Page 1
Scale
Date
Drawn By
Checked By
Project Number
4/5/2013 4:11:05 PM
G100
Cover Sheet
ProjectVanucur
CG
CLG
100
Pro
ject V
anucur
1 E
. H
igh S
tre
et O
xfo
rd O
H
Project Vanucur1 East High St,Oxford OHDesigned by Craig GenetStudio 602
Drawing Index
SheetNumber Sheet Name Drawn By
G100 Cover Sheet CLG
G101 Code requirements CLG
S101 foundation CLG
S102 framing plan floors 2 and 3 CLG
S103 framing plan floor 4 CLG
S104 Roof Framing Plan CLG
S200 3D axon CLG
S201 Detail axon of corner roof CLG
S300 Framing schedule columns CLG
S301 Framing schedule CLG
Drawing Index
SheetNumber Sheet Name Drawn By
A401 Kitchen detail CLG
A402 wall sections CLG
A403 detail plans CLG
A404 details section floor 2 CLG
A405 details section roof CLG
A406 Details section windows CLG
A407 Detail section lightwell CLG
A408 Detail section corner roof CLG
A410 Interior elevations CLG
A500 window schedule, Door Schedule CLG
A600 room finish schedule CLG
Drawing Index
SheetNumber Sheet Name Drawn By
A000 Site Plan CLG
A101 First Floor Plan CLG
A102 Second/Third Floor Plans CLG
A103 Fourth Floor, Roof Plan CLG
A104 First/Second Floor Reflected Ceiling Plans CLG
A105 Third/Fourth Floor Reflected Ceiling Plans CLG
A201 elevation north and west CLG
A202 elevation south and east CLG
A301 section looking east CLG
A302 section 3 core CLG
A303 Section East 2 CLG
A304 Section corner of building CLG
A306 section looking north CLG
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Page 2
Scale
Date
Drawn By
Checked By
Project Number
4/5/2013 4:11:06 PM
G101
Code requirements
ProjectVanucur
CG
CLG
100
Pro
ject V
anucur
1 E
. H
igh S
tre
et O
xfo
rd O
H
OBC CODE REQUIREMENT SUMMARY:PROJECT VANUCURUSE GROUP #1: ASSEMBLY A2 (RESTURANT)CONSTRUCTION TYPE: TYPE 2A
BUILDING ALLOWABLE SQUARE FOOTAGE: 15,500 SQ FTBUILDING IS SPRINKLERED: 200% INCREASETOTAL SQUARE FOOTAGE ALLOWED: 15,500 X 200% 31,000 SQ FT
ACTUAL BUILDING SQ FT: 4,828 SQ FTOCCUPANCY
ASSEMBLY UNCONCETRATED TABLES AND CHAIRS2,824 SQ FT / 15 NET = 188 PEOPLE
ASSEMBLY CONCENTRATED (VESTIBULE)125 SQ FT / 5 NET = 25 PEOPLE
KITCHEN (COMMERCIAL)830 SQ FT / 200 GROSS = 5
TOTAL OCCUPANCY: 218 PEOPLE
OBC PLUMBING CODE REQUIREMENTSPLUMBING MALES 109/ FEMALES 109
REQUIRED PROVIDEDTOILETS 3 4LAVATORIES 2 2DRINKING FOUNTAINS 0 0SERVICE SINK 1 1
OBC CODE REQUIREMENT SUMMARY:PROJECT VANUCURUSE GROUP #2: BUSINESSCONSTRUCTION TYPE: TYPE 2A
BUILDING ALLOWABLE SQUARE FOOTAGE: 37,500 SQ FTBUILDING IS SPRINKLERED: 200% INCREASETOTAL SQUARE FOOTAGE ALLOWED: 37,500 X 200% = 75,000 SQ FT
