Birmingham Public Schools 2015 Bond Program Monthly Construction Update May 2018 Brief Project Description Bid Pack 6 is wrapping up this year with work at Seaholm and Beverly Elementary. The work at Seaholm will include a scene shop addition; renovations to the auditorium including new sound systems, stage flooring and lighting; and upgrades to STEM labs and media center to create a more collaborative learning environment. At Beverly Elementary epoxy flooring will be installed in the restrooms. Bid Pack 11 will also take place this summer and includes the replacement of roof top units at West Maple Elementary. This project will begin when school is released for summer. The auditorium and addition are scheduled to be completed in October, and all other work will be completed before the 2018/2019 school year. Construction Schedule Update Seaholm High School: Masonry block walls for the addition are completed and vapor barrier installed. Brick for the addition has begun. Precast plank for the roof has been set and grouted. Roof blocking is completed, roofing has started. Underground plumbing and electrical in the addition is ongoing. Roof drains have been installed. Installation of the rigging above the stage has started. Fire protection and duct work above the stage is completed. Starter Boxes and Master Control Cabinet on the stage have been installed. Dimming & controls wiring is 75% complete and sound system conduit is complete. Auditorium house lighting is 60% complete. Caliper masonry has been completed. The metal decking was installed and the concrete on the calipers has been completed. Demolition of the old boilers in our new dressing room area has been completed, the walls have been removed and saw cutting of the floor has been completed. Roof openings and curbs for the Energy Recovery Unit have been completed Beverly Elementary: Work will begin when school is dismissed for summer break. West Maple Elementary: Work will begin when school is dismissed for summer break.