Top Banner
Scale Date Drawn By Checked By Project Number 4/5/2013 4:11:05 PM G100 Cover Sheet Project Vanucur CG CLG 100 Project Vanucur 1 E. High Street Oxford OH Project Vanucur 1 East High St, Oxford OH Designed by Craig Genet Studio 602 Drawing Index Sheet Number Sheet Name Drawn By G100 Cover Sheet CLG G101 Code requirements CLG S101 foundation CLG S102 framing plan floors 2 and 3 CLG S103 framing plan floor 4 CLG S104 Roof Framing Plan CLG S200 3D axon CLG S201 Detail axon of corner roof CLG S300 Framing schedule columns CLG S301 Framing schedule CLG Drawing Index Sheet Number Sheet Name Drawn By A401 Kitchen detail CLG A402 wall sections CLG A403 detail plans CLG A404 details section floor 2 CLG A405 details section roof CLG A406 Details section windows CLG A407 Detail section lightwell CLG A408 Detail section corner roof CLG A410 Interior elevations CLG A500 window schedule, Door Schedule CLG A600 room finish schedule CLG Drawing Index Sheet Number Sheet Name Drawn By A000 Site Plan CLG A101 First Floor Plan CLG A102 Second/Third Floor Plans CLG A103 Fourth Floor, Roof Plan CLG A104 First/Second Floor Reflected Ceiling Plans CLG A105 Third/Fourth Floor Reflected Ceiling Plans CLG A201 elevation north and west CLG A202 elevation south and east CLG A301 section looking east CLG A302 section 3 core CLG A303 Section East 2 CLG A304 Section corner of building CLG A306 section looking north CLG PRODUCED BY AN AUTODESK STUDENT PRODUCT PRODUCED BY AN AUTODESK STUDENT PRODUCT PRODUCED BY AN AUTODESK STUDENT PRODUCT PRODUCED BY AN AUTODESK STUDENT PRODUCT
35

Construction Document Set

Mar 08, 2016

Download

Documents

Craig genet

A mixed use project in Oxford, Ohio, including restaurant, retail, and office space. This was our studio project from spring 2013.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Construction Document Set

Scale

Date

Drawn By

Checked By

Project Number

4/5/2013 4:11:05 PM

G100

Cover Sheet

ProjectVanucur

CG

CLG

100

Pro

ject V

anucur

1 E

. H

igh S

tre

et O

xfo

rd O

H

Project Vanucur1 East High St,Oxford OHDesigned by Craig GenetStudio 602

Drawing Index

SheetNumber Sheet Name Drawn By

G100 Cover Sheet CLG

G101 Code requirements CLG

S101 foundation CLG

S102 framing plan floors 2 and 3 CLG

S103 framing plan floor 4 CLG

S104 Roof Framing Plan CLG

S200 3D axon CLG

S201 Detail axon of corner roof CLG

S300 Framing schedule columns CLG

S301 Framing schedule CLG

Drawing Index

SheetNumber Sheet Name Drawn By

A401 Kitchen detail CLG

A402 wall sections CLG

A403 detail plans CLG

A404 details section floor 2 CLG

A405 details section roof CLG

A406 Details section windows CLG

A407 Detail section lightwell CLG

A408 Detail section corner roof CLG

A410 Interior elevations CLG

A500 window schedule, Door Schedule CLG

A600 room finish schedule CLG

Drawing Index

SheetNumber Sheet Name Drawn By

A000 Site Plan CLG

A101 First Floor Plan CLG

A102 Second/Third Floor Plans CLG

A103 Fourth Floor, Roof Plan CLG

A104 First/Second Floor Reflected Ceiling Plans CLG

A105 Third/Fourth Floor Reflected Ceiling Plans CLG

A201 elevation north and west CLG

A202 elevation south and east CLG

A301 section looking east CLG

A302 section 3 core CLG

A303 Section East 2 CLG

A304 Section corner of building CLG

A306 section looking north CLG

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 2: Construction Document Set

Scale

Date

Drawn By

Checked By

Project Number

4/5/2013 4:11:06 PM

G101

Code requirements

ProjectVanucur

CG

CLG

100

Pro

ject V

anucur

1 E

. H

igh S

tre

et O

xfo

rd O

H

OBC CODE REQUIREMENT SUMMARY:PROJECT VANUCURUSE GROUP #1: ASSEMBLY A2 (RESTURANT)CONSTRUCTION TYPE: TYPE 2A

BUILDING ALLOWABLE SQUARE FOOTAGE: 15,500 SQ FTBUILDING IS SPRINKLERED: 200% INCREASETOTAL SQUARE FOOTAGE ALLOWED: 15,500 X 200% 31,000 SQ FT

ACTUAL BUILDING SQ FT: 4,828 SQ FTOCCUPANCY

ASSEMBLY UNCONCETRATED TABLES AND CHAIRS2,824 SQ FT / 15 NET = 188 PEOPLE

ASSEMBLY CONCENTRATED (VESTIBULE)125 SQ FT / 5 NET = 25 PEOPLE

KITCHEN (COMMERCIAL)830 SQ FT / 200 GROSS = 5

TOTAL OCCUPANCY: 218 PEOPLE

OBC PLUMBING CODE REQUIREMENTSPLUMBING MALES 109/ FEMALES 109

REQUIRED PROVIDEDTOILETS 3 4LAVATORIES 2 2DRINKING FOUNTAINS 0 0SERVICE SINK 1 1

OBC CODE REQUIREMENT SUMMARY:PROJECT VANUCURUSE GROUP #2: BUSINESSCONSTRUCTION TYPE: TYPE 2A

BUILDING ALLOWABLE SQUARE FOOTAGE: 37,500 SQ FTBUILDING IS SPRINKLERED: 200% INCREASETOTAL SQUARE FOOTAGE ALLOWED: 37,500 X 200% = 75,000 SQ FT

ACTUAL BUILDING SQ FT: 9,491 PEOPLEOCCUPANCY

BUSINESS AREAS9,491 SQ FT / 100 GROSS = 95 PEOPLE

TOTAL OCCUPANCY: 95 PEOPLE

OBC PLUMBING CODE REQUIREMENTSPLUMBING MALES 48 / FEMALES 48

REQUIRED PROVIDEDTOILETS 1 3LAVATORIES 1 2DRINKING FOUNTAINS 1 1SERVICE SINK 1 1

OBC CODE REQUIREMENT SUMMARY:PROJECT VANUCURUSE GROUP #1: MERCANTILECONSTRUCTION TYPE: TYPE 2A

BUILDING ALLOWABLE SQUARE FOOTAGE: 21,500 SQ FTBUILDING IS SPRINKLERED: 200% INCREASETOTAL SQUARE FOOTAGE ALLOWED: 21,500 SQ FT X 200% = 43,000 SQ FT

ACTUAL BUILDING SQ FT: 1,250 SQ FTOCCUPANCY

MERCANTILE AREAS1,250 SQ FT / 60 NET = 21 PEOPLE

TOTAL OCCUPANCY: 21 PEOPLE

OBC PLUMBING CODE REQUIREMENTSPLUMBING MALES 119/ FEMALES 119

REQUIRED PROVIDEDTOILETS 1 1LAVATORIES 1 1DRINKING FOUNTAINS 0 0SERVICE SINK 1 1

FIRE RATING REQUIREMENTS

PRIMARY STRUCTURAL FRAMES 1 HOURBEARING WALLSEXTERIOR 1 HOURINTERIOR 1 HOURFLOOR CONSTRUCTION ANDASSOCIATED SECONDARY MEMBERS 1 HOURROOF CONSTRUCTION AND ASSOCIATEDSECONDARY MEMBERS 1 HOUR

SEPERATED OCCUPANCIESASSEMBLY AND MERCANTILE 2 HOUR 1 HOUR SPRINKLERED

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 3: Construction Document Set

DN

High Street

Main

Str

eet

20

' - 9

23/3

2"

13

2' -

0"

13

' - 1

0"

27' - 7" 78' - 0"

6' -

0"

2' -

6"

3' - 0"

6' - 6"

Scale

Date

Drawn By

Checked By

Project Number

1/16" = 1'-0"

4/5/2013 4:10:24 PM

A000

Site Plan

ProjectVanucur

CG

CLG

100

Pro

ject V

anucur

1 E

. H

igh S

tre

et O

xfo

rd O

H

1/16" = 1'-0"1

site Plan

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 4: Construction Document Set

DN

2

A306

2

A306

1

A302

1

A302

2

A301

2

A301

1

A303

1

A303

1.5

1.5

3 4 5

A.5A.5

C

D

E

F

G

3

A306

3

A306

A4011

A403

1

A403

2

A403

3

1

A304

5' - 0" 22' - 0" 27' - 0" 17' - 6"

21

' - 6

"2

6' -

0"

26

' - 0

"2

6' -

0"

21

' - 0

"5

' - 0

"

R 31' - 0"

2834 SF

Restaurant dining

102

415 SF

elevator hall

103

242 SF

Office Lobby

104

271 SF

Back Hall

106

819 SF

Kitchen

107

Not Enclosed

Retail

108

198 SF

Wbath

109

177 SF

Mbath

110

35 SF

Restroom

111

126 SF

Vestibule

101

Patio Dining

2

B

A

3' -

0"

1.0 3' - 6"