ACTUAL BUILDING SQ FT: 9,491 PEOPLEOCCUPANCY
BUSINESS AREAS9,491 SQ FT / 100 GROSS = 95 PEOPLE
TOTAL OCCUPANCY: 95 PEOPLE
OBC PLUMBING CODE REQUIREMENTSPLUMBING MALES 48 / FEMALES 48
REQUIRED PROVIDEDTOILETS 1 3LAVATORIES 1 2DRINKING FOUNTAINS 1 1SERVICE SINK 1 1
OBC CODE REQUIREMENT SUMMARY:PROJECT VANUCURUSE GROUP #1: MERCANTILECONSTRUCTION TYPE: TYPE 2A
BUILDING ALLOWABLE SQUARE FOOTAGE: 21,500 SQ FTBUILDING IS SPRINKLERED: 200% INCREASETOTAL SQUARE FOOTAGE ALLOWED: 21,500 SQ FT X 200% = 43,000 SQ FT
ACTUAL BUILDING SQ FT: 1,250 SQ FTOCCUPANCY
MERCANTILE AREAS1,250 SQ FT / 60 NET = 21 PEOPLE
TOTAL OCCUPANCY: 21 PEOPLE
OBC PLUMBING CODE REQUIREMENTSPLUMBING MALES 119/ FEMALES 119
REQUIRED PROVIDEDTOILETS 1 1LAVATORIES 1 1DRINKING FOUNTAINS 0 0SERVICE SINK 1 1
FIRE RATING REQUIREMENTS
PRIMARY STRUCTURAL FRAMES 1 HOURBEARING WALLSEXTERIOR 1 HOURINTERIOR 1 HOURFLOOR CONSTRUCTION ANDASSOCIATED SECONDARY MEMBERS 1 HOURROOF CONSTRUCTION AND ASSOCIATEDSECONDARY MEMBERS 1 HOUR
SEPERATED OCCUPANCIESASSEMBLY AND MERCANTILE 2 HOUR 1 HOUR SPRINKLERED
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Page 3
DN
High Street
Main
Str
eet
20
' - 9
23/3
2"
13
2' -
0"
13
' - 1
0"
27' - 7" 78' - 0"
6' -
0"
2' -
6"
3' - 0"
6' - 6"
Scale
Date
Drawn By
Checked By
Project Number
1/16" = 1'-0"
4/5/2013 4:10:24 PM
A000
Site Plan
ProjectVanucur
CG
CLG
100
Pro
ject V
anucur
1 E
. H
igh S
tre
et O
xfo
rd O
H
1/16" = 1'-0"1
site Plan
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Page 4
DN
2
A306
2
A306
1
A302
1
A302
2
A301
2
A301
1
A303
1
A303
1.5
1.5
3 4 5
A.5A.5
C
D
E
F
G
3
A306
3
A306
A4011
A403
1
A403
2
A403
3
1
A304
5' - 0" 22' - 0" 27' - 0" 17' - 6"
21
' - 6
"2
6' -
0"
26
' - 0
"2
6' -
0"
21
' - 0
"5
' - 0
"
R 31' - 0"
2834 SF
Restaurant dining
102
415 SF
elevator hall
103
242 SF
Office Lobby
104
271 SF
Back Hall
106
819 SF
Kitchen
107
Not Enclosed
Retail
108
198 SF
Wbath
109
177 SF
Mbath
110
35 SF
Restroom
111
126 SF
Vestibule
101
Patio Dining
2
B
A
3' -
0"
1.0 3' - 6"
305 SF
Mechanical
112
DN
UP
UPDN
48 SF
elevator supply
113
163
163
163
163
163
163
163
163
163
163
13
163
122 122
122
122
163 163163 163
22
22
31
31
13
13
31
22
21
31
13
13
22
22
1313
12
41
41
22
15
11
Scale
Date
Drawn By
Checked By
Project Number
1/8" = 1'-0"
4/5/2013 4:10:25 PM
A101
First Floor Plan
ProjectVanucur
CG
CLG
100
Pro
ject V
anucur
1 E
. H
igh S
tre
et O
xfo
rd O
H
1/8" = 1'-0"1
1st Floor
