  • 7/29/2019 Content List Civil Structure

    1/26

    DOCUMENT No.

    I. Final Inspection 4030/AFI/31/CV/135 A

    II. Punch List 008/PF-NPU/PN/2009

    III. Preparation Work

    III.1. Material Inspection

    - Checker Plate 4030/AFI/31/CV/105

    III.2. Inspeksi Bersama Bore Pile Tk. 1 s/d Tk. 4 05-Area 31

    IV. Bore Pile

    IV. 1. Pouring Concrete Tk. 4 4030/AFI/31/CV/022

    - Compression Strength Test Tk. 4 (Age 7 day) 4030/AFI/31/CV/036

    - Compression Strength Test Tk. 4 (Age 14 day) 4030/AFI/31/CV/047

    - Compression Strength Test Tk. 4 (Age 28 day) 4030/AFI/31/CV/073

    IV. 2. Pouring Concrete Tk. 2 4030/AFI/31/CV/023

    - Compression Strength Test Tk. 2 (Age 7 day) 4030/AFI/31/CV/038

    - Compression Strength Test Tk. 2 (Age 14 day) 4030/AFI/31/CV/052

    - Compression Strength Test Tk. 2 (Age 27 day) 4030/AFI/31/CV/074

    IV. 3. Pouring Concrete Tk. 1 4030/AFI/31/CV/025

    - Compression Strength Test Tk. 1 (Age 7 day) 4030/AFI/31/CV/040

    - Compression Strength Test Tk. 1 (Age 14 day) 4030/AFI/31/CV/053

    - Compression Strength Test Tk. 1 (Age 29 day) 4030/AFI/31/CV/077

    IV. 4. Pouring Concrete Tk. 3 4030/AFI/31/CV/028

    - Compression Strength Test Tk. 3 (Age 7 day) 4030/AFI/31/CV/044

    - Compression Strength Test Tk. 3 (Age 14 day) 4030/AFI/31/CV/056

    - Compression Strength Test Tk. 3 (Age 28 day) 4030/AFI/31/CV/083

    V. Foundation

    V.1. Lean Concrete 4030/AFI/31/CV/042

    V. 2. Pouring Concrete (Footing Foundation) 4030/AFI/31/CV/046

    - Compression Strength Test (Footing Foundation) (Age 7 day) 4030/AFI/31/CV/059

    - Compression Strength Test (Footing Foundation) (Age 14 day) 4030/AFI/31/CV/075

    - Compression Strength Test (Footing Foundation) (Age 28 day) 4030/AFI/31/CV/100

    V. 3. Pouring Concrete (Column & Beam Elev. + 6900) 4030/AFI/31/CV/082

    - Compression Strength Test (Column & Beam Elev. + 6900) (Age 7 day) 4030/AFI/31/CV/099

    - Compression Strength Test (Column & Beam Elev. + 6900) (Age 14 day) 4030/AFI/31/CV/109

    - Compression Strength Test (Column & Beam Elev. + 6900) (Age 28 day) 4030/AFI/31/CV/127

    V. 4. Pouring Concrete (Column Elev. + 6900 to Elev. + 8200) 4030/AFI/31/CV/098

    - Compression Strength Test (Column Elev. +6900 to Elev. +8200) (Age 7 day) 4030/AFI/31/CV/108- Compression Strength Test (Column Elev. +6900 to Elev. +8200) (Age 14 day) 4030/AFI/31/CV/120

    - Compression Strength Test (Column Elev. +6900 to Elev. +8200) (Age 28 day) 4030/AFI/31/CV/134

    Mechanical Completion Facilities as Per Discrete Unit

    PROYEK :

    EPC PROYEK PENINGKATAN FLEKSIBILITAS OPERASI NPU RU-VI

    BALONGAN

    CONTAIN LIST OF CIVIL STRUCTURE 31-E-113

    Konsorsium KE - SBS

    REMARKSDOCUMENTS

    Page 1 of 26

  • 7/29/2019 Content List Civil Structure

    2/26

    DOCUMENT No.

    PROYEK :

    EPC PROYEK PENINGKATAN FLEKSIBILITAS OPERASI NPU RU-VI

    BALONGAN

    CONTAIN LIST OF CIVIL STRUCTURE 31-E-113

    Konsorsium KE - SBS

    REMARKSDOCUMENTS

    V. 5. Anchor Bolt Installation 4030/AFI/31/CV/095

    V. 6. Padding Installation 4030/AFI/31/CV/176

    V. 7. Grouting Inspection 4030/AFI/31/CV/208

    VI. Steel Structure

    VI.1. Steel Frame Structure ( Dimensional and Measurement ) 4030/AFI/31/CV/096

    VI.2. Painting Inspection 4030/AFI/31/CV/114 A

    Page 2 of 26

  • 7/29/2019 Content List Civil Structure

    3/26

    DOCUMENT No.

    I. Final Inspection 4030/AFI/31/CV/135 D

    II. Punch List 003/PF-NPU/PN/2009

    III. Preparation Work

    III. 1. Material Inspection

    - Anchor Bolt 4030/AFI/31/CV/082 A

    III. 2. Inspection Manual Digging Tk. 19 s/d Tk. 24 02-Area 31

    III. 3. Inspeksi Bersama Titik Pile Tk. 19 s/d Tk. 24 10-Area 31

    IV. Pilling ( Hydrolic Pile Injection )

    IV.1. Pile No. 19 10 B-Area 31

    IV.2. Pile No. 20 10 B-Area 31

    IV.3. Pile No. 21 10 B-Area 31

    IV.4. Pile No. 22 12 B-Area 31

    IV.5. Pile No. 23 12 B-Area 31

    IV.6. Pile No. 24 12 B-Area 31

    V. Foundation

    V.1. Lean Concrete 4030/AFI/31/CV/032

    V. 2. Pouring Concrete (Footing Foundation) 4030/AFI/31/CV/063- Compression Strength Test (Footing Foundation) (Age 7 day) 4030/AFI/31/CV/078

    - Compression Strength Test (Footing Foundation) (Age 14 day) 4030/AFI/31/CV/091

    - Compression Strength Test (Footing Foundation) (Age 28 day) 4030/AFI/31/CV/118

    V. 3. Pouring Concrete (Column & Beam ) 4030/AFI/31/CV/086

    - Compression Strength Test (Column & Beam ) (Age 7 day) 4030/AFI/31/CV/103

    - Compression Strength Test (Column & Beam ) (Age 14 day) 4030/AFI/31/CV/115

    - Compression Strength Test (Column & Beam ) (Age 28 day) 4030/AFI/31/CV/130

    V.4. Anchor Bolt Installation 4030/AFI/31/CV/093

    V.5. Padding Installation 4030/AFI/31/CV/183

    V. 6. Grouting Inspection 4030/AFI/31/CV/216

    VI. Steel Structure

    VI.1. Dimensional and Painting Inspection 4030/AFI/31/CV/223 C

    CONTAIN LIST OF CIVIL STRUCTURE 31-E-111 A

    DOCUMENTS

    Mechanical Completion Facilities as Per Discrete Unit

    REMARKS

    PROYEK :

    EPC PROYEK PENINGKATAN FLEKSIBILITAS OPERASI NPU RU-

    VI BALONGANKonsorsium KE - SBS

    Page 3 of 26

  • 7/29/2019 Content List Civil Structure

    4/26

    DOCUMENT No.