305 SF

Mechanical

112

DN

UP

UPDN

48 SF

elevator supply

113

163

163

163

163

163

163

163

163

163

163

13

163

122 122

122

122

163 163163 163

22

22

31

31

13

13

31

22

21

31

13

13

22

22

1313

12

41

41

22

15

11

Scale

Date

Drawn By

Checked By

Project Number

1/8" = 1'-0"

4/5/2013 4:10:25 PM

A101

First Floor Plan

ProjectVanucur

CG

CLG

100

Pro

ject V

anucur

1 E

. H

igh S

tre

et O

xfo

rd O

H

1/8" = 1'-0"1

1st Floor

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 5: Construction Document Set

1

A302

1

A302

2

A301

2

A301

1

A303

1

A303

1.5

1.5

3 4 5

A.5A.5

C

D

E

F

G

3

A306

3

A306

A403

4

1

A304

5' - 0" 22' - 0" 27' - 0" 17' - 6"

21

' - 6

"2

6' -

0"

26

' - 0

"2

6' -

0"

21

' - 0

"5

' - 0

"

7667 SF

Office 2nd floor

201

721 SF

Hallway

200

102 SF

Mbath

202

128 SF

Wbath

203

2

B

A

3' -

0"

1.0

3' - 6"

39 SF

Janitor

204

56 SF

Electrical

205

UP DN

UP DN

36

36

36

36

3636

37

37

37

32

37

37

37

32

37

37

37

32

35

41

14

41

14

12

12

12

12

A4091

A409

2

2

A306

2

A306

1

A302

1

A302

2

A301

2

A301

1

A303

1

A303

1.5

1.5

3 4 5

A.5A.5

C

D

E

F

G

3

A306

3

A306

1

A3045' - 0" 22' - 0" 27' - 0" 17' - 6"

21

' - 6

"2

6' -

0"

26

' - 0

"2

6' -

0"

21

' - 0

"5

' - 0

"

102 SF

Mbath

3026863 SF

Office 3rd floor

301

707 SF

Hallway

300

127 SF

Wbath

303

56 SF

Electric

304

2

B

A

3' -

0"

1.03' - 6"

39 SF

janitor

305

UPDN

UPDN

36

3636

36

3636

37

37

37

32

37

37

37

32

37

37

37

32

35

12

12

12

12

41

14

41

14

Scale

Date

Drawn By

Checked By

Project Number

1/8" = 1'-0"

4/7/2013 10:58:21 PM

A102

Second/Third FloorPlans

ProjectVanucur

CG

CLG

100

Pro

ject V

anucur

1 E

. H

igh S

tre

et O

xfo

rd O

H

1/8" = 1'-0"1

2nd Floor 1/8" = 1'-0"

23rd Floor

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 6: Construction Document Set

2

A306

2

A306

1

A302

1

A302

2

A301

2

A301

1

A303

1

A303

1.5

1.5

3 4 5

A.5A.5

C

D

E

F

G

3

A306

3

A306

1

A304

5' - 0" 22' - 0" 27' - 0" 17' - 6"

21

' - 6

"2

6' -

0"

26

' - 0

"2

6' -

0"

21

' - 0

"5

' - 0

"

5681 SF

Office 4th floor

401

752 SF

Hallway

400

131 SF

Wbath

403

56 SF

Electric

404

107 SF

Mbath

402

1069 SF

Balcony

406

2

B

A

3' -

0"

1.0

3' - 6"

39 SF

janitor

405

UP DN

UP DN

25 22 26

16

16

28 222828

36

36

3636

37

37

37

32

37

37

37

32

37

37

37

32

35

41

12

41

14

12

12

12

12

14

2

A306

2

A306

1

A302

1

A302

2

A301

2

A301

1

A303

1

A303

1.5

1.5

3 4 5

A.5A.5

C

D

E

F

G

3

A306

3

A306

1

A304

21

' - 6

"2

6' -

0"

26

' - 0

"2

6' -

0"

21

' - 0

"5

' - 0

"

5' - 0" 22' - 0" 27' - 0" 17' - 6"

2

B

A

3' -

0"

1.0

3' - 6"

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

Scale

Date

Drawn By

Checked By

Project Number

1/8" = 1'-0"

4/5/2013 4:10:27 PM

A103

Fourth Floor, RoofPlan

ProjectVanucur

CG

CLG

100

Pro

ject V

anucur

1 E

. H

igh S

tre

et O

xfo

rd O

H

1/8" = 1'-0"1

4th Floor 1/8" = 1'-0"

2ROOF

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 7: Construction Document Set

2

A306

2

A306

1

A302

1

A302

2

A301

1

A303

1

A303

1.5

1.5

3 4 5

A.5A.5

C

D

E

F

G

3

A306

3

A306

1

A304

5' - 0" 22' - 0" 27' - 0" 17' - 6"

21

' - 6

"2

6' -

0"

26

' - 0

"2

6' -

0"

21

' - 0

"5

' - 0

"

4' -

10"

12' -

0"

4' -

8"

7' -

4"

12' -

0"

6' -

8"

5' -

0"

8' -

0"

8' -

0"

5' -

0"

5' -

0"

8' -

0"

8' -

0"

5' -

0"

5' -

6"

3' - 2" 5' - 0" 8' - 0" 8' - 6" 5' - 6" 4' - 0" 9' - 5" 4' - 1"

6' -

6"

6' -

6"

6' -

6"

6' -

6"

6' -

6"

6' -

6"

4' -

0"

6' -

6"

2' -

0"

4' -

6"

6' -

8"

2' -

4"

4' -

0"

6' -

6"

2

B

A

3' -

0"

1.0

Open

Open

Open

Open

Open

acoustic ceiling tiles

GypsumBoard

GypsumBoard

acoustic ceiling tiles

acoustic ceiling tiles

2

A306

2

A306

1

A302

1

A302

2

A301

2

A301

1

A303

1

A303

1.5

1.5

3 4 5

A.5A.5

C

D

E

F

G

3

A306

3

A306

1

A3045' - 0" 22' - 0" 27' - 0" 17' - 6"

21

' - 6

"2

6' -

0"

26

' - 0

"2

6' -

0"

21

' - 0

"5

' - 0

"

8' - 5" 8' - 3" 7' - 8" 2' - 8" 5' - 4" 8' - 0" 4' - 2"

4' -

8 3

/16"

9' -

0"

8' -

0"

9' -

0"

9' -

0"

8' -

0"

9' -

0"

9' -

0"

8' -

0"

9' -

0"

6' -

6"

6' -

6"

6' -

6"

6' -

6"

6' -

6"

6' -

6"

6' -

6"

5' -

3"

1' -

3"

6' -

6"

6' -

0"

0' -

6"

6' -

6"

6' -

6"

6' -

6"

6' -

4"

2

B

A

3' -

0"

1.0

3' - 6"

Open

Open

Open

Open

Open

Open

Open

OpenOpen

Open

acoustic ceiling tiles

GypsumBoard

acoustic ceiling tiles

GypsumBoard

GypsumBoard

GypsumBoard

Scale

Date

Drawn By

Checked By

Project Number

1/8" = 1'-0"

4/5/2013 4:10:28 PM

A104

First/Second FloorReflected Ceiling

Plans

ProjectVanucur

CG

CLG

100

Pro

ject V

anucur

1 E

. H

igh S

tre

et O

xfo

rd O

H

1/8" = 1'-0"1

1st Floor Reflected Ceiling Plan 1/8" = 1'-0"

22nd Floor Reflected Ceiling Plan

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 8: Construction Document Set

2

A306

2

A306

1

A302

1

A302

2

A301

2

A301

1

A303

1

A303

1.5

1.5

3 4 5

A.5A.5

C

D

E

F

G

3

A306

3

A306

1

A304

21

' - 6

"2

6' -

0"

26

' - 0

"2

6' -

0"

21

' - 0

"5

' - 0

"

5' - 0" 22' - 0" 27' - 0" 17' - 6"

6' -

6"

6' -

6"

6' -

6"

6' -

6"

6' -

6"

6' -

6"

6' -

6"

6' -

6"

6' -

6"

6' -

6"

6' -

6"

6' -

6"

6' -

6"

6' -

6"

9' -

0"

8' -

0"

9' -

0"

9' -

0"

8' -

0"

9' -

0"

9' -

0"

8' -

0"

9' -

0"

2

B

A

3' -

0"

8' - 5" 8' - 3" 7' - 8" 2' - 8" 5' - 4" 8' - 0" 4' - 2"

1.0

3' - 6"

Open

Open

Open

OpenOpen

Open

Open

Open

Open

Open

acoustic ceiling tiles

GypsumBoard

acoustic ceiling tiles

GypsumBoard

GypsumBoard

GypsumBoard

2

A306

2

A306

1

A302

1

A302

2

A301

2

A3011

A303

1

A303

1.5

1.5

3 4 5

A.5

C

D

E

F

G

3

A306

3

A306

1

A304

5' - 0" 22' - 0" 27' - 0" 17' - 6"

21

' - 6

"2

6' -

0"

26

' - 0

"2

6' -

0"

21

' - 0

"5

' - 0

"

8' - 5" 8' - 3" 7' - 8" 2' - 8" 5' - 4" 8' - 0" 4' - 2"

9' -

0"

8' -

0"

9' -

0"

9' -

0"

8' -

0"

9' -

0"

9' -

0"

8' -

0"

9' -

0"

6' -

6"

6' -

6"

6' -

6"

6' -

6"

6' -

6"

6' -

6"

6' -

6"

5' -

3"

1' -

3"

6' -

6"

