Construction of Landscape Works for Lake-3 and all allied works
including Operation & Maintenance for 18 months at AURIC -
Shendra (Ref No: AITL/SBIA/2017-18/03)
pg. 1
Date:
In reference to the pre-bid queries received by AITL and the
pre-bid meeting held at the office of AITL at Mumbai on August 02,
2017, Bidders are requested to take note of the Responses and
Clarifications to the Pre-Bid Queries provided below. Additionally,
Bidders are requested to take note of CORRIGENDUM No. 2 below for
changes/clarification of Bid conditions.
Responses and Clarification to Pre-Bid Queries
Sl.
No.
Section / Page / Clause No’s.
Clause Reference
Query or Clarification Requested
Employer’s Response
01.
2.2.2 /A (v) Page 20
Eligibility of Bidders- Technical Capacity v. Plant, Machinery
and equipment capacity : The bidder must have owned assets in plant
machinery and equipment worth a minimum of Rs.25 Cr
Considering the quantum of work, we feel that this activity can
be carried out by hiring local plant and machineries to make cost
effective bid, so we propose that this clause can be exempted from
the tender documents.
Refer Corrigendum No.2
02.
2.2.2/B (i) Page 20
Eligibility of Bidders – Financial Capacity i. Net Worth: The
Bidder Shall have a minimum Net Worth(the “Financial Capacity) of
Rs. 5 Crore at the close of the preceding financial year
Can company net worth be considered as 2.5Crore? or Whether
directors network can be clubbed together?
Conditions provided in the tender remains unchanged
03.
2.2.2/B (iii) Page 20
iii. Liquid assets and/or credit facilities of not less than
Rs.5 Crore
Can this amount be considered in combination with total bank
facility exposure (CC + LC + BG ) Or Whether this amount can be
reduced to Rs. 4 Crore.
Conditions provided in the tender remains unchanged
-
Construction of Landscape Works for Lake-3 and all allied works
including Operation & Maintenance for 18 months at AURIC -
Shendra (Ref No: AITL/SBIA/2017-18/03)
pg. 2
Corrigendum No.2: Bidders are requested to make note of the
changes to the bidding conditions as per the revised clauses
below:
Sr. no.
Section /
Page / Clause No’s
Clause Reference
Revised Clause to be read as
1 2.2.2 /A (v) Page 20
Eligibility of Bidders- Technical Capacity
v. Plant, Machinery and equipment capacity : The bidder must
have owned assets in plant machinery and equipment worth a minimum
of Rs.25 Cr
Eligibility of Bidders- Technical Capacity v. Plant, Machinery
and equipment capacity : The bidder must have owned assets in plant
machinery and equipment worth a minimum of Rs.10 Crore
2
BOQ - Part:1.1- Item No.05 Quantity - 2489.83 Cum Quantity -
3000 Cum
3
BOQ - Part:1.1- Item No.06 Quantity - 345.95 Cum Quantity - 1050
Cum
4
BOQ - Part:1.1- Item No.07
Reference Drawing - D6.0, D8.0, D13.0, D21.0, D25.0, D3.0, D4.0,
D1.0, D1.1,
Reference Drawing - D1.1, D3.0, D4.0, D21.0, D25.0
5
BOQ - Part:1.1 - Item No.10
Reference Drawing - D1.0, D1.1, D3.0, D4.0, D8.0, D13.0, D21.0,
D24.0
Reference Drawing - D1.0, D1.1, D3.0, D4.0, D8.0, D13.0, D14.0,
D18.0, D21.0, D24.0, D25.0
6
BOQ - Part:1.1 - Item No.12 Reference Drawing - D3.0, D21.0
Reference Drawing - D3.0, D26.0
-
Construction of Landscape Works for Lake-3 and all allied works
including Operation & Maintenance for 18 months at AURIC -
Shendra (Ref No: AITL/SBIA/2017-18/03)
pg. 3
Sr. no.