    I. Final Inspection 4030/AFI/31/CV/135 C

    II. Punch List 002/PF-NPU/PN/2009

    III. Preparation Work

    III. 1. Inspection Manual Digging Tk. 13 s/d Tk. 15 03-Area 31

    III. 2. Inspection Manual Digging Tk. 16 s/d Tk. 18 07-Area 31

    III. 3. Inspeksi Bersama Titik Pile Tk. 13 s/d Tk. 15 09-Area 31

    III. 4. Inspeksi Bersama Titik Pile Tk. 16 s/d Tk. 18 11-Area 31

    IV. Pilling ( Hydrolic Pile Injection )

    IV.1. Pile No. 13 14 A-Area 31

    IV.2. Pile No. 14 14 A-Area 31

    IV.3. Pile No. 15 14 A-Area 31

    IV.4. Pile No. 16 12 C-Area 31

    IV.5. Pile No. 17 12 C-Area 31

    IV.6. Pile No. 18 12 C-Area 31

    V. Foundation

    V.1. Lean Concrete 4030/AFI/31/CV/033

    V. 2. Pouring Concrete (Footing Foundation) 4030/AFI/31/CV/064

    - Compression Strength Test (Footing Foundation) (Age 7 day) 4030/AFI/31/CV/079

    - Compression Strength Test (Footing Foundation) (Age 14 day) 4030/AFI/31/CV/092

    - Compression Strength Test (Footing Foundation) (Age 28 day) 4030/AFI/31/CV/119

    V. 3. Pouring Concrete (Column & Beam ) 4030/AFI/31/CV/087

    - Compression Strength Test (Column & Beam ) (Age 7 day) 4030/AFI/31/CV/104

    - Compression Strength Test (Column & Beam ) (Age 14 day) 4030/AFI/31/CV/116

    - Compression Strength Test (Column & Beam ) (Age 28 day) 4030/AFI/31/CV/131

    V.4. Anchor Bolt Installation 4030/AFI/31/CV/094

    V.5. Padding Installation 4030/AFI/31/CV/184

    V.6. Grouting Inspection 4030/AFI/31/CV/209

    VI. Steel Structure

    VI.1. Dimensional and Painting Inspection 4030/AFI/31/CV/223 D

    REMARKS

    EPC PROYEK PENINGKATAN FLEKSIBILITAS OPERASI NPU RU-

    VI BALONGAN

    CONTAIN LIST OF CIVIL STRUCTURE 31-E-111 B

    DOCUMENTS

    Mechanical Completion Facilities as Per Discrete Unit

    PROYEK :

    Konsorsium KE - SBS

    Page 4 of 26

  • 7/29/2019 Content List Civil Structure

    5/26

    DOCUMENT No

    I. Final Inspection 4030/AFI/31/CV/2

    II. Punch List N/A

    III. Preparation Work

    III. 1. Inspection Manual Digging Tk. 35 s/d Tk. 36 4030/AFI/31/CV/

    IV. Bore PileIV. 1. Pouring Concrete Tk. 35 4030/AFI/31/CV/

    - Compression Strength Test Tk. 35 (Age 7 day) 4030/AFI/31/CV/

    - Compression Strength Test Tk. 35 (Age 14 day) 4030/AFI/31/CV/

    - Compression Strength Test Tk. 35 (Age 28 day) 4030/AFI/31/CV/

    IV. 2. Pouring Concrete Tk. 36 4030/AFI/31/CV/

    - Compression Strength Test Tk. 36 (Age 7 day) 4030/AFI/31/CV/

    - Compression Strength Test Tk. 36 (Age 14 day) 4030/AFI/31/CV/

    - Compression Strength Test Tk. 36 (Age 27 day) 4030/AFI/31/CV/

    V. Foundation

    V.1. Lean Concrete 4030/AFI/31/CV/

    V. 2. Pouring Concrete (Footing Foundation) 4030/AFI/31/CV/

    - Compression Strength Test (Footing Foundation) (Age 7 day) 4030/AFI/31/CV/

    - Compression Strength Test (Footing Foundation) (Age 14 day) 4030/AFI/31/CV/

    - Compression Strength Test (Footing Foundation) (Age 28 day) 4030/AFI/31/CV/

    V.3. Padding Installation 4030/AFI/31/CV/

    V.4. Grouting Inspection 4030/AFI/31/CV/

    PROYEK :

    EPC PROYEK PENINGKATAN FLEKSIBILITAS OPERASI NPU RU-VI

    BALONGAN

    CONTAIN LIST OF CIVIL STRUCTURE 31-P-113 A/B

    Konsorsium KE - SBS

    DOCUMENTS

    Mechanical Completion Facilities as Per Discrete Unit

  • 7/29/2019 Content List Civil Structure

    6/26

    DOCUMENT No.

    I. Final Inspection 4030/AFI/31/CV/23

    II. Punch List N/A

    III. Preparation Work

    III. 1. Inspection Manual Digging Tk. 31 s/d Tk. 34 4030/AFI/31/CV/0

    IV. Bore Pile

    IV. 1. Pouring Concrete Tk. 32 4030/AFI/31/CV/0

    - Compression Strength Test Tk. 32 (Age 7 day) 4030/AFI/31/CV/0

    - Compression Strength Test Tk. 32 (Age 14 day) 4030/AFI/31/CV/0

    - Compression Strength Test Tk. 32 (Age 28 day) 4030/AFI/31/CV/0

    IV. 2. Pouring Concrete Tk. 31 4030/AFI/31/CV/0

    - Compression Strength Test Tk. 31 (Age 7 day) 4030/AFI/31/CV/0

    - Compression Strength Test Tk. 31 (Age 14 day) 4030/AFI/31/CV/0

    - Compression Strength Test Tk. 31 (Age 27 day) 4030/AFI/31/CV/0

    IV. 3. Pouring Concrete Tk. 34 4030/AFI/31/CV/0

    - Compression Strength Test Tk. 34 (Age 7 day) 4030/AFI/31/CV/0

    - Compression Strength Test Tk. 34 (Age 14 day) 4030/AFI/31/CV/0

    - Compression Strength Test Tk. 34 (Age 27 day) 4030/AFI/31/CV/0

    IV. 4. Pouring Concrete Tk. 33 4030/AFI/31/CV/0

    - Compression Strength Test Tk. 33 (Age 7 day) 4030/AFI/31/CV/0

    - Compression Strength Test Tk. 33 (Age 14 day) 4030/AFI/31/CV/0

    - Compression Strength Test Tk. 33 (Age 27 day) 4030/AFI/31/CV/0

    V. Foundation

    V.1. Lean Concrete 4030/AFI/31/CV/0

    V. 2. Pouring Concrete (Footing Foundation) 4030/AFI/31/CV/0

    - Compression Strength Test (Footing Foundation) (Age 7 day) 4030/AFI/31/CV/0

    - Compression Strength Test (Footing Foundation) (Age 14 day) 4030/AFI/31/CV/0

    - Compression Strength Test (Footing Foundation) (Age 28 day) 4030/AFI/31/CV/1

    V.3. Padding Installation 4030/AFI/31/CV/2

    V.4. Grouting Inspection 4030/AFI/31/CV/2

    PROYEK :

    EPC PROYEK PENINGKATAN FLEKSIBILITAS OPERASI NPU RU-VI

    BALONGAN

    CONTAIN LIST OF CIVIL STRUCTURE 31-P-112 A/B

    Konsorsium KE - SBS

    DOCUMENTS

    Mechanical Completion Facilities as Per Discrete Unit

  • 7/29/2019 Content List Civil Structure

    7/26

  • 7/29/2019 Content List Civil Structure

    8/26

    DOCUMENT No.