6' -

6"

6' -

6"

6' -

6"

6' -

6"

6' -

6"

2

B

A

3' -

0"

1.0

3' - 6"

Open

NoFinishedCeiling

No finishedCeiling

Open

Open

Open

Open

OpenOpen

Open

acoustic ceiling tiles

GypsumBoard

acoustic ceiling tiles

GypsumBoard

GypsumBoard

GypsumBoard

Scale

Date

Drawn By

Checked By

Project Number

1/8" = 1'-0"

4/5/2013 4:10:30 PM

A105

Third/Fourth FloorReflected Ceiling

Plans

ProjectVanucur

CG

CLG

100

Pro

ject V

anucur

1 E

. H

igh S

tre

et O

xfo

rd O

H

1/8" = 1'-0"1

3rd Floor Reflected Ceiling Plan 1/8" = 1'-0"

24th Floor Reflected Ceiling Plan

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 9: Construction Document Set

1st Floor0' - 0"

2

A306

2nd Floor15' - 0"

3rd Floor28' - 0"

4th Floor41' - 0"

ROOF53' - 9"

A.5 C D E F G3

A306

B

Precast concrete

Light Red Brick Veneer

Red Brick Veneer

Travertine

Travertine

Copper Skin Roof

Travertine

Light Red Brick Veneer

Travertine

Light Red Brick Veneer

Concrete Column

Precast concrete

1st Floor0' - 0"

1

A302

2nd Floor15' - 0"

3rd Floor28' - 0"

4th Floor41' - 0"

ROOF53' - 9"

2

A301

1

A303 1.5345

1

A304

1.0

Precast concrete

Light Red Brick Veneer

Red Brick Veneer

Travertine

Travertine

Copper Skin Roof

Travertine

Light Red Brick Veneer

Travertine

Light Red Brick Veneer

Concrete Column

Scale

Date

Drawn By

Checked By

Project Number

1/8" = 1'-0"

4/5/2013 4:10:32 PM

A201

elevation north andwest

ProjectVanucur

CG

CLG

100

Pro

ject V

anucur

1 E

. H

igh S

tre

et O

xfo

rd O

H

1/8" = 1'-0"2

Elevation west side

1/8" = 1'-0"1

Elevation North Side

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 10: Construction Document Set

1st Floor0' - 0"

1

A302

2nd Floor15' - 0"

3rd Floor28' - 0"

4th Floor41' - 0"

ROOF53' - 9"

2

A301

1

A303

1.5 3 4 51.0

Light Red Brick Veneer

Concrete Masonry

Concrete

Travertine

Light Red Brick Veneer

Red Brick Veneer

Concrete masonry

1st Floor0' - 0"

2

A306

2nd Floor15' - 0"

3rd Floor28' - 0"

4th Floor41' - 0"

ROOF53' - 9"

foundation-8' - 3"

A.5CDEFG

3

A306

Concrete Masonry

LightBrick Veneer

Light Brick Veneer

Travertine

Scale

Date

Drawn By

Checked By

Project Number

1/8" = 1'-0"

4/5/2013 4:10:34 PM

A202

elevation southand east

ProjectVanucur

CG

CLG

100

Pro

ject V

anucur

1 E

. H

igh S

tre

et O

xfo

rd O

H

1/8" = 1'-0"2

Elevation south side

1/8" = 1'-0"1

Elevation east side

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 11: Construction Document Set

1st Floor0' - 0"

2

A306

2nd Floor15' - 0"

3rd Floor28' - 0"

4th Floor41' - 0"

ROOF53' - 9"

foundation-8' - 3"

A.5 C D E F G

3

A306

A402

2

A410

1

Scale

Date

Drawn By

Checked By

Project Number

1/8" = 1'-0"

4/5/2013 4:10:35 PM

A301

section lookingeast

ProjectVanucur

CG

CLG

100

Pro

ject V

anucur

1 E

. H

igh S

tre

et O

xfo

rd O

H

1/8" = 1'-0"2

Section looking east

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 12: Construction Document Set

1st Floor0' - 0"

2

A306

2nd Floor15' - 0"

3rd Floor28' - 0"

4th Floor41' - 0"

ROOF53' - 9"

C D E F G

3

A306

----

A

Scale

Date

Drawn By

Checked By

Project Number

1/8" = 1'-0"

4/5/2013 4:10:39 PM

A302

section 3 core

ProjectVanucur

CG

CLG

100

Pro

ject V

anucur

1 E

. H

igh S

tre

et O

xfo

rd O

H

1/8" = 1'-0"1

Section core looking east

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 13: Construction Document Set

1st Floor0' - 0"

2

A306

2nd Floor15' - 0"

3rd Floor28' - 0"

4th Floor41' - 0"

ROOF53' - 9"

A.5 C D E F G

3

A306

A407

2

Scale

Date

Drawn By

Checked By

Project Number

1/8" = 1'-0"

4/5/2013 4:10:42 PM

A303

Section East 2

ProjectVanucur

CG

CLG

100

Pro

ject V

anucur

1 E

. H

igh S

tre

et O

xfo

rd O

H

1/8" = 1'-0"1

Section lightwell

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 14: Construction Document Set

1st Floor0' - 0"

2

A306

2nd Floor15' - 0"

3rd Floor28' - 0"

4th Floor41' - 0"

ROOF53' - 9"

A.5 C

A408

1

Scale

Date

Drawn By

Checked By

Project Number

1/4" = 1'-0"

4/5/2013 4:10:43 PM

A304

Section corner ofbuilding

ProjectVanucur

CG

CLG

100

Pro

ject V

anucur

1 E

. H

igh S

tre

et O

xfo

rd O

H

1/4" = 1'-0"1

Section corner of building

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 15: Construction Document Set

1st Floor0' - 0"

1

A302

2nd Floor15' - 0"

3rd Floor28' - 0"

4th Floor41' - 0"

ROOF53' - 9"

2

A301

1

A303

foundation-8' - 3"

1.5 3 4 5

1

A304

1.0

1st Floor0' - 0"

1

A302

2nd Floor15' - 0"

3rd Floor28' - 0"

4th Floor41' - 0"

ROOF53' - 9"

2

A301

1

A303

foundation-8' - 3"

1.5 3 4 5

A402

1

1.0 A4071

Scale

Date

Drawn By

Checked By

Project Number

1/8" = 1'-0"

4/5/2013 4:10:46 PM

A306

section lookingnorth

ProjectVanucur

CG

CLG

100

Pro

ject V

anucur

1 E

. H

igh S

tre

et O

xfo

rd O

H

1/8" = 1'-0"2

Section looking north 1/8" = 1'-0"

3Section north lightwell

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 16: Construction Document Set

2

A301

2

A301

1

A303

1

A303

3

A306

3

A306

- ---

4 d

ee

p fry

ers

48

x 3

0 in g

rid

dle

with

ove

n o

n b

otto

m

72

in

co

okin

g r

ang

ew

ith

12

burn

ers

an

dtw

o o

ven

s o

n b

otto

m

2 3

0 x

30

co

nve

ctio

no

ven

s s

tacke

d

Wa

ter

he

ate

rs

Po

p C

oo

lers

/R

efr

ige

rato

rs

Po

p C

oo

lers

/R

efr

ige

rato

rs

Expre

sso

Machin

eB

eve

rage

Dis

pen

se

rIc

e M

ach

ine

ga

rbag

ed

isposal

com

me

rcia

ld

ish

washer

Scale

Date

Drawn By

Checked By

Project Number

1/2" = 1'-0"

4/8/2013 3:48:17 PM

A401

Kitchen detail

ProjectVanucur

CG

CLG

100

Pro

ject V

anucur

1 E

. H

igh S

tre

et O

xfo

rd O

H

1/2

" =

1'-0

"1

Kitch

en o

f L

eve

l 1

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 17: Construction Document Set

1st Floor0' - 0"

2nd Floor15' - 0"

3rd Floor28' - 0"

4th Floor41' - 0"

ROOF53' - 9"

foundation-8' - 3"

1.5

A4042

A4052

metal studs 6"

Brick veneer

Storefront window, double paned

metal studs 6"

precast concrete panel 4"

travertine

5" rigid insulation

concrete column (background)

1.0

---

-

3' -

0"

1st Floor0' - 0"

2nd Floor15' - 0"

3rd Floor28' - 0"

4th Floor41' - 0"

ROOF53' - 9"

A.5

A4041

Brick Veneer

5 in rigid insulation

Metal stud 6"

Travertine stud wall

precast concrete stud wall

metal studs 6"

Storefront window doublepaned

concrete column(background)

A4051

---

-

Scale

Date

Drawn By

Checked By

Project Number

3/8" = 1'-0"

4/5/2013 4:10:49 PM

A402

wall sections

ProjectVanucur

CG

CLG

100

Pro

ject V

anucur

1 E

. H

igh S

tre

et O

xfo

rd O

H

3/8" = 1'-0"1

wall Section west

3/8" = 1'-0"2

wall section north

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 18: Construction Document Set

128 SF

Wbath

203

102 SF

Mbath

202

56 SF

Electrical

205

39 SF

Janitor

204

12

12

12

12

2

A306

2

A306

2

A301

2

A301

1

A303

1

A303

1.5 3 4

A.5

C

D

E

1

A304

2

B

A

Scale

Date

Drawn By

Checked By

Project Number

As indicated

4/7/2013 9:17:08 PM

A403

detail plans

ProjectVanucur

CG

CLG

100

Pro

ject V

anucur

1 E

. H

igh S

tre

et O

xfo

rd O

H

1/2" = 1'-0"4

bathroom 2

1/8" = 1'-0"5

1st floor furniture plan

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 19: Construction Document Set