Section /
Page / Clause No’s
Clause Reference
Revised Clause to be read as
7
BOQ - Part:1.1 - Item No.13 Quantity - 1379.19 sqm Quantity -
2500 sqm
8
BOQ - Part:1.1 - Item No.16 Quantity - 98.07 / Reference Drawing
D.11.0 Quantity - 150 cum / Reference Drawing D6.0
9
BOQ - Part:1.1 - Item No.17 Reference Drawing D6.0 Reference
Drawing D3.0
10
BOQ - Part:1.1 - Item No.22 Quantity - 28.75 sqm Quantity -
264.82 sqm
11
BOQ - Part:2.0 - Item No.1 Quantity - 5974.89 Sqm Quantity -
6000 sqm
12
BOQ - Part:4.0 - Item No.8
Providing and fixing white glazed earthenware sink 60cm x 45cm x
20cm size including all connection of the G.I. supply and PVC waste
pipes upto outside face of wall, cold water chromium plated screw
down bib tap, rolled steel or C.I. brackets stop tap etc. item
complete. (Jaquar, Kohler, Hindware or equivalent Company)
Providing and fixing stainless steel sink 60cm x 45cm x 20cm
size including all connection of the G.I. supply and PVC waste
pipes upto outside face of wall, cold water chromium plated screw
down bib tap, rolled steel or C.I. brackets stop tap etc. item
complete. (Jaquar, Kohler, Hindware or equivalent Company)
13 Specification - 5.2 B
The contractor shall adhere to the maintenance schedule during
the maintenance period of all the plants, contractor shall be
responsible for any replacement towards mortality and the trees or
the area of the plantation under shrubs/creepers/ground covers etc
should be in healthy condition during the inspection conducted by
the site-in-charge on every 25th day of the month
The contractor shall adhere to the maintenance schedule during
the maintenance period of all the plants, contractor shall be
responsible for any replacement towards mortality and the trees or
the area of the plantation under shrubs/creepers/ground covers etc
should be in healthy condition during the inspection conducted by
the site-in-
-
Construction of Landscape Works for Lake-3 and all allied works
including Operation & Maintenance for 18 months at AURIC -
Shendra (Ref No: AITL/SBIA/2017-18/03)
pg. 4
Sr. no.
Section /
Page / Clause No’s
Clause Reference
Revised Clause to be read as
to avoid the penalty clause (f) and also subsequently amounting
to holding of the payment due for quarterly installment.
charge on every 25th day of the month to avoid the penalty
clause 5.1 (e) and also subsequently amounting to holding of the
payment due for quarterly installment.
14 Specification - 5.4 Maintainance
h. The contractor shall ensure that the fertilisers, pesticides
and the fungicides used for the maintainance do not pollute or
contaminate the waterbodies and groundwater.
15
Specification - 5.3.2.3 (3)
Maintenance of ground cover up to two month by regular watering
and attending the inter-cultivation practices such as weeding,
raking, gap filling, trimming and pruning etc. The ground cover
should be well maintained, disease free, well-trimmed at the time
of handing over.
Maintenance of ground cover up to twelve month by regular
watering and attending the inter-cultivation practices such as
weeding, raking, gap filling, trimming and pruning etc. The ground
cover should be well maintained, disease free, well-trimmed at the
time of handing over.
16 Specification - 3.2.8 EARTH WORK / EXCAVATION BY MECHANICAL
MEANS
BACKFILLING As soon as possible backfill the excavation after
placement of the permanent structure. Use backfill free from stones
large enough to interfere with compaction; large or frozen lumps
that will not break down readily under compaction; and wood or
other extraneous material. Obtain backfill material from excavation
or from other sources. In areas not supporting a completed roadbed,
retaining wall, or embankment, place backfill in layers at most 10
in. deep (loose measurement). In areas supporting a portion of a
roadbed, retaining wall, or embankment, place backfill in uniform
layers at most 8 in. deep (loose measurement). Compact each layer
to meet the density requirements of the roadbed, retaining wall,
embankment material, or as shown on the plans. Bring each layer of
backfill material to the moisture content needed to obtain the
required density.
-
Construction of Landscape Works for Lake-3 and all allied works
including Operation & Maintenance for 18 months at AURIC -
Shendra (Ref No: AITL/SBIA/2017-18/03)
pg. 5
Sr. no.
Section /
Page / Clause No’s
Clause Reference
Revised Clause to be read as
Use mechanical tamps or rammers to compact the backfill. Rollers
may be used to compact backfill if feasible. Cohesion less
materials such as sand may be used for backfilling. Compact
cohesion less materials using vibratory equipment, water-ponding,
or a combination of both.
17 Specification - 5.1 Additional Items
5.1.1 SPREADING GOOD EARTH 5.1.1.1 Good earth shall be removed
from stacks by head load and spread evenly over the surface to the
thickness ordered by the Engineer-in-charge. It shall be spread
with a twisting motion to avoid segregation and to ensure that
spreading is uniform over the entire area. 5.1.1.2 Measurements:
The quantity of good earth spread shall be determined by the
difference in the volume of good earth in stacks before and after
spreading duly reduced for looseness in stacking by 20% of good
earth. 5.1.1.3 Rate: The rate shall include of all the labour and
material involved in all the operations described above, but does
not include the cost of the good earth which shall be paid for
separately unless specifically described in the item.