    I. Final Inspection 4030/AFI/31/CV/135 B

    II. Punch List 004/PF-NPU/PN/2009

    III. Preparation Work

    III. 1. Inspection Manual Digging Tk. 5 s/d Tk. 12 01-Area 31

    III. 2. Inspeksi Bersama Titik Pile Tk. 5 s/d Tk. 12 08 A-Area 31

    IV. Pilling ( Hydrolic Pile Injection )IV.1. Pile No. 5 08 C-Area 31

    IV.2. Pile No. 6 08 B-Area 31

    IV.3. Pile No. 7 10 A-Area 31

    IV.4. Pile No. 8 10 A-Area 31

    IV.5. Pile No. 9 10 A-Area 31

    IV.6. Pile No. 10 10 A-Area 31

    IV.7. Pile No. 11 08 C-Area 31

    IV.8. Pile No. 12 08 C-Area 31

    V. Foundation

    V.1. Lean Concrete 4030/AFI/31/CV/030

    V. 2. Pouring Concrete (Footing Foundation) 4030/AFI/31/CV/051

    - Compression Strength Test (Footing Foundation) (Age 7 day) 4030/AFI/31/CV/060

    - Compression Strength Test (Footing Foundation) (Age 14 day) 4030/AFI/31/CV/076

    - Compression Strength Test (Footing Foundation) (Age 28 day) 4030/AFI/31/CV/101

    V. 3. Pouring Concrete (Slab Elev. + 4000) 4030/AFI/31/CV/112

    - Compression Strength Test (Slab Elev. + 4000) (Age 7 day) 4030/AFI/31/CV/125

    - Compression Strength Test (Slab Elev. + 4000) (Age 14 day) 4030/AFI/31/CV/133

    - Compression Strength Test (Slab Elev. + 4000) (Age 28 day) 4030/AFI/31/CV/141

    V. 4. Pouring Concrete (Ring Pedestal Elev. + 5300) 4030/AFI/31/CV/123

    - Compression Strength Test (Ring Pedestal Elev. + 5300) (Age 7 day) 4030/AFI/31/CV/129- Compression Strength Test (Ring Pedestal Elev. + 5300) (Age 14 day) 4030/AFI/31/CV/136

    - Compression Strength Test (Ring Pedestal Elev. + 5300) (Age 28 day) 4030/AFI/31/CV/148

    V. 5. Anchor Bolt Installation 4030/AFI/31/CV/106

    V. 6. Padding Installation 4030/AFI/31/CV/195

    4030/AFI/31/CV/213 A

    V. 7. Grouting Inspection 4030/AFI/31/CV/215

    V. 8. Fire Proofing Inspection 4030/AFI/31/CV/225

    VI. Steel Structure

    VI.1. Dimensional and Painting Inspection 4030/AFI/31/CV/223 B

    PROYEK :

    EPC PROYEK PENINGKATAN FLEKSIBILITAS OPERASI NPU RU-VI BALONGAN

    CONTAIN LIST OF CIVIL STRUCTURE 31-C-104

    Konsorsium KE - SBS

    DOCUMENTS

    Mechanical Completion Facilities as Per Discrete Unit

    REMA

    Page 8 of 26

  • 7/29/2019 Content List Civil Structure

    9/26

    KS

    Page 9 of 26

  • 7/29/2019 Content List Civil Structure

    10/26

    DOCUMENT No.

    I. Punch List 007/PF-NPU/PN/2009

    II. Preparation Work

    II.1. Welder Test PT. Purba Karya Baja (for AWS D1.1 Plat A 36 Posisi 3 G) 4030/AFI/31/L/014

    II.2. Material Inspection

    - Material Inspection For Steel Structure 4030/AFI/31/CV/150 A

    II.3. Material Inspection

    - Chemical Bolt 4030/AFI/31/CV/197

    II.4. Material Inspection

    - Material Fire Proofing 4030/AFI/31/CV/219

    III. Steel Structure

    III.1. Anchor Installation Inspection 4030/AFI/42/CV/201

    III.2. Anchor Installation Inspection 4030/AFI/42/CV/207

    III.3. Fire Proofing Inspection 4030/AFI/42/CV/220

    III.4. Dimensional and Painting Inspection 4030/AFI/42/CV/223 A

    REMARKSDOCUMENTS

    Mechanical Completion Facilities as Per Discrete Unit

    Konsorsium KE - SBS

    PROYEK :

    EPC PROYEK PENINGKATAN FLEKSIBILITAS OPERASI NPU RU-VI

    BALONGAN

    CONTAIN LIST OF CIVIL STRUCTURE 31-E-112

    Page 10 of 26

  • 7/29/2019 Content List Civil Structure

    11/26

    DOCUMENT No.

    I. Final Inspection 4030/AFI/31/CV/211 A

    II. Punch List 006/PF-NPU/PN/2009

    III. Preparation Work

    III. 1. Material Inspection

    - Rebar D 10 (P) ; Rebar D 13 (S) ; Rebar D 16 (S) 4030/AFI/31/CV/138

    III.2. Material Inspection

    - Anchor Bolt (400 x dia. 24) mm 4030/AFI/31/CV/173

    III.3. Inspection Manual Digging Tk. 39, Tk. 40, Tk. 42 4030/AFI/31/CV/139

    III.4. Inspection Manual Digging Tk. 41, Tk. 43 , Tk. 44, Tk. 45, Tk. 46 4030/AFI/31/CV/140

    IV. Bore Pile

    IV. 1. Pouring Concrete Tk. 39 4030/AFI/31/CV/143

    - Compression Strength Test Tk. 39 (Age 7 day) 4030/AFI/31/CV/152

    - Compression Strength Test Tk. 39 (Age 14 day) 4030/AFI/31/CV/164

    - Compression Strength Test Tk. 39 (Age 28 day) 4030/AFI/31/CV/186

    IV. 2. Pouring Concrete Tk. 40 4030/AFI/31/CV/145

    - Compression Strength Test Tk. 40 (Age 7 day) 4030/AFI/31/CV/155

    - Compression Strength Test Tk. 40 (Age 14 day) 4030/AFI/31/CV/172

    - Compression Strength Test Tk. 40 (Age 27 day) 4030/AFI/31/CV/187

    IV. 3. Pouring Concrete Tk. 41 4030/AFI/31/CV/146

    - Compression Strength Test Tk. 41 (Age 7 day) 4030/AFI/31/CV/157

    - Compression Strength Test Tk. 41 (Age 14 day) 4030/AFI/31/CV/174

    - Compression Strength Test Tk. 41 (Age 29 day) 4030/AFI/31/CV/185

    IV. 4. Pouring Concrete Tk. 42 4030/AFI/31/CV/150

    - Compression Strength Test Tk. 42 (Age 7 day) 4030/AFI/31/CV/158

    - Compression Strength Test Tk. 42 (Age 14 day) 4030/AFI/31/CV/177

    - Compression Strength Test Tk. 42 (Age 28 day) 4030/AFI/31/CV/188

    IV. 5. Pouring Concrete Tk. 44 4030/AFI/31/CV/151

    - Compression Strength Test Tk. 44 (Age 7 day) 4030/AFI/31/CV/163

    - Compression Strength Test Tk. 44 (Age 14 day) 4030/AFI/31/CV/179

    - Compression Strength Test Tk. 44 (Age 28 day) 4030/AFI/31/CV/189

    IV. 6. Pouring Concrete Tk. 43 4030/AFI/31/CV/153

    - Compression Strength Test Tk. 43 (Age 7 day) 4030/AFI/31/CV/169

    - Compression Strength Test Tk. 43 (Age 14 day) 4030/AFI/31/CV/180

    - Compression Strength Test Tk. 43 (Age 28 day) 4030/AFI/31/CV/191

    IV. 7. Pouring Concrete Tk. 46 4030/AFI/31/CV/154

    - Compression Strength Test Tk. 46 (Age 7 day) 4030/AFI/31/CV/171

    - Compression Strength Test Tk. 46 (Age 14 day) 4030/AFI/31/CV/181

    - Compression Strength Test Tk. 46 (Age 28 day) 4030/AFI/31/CV/192

    PROYEK :