2nd Floor15' - 0"

1.5

20K9 open web steel joist

3 in concrete floor

2 in corrugated metal decking

L 7.5x5x1/2 angle

5 in metal stud with batt insulation

travertine 9"

W 12 x 26 Wide Flange

L 9x3x1/2 angle

rigid insulation

metal soffit

concrete column (background)

5 inch metal stud w/ batt insulation

HP Bearing Column 10 x 42

L 8x6x1/2 angle

window

dark brick veneer

----

metal support b/w travertine and stud

L 6x4x1/2 angle

2nd Floor15' - 0"

A.5

metal soffit

5 inch metal stud

concrete column (background)

travertine 9"

5 in metal stud w/ batt insulation

W 12 x 26 Wide Flange

L 7.5 x 5 x 1/2 angle

2 in corrugated metal decking

3 inch concrete floor

dark brick veneer

L8x6x1/2 Angle

20K9 open web steel joist

0' - 11"

L 9 x 3 x 1/2 angle

1 in air space

HP 10 x 42 column

Storefront window double paned

Metal support b/w travertine and stud

L 6x4x1/2 angle

metal soffit

Rigid Insulation

Scale

Date

Drawn By

Checked By

Project Number

1 1/2" = 1'-0"

4/8/2013 3:47:51 PM

A404

details section floor2

ProjectVanucur

CG

CLG

100

Pro

ject V

anucur

1 E

. H

igh S

tre

et O

xfo

rd O

H

1 1/2" = 1'-0"2

wall section west floor 2 1 1/2" = 1'-0"

1wall section north floor 2

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 20: Construction Document Set

ROOF53' - 9"

A.5

moisture barrier

3 in metal stud brace

rigid insulation infill

stone ballast

metal deck

W 12 x 26

HP 10 x 42

L 8x6x1/2 angle

L 8x6x1/2 angle

rigid insulation

concrete 4 in

concrete parapet

concrete 9 in

metal support

metal stud 5 in

1 in air space

Roof Drain

ROOF53' - 9"

1.5

moisture barrier

3 in metal stud brace

ridid insulation infill

stone ballast

rigid insulation

metal deck

20K9 open web joist

W 12 x 26

HP 10 x 42

L 8x6x1/2

concrete parapet

concrete 9 in

metal support

metal stud 5 in

1in air space

concrete 4 in

L 8x6x1/2 angle

Roof drain

Scale

Date

Drawn By

Checked By

Project Number

1 1/2" = 1'-0"

4/5/2013 4:10:53 PM

A405

details section roof

ProjectVanucur

Checker

CLG

100

Pro

ject V

anucur

1 E

. H

igh S

tre

et O

xfo

rd O

H

1 1/2" = 1'-0"1

wall section north roof 1 1/2" = 1'-0"

2wall section west roof

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 21: Construction Document Set

GENERAL NOTES

RESIDENTIAL STEEL FRAME STRUCTURE w/ MASONRYVENEER

WINDOW HEAD DETAIL(HEATINGCLIMATE)

*SEAL ALL TYVEK JOINTS OR PENETRATIONS WITH APPROVED TAPE.

(ex. DUPONT CONTRACTOR TAPE)

*FASTEN TYVEK AND RIGID INSULATION TO STEEL STUDS

USING SCREWS W/ WASHERS.(ex. DUPONT WRAPCAPS)

* SEAL OR GASKET BRICK TIES AT THE FACE OF TYVEK

*LOCAL LAWS, ZONING, AND BUILDING CODES VARY AND

THEREFORE GOVERNS OVER MATERIAL SELECTION AND DETAILING SHOWN

BELOW.

LAP 6" & TAPE TYVEK

OVER THROUGH−WALL

FLASHING

TAPE THROUGH−WALL

FLASHING TO RIGID

INSULATION USING

TYVEK FLEXWRAP

CAULKING

MINIMALLY EXPANDINGPOLYURETHANE FOAMOR APPROVED CAULK

(AROUND WINDOW RSO)

WINDOW

TYPICAL WALL

MASONRY VENEER

1" AIR SPACE

TYVEK HOMEWRAP

1−1/2" RIGID INSULATION

4" STEEL STUDS

w/ R−13 BATT INSULATION

VAPOR RETARDER

1/2" GYPSUM BOARD

METAL LINTEL

WINDOW SILL DETAILRESIDENTIAL STEEL FRAME STRUCTURE w/ MASONRYVENEER

GENERAL NOTES

(HEATINGCLIMATE)

*SEAL ALL TYVEK JOINTS AND PENETRATIONS WITH APPROVED TAPE.

(ex. DUPONT CONTRACTOR TAPE)

*FASTEN TYVEK AND RIGID INSULATION TO STEEL STUDS

USING SCREWS W/ WASHERS.(ex. DUPONT WRAPCAPS)

* SEAL OR GASKET BRICK TIES AT THE FACE OF TYVEK

*LOCAL LAWS, ZONING, AND BUILDING CODES VARY AND

THEREFORE GOVERNS OVER MATERIAL SELECTION AND DETAILING SHOWN

BELOW.

CAULKING

THROUGH−WALL FLASHING

WRAP TYVEK INTO

OPENING & TAPE TO

SILL (ESP. @ CORNERS) &

OVER FLASHING

USING TYVEK FLEXWRAP

LAP & TAPE TYVEK

AT JOINTS (UPPER SHEET

OVER LOWER SHEET)

WINDOW

INSTALL TYVEK FLEXWRAP

AROUND PERIMETER OF OPENING

MINIMALLY EXPANDINGPOLYURETHANE FOAMOR APPROVED CAULK

(AROUND WINDOW RSO)

TYPICAL WALL

MASONRY VENEER1" AIR SPACE

TYVEK HOMEWRAP

1−1/2" RIGID INSULATION4" STEEL STUDSw/ R−13 BATT INSULATIONVAPOR RETARDER 1/2" GYPSUM BOARD

CONCRETE SILL w/ DRIP EDGE

FASTEN TYVEK FLEXWRAP

CORNER USING MECHANICAL

FASTENER

Scale

Date

Drawn By

Checked By

Project Number

4/7/2013 9:17:42 PM

A406

Details sectionwindows

ProjectVanucur

Checker

CLG

100

Pro

ject V

anucur

1 E

. H

igh S

tre

et O

xfo

rd O

H

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 22: Construction Document Set

ROOF53' - 9"

4

triple glazed roof

mullein

steel connection plate

steel MT 9x5

3 1/2 in metal studs

insulation

steel cladding

Hatch over Kitchen vent

moisture barrier

1 in air space

L 7x5x1/2 angle

W 12x26

Exhaust vent from kitchen

L 7x5x1/2 angle

4 7/8 int partition

gyp wall board

Stone ballast

rigid insulation

metal deck

W 12x26

ROOF53' - 9"

triple pane glazing

L 3x2x1/2

mullein

MT 9x5 Steel

3 1/2 in metal studs

1 in air space

gyp wall board

steel cladding

stone ballast

rigid insulation

metal deck

L 7x5x1/2 angle

W 12 x 26 (sloping)

L 7x5x1/2 angle

20K9 open web joist

Drop ceiling

curtain wall

Scale

Date

Drawn By

Checked By

Project Number

1 1/2" = 1'-0"

4/5/2013 4:10:53 PM

A407

Detail sectionlightwell

ProjectVanucur

Checker

CLG

100

Pro

ject V

anucur

1 E

. H

igh S

tre

et O

xfo

rd O

H

1 1/2" = 1'-0"1

Lightwell detail north 1 1/2" = 1'-0"2

Lightwell detail west

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 23: Construction Document Set

ROOF53' - 9"

A.5

A408

3

A4082

L6X4X1/2

W12X

26

W12X26

MC8X8.5

W12X

26

L6X4X1/2

MC8X8.5

MC

8X

8.5

MC8X8.5

MC8X8.5

L4X4X1/2 2 2

L5X4X1/4 2

L5X4X1/4 2

C5 1

/2

C5 1

/2

C5 1

/2

C5 1

/2

C5 1

/2

C5 1

/2

C5 1

/2

C5 1

/2

C5 1

/2

C5 1

/2

C5 1

/2

C5 1

/2

C5 1

/2

C5 1

/2

C5 1

/2

C5 1

/2

C5

1/2

C5 1/2

C5 1

/2

C5 1/2

C5 1

/2

C5

1/2

C5 1

/2

Metal Roof

rigid insulation

2 overlappinglayers plywood

Steel flat plate

ROOF53' - 9"

ROOF53' - 9"

W12X

26

C5 1

/2

MC8X8.5

L6X4X1/2

Scale

Date

Drawn By

Checked By

Project Number

As indicated

4/5/2013 4:10:54 PM

A408

Detail sectioncorner roof

ProjectVanucur

Checker

CLG

100

Pro

ject V

anucur

1 E

. H

igh S

tre

et O

xfo

rd O

H

3/4" = 1'-0"1

corner of building roof

1 1/2" = 1'-0"3

corner of building roof edge N

1 1/2" = 1'-0"2

Corner of building roof edge S

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 24: Construction Document Set

3

E

5

C

2nd Floor15' - 0"

3rd Floor28' - 0"

Scale

Date

Drawn By

Checked By

Project Number

As indicated

4/8/2013 3:52:59 PM

A409

details columnsand stairwell

ProjectVanucur

Checker

Author

100

Pro

ject V

anucur

1 E

. H

igh S

tre

et O

xfo

rd O

H

1 1/2" = 1'-0"1

detail of interior wet column

1 1/2" = 1'-0"2

detail of exterior column

8 in cmu

12 in cmu b/w elvator and stairwell

HP 10 x 42

concrete encased column

8 in cmu wall

Space for W 12x26 beam

HP 10 x 42

Various plumbing:roof drain

hot/cold water

3.5 in Metal stud

insulation maybe?