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Page 5
1
A302
1
A302
2
A301
2
A301
1
A303
1
A303
1.5
1.5
3 4 5
A.5A.5
C
D
E
F
G
3
A306
3
A306
A403
4
1
A304
5' - 0" 22' - 0" 27' - 0" 17' - 6"
21
' - 6
"2
6' -
0"
26
' - 0
"2
6' -
0"
21
' - 0
"5
' - 0
"
7667 SF
Office 2nd floor
201
721 SF
Hallway
200
102 SF
Mbath
202
128 SF
Wbath
203
2
B
A
3' -
0"
1.0
3' - 6"
39 SF
Janitor
204
56 SF
Electrical
205
UP DN
UP DN
36
36
36
36
3636
37
37
37
32
37
37
37
32
37
37
37
32
35
41
14
41
14
12
12
12
12
A4091
A409
2
2
A306
2
A306
1
A302
1
A302
2
A301
2
A301
1
A303
1
A303
1.5
1.5
3 4 5
A.5A.5
C
D
E
F
G
3
A306
3
A306
1
A3045' - 0" 22' - 0" 27' - 0" 17' - 6"
21
' - 6
"2
6' -
0"
26
' - 0
"2
6' -
0"
21
' - 0
"5
' - 0
"
102 SF
Mbath
3026863 SF
Office 3rd floor
301
707 SF
Hallway
300
127 SF
Wbath
303
56 SF
Electric
304
2
B
A
3' -
0"
1.03' - 6"
39 SF
janitor
305
UPDN
UPDN
36
3636
36
3636
37
37
37
32
37
37
37
32
37
37
37
32
35
12
12
12
12
41
14
41
14
Scale
Date
Drawn By
Checked By
Project Number
1/8" = 1'-0"
4/7/2013 10:58:21 PM
A102
Second/Third FloorPlans
ProjectVanucur
CG
CLG
100
Pro
ject V
anucur
1 E
. H
igh S
tre
et O
xfo
rd O
H
1/8" = 1'-0"1
2nd Floor 1/8" = 1'-0"
23rd Floor
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Page 6
2
A306
2
A306
1
A302
1
A302
2
A301
2
A301
1
A303
1
A303
1.5
1.5
3 4 5
A.5A.5
C
D
E
F
G
3
A306
3
A306
1
A304
5' - 0" 22' - 0" 27' - 0" 17' - 6"
21
' - 6
"2
6' -
0"
26
' - 0
"2
6' -
0"
21
' - 0
"5
' - 0
"
5681 SF
Office 4th floor
401
752 SF
Hallway
400
131 SF
Wbath
403
56 SF
Electric
404
107 SF
Mbath
402
1069 SF
Balcony
406
2
B
A
3' -
0"
1.0
3' - 6"
39 SF
janitor
405
UP DN
UP DN
25 22 26
16
16
28 222828
36
36
3636
37
37
37
32
37
37
37
32
37
37
37
32
35
41
12
41
14
12
12
12
12
14
2
A306
2
A306
1
A302
1
A302
2
A301
2
A301
1
A303
1
A303
1.5
1.5
3 4 5
A.5A.5
C
D
E
F
G
3
A306
3
A306
1
A304
21
' - 6
"2
6' -
0"
26
' - 0
"2
6' -
0"
21
' - 0
"5
' - 0
"
5' - 0" 22' - 0" 27' - 0" 17' - 6"
2
B
A
3' -
0"
1.0
3' - 6"
DN
DN
DN
DN
DN
DN
DN
DN
DN
DN
DN
DN
DN
Scale
Date
Drawn By
Checked By
Project Number
1/8" = 1'-0"
4/5/2013 4:10:27 PM
A103
Fourth Floor, RoofPlan
ProjectVanucur
CG
CLG
100
Pro
ject V
anucur
1 E
. H
igh S
tre
et O
xfo
rd O
H
1/8" = 1'-0"1
4th Floor 1/8" = 1'-0"
2ROOF
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Page 7
2
A306
2
A306
1
A302
1
A302
2
A301
1
A303
1
A303
1.5
1.5
3 4 5
A.5A.5
C
D
E
F
G
3
A306
3
A306
1
A304
5' - 0" 22' - 0" 27' - 0" 17' - 6"
21
' - 6
"2
6' -
0"
26
' - 0
"2
6' -
0"
21
' - 0
"5
' - 0
"
4' -