    EPC PROYEK PENINGKATAN FLEKSIBILITAS OPERASI NPU RU-VI

    BALONGAN

    CONTAIN LIST OF CIVIL STRUCTURE East Pipe Rack

    DOCUMENTS

    Konsorsium KE - SBS

    Mechanical Completion Facilities as Per Discrete Unit

    REMA

    Page 11 of 26

  • 7/29/2019 Content List Civil Structure

    12/26

    DOCUMENT No.

    PROYEK :

    EPC PROYEK PENINGKATAN FLEKSIBILITAS OPERASI NPU RU-VI

    BALONGAN

    CONTAIN LIST OF CIVIL STRUCTURE East Pipe Rack

    DOCUMENTS

    Konsorsium KE - SBS

    REMA

    IV. 8. Pouring Concrete Tk. 45 4030/AFI/31/CV/156

    - Compression Strength Test Tk. 45 (Age 7 day) 4030/AFI/31/CV/175

    - Compression Strength Test Tk. 45 (Age 14 day) 4030/AFI/31/CV/182

    - Compression Strength Test Tk. 45 (Age 28 day) 4030/AFI/31/CV/194

    V. Foundation

    V.1. Lean Concrete

    - Lean Concrete Tk. 39 4030/AFI/31/CV/159

    - Lean Concrete Tk. 40 4030/AFI/31/CV/160

    - Lean Concrete Tk. 41 4030/AFI/31/CV/161

    - Lean Concrete Tk. 42 4030/AFI/31/CV/162

    - Lean Concrete Tk. 43 4030/AFI/31/CV/165

    - Lean Concrete Tk. 44 4030/AFI/31/CV/166

    - Lean Concrete Tk. 45 4030/AFI/31/CV/167

    - Lean Concrete Tk. 46 4030/AFI/31/CV/168

    V. 2. Pouring Concrete Tk.39-Tk.44, Tk.46 (Footing Foundation) 4030/AFI/31/CV/170

    - Compression Strength Test Tk.39-Tk.42 (Footing Foundation) (Age 7 day) 4030/AFI/31/CV/193

    - Compression Strength Test Tk.43-Tk.46 (Footing Foundation) (Age 7 day) 4030/AFI/31/CV/196

    - Compression Strength Test Tk.39-Tk.42 (Footing Foundation) (Age 14 day) 4030/AFI/31/CV/199

    - Compression Strength Test Tk.43-Tk.46 (Footing Foundation) (Age 14 day) 4030/AFI/31/CV/200

    - Compression Strength Test Tk.39-Tk.42 (Footing Foundation) (Age 28 day) 4030/AFI/31/CV/205

    - Compression Strength Test Tk.43-Tk.46 (Footing Foundation) (Age 28 day) 4030/AFI/31/CV/206

    V. 3. Pouring Concrete Tk. 45 (Footing Foundation) 4030/AFI/31/CV/198

    - Compression Strength Test Tk. 45 (Footing Foundation) (Age 7 day) 4030/AFI/31/CV/203

    - Compression Strength Test Tk. 45 (Footing Foundation) (Age 14 day) 4030/AFI/31/CV/204

    - Compression Strength Test Tk. 45 (Footing Foundation) (Age 28 day) 4030/AFI/31/CV/211

    V. 4. Padding Installation 4030/AFI/31/CV/214

    V. 5. Grouting Inspection 4030/AFI/31/CV/221

    VI. Steel Structure

    VI.1. Dimensional and Painting Inspection 4030/AFI/31/CV/223 E

    Page 12 of 26

  • 7/29/2019 Content List Civil Structure

    13/26

    KS

    Page 13 of 26

  • 7/29/2019 Content List Civil Structure

    14/26

    KS

    Page 14 of 26

  • 7/29/2019 Content List Civil Structure

    15/26

    DOCUMENT No.

    I. Preparation Work

    I. 1. Material Inspection

    - Pipa Bertulang kelas B 01 - Area 31

    I.2. Manual Digging at Crossing Road 14 4030/AFI/31/CV/005

    I.3. Back Fill ( Sub Grade ) 4030/AFI/31/CV/019

    - CBR Test 4030/AFI/31/CV/018

    I.4. Back Fill ( Sub Base Course ) 4030/AFI/31/CV/024- CBR Test 4030/AFI/31/CV/025

    I.5. Back Fill ( Base Course ) 4030/AFI/31/CV/020

    - CBR Test 4030/AFI/31/CV/028

    I.6. Asphalt Inspection 4030/AFI/31/CV/029

    II. Pouring Concrete

    II.1. Pouring Concrete Open Ditch Road 14 03 - Area 31

    - Compression Strength Test Open Ditch Road 14 (Age 7 day) 04 - Area 31

    - Compression Strength Test Open Ditch Road 14 (Age 14 day) 4030/AFI/31/CV/006

    - Compression Strength Test Open Ditch Road 14 (Age 28 day) 4030/AFI/31/CV/007

    II.2. Pouring Concrete Cable Protection ( Instrument & Cable Optic ) 4030/AFI/31/CV/008

    - Compression Strength Test Cable Protect ion ( Instrument & Cable Optic ) (Age 7 day) 4030/AFI/31/CV/010

    - Compression Strength Test Cable Protection ( Instrument & Cable Optic ) (Age 14 day) 4030/AFI/31/CV/013

    - Compression Strength Test Cable Protection ( Instrument & Cable Optic ) (Age 28 day) 4030/AFI/31/CV/021

    II.3. Pouring Concrete New Drainage & Cable Protection 4030/AFI/31/CV/009

    - Compression Strength Test New Drainage & Cable Protection (Age 7 day) 4030/AFI/31/CV/012

    - Compression Strength Test New Drainage & Cable Protection (Age 14 day) 4030/AFI/31/CV/015

    - Compression Strength Test New Drainage & Cable Protection (Age 28 day) 4030/AFI/31/CV/022

    II.4. Pouring Concrete New Drainage & Cable Protection ( Slab ) 4030/AFI/31/CV/011

    - Compression Strength Test New Drainage & Cable Protection ( Slab ) (Age 7 day) 4030/AFI/31/CV/014

    - Compression Strength Test New Drainage & Cable Protection ( Slab ) (Age 14 day) 4030/AFI/31/CV/017

    - Compression Strength Test New Drainage & Cable Protection ( Slab ) (Age 28 day) 4030/AFI/31/CV/026

    II.5. Pouring Concrete Talud 4030/AFI/31/CV/031

    - Compression Strength Test Talud (Age 7 day) 4030/AFI/31/CV/032

    - Compression Strength Test Talud (Age 14 day) 4030/AFI/31/CV/033

    - Compression Strength Test Talud (Age 28 day) 4030/AFI/31/CV/034

    II.6. Pouring Concrete Pavement 31-E-113 4030/AFI/31/CV/226

    - Compression Strength Test Pavement 31-E-113 (Age 7 day) 4030/AFI/31/CV/227

    - Compression Strength Test Pavement 31-E-113 (Age 14 day) 4030/AFI/31/CV/232

    - Compression Strength Test Pavement 31-E-113 (Age 28 day) 4030/AFI/31/CV/244

    Konsorsium KE - SBS

    DOCUMENTS

    Mechanical Completion Facilities as Per Discrete Unit

    REMA

    PROYEK :

    EPC PROYEK PENINGKATAN FLEKSIBILITAS OPERASI NPU RU-VI BALONGAN

    CONTAIN LIST OF CIVIL STRUCTURE (Civil Work Area-31)

    Page 15 of 26

  • 7/29/2019 Content List Civil Structure

    16/26

    DOCUMENT No.