5/8 gyp board

shaft for ductwork

1/2" = 1'-0"3

callout of south staircase

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 25: Construction Document Set

1st Floor0' - 0"

2nd Floor15' - 0"

D E3

A306

3

A306

Scale

Date

Drawn By

Checked By

Project Number

1/2" = 1'-0"

4/5/2013 4:10:55 PM

A410

Interior elevations

ProjectVanucur

Checker

CLG

100

Pro

ject V

anucur

1 E

. H

igh S

tre

et O

xfo

rd O

H

1/2" = 1'-0"1

1st floor bathroom elevation

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 26: Construction Document Set

Scale

Date

Drawn By

Checked By

Project Number

4/5/2013 4:10:55 PM

A500

window schedule,Door Schedule

ProjectVanucur

CG

CLG

100

Pro

ject V

anucur

1 E

. H

igh S

tre

et O

xfo

rd O

H

Window Schedule

Family Type Height Level Count Type Mark

Fixed

Fixed 2 x 3.5 3' - 4" 1st Floor 4 121

Fixed 2 x 7.5 7' - 5" 1st Floor 4 122

Fixed 6 x 3 2' - 6" 1st Floor 17 161

Fixed 6 x 4 3' - 4" 1st Floor 2 162

Fixed 6x7 7' - 0" 1st Floor 15 163

Fixed 36" x 24" 2' - 0" 1st Floor 1 13

fixed window for spring studio

fixed window for spring studio 6 x 9 8' - 6" 4th Floor 2 16

fixed window for spring studio 3 panel

fixed window for spring studio 3 panel 2 x 10 10' - 0" 12 32

fixed window for spring studio 3 panel 5 x 10 10' - 0" 6 35

fixed window for spring studio 3 panel 6 x 10 10' - 0" 16 36

fixed window for spring studio 3 panel 7 x 10 10' - 0" 36 37

fixed window for spring studio other 2 panel

fixed window for spring studio other 2 panel 2 x 9 8' - 6" 4th Floor 2 22

fixed window for spring studio other 2 panel 5 x 9 8' - 6" 4th Floor 1 25

fixed window for spring studio other 2 panel 6 x 9 8' - 6" 4th Floor 1 26

fixed window for spring studio other 2 panel 8 x 9 8' - 6" 4th Floor 3 28

Skylight-Major_Industries-Ridge_End

Skylight-Major_Industries-Ridge_End Ridge withEnd Walls

6' - 10 9/32" ROOF 1 14

Grand total: 123

Door Schedule

Mark Family Height Width Type CountFrame

Material

11 Single-Flush 6' - 8" 2' - 0" 24" x 80" 1 metal

12 Single-Flush 6' - 8" 2' - 6" 30" x 80" 14 metal

13 Single-Flush 6' - 8" 3' - 0" 36" x 80" 6 metal

14 Single-Flush 7' - 0" 3' - 0" 36" x 84" 7 metal

15 Single-Flush 7' - 0" 4' - 0" 48" x 84" 1 metal

21 Double-Glass 1 7' - 0" 6' - 0" 72" x 84" 1 aluminumand glass

22 Double-Glass 1 7' - 4" 5' - 8" 68" x 84" 6 aluminumand glass

31 Double-Panel 1 6' - 8" 5' - 8" 68" x 80" 4 metal

41 Sliding-2 panel opaque 6' - 8" 4' - 2" 50" x 80" 9 metal

Grand total: 49

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 27: Construction Document Set

Scale

Date

Drawn By

Checked By

Project Number

4/5/2013 4:10:56 PM

A600

room finishschedule

ProjectVanucur

CG

CLG

100

Pro

ject V

anucur

1 E

. H

igh S

tre

et O

xfo

rd O

H

Room Schedule

Number Name Level Area Floor Finish Ceiling Finish Wall Finish Base Finish

101 Vestibule 1st Floor 126 SF Concrete Gypsum board ceiling gyp board rubber

102 Restaurant dining 1st Floor 2834 SF Hardwood Gypsum board ceiling wood wood no 1

103 elevator hall 1st Floor 415 SF Hardwood Gypsum board ceiling gyp board wood no 2

104 Office Lobby 1st Floor 242 SF Hardwood Gypsum board ceiling gyp board wood no 2

106 Back Hall 1st Floor 271 SF Concrete Gypsum board ceiling gyp board rubber

107 Kitchen 1st Floor 819 SF Rubber Tile Acoustic hung ceiling fiberglasswall panel

rubber

108 Retail 1st Floor NotEnclosed

Carpet Acoustic hung ceiling gyp board none

109 Wbath 1st Floor 198 SF CeramicTile

Acoustic hung ceiling fiberglasswall panel

rubber

110 Mbath 1st Floor 177 SF Tile Acoustic hung ceiling fiberglasswall panel

rubber

111 Restroom 1st Floor 35 SF Tile Acoustic hung ceiling fiberglasswall panel

rubber

112 Mechanical 1st Floor 305 SF Concrete Gypsum board ceiling gyp board rubber

113 elevator supply 1st Floor 48 SF Concrete Gypsum board ceiling gyp board rubber

200 Hallway 2nd Floor 721 SF Concrete Gypsum board ceiling gyp board wood no 2

201 Office 2nd floor 2nd Floor 7667 SF Hardwood Acoustic hung ceiling gyp board wood no 2

202 Mbath 2nd Floor 102 SF CeramicTile

Gypsum board ceiling fiberglasswall panel

rubber

203 Wbath 2nd Floor 128 SF CeramicTile

Gypsum board ceiling fiberglasswall panel

rubber

204 Janitor 2nd Floor 39 SF Concrete Gypsum board ceiling gyp board rubber

205 Electrical 2nd Floor 56 SF Concrete Gypsum board ceiling gyp board rubber

300 Hallway 3rd Floor 707 SF Concrete Gypsum board ceiling gyp board wood no 2

301 Office 3rd floor 3rd Floor 6863 SF Hardwood Acoustic hung ceiling gyp board wood no 2

302 Mbath 3rd Floor 102 SF CeramicTile

Gypsum board ceiling fiberglasswall panel

rubber

303 Wbath 3rd Floor 127 SF CeramicTile

Gypsum board ceiling fiberglasswall panel

rubber

304 Electric 3rd Floor 56 SF Concrete Gypsum board ceiling gyp board rubber

305 janitor 3rd Floor 39 SF Concrete Gypsum board ceiling gyp board rubber

400 Hallway 4th Floor 752 SF Concrete Gypsum board ceiling gyp board wood no 2

401 Office 4th floor 4th Floor 5681 SF Hardwood Acoustic hung ceiling gyp board wood no 2

402 Mbath 4th Floor 107 SF CeramicTile

Gypsum board ceiling fiberglasswall panel

rubber

403 Wbath 4th Floor 131 SF CeramicTile

Gypsum board ceiling fiberglasswall panel

rubber

404 Electric 4th Floor 56 SF Concrete Gypsum board ceiling gyp board rubber

405 janitor 4th Floor 39 SF Concrete Gypsum board ceiling gyp board rubber

406 Balcony 4th Floor 1069 SF Concrete none none none

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 28: Construction Document Set

2

A306

2

A306

1

A302

1

A302

2

A301

2

A301

1

A303

1

A303

1.5

1.5

3 4 5

A.5A.5

C

D

E

F

G

3

A306

1

A304

5' - 0" 22' - 0" 27' - 0" 17' - 6"

21

' - 6

"2

6' -

0"

26

' - 0

"2

6' -

0"

21

' - 0

"5

' - 0

"

3' - 6"

2

B

A

3' -

0"

1.0

Scale

Date

Drawn By

Checked By

Project Number

1/8" = 1'-0"

4/5/2013 4:11:06 PM

S101

foundation

ProjectVanucur

CG

CLG

100

Pro

ject V

anucur

1 E

. H

igh S

tre

et O

xfo

rd O

H

1/8" = 1'-0"1

foundation

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 29: Construction Document Set

2

A306

2

A306

1

A302

1

A302

2

A301

2

A301

1

A303

1

A303

1.5

1.5

3 4 5

A.5A.5

C

D

E

F

G

3

A306

3

A306

1

A304

5' - 0" 22' - 0" 27' - 0" 17' - 6"

21

' - 6

"2

6' -

0"

26

' - 0

"2

6' -

0"

21

' - 0

"5

' - 0

"

W12X26 W12X26

W12X26 W12X26 W12X26

W12X26 W12X26 W12X26

W12X26 W12X26

W12X26 W18 X26 2

W12X

26

W12X

26

W12X

26

W12X

26

W12X

26

W12X

26

W12X

26

W12X

26

W12X

26

W12X

26

W12X

26

W12X

26

W12X

26 W

12X

26

W12X

26

W12X26

W12X26

W12X

26

W12X

26

W12X

26

W12X

26

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

2

B

A

3' -

0"