18 Specification - 5.1 Additional Items
5.1.2 SPREADING SLUDGE/MANURE 5.1.2.1 Good earth shall be
thoroughly mixed with sludge or manure in specified proportion as
described in the item or as directed by the Engineer-in-Charge. The
mixing shall be spread as described
-
Construction of Landscape Works for Lake-3 and all allied works
including Operation & Maintenance for 18 months at AURIC -
Shendra (Ref No: AITL/SBIA/2017-18/03)
pg. 6
Sr. no.
Section /
Page / Clause No’s
Clause Reference
Revised Clause to be read as
in 23.9.1 to the thickness ordered by the Engineer-in-Charge.
5.1.2.2 Measurements The quantity of good earth and sludge or
manure mixed shall be determined by the difference in the volume of
good earth and sludge or manure in stack, before and after
spreading duly accounted for voids and looseness in stack. 5.1.2.3
Rate The rate shall include of all the labour and material involved
in all the operations described above, but does not include the
cost of good earth sludge or manure which shall be paid for
separately, unless otherwise described in the item.
19 Specification - 5.1 Additional Items
5.1.3 MIXING OF GOOD EARTH AND SLUDGE/MANURE 5.1.3.1 The stacked
earth shall, before mixing be broken down top particle of sizes not
exceeding 6 mm in any direction. Good earth shall be thoroughly
mixed with sludge or manure in specified proportion as described in
the item or as directed by the Engineer-in-charge. 5.1.3.2
Measurements The quantity of good earth and sludge or manure mixed
shall be determined by the difference in the volume of good earth,
sludge or manure in stack, before and after spreading duly
accounted for voids and looseness in stack. 5.1.3.3 Rate
-
Construction of Landscape Works for Lake-3 and all allied works
including Operation & Maintenance for 18 months at AURIC -
Shendra (Ref No: AITL/SBIA/2017-18/03)
pg. 7
Sr. no.
Section /
Page / Clause No’s
Clause Reference
Revised Clause to be read as
The rate shall include the cost of all labour and materials
involved in all the operations described above, but does not
include the cost of good earth sludge or manure which shall be paid
for separately, unless otherwise described in the item.
20
Specification - 10.3.3 - B(3)
PVC UV radiation resistant lateral pipe shall be installed
directly on the soil surface.
Linear low-density polyethylene UV radiation resistant lateral
pipe shall be installed directly on the soil surface
Drawing - E16-03 / TD 3.0 Revised (drawing numbers remain
same)
Drawing - E16-03 / TD 4.0 Revised (drawing numbers remain
same)
Drawing - E16-03 / TD 5.0 Revised (drawing numbers remain
same)
Drawing - E16-03 / TD 6.0 Revised (drawing numbers remain
same)
Drawing - E16-03 / TD 10.0.a Revised (drawing numbers remain
same)
Drawing - E16-03 / TD 10.b.00 Revised (drawing numbers remain
same)
-
Construction of Landscape Works for Lake-3 and all allied works
including Operation & Maintenance for 18 months at AURIC -
Shendra (Ref No: AITL/SBIA/2017-18/03)
pg. 8
Sr. no.
Section /
Page / Clause No’s
Clause Reference
Revised Clause to be read as
Drawing - E16-03 / TD 10.b.01 Revised (drawing numbers remain
same)
Drawing - E16-03 / TD 10.b.05 Revised (drawing numbers remain
same)
Drawing - E16-03 / TD 10.b.08 Revised (drawing numbers remain
same)
Drawing - E16-03 / TD 14.0
Revised (drawing numbers remain same)
Drawing - E16-03 / TD D 1.1
Revised (drawing numbers remain same)
Drawing - E16-03 / TD D 1.0 Revised (drawing numbers remain
same)
Drawing - E16-03 / TD D 2.0 Revised (drawing numbers remain
same)
Drawing - E16-03 / TD D 9.0 Revised (drawing numbers remain
same)
Drawing - E16-03 / TD D 18.0 Revised (drawing numbers remain
same)
-
Construction of Landscape Works for Lake-3 and all allied works
including Operation & Maintenance for 18 months at AURIC -
Shendra (Ref No: AITL/SBIA/2017-18/03)
pg. 9
Sr. no.
Section /
Page / Clause No’s
Clause Reference
Revised Clause to be read as
Drawing - E16-03 / TD 10.D.01 Revised (drawing numbers remain
same)
Sd/- Managing Director AITL