Engineering Division City of Greenville 206 South Main Street Greenville, SC 29601 864-467-4400 Clear vegetation and material from construction entrance area Install filter cloth • Make it wide enough for all vehicles entering the site • Widen towards road to prevent tracking of mud onto roadways Secure cloth with U-shaped wire staples • Use mallet to ensure staples will not be dislodged Place large stones along the length of the cloth • Make sure stone layer is 6” deep CONSTRUCTION ENTRANCES (GRAVEL PAD) • Inspect weekly and after storms • Add stones periodically to maintain 6” layer • Wash stones as needed INSTALLATION 1. 2. 3. 4. 1. Despejar la veg- etación y materiales de la entrada del área de construcción Instalar tela filtrante • Hacerla lo suficiente ancha para todos vehic- ulos entrando la zona • Ampliar hacia la carretera para evitar el rastreo de barro Sujetar la tela con grapas de alambre en forma de ‘U’ • Usa el mazo para asegurar que las grapas no se desplazen Coloca piedras grandes a lo largo de la tela • Asegúrese de que la capa de piedra tenga una profundidad de 6” 1. 2. 3. 4. INSTALACIÓN MAINTENANCE MANTENIMIENTO Your actions can affect the quality of our waterways and your project. By properly installing and maintaining sediment and erosion control practices, you can help keep our waterways free from pollutants such as pesticides, construction chemi- cals, asphalts, and acids that contaminate stormwater runoff. Improperly installed sediment and erosion control can result in stop work orders, fines, and even jail time. Keep your site in compli- ance by following these simple instructions for installing and maintaining construction entrances and silt fences. If a construction entrance and silt fence do not adequately control sediment runoff, the City may require additional measures, in coordination with the permittee. For more information about sediment and erosion control, contact the City’s Engineer- ing Division at 864-467-4400. • Inspeccionar semanalmente y después de las tormentas • Añade piedras periódicamente para mantener la capa de 6” • Lavar piedras según sea necesario