1.03' - 6"

W12X26

W12X

26

W6X9

W12X

26

20K9

20K9

20K9

20K9

L6X

4X

1/2

W12X

26

W12X26

W12X26

20K

9

20K

9

12K1

12K1

12K1

12K

120K

9

12K1

12K1

12K1

12K1

12K1

12K1

12K1

8K

1

8K

1

8K

18K

1

8K

1

8K

1

W6X9

W6X9

W12X

26

W12X

26

W12X26

MT

6X

5.9

MT

6X

5.9

MT

6X

5.9

MT

6X

5.9

20K

9

20K

9

20K

9

20K9

20K9

20K9

20K9

20K9

20K

920K

9

2

A306

2

A306

1

A302

1

A302

2

A301

2

A301

1

A303

1

A303

1.5

1.5

3 4 5

A.5A.5

C

D

E

F

G

3

A306

3

A306

1

A3045' - 0" 22' - 0" 27' - 0" 17' - 6"

21

' - 6

"2

6' -

0"

26

' - 0

"2

6' -

0"

21

' - 0

"5

' - 0

"

W12X26

W12X26

W12X26 W12X26

W12X26

W12X26

W12X26

W12X26

W12X26

W12X

26

W12X

26

W12X

26

W12X

26

W12X

26

W12X

26

W12X26

W12X

26

W12X

26

W12X

26

W12X

26

W12X

26

W12X

26

W12X26

W12X26

W12X26

W12X

26

W12X

26

W12X

26

W12X

26

W12X

26

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

W12X26

W6X9

W12X

26

W12X26

W12X

26

MT

6X

5.9

MT

6X

5.9

MT

6X

5.9

MT

6X

5.9

L6X

4X

1/2

W12X

26

2

B

A

3' -

0"

1.0 3' - 6"

W12X26

W12X

26

20K

9

12K1

12K1

12K1

12K

1

W12X26

W12X26

20K

9

12K1

12K1

12K1

12K1

12K1

12K1

12K1

8K

1

8K

1

8K

18K

1

8K

1

8K

1

W6X9

W6X9

W12X

26

W12X

26

20K

9

20K

9

20K

9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K

9

20K9

20K9

20K9

20K9

20K9

20K9

20K

9

Scale

Date

Drawn By

Checked By

Project Number

1/8" = 1'-0"

4/5/2013 4:11:07 PM

S102

framing plan floors2 and 3

ProjectVanucur

CG

CLG

100

Pro

ject V

anucur

1 E

. H

igh S

tre

et O

xfo

rd O

H

1/8" = 1'-0"2

2nd Floor 1/8" = 1'-0"

13rd Floor

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 30: Construction Document Set

2

A306

1

A302

1

A302

2

A301

2

A301

1

A303

1

A303

1.5

1.5

3 4 5

A.5A.5

C

D

E

F

G

3

A306

1

A3045' - 0" 22' - 0" 27' - 0" 17' - 6"

21

' - 6

"2

6' -

0"

26

' - 0

"2

6' -

0"

21

' - 0

"5

' - 0

"

W12X26

W12X26 W12X26 W12X26

W12X26 W12X26

W12X26 W12X26

W12X26 W18 X26 2

W12X

26

W12X

26

W12X

26

W12X

26

W12X

26

W12X

26

W12X

26

W12X

26

W12X

26 W

12X

26

W12X

26

W12X

26

W12X

26

W12X

26

W12X26

W12X

26

W12X

26

W12X

26

W12X

26

W12X26

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

2

B

A

3' -

0"

1.0

3' - 6"

W12X26

W12X

26

W12X26

W12X26

W12X26

W12X

26 W6X9

20K9

MT

6X

5.9

MT

6X

5.9

MT

6X

5.9

MT

6X

5.9

L6X

4X

1/2

20K

9

20K

9

12K1

12K1

12K1

12K

120K

9

12K1

12K1

12K1

12K1

12K1

12K1

12K18K

1

8K

1

8K

18K

1

8K

1

8K

1

W12X26

W6X9

W6X9

W12X

26

W12X

26

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

W12X

26

W12X26

20K

9

20K

9

20K

9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K920K9

20K9

20K9

20K

920K

9

20K9

Scale

Date

Drawn By

Checked By

Project Number

1/8" = 1'-0"

4/5/2013 4:11:07 PM

S103

framing plan floor 4

ProjectVanucur

CG

CLG

100

Pro

ject V

anucur

1 E

. H

igh S

tre

et O

xfo

rd O

H

1/8" = 1'-0"1

4th Floor

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 31: Construction Document Set

2

A306

1

A302

1

A302

2

A301

2

A301

1

A303

1

A303

1.5

1.5

3 4 5

A.5A.5

C

D

E

F

G

3

A306

3

A306

1

A3045' - 0" 22' - 0" 27' - 0" 17' - 6"

21

' - 6

"2

6' -

0"

26

' - 0

"2

6' -

0"

21

' - 0

"5

' - 0

"

W12X

26

W12X

26

W12X

26

W12X

26

W12X26

W12X26

W12X26

W12X

26

W12X

26

W12X

26

W12X

26

W12X

26

W12X

26

W12X

26

W12X

26

W12X

26

W12X

26 W

12X

26

W12X

26

W12X

26

20K9

20K9

12K1

W12X26

20K9

2

B

A

3' -

0"

1.03' - 6"

W12X26

W12X

26

W12X

26 W6X9 W12X26

W12X26

20K

912K

120K

9

8K

1

8K

1

8K

1

W6X9W12X

26

W12X26

12K1

W12X26

W12X26

W12X26

W12X26

W12X26

W12X

26

20K

9

20K

9

20K

9

20K

9

20K

9

20K

9

20K

9

20K

9

20K

9

W12X26

12K1

12K1

12K1

12K1

12K1

20K9

20K9

20K9

20K9

20K9

20K9

20K9

12K1

12K1

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K9

20K

9

W12X

26

W12X

26

W12X

26

W12X

26

W12X26

W12X26

W12X26

W12X26

W12X26

W12X26

L6X4X1/2

W12X

26

W12X

26

Scale

Date

Drawn By

Checked By

Project Number

1/8" = 1'-0"

4/5/2013 4:11:08 PM

S104

Roof Framing Plan

ProjectVanucur

Checker

CLG

100

Pro

ject V

anucur

1 E

. H

igh S

tre

et O

xfo

rd O

H

1/8" = 1'-0"1

ROOF

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 32: Construction Document Set

Scale

Date

Drawn By

Checked By

Project Number

4/5/2013 4:11:13 PM

S200

3D axon

ProjectVanucur

CG

CLG

100

Pro

ject V

anucur

1 E

. H

igh S

tre

et O

xfo

rd O

H

1Iso web joists

2Iso foundation

3Iso columns and beams

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 33: Construction Document Set

L4X4X1/2 2 2

MC8X8.5

MC8X8.5

L5X4X1/4 2

L5X4X1/4 2

C5 1

/2

C5 1

/2

L6X4X1/2

C5 1

/2

C5 1

/2

MC

8X8.5

MC

8X

8.5

MC8X

8.5

L6X4X1/2

MC

8X

8.5

L6X4X1/2

C5 1/2

C5

1/2

C5 1

/2

C5 1/2

C5 1/2

C5

1/2

C5 1

/2

C5 1/2

C5 1/2

C5 1

/2

C5 1/2

C5 1/2

C5 1/2

C5 1

/2

C5 1/2

C5 1/2

C5 1/2

MC8X

8.5

MC8X8.5

MC8X8.5

MC

8X

8.5

MC8X

8.5

MC8X8.5

MC8X8.5

L4X4X1/2 2 2

L5X4X1/4 2

L5X4X

1/4 2

C5

1/2

C5 1

/2

C5 1/2

C5 1/2

C5

1/2

C5 1

/2

C5 1/2

25' - 7 31/32"

R 1' - 4 7/16"

R 5' - 1 25/32"

R 9' - 1 25/32"

R 12' - 9 31/32"

Scale

Date

Drawn By

Checked By

Project Number

4/5/2013 4:11:14 PM

S201

Detail axon ofcorner roof

ProjectVanucur

Checker

CLG

100

Pro

ject V

anucur

1 E

. H

igh S

tre

et O

xfo

rd O

H

13d detail of roof peak

23d detail of roof peak top

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 34: Construction Document Set

Scale

Date

Drawn By

Checked By

Project Number

4/5/2013 4:11:14 PM

S300

Framing schedulecolumns

ProjectVanucur

Checker

CLG

100

Pro

ject V

anucur

1 E

. H

igh S

tre

et O

xfo

rd O

H

Structural Column Schedule

Family Type Base Level Length

ColumnLocation

Mark

HP-Bearing Pile-Column HP10X42 4th Floor 12' - 1 1/2" C-1.5

HP-Bearing Pile-Column HP10X42 4th Floor 12' - 1 1/2" D-1.5

HP-Bearing Pile-Column HP10X42 4th Floor 12' - 1 1/2" E-1.5

HP-Bearing Pile-Column HP10X42 4th Floor 12' - 1 1/2" F-1.0

HP-Bearing Pile-Column HP10X42 4th Floor 12' - 1 1/2" G-1.0

HP-Bearing Pile-Column HP10X42 4th Floor 12' - 1 1/2" B-1.5

HP-Bearing Pile-Column HP10X42 4th Floor 12' - 1 1/2" A.5-2

HP-Bearing Pile-Column HP10X42 4th Floor 13' - 0" C-3

HP-Bearing Pile-Column HP10X42 4th Floor 13' - 0" D-3

HP-Bearing Pile-Column HP10X42 4th Floor 13' - 0" E-3

HP-Bearing Pile-Column HP10X42 4th Floor 13' - 0" F-3

HP-Bearing Pile-Column HP10X42 4th Floor 13' - 0" A.5-3

HP-Bearing Pile-Column HP10X42 4th Floor 13' - 4 1/2" G-3(-9' - 3")