    Konsorsium KE - SBS

    DOCUMENTS REMA

    PROYEK :

    EPC PROYEK PENINGKATAN FLEKSIBILITAS OPERASI NPU RU-VI BALONGAN

    CONTAIN LIST OF CIVIL STRUCTURE (Civil Work Area-31)

    II.7. Pouring Concrete Cable Trench 4030/AFI/31/CV/228- Compression Strength Test Cable Trench (Age 7 day) 4030/AFI/31/CV/235

    - Compression Strength Test Cable Trench (Age 14 day) 4030/AFI/31/CV/240

    - Compression Strength Test Cable Trench (Age 28 day) 4030/AFI/31/CV/250

    II.8. Pouring Concrete Cable Trench 4030/AFI/31/CV/231

    - Compression Strength Test Cable Trench (Age 7 day) 4030/AFI/31/CV/238

    - Compression Strength Test Cable Trench (Age 14 day) 4030/AFI/31/CV/241

    - Compression Strength Test Cable Trench (Age 28 day) 4030/AFI/31/CV/254

    II.9. Pouring Concrete Pavement 31-V-108 4030/AFI/31/CV/233

    - Compression Strength Test Pavement 31-V-108 (Age 7 day) 4030/AFI/31/CV/239 A

    - Compression Strength Test Pavement 31-V-108 (Age 14 day) 4030/AFI/31/CV/245- Compression Strength Test Pavement 31-V-108 (Age 28 day) 4030/AFI/31/CV/256

    II.10. Pouring Concrete Pipe Sleeper 4030/AFI/31/CV/239

    - Compression Strength Test Pipe Sleeper (Age 7 day) 4030/AFI/31/CV/242

    - Compression Strength Test Pipe Sleeper (Age 14 day) 4030/AFI/31/CV/247

    - Compression Strength Test Pipe Sleeper (Age 28 day) 4030/AFI/31/CV/259

    II.11. Pouring Concrete Pavement 31-E-111 A 4030/AFI/31/CV/243

    - Compression Strength Test Pavement 31-E-111 A (Age 7 day) 4030/AFI/31/CV/252

    - Compression Strength Test Pavement 31-E-111 A (Age 14 day) 4030/AFI/31/CV/257

    - Compression Strength Test Pavement 31-E-111 A (Age 28 day) 4030/AFI/31/CV/261

    II.12. Pouring Concrete Pavement 31-C-104 4030/AFI/31/CV/246

    - Compression Strength Test Pavement 31-C-104 (Age 7 day) 4030/AFI/31/CV/253

    - Compression Strength Test Pavement 31-C-104 (Age 14 day) 4030/AFI/31/CV/258

    - Compression Strength Test Pavement 31-C-104 (Age 28 day) 4030/AFI/31/CV/262

    II.13. Pouring Concrete Pavement 31-E-111 B 4030/AFI/31/CV/248

    - Compression Strength Test Pavement 31-E-111 B (Age 7 day) 4030/AFI/31/CV/255

    - Compression Strength Test Pavement 31-E-111 B (Age 14 day) 4030/AFI/31/CV/260

    - Compression Strength Test Pavement 31-E-111 B (Age 28 day) 4030/AFI/31/CV/263

    Page 16 of 26

  • 7/29/2019 Content List Civil Structure

    17/26

    KS

    Page 17 of 26

  • 7/29/2019 Content List Civil Structure

    18/26

    KS

    Page 18 of 26

  • 7/29/2019 Content List Civil Structure

    19/26

    DOCUMENT No.

    I. Preparation Work

    I.1. Material Inspection

    - UNP 150x75x6,5 ; UNP 50x38x5 ; etc 4030/AFI/42/CV/018

    I.2. Material Inspection

    - Pipa Beton 1200 R x 2500 kelas L (BS), Rubber Ring 1200 Type NH 4030/AFI/42/CV/019

    I.3. Material Inspection

    - Rebar D 16 ; Rebar D 13 ; Rebar D 10 4030/AFI/42/CV/045

    I.4. Material Inspection

    - UNP 125 x 65 x 6 4030/AFI/42/CV/050

    I.5. Material Inspection

    - Rebar 13, Rebar 10, etc. 4030/AFI/42/CV/069 A

    II. Pouring Concrete

    II. 1. Pouring Concrete Box Culvert ( for Oil Spillway ) 4030/AFI/42/CV/020

    - Compression Strength Test Box Culvert ( for Oil Spillway ) (Age 7 day) 4030/AFI/42/CV/022

    - Compression Strength Test Box Culvert ( for Oil Spillway ) (Age 14 day) 4030/AFI/42/CV/025

    - Compression Strength Test Box Culvert ( for Oil Spillway ) (Age 28 day) 4030/AFI/42/CV/028

    II. 2. Pouring Concrete Oil Spillway Control Box ( South Side ) 4030/AFI/42/CV/027

    - Compression Strength Test Oil Spillway ( South Side ) (Age 7 day) 4030/AFI/42/CV/033

    - Compression Strength Test Oil Spillway ( South Side ) (Age 14 day) 4030/AFI/42/CV/036

    - Compression Strength Test Oil Spillway ( South Side ) (Age 28 day) 4030/AFI/42/CV/042

    II. 3. Pouring Concrete Oil Spillway Control Box ( South Side ) 4030/AFI/42/CV/030

    - Compression Strength Test Oil Spillway ( South Side ) (Age 7 day) 4030/AFI/42/CV/034

    - Compression Strength Test Oil Spillway ( South Side ) (Age 14 day) 4030/AFI/42/CV/037

    - Compression Strength Test Oil Spillway ( South Side ) (Age 28 day) 4030/AFI/42/CV/043

    II. 4. Pouring Concrete Oil Spillway Control Box ( North Side ) Elev. -1761 up to +450 4030/AFI/42/CV/031

    - Compression Strength Test Oil Spillway ( North Side ) Elev. -1761 up to +450 (Age 7 day) 4030/AFI/42/CV/038

    - Compression Strength Test Oil Spillway ( North Side ) Elev. -1761 up to +450 (Age 14 day) 4030/AFI/42/CV/039

    - Compression Strength Test Oil Spillway ( North Side ) Elev. -1761 up to +450 (Age 28 day) 4030/AFI/42/CV/044

    II. 5. Pouring Concrete Oil Spi llway Control Box ( North Side ) Elev. +450 up to + 1705 4030/AFI/42/CV/032 A

    - Compression Strength Test Oil Spillway ( North Side ) Elev. +450 up to +1705 (Age 7 day) 4030/AFI/42/CV/035

    - Compression Strength Test Oil Spillway ( North Side ) Elev. +450 up to +1705 (Age 14 day) 4030/AFI/42/CV/040

