Construction Photo’s of FANDIC July, 2010. The Front of FANDIC Building 1st floorThe two floors.

Jan 01, 2016

Download

Documents

Gerald Russell
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Construction Photo’s of FANDIC July, 2010. The Front of FANDIC Building 1st floorThe two floors.

Construction Photo’s of FANDIC

July, 2010

Page 2: Construction Photo’s of FANDIC July, 2010. The Front of FANDIC Building 1st floorThe two floors.

The Front of FANDIC Building

1st floor The two floors

Page 3: Construction Photo’s of FANDIC July, 2010. The Front of FANDIC Building 1st floorThe two floors.

The Garage

View from outside looking in View from inside looking out

Page 4: Construction Photo’s of FANDIC July, 2010. The Front of FANDIC Building 1st floorThe two floors.

Physiotherapy Salon

3 rooms were made into one

Page 5: Construction Photo’s of FANDIC July, 2010. The Front of FANDIC Building 1st floorThe two floors.

Access to the Second Floor

The brown door is the office

Steps to the first floor

Page 6: Construction Photo’s of FANDIC July, 2010. The Front of FANDIC Building 1st floorThe two floors.

Second FloorEducation Ssalon Putting on the roof

Page 7: Construction Photo’s of FANDIC July, 2010. The Front of FANDIC Building 1st floorThe two floors.

The Kitchen

Page 8: Construction Photo’s of FANDIC July, 2010. The Front of FANDIC Building 1st floorThe two floors.

The Dining Room

Page 9: Construction Photo’s of FANDIC July, 2010. The Front of FANDIC Building 1st floorThe two floors.

The Dining Room

Page 10: Construction Photo’s of FANDIC July, 2010. The Front of FANDIC Building 1st floorThe two floors.

Additional PhotosElectrical instalations

The bricklayer is the father of Juan Nicolas of Fandic, Luis Ignacio Celis.

Page 11: Construction Photo’s of FANDIC July, 2010. The Front of FANDIC Building 1st floorThe two floors.

View from the second floor Columns

Page 12: Construction Photo’s of FANDIC July, 2010. The Front of FANDIC Building 1st floorThe two floors.

Support Beams They were installed to avoid putting 2 columns in the middle

The cost was 1 Million pesos