HP-Bearing Pile-Column HP10X42 4th Floor 13' - 10" C-4

HP-Bearing Pile-Column HP10X42 4th Floor 13' - 10" D-4

HP-Bearing Pile-Column HP10X42 4th Floor 13' - 10" F-4

HP-Bearing Pile-Column HP10X42 4th Floor 13' - 10" A-4

HP-Bearing Pile-Column HP10X42 4th Floor 13' - 11" E-4

HP-Bearing Pile-Column HP10X42 4th Floor 14' - 5" C-5

HP-Bearing Pile-Column HP10X42 4th Floor 14' - 5" D-5

HP-Bearing Pile-Column HP10X42 4th Floor 14' - 5" E-5

HP-Bearing Pile-Column HP10X42 4th Floor 14' - 5" F-5

HP-Bearing Pile-Column HP10X42 4th Floor 14' - 5" A-5

Structural Column Schedule

Family Type Base Level Length

ColumnLocation

Mark

HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" C-3

HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" C-1.5

HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" C-4

HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" C-5

HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" D-3

HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" D-1.5

HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" D-4

HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" D-5

HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" E-3

HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" E-1.5

HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" E-4

HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" E-5

HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" F-3

HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" F-1.0

HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" F-4

HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" F-5

HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" G-5

HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" A-4

HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" A-5

HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" A.5-3

HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" G-3

HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" G-1.0

HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" B-1.5

HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" A.5-2

Structural Column Schedule

Family Type Base Level Length

ColumnLocation

Mark

HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" C-3

HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" C-1.5

HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" C-4

HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" C-5

HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" D-3

HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" D-1.5

HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" D-4

HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" D-5

HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" E-3

HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" E-1.5

HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" E-4

HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" E-5

HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" F-3

HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" F-1.0

HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" F-4

HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" F-5

HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" G-3

HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" G-5

HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" A-4

HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" A-5

HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" A.5-3

HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" G-1.0

HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" B-1.5

HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" A.5-2

Structural Column Schedule

Family Type Base Level Length

ColumnLocation

Mark

Structural Column Schedule

Family Type Base Level Length

ColumnLocation

Mark

HP-Bearing Pile-Column HP10X42 foundation 19' - 2" B-1.5

HP-Bearing Pile-Column HP10X42 foundation 19' - 2" A.5-2

HP-Bearing Pile-Column HP10X42 foundation 19' - 2" A-4

HP-Bearing Pile-Column HP10X42 foundation 19' - 2" A-5

HP-Bearing Pile-Column HP10X42 foundation 19' - 2" A.5-3

HP-Bearing Pile-Column HP10X42 foundation 20' - 0" C-3

HP-Bearing Pile-Column HP10X42 foundation 20' - 0" C-1.5

HP-Bearing Pile-Column HP10X42 foundation 20' - 0" C-4

HP-Bearing Pile-Column HP10X42 foundation 20' - 0" C-5

HP-Bearing Pile-Column HP10X42 foundation 20' - 10" D-3

HP-Bearing Pile-Column HP10X42 foundation 20' - 10" D-1.5

HP-Bearing Pile-Column HP10X42 foundation 20' - 10" D-4

HP-Bearing Pile-Column HP10X42 foundation 20' - 10" D-5

HP-Bearing Pile-Column HP10X42 foundation 21' - 9" E-3

HP-Bearing Pile-Column HP10X42 foundation 21' - 9" E-1.5

HP-Bearing Pile-Column HP10X42 foundation 21' - 9" E-4

HP-Bearing Pile-Column HP10X42 foundation 21' - 9" E-5

HP-Bearing Pile-Column HP10X42 foundation 22' - 7" F-3

HP-Bearing Pile-Column HP10X42 foundation 22' - 7" F-1.0

HP-Bearing Pile-Column HP10X42 foundation 22' - 7" F-4

HP-Bearing Pile-Column HP10X42 foundation 22' - 7" F-5

HP-Bearing Pile-Column HP10X42 foundation 23' - 3" G-3

HP-Bearing Pile-Column HP10X42 foundation 23' - 3" G-1.0

HP-Bearing Pile-Column HP10X42 foundation 23' - 3" G-5

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT

Page 35: Construction Document Set

Scale

Date

Drawn By

Checked By

Project Number

4/5/2013 4:11:15 PM

S301

Framing schedule

ProjectVanucur

CG

CLG

100

Pro

ject V

anucur

1 E

. H

igh S

tre

et O

xfo

rd O

H

Structural Framing Schedule

Family Type LengthReference

Level Count

W-Wide Flange W12X26 27' - 0" 3rd Floor 8

W-Wide Flange W12X26 28' - 9 15/32" 3rd Floor 1

W-Wide Flange W12X26 29' - 0" 3rd Floor 1

W-Wide Flange W12X26 31' - 0" 3rd Floor 2

W-Wide Flange W12X26 44' - 9" 3rd Floor 1

W-Wide Flange W6X9 5' - 0" 4th Floor 1

W-Wide Flange W12X26 5' - 5" 4th Floor 1

W-Wide Flange W6X9 11' - 5 7/8" 4th Floor 1

W-Wide Flange W6X9 11' - 6" 4th Floor 1

W-Wide Flange W12X26 17' - 5" 4th Floor 4

W-Wide Flange W12X26 17' - 6" 4th Floor 1

W-Wide Flange W12X26 21' - 0" 4th Floor 1

W-Wide Flange W12X26 21' - 6" 4th Floor 2

W-Wide Flange W12X26 21' - 7 1/4" 4th Floor 2

W-Wide Flange W12X26 22' - 0" 4th Floor 1

W-Wide Flange W12X26 26' - 0" 4th Floor 14

W-Wide Flange W12X26 26' - 0" 4th Floor 1

W-Wide Flange W12X26 26' - 11 3/4" 4th Floor 2

W-Wide Flange W12X26 27' - 0" 4th Floor 6

W-Wide Flange W12X26 29' - 0" 4th Floor 2

W-Wide Flange W12X26 30' - 6" 4th Floor 2

W-Wide Flange W18 X26 2 44' - 5" 4th Floor 1

W-Wide Flange W6X9 5' - 0" ROOF 1

W-Wide Flange W12X26 5' - 5" ROOF 1

W-Wide Flange W12X26 6' - 4 27/32" ROOF 2

W-Wide Flange W12X26 6' - 8" ROOF 1

W-Wide Flange W12X26 6' - 9" ROOF 1

W-Wide Flange W6X9 11' - 2 1/4" ROOF 1

W-Wide Flange W12X26 17' - 2 1/2" ROOF 1

W-Wide Flange W12X26 17' - 5" ROOF 3

W-Wide Flange W12X26 17' - 6" ROOF 1

W-Wide Flange W12X26 17' - 6 3/32" ROOF 3

W-Wide Flange W12X26 17' - 6 3/32" ROOF 1