    - Compression Strength Test Oil Spillway ( North Side ) Elev. +450 up to +1705 (Age 28 day) 4030/AFI/42/CV/046

    II. 6. Pouring Concrete Box Culvert - Bottom ( for Pipe Sleeper ) 4030/AFI/42/CV/048

    - Compression Strength Test Box Culvert - Bottom ( for Pipe Sleeper ) (Age 7 day) 4030/AFI/42/CV/051

    - Compression Strength Test Box Culvert - Bottom ( for Pipe Sleeper ) (Age 14 day) 4030/AFI/42/CV/055

    - Compression Strength Test Box Culvert - Bottom ( for Pipe Sleeper ) (Age 28 day) 4030/AFI/42/CV/065

    II. 7. Pouring Concrete Box Culvert - Top ( for Pipe Sleeper ) 4030/AFI/42/CV/049

    - Compression Strength Test Box Culvert - Top ( for Pipe Sleeper ) (Age 7 day) 4030/AFI/42/CV/052

    - Compression Strength Test Box Culvert - Top ( for Pipe Sleeper ) (Age 14 day) 4030/AFI/42/CV/058

    - Compression Strength Test Box Culvert - Top ( for Pipe Sleeper ) (Age 28 day) 4030/AFI/42/CV/070

    PROYEK :

    EPC PROYEK PENINGKATAN FLEKSIBILITAS OPERASI NPU RU-VI BALONGAN

    CONTAIN LIST OF CIVIL STRUCTURE (Civil Work Area-42)

    Konsorsium KE - SBS

    REMARKSDOCUMENTS

    Mechanical Completion Facilities as Per Discrete Unit

    Page 19 of 26

  • 7/29/2019 Content List Civil Structure

    20/26

    DOCUMENT No.

    PROYEK :

    EPC PROYEK PENINGKATAN FLEKSIBILITAS OPERASI NPU RU-VI BALONGAN

    CONTAIN LIST OF CIVIL STRUCTURE (Civil Work Area-42)

    Konsorsium KE - SBS

    REMARKSDOCUMENTS

    II. 8. Pouring Concrete for Pipe Sleeper Type I 4030/AFI/42/CV/053- Compression Strength Test for Pipe Sleeper Type I (Age 7 day) 4030/AFI/42/CV/059

    - Compression Strength Test for Pipe Sleeper Type I (Age 14 day) 4030/AFI/42/CV/064

    - Compression Strength Test for Pipe Sleeper Type I (Age 28 day) 4030/AFI/42/CV/076

    II. 9. Pouring Concrete for Pipe Sleeper Type I, II, III, IV, V, V A 4030/AFI/42/CV/057

    - Compression Strength Test for Pipe Sleeper Type I, II, III, IV, V, V A (Age 7 day) 4030/AFI/42/CV/063

    - Compression Strength Test for Pipe Sleeper Type I, II, III, IV, V, V A (Age 14 day) 4030/AFI/42/CV/071

    - Compression Strength Test for Pipe Sleeper Type I, II, III, IV, V, V A (Age 28 day) 4030/AFI/42/CV/083

    II. 10. Pouring Concrete for Pipe Sleeper Type I ( PS 1 - 15, 29 ) 4030/AFI/42/CV/060

    - Compression Strength Test for Pipe Sleeper Type I ( PS 1 - 15, 29 ) (Age 7 day) 4030/AFI/42/CV/066

    - Compression Strength Test for Pipe Sleeper Type I ( PS 1 - 15, 29 ) (Age 14 day) 4030/AFI/42/CV/073

    - Compression Strength Test for Pipe Sleeper Type I ( PS 1 - 15, 29 ) (Age 28 day) 4030/AFI/42/CV/084

    II. 11. Pouring Concrete for Pipe Sleeper Type I and Type II 4030/AFI/42/CV/061

    - Compression Strength Test for Pipe Sleeper Type I and Type II (Age 7 day) 4030/AFI/42/CV/069

    - Compression Strength Test for Pipe Sleeper Type I and Type II (Age 14 day) 4030/AFI/42/CV/074

    - Compression Strength Test for Pipe Sleeper Type I and Type II (Age 28 day) 4030/AFI/42/CV/085

    II.12. Pouring Concrete for Pipe Sleeper Type I and Type II 4030/AFI/42/CV/062

    - Compression Strength Test for Pipe Sleeper Type I and Type II (Age 7 day) 4030/AFI/42/CV/072

    - Compression Strength Test for Pipe Sleeper Type I and Type II (Age 14 day) 4030/AFI/42/CV/077

    - Compression Strength Test for Pipe Sleeper Type I and Type II (Age 28 day) 4030/AFI/42/CV/087

    II.13. Pouring Concrete for Pipe Sleeper Type F1, F2, II, VA, VI, VII, VIII, IX 4030/AFI/42/CV/068

    - Compression Strength Test for Pipe Sleeper Type F1, F2, II, VA, VI, VII, VIII, IX (Age 7 day) 4030/AFI/42/CV/075

    - Compression Strength Test for Pipe Sleeper Type F1, F2, II, VA, VI, VII, VIII, IX (Age 14 day) 4030/AFI/42/CV/079

    - Compression Strength Test for Pipe Sleeper Type F1, F2, II, VA, VI, VII, VIII, IX (Age 28 day) 4030/AFI/42/CV/091

    II.14. Pouring Concrete for Pipe Sleeper Type XIX 4030/AFI/42/CV/078

    - Compression Strength Test for Pipe Sleeper Type XIX (Age 7 day) 4030/AFI/42/CV/081

    - Compression Strength Test for Pipe Sleeper Type XIX (Age 14 day) 4030/AFI/42/CV/088

    - Compression Strength Test for Pipe Sleeper Type XIX (Age 28 day) 4030/AFI/42/CV/099

    II.15. Pouring Concrete for Pipe Sleeper Type XIX 4030/AFI/42/CV/079

    - Compression Strength Test for Pipe Sleeper Type XIX (Age 7 day) 4030/AFI/42/CV/086

    - Compression Strength Test for Pipe Sleeper Type XIX (Age 14 day) 4030/AFI/42/CV/092

    - Compression Strength Test for Pipe Sleeper Type XIX (Age 28 day) 4030/AFI/42/CV/102

    II.16. Pouring Concrete for Pipe Sleeper Type XIX, XVIII, XVII, XVI, XV 4030/AFI/42/CV/080

    - Compression Strength Test for Pipe Sleeper Type XIX, XVIII, XVII, XVI, XV (Age 7 day) 4030/AFI/42/CV/089

    - Compression Strength Test for Pipe Sleeper Type XIX, XVIII, XVII, XVI, XV (Age 14 day) 4030/AFI/42/CV/095

    - Compression Strength Test for Pipe Sleeper Type XIX, XVIII, XVII, XVI, XV (Age 28 day) 4030/AFI/42/CV/104

    II.17. Pouring Concrete for Pipe Sleeper Type XI, XII, XIII, XIV, XV, VI, XVII, V 4030/AFI/42/CV/082

    - Compression Strength Test for Pipe Sleeper Type XI, XII, XIII, XIV, XV, VI, XVII, V (Age 7 day) 4030/AFI/42/CV/090

    - Compression Strength Test for Pipe Sleeper Type XI, XII, XIII, XIV, XV, VI, XVII, V (Age 14 day) 4030/AFI/42/CV/096

    - Compression Strength Test for Pipe Sleeper Type XI, XII, XIII, XIV, XV, VI, XVII, V (Age 28 day) 4030/AFI/42/CV/106

    Page 20 of 26

  • 7/29/2019 Content List Civil Structure

    21/26

    DOCUMENT No.

