standards will be accepted, BS have already adopted these standards BS EN1366-2
• Anticipated from Nov 2009 a new HVCA guide, DW145 for the installation of fire and smoke dampers will replace the current standard DW144
• DW145 - small number of installation methods (no assessments)- safe access for future damper maintenance, operation and inspection - Witnessed handover register
Damper Standards& DW 145
• BS9999 - Code of Practice for Fire Safety Supersedes previous publications since 6th April 2009
• Maintenance of fire smoke dampers and their controls, is of paramount importance both in preventing fire and ensuring that measures taken to mitigate its consequences are effective when needed.
• Weekly - Smoke Control Systems used for means of escape. Actuation of the system should be simulated once a week.
• Three-monthly - The actuation of all smoke control systems should be simulated once every three months.
BS Codes of Practice
• 5 off curtain type fire dampers from different manufacturers were tested in an as installed environment
• 500 kW fire with fan running - average time to close 6min 46s
• 300 kW fire with fan running - average time to close 9min 11s
• 500 kW fire with fan off after 2 min - none closed!
BRE (Building ResearchEstablishment) - Test 2005
• Fire dampers activated only by fusible links are not suitable for protecting escape routes. Smoke/fire dampers to EN 1366-2 class ES activated by a suitable smoke/fire detection system may be used.
• Where a building involves a sleeping risk, such as an hotel or care home, fire dampers should be actuated by smoke detection as well a fusible link.
• Fire & smoke/fire dampers should be manufactured to meet the fire test requirements of BS EN 1366-2.
Approved Doc B - BuildingRegulations - Jan 2007
Why do we need to control & monitor dampers?
• In the UK last year there were 33,400 fires in non-domestic premises, leading to 27 deaths and over £1 billion worth of insured losses.
• Fire, smoke & smoke/fire dampers are all life safety critical and also protect the building fabric/contents therefore they must be controlled and monitored to ensure their reliable functionality.
• Automatic dampers will become the standard when European legislation demands regular testing of dampers.
• Fire Dampers are rarely, if ever, tested because manual testing of even a small number of fire dampers is a prodigious task.
Life Safety Dampers
17 die 62 hospitalised
Dusseldorf Airport 1996
• Life safety & protection of building fabric/contents
• Isolates fire zones & compartments
• Keeps escape routes & fire fighting access open
• Provides pressurisation & smoke extract by integrated
operation of dampers, AHU’s and fans
Addressable Systems
• Live graphical user interface (GUI)
• Cause & effect and damper details viewable at GUI
• Very user friendly
• Solid state technology – no moving parts
• Explanation of everything in simple text and all activity logged
• Accommodates multiple wiring configurations
• Open protocol – allows for support by others
• Allows for phased commissioning and future expansion
Benefits of intelligent system
• In built flexibility from tried and trusted standard software
• Multiple options for cause & effect scenarios, including three priority levels
• Accepts duct heat/smoke detectors straight into the damper interface
• Accommodates multiple damper interfaces (DI’s)
• System designed to cater for environmental occupancy as well as the building’s smoke/fire strategy.
• Optional remote access available
Benefits cont’d
PROJECT REFERENCE LOCATION
Longbridge House Belfast
Harold's Cross Hospice Dublin
Xerox Building 3,4 &5 Dublin
Temple Street Children's Hospital Dublin
Nenagh General Hospital Nenagh
Scotch Hall Shopping Centre Drogheda
Uxmouth Power Station UK
Aboyne Hospital Aberdeenshire
St James Hospital Dublin
Air Traffic Control Centre Dublin
James Connolly Memorial Hospital Dublin
Queen Elizabeth Hospital Manchester
Dalkeith Shopping Centre Bournemouth
Altnagelvin Hospital Derry
St Vincent's Hospital Dublin
Castlebar Courthouse Castlebar
PROJECT REFERENCE LOCATION
Trinity College Dublin
Whitfield Cancer Clinic Waterford
Stansted Airport London
Liverpool University Liverpool
Heartlands Hospital Birmingham
Windsor Office Development London
Microsoft European H.Q. Dublin
Microsoft EPDC-5 Dublin
Clare Exchange Belfast
Global Switch London
Kings Library London
Belfast City Hospital Belfast
Royal Aberdeen Children’s Hospital Aberdeen
Cumberland Hotel Wales
30 Gresham Street (office block) London
Charing Cross Hospital London
Victoria Square Belfast
Reference Sites
PROJECT REFERENCE LOCATION
Royal Gwent Hospital Wales
Smithfield Apts & Cinema Dublin
Neville Hall Hospital Scotland
Plot4 Gasworks Belfast
Rutland Gate London
Royal Free Hospital London
Air Traffic Control Shannon
James Street Apartments Dublin
Office of Public Works Dublin
Nine Wells Hospital Dundee
Dublin Airport Dublin
Customs House Belfast
Mid Western Regional Hospital Limerick
European Justice Court Luxembourg
PROJECT REFERENCE LOCATION
British Museum London
Aviva (Lansdowne Rd) Dublin
John Radcliffe Hospital UK
Finsbury Square (Office Block) London
Prince Philip Hospital Leeds
Musgrave Hospital Belfast
R.A.F. Mildenhall Suffolk
140 Aldersgate (Office Block) London
Queen Elizabeth Hospital Gateshead
Dexia Luxumberg
UCC Medical Nursing Cork
Royal Victory Hospital Belfast
Western Hospital Scotland
University Hospital Southhampton
Reference Sites continued…
Use Motorised Smoke/Fire Dampers activated by
smoke in conjunction with a dedicated Intelligent
Control & Monitoring System
Recommendations
Our Product Range:
Who are Actionair?
• Smoke Shield
• Fire Shield
• Air Shield
• Energy Shield
• Vent Shield
• Hot Shield
THINK SMOKE NOT FIRE - ADOPT BEST PRACTICE