W-Wide Flange W12X26 20' - 5 9/32" ROOF 1

W-Wide Flange W12X26 21' - 0" ROOF 1

W-Wide Flange W12X26 21' - 3" ROOF 1

W-Wide Flange W12X26 21' - 6" ROOF 1

W-Wide Flange W12X26 21' - 6 25/32" ROOF 1

W-Wide Flange W12X26 25' - 9 15/16" ROOF 1

W-Wide Flange W12X26 25' - 11 17/32" ROOF 1

W-Wide Flange W12X26 26' - 0" ROOF 11

W-Wide Flange W12X26 26' - 0 1/32" ROOF 1

W-Wide Flange W12X26 27' - 0" ROOF 2

W-Wide Flange W12X26 27' - 0 3/32" ROOF 4

W-Wide Flange W12X26 27' - 0 1/8" ROOF 1

W-Wide Flange W12X26 27' - 0 1/8" ROOF 5

W-Wide Flange W12X26 29' - 0" ROOF 2

W-Wide Flange W12X26 30' - 6 5/32" ROOF 1

Grand total: 695

Structural Framing Schedule

Family Type LengthReference

Level Count

MT-Structural Tee MT6X5.9 3' - 4" 2nd Floor 2

MT-Structural Tee MT6X5.9 3' - 11 3/4" 2nd Floor 2

MT-Structural Tee MT6X5.9 3' - 4" 3rd Floor 2

MT-Structural Tee MT6X5.9 3' - 11 3/4" 3rd Floor 2

MT-Structural Tee MT6X5.9 3' - 4" 4th Floor 2

MT-Structural Tee MT6X5.9 3' - 11 3/4" 4th Floor 2

MT-Structural Tee MT9X5 10' - 0" ROOF 1

MT-Structural Tee MT9X5 39' - 5 3/32" ROOF 2

W-Wide Flange W6X9 5' - 0" 2nd Floor 1

W-Wide Flange W12X26 5' - 5" 2nd Floor 1

W-Wide Flange W6X9 11' - 5 7/8" 2nd Floor 1

W-Wide Flange W6X9 11' - 6" 2nd Floor 1

W-Wide Flange W12X26 17' - 5" 2nd Floor 4

W-Wide Flange W12X26 17' - 6" 2nd Floor 3

W-Wide Flange W12X26 21' - 0" 2nd Floor 1

W-Wide Flange W12X26 21' - 6" 2nd Floor 1

W-Wide Flange W12X26 21' - 7 1/4" 2nd Floor 3

W-Wide Flange W12X26 22' - 0" 2nd Floor 1

W-Wide Flange W12X26 26' - 0" 2nd Floor 13

W-Wide Flange W12X26 26' - 0" 2nd Floor 2

W-Wide Flange W12X26 27' - 0" 2nd Floor 8

W-Wide Flange W12X26 29' - 0" 2nd Floor 2

W-Wide Flange W12X26 30' - 6" 2nd Floor 2

W-Wide Flange W18 X26 2 44' - 5" 2nd Floor 1

W-Wide Flange W6X9 5' - 0" 3rd Floor 1

W-Wide Flange W12X26 5' - 5" 3rd Floor 1

W-Wide Flange W6X9 11' - 5 7/8" 3rd Floor 1

W-Wide Flange W6X9 11' - 6" 3rd Floor 1

W-Wide Flange W12X26 17' - 4 31/32" 3rd Floor 1

W-Wide Flange W12X26 17' - 5" 3rd Floor 2

W-Wide Flange W12X26 17' - 6" 3rd Floor 1

W-Wide Flange W12X26 17' - 9" 3rd Floor 3

W-Wide Flange W12X26 21' - 0" 3rd Floor 1

W-Wide Flange W12X26 21' - 6" 3rd Floor 1

W-Wide Flange W12X26 21' - 7 1/4" 3rd Floor 2

W-Wide Flange W12X26 21' - 8 17/32" 3rd Floor 1

W-Wide Flange W12X26 22' - 0" 3rd Floor 1

W-Wide Flange W12X26 26' - 0" 3rd Floor 13

W-Wide Flange W12X26 26' - 0" 3rd Floor 1

Structural Framing Schedule

Family Type LengthReference

Level Count

L-Angle face up L9X3X1/2 0' - 8" 2nd Floor 2

L-Angle face up L7X5X1/2 2 7' - 9" 2nd Floor 5

L-Angle face up 8' - 2 1/2" 2nd Floor 2

L-Angle face up L6X4X1/2 41' - 0 5/8" 2nd Floor 1

L-Angle face up L9X3X1/2 0' - 8" 3rd Floor 2

L-Angle face up L7X5X1/2 2 7' - 9" 3rd Floor 5

L-Angle face up L7X5X1/2 2 8' - 2 1/2" 3rd Floor 1

L-Angle face up L6X4X1/2 41' - 0 5/8" 3rd Floor 1

L-Angle face up L9X3X1/2 0' - 8" 4th Floor 1

L-Angle face up L7X5X1/2 2 7' - 9" 4th Floor 5

L-Angle face up L7X5X1/2 2 8' - 2 1/2" 4th Floor 1

L-Angle face up L7X5X1/2 2 16' - 7" 4th Floor 1

L-Angle face up L6X4X1/2 41' - 0 5/8" 4th Floor 1

L-Angle face up L9X3X1/2 0' - 5" ROOF 1

L-Angle face up 7' - 9" ROOF 4

L-Angle face up L7X5X1/2 2 20' - 0 5/16" ROOF 2

L-Angle face up L7X5X1/2 2 25' - 9 1/8" ROOF 1

L-Angle face up L5X4X1/4 2 32' - 3 23/32" ROOF 1

L-Angle face up L7X5X1/2 2 39' - 5 3/32" ROOF 1

L-Angle face up L7X5X1/2 2 39' - 6" ROOF 1

L-Angle face up L5X4X1/4 2 57' - 4 31/32" ROOF 1

L-Angle face up L6X4X1/2 78' - 5 5/16" ROOF 1

L-Angle face up L6X4X1/2 79' - 4 3/16" ROOF 2

L-Angle thin L3X2X1/2 0' - 6" 2nd Floor 10

L-Angle thin face up L3X2X1/2 10' - 0" ROOF 1

Light Gauge-Joists C3 1/2 1' - 10 3/4" ROOF 1

Light Gauge-Joists C3 1/2 2' - 0 3/4" ROOF 1

Light Gauge-Joists C5 1/2 3' - 5 3/4" ROOF 32

Light Gauge-Joists C5 1/2 8' - 3 11/16" ROOF 1

Light Gauge-Joists C5 1/2 8' - 3 23/32" ROOF 1

Light Gauge-Joists C5 1/2 8' - 3 3/4" ROOF 2

Light Gauge-Joists C5 1/2 8' - 3 27/32" ROOF 1

Light Gauge-Joists C5 1/2 8' - 3 29/32" ROOF 1

Light Gauge-Joists C5 1/2 8' - 4" ROOF 1

Light Gauge-Joists C5 1/2 8' - 4 1/16" ROOF 1

Light Gauge-Joists C5 1/2 8' - 4 3/16" ROOF 1

Light Gauge-Joists C5 1/2 8' - 4 1/4" ROOF 1

Light Gauge-Joists C5 1/2 8' - 4 11/32" ROOF 1

Light Gauge-Joists C5 1/2 8' - 4 13/32" ROOF 1

Light Gauge-Joists C5 1/2 8' - 4 9/16" ROOF 1

Light Gauge-Joists C5 1/2 8' - 4 9/16" ROOF 1

Light Gauge-Joists C5 1/2 8' - 4 5/8" ROOF 1

Light Gauge-Joists C5 1/2 8' - 4 5/8" ROOF 1

Light Gauge-Joists C5 1/2 8' - 6 5/32" ROOF 2

Light Gauge-Joists C5 1/2 8' - 6 3/16" ROOF 2

Light Gauge-Joists C5 1/2 8' - 6 3/16" ROOF 2

Light Gauge-Joists C5 1/2 8' - 6 7/32" ROOF 2

MC-Miscellaneous Channel MC8X8.5 13' - 4" ROOF 8

Structural Framing Schedule

Family Type LengthReference

Level Count

K-Series Bar Joist-Angle Web 12K1 17' - 6" 2nd Floor 11

K-Series Bar Joist-Angle Web 20K9 23' - 10 3/4" 2nd Floor 8

K-Series Bar Joist-Angle Web 20K9 26' - 0" 2nd Floor 8

K-Series Bar Joist-Angle Web 20K9 27' - 0" 2nd Floor 63

K-Series Bar Joist-Angle Web 20K9 30' - 6" 2nd Floor 7

K-Series Bar Joist-Angle Web 12K1 17' - 6" 3rd Floor 11

K-Series Bar Joist-Angle Web 20K9 26' - 0" 3rd Floor 7

K-Series Bar Joist-Angle Web 20K9 27' - 0" 3rd Floor 53

K-Series Bar Joist-Angle Web 20K9 30' - 6" 3rd Floor 7

K-Series Bar Joist-Angle Web 20K9 32' - 6" 3rd Floor 8

K-Series Bar Joist-Angle Web 12K1 17' - 6" 4th Floor 11

K-Series Bar Joist-Angle Web 20K9 26' - 0" 4th Floor 8

K-Series Bar Joist-Angle Web 20K9 27' - 0" 4th Floor 53

K-Series Bar Joist-Angle Web 20K9 30' - 6" 4th Floor 7

K-Series Bar Joist-Angle Web 20K9 32' - 3" 4th Floor 8

K-Series Bar Joist-Angle Web 12K1 1 8' - 4" ROOF 4

K-Series Bar Joist-Angle Web 12K1 17' - 9" ROOF 4

K-Series Bar Joist-Angle Web 12K1 21' - 3" ROOF 6

K-Series Bar Joist-Angle Web 20K9 26' - 0" ROOF 12

K-Series Bar Joist-Angle Web 20K9 27' - 0" ROOF 45

K-Series Bar Joist-Rod Web 8' 8K1 9' - 0" 2nd Floor 3

K-Series Bar Joist-Rod Web 8' 8K1 10' - 6 7/16" 2nd Floor 3

K-Series Bar Joist-Rod Web 8' 8K1 9' - 0" 3rd Floor 3

K-Series Bar Joist-Rod Web 8' 8K1 10' - 6 7/16" 3rd Floor 3

K-Series Bar Joist-Rod Web 8' 8K1 9' - 0" 4th Floor 3

K-Series Bar Joist-Rod Web 8' 8K1 10' - 6 7/16" 4th Floor 3

K-Series Bar Joist-Rod Web 8' 8K1 9' - 0" ROOF 3

L-Angle face down 7' - 9" 2nd Floor 3

L-Angle face down L6X4X1/2 20' - 0 9/16" 2nd Floor 2

L-Angle face down L8X6X1/2 2 7' - 9" 3rd Floor 2

L-Angle face down L8X6X1/2 2 7' - 9" 4th Floor 2

L-Angle face down L8X6X1/2 2 7' - 9" ROOF 2

L-Angle face down L4X4X1/2 22

8' - 7 7/32" ROOF 1

L-Angle face down L6X4X1/2 35' - 9 3/4" ROOF 1

L-Angle face down L6X4X1/2 39' - 6" ROOF 3

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UT

OD

ES

K S

TU

DE

NT

PR

OD

UC

TPRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TO

DE

SK

ST

UD

EN

T P

RO

DU

CT