    PROYEK :

    EPC PROYEK PENINGKATAN FLEKSIBILITAS OPERASI NPU RU-VI BALONGAN

    CONTAIN LIST OF CIVIL STRUCTURE (Civil Work Area-42)

    Konsorsium KE - SBS

    REMARKSDOCUMENTS

    II.18. Pouring Concrete for Reinforcement Pipe Sleeper Type II 4030/AFI/42/CV/093- Compression Strength Test for Reinforcement Pipe Sleeper Type II (Age 7 day) 4030/AFI/42/CV/098

    - Compression Strength Test for Reinforcement Pipe Sleeper Type II (Age 14 day) 4030/AFI/42/CV/103

    - Compression Strength Test for Reinforcement Pipe Sleeper Type II (Age 28 day) 4030/AFI/42/CV/110 A

    II.19. Pouring Concrete for Reinforcement Pipe Sleeper Type II 4030/AFI/42/CV/094

    - Compression Strength Test for Reinforcement Pipe Sleeper Type II (Age 7 day) 4030/AFI/42/CV/100

    - Compression Strength Test for Reinforcement Pipe Sleeper Type II (Age 14 day) 4030/AFI/42/CV/105

    - Compression Strength Test for Reinforcement Pipe Sleeper Type II (Age 28 day) 4030/AFI/42/CV/112

    II.20. Pouring Concrete for Reinforcement Pipe Sleeper Type II 4030/AFI/42/CV/097

    - Compression Strength Test for Reinforcement Pipe Sleeper Type II (Age 7 day) 4030/AFI/42/CV/101

    - Compression Strength Test for Reinforcement Pipe Sleeper Type II (Age 14 day) 4030/AFI/42/CV/107- Compression Strength Test for Reinforcement Pipe Sleeper Type II (Age 28 day) 4030/AFI/42/CV/114

    II.21. Pouring Concrete for Maintenance Acces 4030/AFI/42/CV/109

    - Compression Strength Test for Maintenance Acces (Age 7 day) 4030/AFI/42/CV/113

    - Compression Strength Test for Maintenance Acces (Age 14 day) 4030/AFI/42/CV/116

    - Compression Strength Test for Maintenance Acces (Age 28 day) 4030/AFI/42/CV/117

    Page 21 of 26

  • 7/29/2019 Content List Civil Structure

    22/26

    DOCUMENT

    I. Final Inspection 4030/AFI/42/CV

    II. Punch List N/A

    III. Preparation Work

    III. 1. Inspection Manual Digging Tk. 37 & Tk. 38 4030/AFI/42/C

    IV. Bore PileIV. 1. Pouring Concrete Tk. 37 4030/AFI/42/C

    - Compression Strength Test Tk. 37 (Age 7 day) 4030/AFI/42/C

    - Compression Strength Test Tk. 37 (Age 14 day) 4030/AFI/42/C

    - Compression Strength Test Tk. 37 (Age 28 day) 4030/AFI/42/C

    IV. 2. Pouring Concrete Tk. 38 4030/AFI/42/C

    - Compression Strength Test Tk. 38 (Age 7 day) 4030/AFI/42/C

    - Compression Strength Test Tk. 38 (Age 14 day) 4030/AFI/42/C

    - Compression Strength Test Tk. 38 (Age 28 day) 4030/AFI/42/C

    V. Foundation

    V. 1. Pouring Concrete (Footing Foundation) 4030/AFI/42/C

    - Compression Strength Test (Footing Foundation) (Age 7 day) 4030/AFI/42/C

    - Compression Strength Test (Footing Foundation) (Age 14 day) 4030/AFI/42/C

    - Compression Strength Test (Footing Foundation) (Age 28 day) 4030/AFI/42/C

    V. 2. Pouring Concrete (Pavement) 4030/AFI/42/C

    - Compression Strength Test (Pavement) (Age 7 day) 4030/AFI/42/C

    - Compression Strength Test (Pavement) (Age 14 day) 4030/AFI/42/C

    - Compression Strength Test (Pavement) (Age 28 day) 4030/AFI/42/C

    V. 3. Padding Installation 4030/AFI/42/C

    V. 4. Grouting Inspection 4030/AFI/42/C

    PROYEK :

    EPC PROYEK PENINGKATAN FLEKSIBILITAS OPERASI NPU RU-VI BALONGAN

    CONTAIN LIST OF CIVIL STRUCTURE 42-P-107 D

    Konsorsium KE - SBS

    DOCUMENTS

    Mechanical Completion Facilities as Per Discrete Unit

  • 7/29/2019 Content List Civil Structure

    23/26

    DOCUMENT No.

    I. Final Inspection 4030/AFI/42/CV/034

    II. Punch List 001/PF-NPU/PN/2009

    III. Preparation Work

    III. 1. Material Inspection

    - Pile Inspection 01-Pile InspectionIII. 2. Material Inspection

    - Pile Inspection 02-Pile Inspection

    III. 3. Material Inspection

    - Pile Inspection 03-Pile Inspection

    III. 4. Material Inspection

    - Pile Inspection 04-Pile Inspection

    III. 5. Material Inspection

    - Pile Inspection 05-Pile Inspection

    III. 6. Material Inspection

    - Pile Inspection 06-Pile Inspection

    III. 7. Material Inspection

    - Pile Inspection 07-Pile InspectionIII. 8. Material Inspection

    - Pile Inspection 08-Pile Inspection

    III. 9. Material Inspection

    - Pile Inspection 09-Pile Inspection

    III. 10. Material Inspection

    - Pile Inspection 10-Pile Inspection

    III. 11. Material Inspection

    - Pile Inspection 11-Pile Inspection

    III. 12. Material Inspection

    - Pile Inspection 12-Pile Inspection

    III. 13. Material Inspection

    - Pile Inspection 13-Pile InspectionIII. 14. Material Inspection

    - Pile Inspection 14-Pile Inspection

    III. 15. Material Inspection

    - Pile Inspection 15-Pile Inspection

    III. 16. Material Inspection

    - Pile Inspection 16-Pile Inspection

    III. 17. Material Inspection

    - Pile Inspection 17-Pile Inspection

    III. 18. Material Inspection

    - Pile Inspection 18-Pile Inspection

    III. 19. Material Inspection

    - Pile Inspection 19-Pile Inspection

    III. 20. Material Inspection

    - Pile Inspection 20-Pile Inspection

    III. 21. Material Inspection

    - Pile Inspection 21-Pile Inspection

    Konsorsium KE - SBS

    DOCUMENTS

    Mechanical Completion Facilities as Per Discrete Unit

    REMARKS

    PROYEK :

    EPC PROYEK PENINGKATAN FLEKSIBILITAS OPERASI NPU RU-VI

    BALONGAN

    CONTAIN LIST OF CIVIL STRUCTURE 42-T-107 D

    Page 23 of 26

  • 7/29/2019 Content List Civil Structure

    24/26

    DOCUMENT No.

    Konsorsium KE - SBS

    DOCUMENTS REMARKS

    PROYEK :

    EPC PROYEK PENINGKATAN FLEKSIBILITAS OPERASI NPU RU-VI

    BALONGAN

    CONTAIN LIST OF CIVIL STRUCTURE 42-T-107 D

    III. 22. Material Inspection

    - Pile Inspection 22-Pile Inspection

    III. 23. Material Inspection

    - Pile Inspection 23-Pile Inspection

    III. 24. Material Inspection

    - Pile Inspection 24-Pile Inspection

    III. 25. Material Inspection

    - Pile Inspection 25-Pile Inspection

    III. 26. Material Inspection

    - Pile Inspection 26-Pile InspectionIII. 27. Material Inspection

    - Pile Inspection 27-Pile Inspection

    III. 28. Material Inspection

    - Pile Inspection 28-Pile Inspection

    III. 29. Material Inspection

    - Pile Inspection 28 A-Pile Inspection

    III. 30. Material Inspection

    - Pile Inspection 29-Pile Inspection

    III. 31. Material Inspection

    - Pile Inspection 30-Pile Inspection

    III. 32. Material Inspection

    - Pile Inspection 31-Pile Inspection

    III. 33. Material Inspection

    - Pile Inspection 32-Pile Inspection

    III. 34. Material Inspection

    - Pile Inspection 33-Pile Inspection

    III. 35. Material Inspection

    - Pile Inspection 34-Pile Inspection

    III. 36. Material Inspection

    - Pile Inspection 35-Pile Inspection

    III. 37. Material Inspection

    - Pile Inspection 36-Pile Inspection

    III. 38. Material Inspection

    - Pile Inspection 37-Pile Inspection

    III. 39. Material Inspection

    - Pile Inspection 38-Pile Inspection

    III. 40. Material Inspection

    - Pile Inspection 39-Pile Inspection

    III. 41. Material Inspection

    - Rebar 10 (P-10) ; Rebar 13 (S-13) ; Rebar 16 (S-16) 01-Area 42

    III. 42. Material Inspection

    - Rebar 19 (S-19) 02-Area 42

    III. 43. Summary Ritase Tanah

    III. 44. Finish Stripping 01-AFI

    02-AFI

    III. 45. Soil Test - Sand Cone (Test Layer-1) 03-AFI

    III. 46. Soil Test - Sand Cone (Test Layer-2) 04-AFI

    Page 24 of 26

  • 7/29/2019 Content List Civil Structure

    25/26

    DOCUMENT No.

    Konsorsium KE - SBS

    DOCUMENTS REMARKS

    PROYEK :

    EPC PROYEK PENINGKATAN FLEKSIBILITAS OPERASI NPU RU-VI

    BALONGAN

    CONTAIN LIST OF CIVIL STRUCTURE 42-T-107 D

    IV. Pilling

    IV.1. Penetrant Test 01-AFI

    IV.2. Penetrant Test 02-AFI

    IV.3. Penetrant Test 03-AFI

    IV.4. Penetrant Test 04-AFI

    IV.5. Penetrant Test 05-AFI

    IV.6. Penetrant Test 06-AFI

    IV.7. Penetrant Test 07-AFI

    IV.8. Penetrant Test 08-AFI

    IV.9. Penetrant Test 09-AFIIV.10. Penetrant Test 10-AFI

    IV.11. Penetrant Test 11-AFI

    IV.12. Penetrant Test 12-AFI

    IV.13. Penetrant Test 13-AFI

    IV.14. Penetrant Test 14-AFI

    IV.15. Penetrant Test 15-AFI

    IV.16. Penetrant Test 16-AFI

    IV.17. Penetrant Test 17-AFI

    IV.18. Penetrant Test 18-AFI

    IV.19. Penetrant Test 19-AFI

    IV.20. Penetrant Test 20-AFI

    IV.21. Penetrant Test 21-AFIIV.22. Penetrant Test 22-AFI

    IV.23. Penetrant Test 23-AFI

    IV.24. Penetrant Test 24-AFI

    IV.25. Penetrant Test 25-AFI

    IV.26. Penetrant Test 26-AFI

    IV.27. Penetrant Test 27-AFI

    IV.28. Penetrant Test 28-AFI

    IV.29. Penetrant Test 29-AFI

    IV.30. Penetrant Test 30-AFI

    IV.31. Penetrant Test 31-AFI

    IV.32. Penetrant Test 32-AFI

    IV.33. Penetrant Test 33-AFI

    IV.34. Penetrant Test 34-AFI

    IV.35. Penetrant Test 35-AFI

    IV.36. Penetrant Test 36-AFI

    IV.37. Penetrant Test 37-AFI

    IV.38. Penetrant Test 38-AFI

    IV.39. Penetrant Test 39-AFI

    IV.40. Penetrant Test 40-AFI

    IV.41. Penetrant Test 41-AFI

    IV.42. Penetrant Test 42-AFI

    IV.43. PDA Test 01-PDA

    IV.44. PDA Test 02-PDA

    IV.45. PDA Test 03-PDA

    Page 25 of 26

  • 7/29/2019 Content List Civil Structure

    26/26

    DOCUMENT No.

    Konsorsium KE - SBS

    DOCUMENTS REMARKS

    PROYEK :

    EPC PROYEK PENINGKATAN FLEKSIBILITAS OPERASI NPU RU-VI

    BALONGAN

    CONTAIN LIST OF CIVIL STRUCTURE 42-T-107 D

    V. Foundation

    V.1. Trial Mix Concrete K-300 03-Area 42

    - Compression Strength Test Trial Mix Concrete K-300 (Age 7 day) 05-Area 42

    - Compression Strength Test Trial Mix Concrete K-300 (Age 14 day) 10-Area 42

    - Compression Strength Test Trial Mix Concrete K-300 (Age 21 day) 11-Area 42

    - Compression Strength Test Trial Mix Concrete K-300 (Age 28 day) 13-Area 42

    V.2. Soil Test - Sand Cone 04-Area 42

    V.3. Compact and Levelling 06-Area 42

    V.4. Urugan Pasir and Levelling 07-Area 42

    V.5. Lean Concrete 08-Area 42

    V.6. Install Rebar 09-Area 42

    V.7. Pre-Pouring Concrete (Slab Concrete) 12-Area 42

    - Compression Strength Test Slab Concrete (Age 7 day) 4030/QC/42/CV/016

    - Compression Strength Test Slab Concrete (Age 13 day) 4030/AFI/42/CV/020

    - Compression Strength Test Slab Concrete (Age 28 day) 4030/AFI/42/CV/027

    - Compression Strength Test Slab Concrete (Age 7 day) 4030/QC/42/CV/017

    - Compression Strength Test Slab Concrete (Age 14 day) 4030/AFI/42/CV/021

    - Compression Strength Test Slab Concrete (Age 28 day) 4030/AFI/42/CV/029

    - Compression Strength Test Slab Concrete (Age 7 day) 4030/QC/42/CV/018

    - Compression Strength Test Slab Concrete (Age 14 day) 4030/AFI/42/CV/022

    - Compression Strength Test Slab Concrete (Age 28 day) 4030/AFI/42/CV/031

    - Compression Strength Test Slab Concrete (Age 7 day) 4030/QC/42/CV/019

    - Compression Strength Test Slab Concrete (Age 14 day) 4030/AFI/42/CV/023

    - Compression Strength Test Slab Concrete (Age 28 day) 4030/AFI/42/CV/032

    V.8. Pre-Pouring Concrete (Ring Pedestal) 4030/QC/42/CV/014

    - Compression Strength Test Slab Concrete (Age 7 day) 4030/AFI/42/CV/021

    - Compression Strength Test Slab Concrete (Age 14 day) 4030/AFI/42/CV/024

    - Compression Strength Test Slab Concrete (Age 28 day) 4030/AFI/42/CV/033

    V.9. Back Fill and Asphalt 4030/AFI/42/CV/025