10"
12' -
0"
4' -
8"
7' -
4"
12' -
0"
6' -
8"
5' -
0"
8' -
0"
8' -
0"
5' -
0"
5' -
0"
8' -
0"
8' -
0"
5' -
0"
5' -
6"
3' - 2" 5' - 0" 8' - 0" 8' - 6" 5' - 6" 4' - 0" 9' - 5" 4' - 1"
6' -
6"
6' -
6"
6' -
6"
6' -
6"
6' -
6"
6' -
6"
4' -
0"
6' -
6"
2' -
0"
4' -
6"
6' -
8"
2' -
4"
4' -
0"
6' -
6"
2
B
A
3' -
0"
1.0
Open
Open
Open
Open
Open
acoustic ceiling tiles
GypsumBoard
GypsumBoard
acoustic ceiling tiles
acoustic ceiling tiles
2
A306
2
A306
1
A302
1
A302
2
A301
2
A301
1
A303
1
A303
1.5
1.5
3 4 5
A.5A.5
C
D
E
F
G
3
A306
3
A306
1
A3045' - 0" 22' - 0" 27' - 0" 17' - 6"
21
' - 6
"2
6' -
0"
26
' - 0
"2
6' -
0"
21
' - 0
"5
' - 0
"
8' - 5" 8' - 3" 7' - 8" 2' - 8" 5' - 4" 8' - 0" 4' - 2"
4' -
8 3
/16"
9' -
0"
8' -
0"
9' -
0"
9' -
0"
8' -
0"
9' -
0"
9' -
0"
8' -
0"
9' -
0"
6' -
6"
6' -
6"
6' -
6"
6' -
6"
6' -
6"
6' -
6"
6' -
6"
5' -
3"
1' -
3"
6' -
6"
6' -
0"
0' -
6"
6' -
6"
6' -
6"
6' -
6"
6' -
4"
2
B
A
3' -
0"
1.0
3' - 6"
Open
Open
Open
Open
Open
Open
Open
OpenOpen
Open
acoustic ceiling tiles
GypsumBoard
acoustic ceiling tiles
GypsumBoard
GypsumBoard
GypsumBoard
Scale
Date
Drawn By
Checked By
Project Number
1/8" = 1'-0"
4/5/2013 4:10:28 PM
A104
First/Second FloorReflected Ceiling
Plans
ProjectVanucur
CG
CLG
100
Pro
ject V
anucur
1 E
. H
igh S
tre
et O
xfo
rd O
H
1/8" = 1'-0"1
1st Floor Reflected Ceiling Plan 1/8" = 1'-0"
22nd Floor Reflected Ceiling Plan
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Page 8
2
A306
2
A306
1
A302
1
A302
2
A301
2
A301
1
A303
1
A303
1.5
1.5
3 4 5
A.5A.5
C
D
E
F
G
3
A306
3
A306
1
A304
21
' - 6
"2
6' -
0"
26
' - 0
"2
6' -
0"
21
' - 0
"5
' - 0
"
5' - 0" 22' - 0" 27' - 0" 17' - 6"
6' -
6"
6' -
6"
6' -
6"
6' -
6"
6' -
6"
6' -
6"
6' -
6"
6' -
6"
6' -
6"
6' -
6"
6' -
6"
6' -
6"
6' -
6"
6' -
6"
9' -
0"
8' -
0"
9' -
0"
9' -
0"
8' -
0"
9' -
0"
9' -
0"
8' -
0"
9' -
0"
2
B
A
3' -
0"
8' - 5" 8' - 3" 7' - 8" 2' - 8" 5' - 4" 8' - 0" 4' - 2"
1.0
3' - 6"
Open
Open
Open
OpenOpen
Open
Open
Open
Open
Open
acoustic ceiling tiles
GypsumBoard
acoustic ceiling tiles
GypsumBoard
GypsumBoard
GypsumBoard
2
A306
2
A306
1
A302
1
A302
2
A301
2
A3011
A303
1
A303
1.5
1.5
3 4 5
A.5
C
D
E
F
G
3
A306
3
A306
1
A304
5' - 0" 22' - 0" 27' - 0" 17' - 6"
21
' - 6
"2
6' -
0"
26
' - 0
"2
6' -
0"
21
' - 0
"5
' - 0
"
8' - 5" 8' - 3" 7' - 8" 2' - 8" 5' - 4" 8' - 0" 4' - 2"
9' -
0"
8' -
0"
9' -
0"
9' -
0"
8' -
0"
9' -
0"
9' -
0"
8' -
0"
9' -
0"
6' -
6"
6' -
6"
6' -
6"
6' -
6"
6' -
6"
6' -
6"
6' -
6"
5' -
3"
1' -
3"
6' -
6"
6' -
6"
6' -
6"
6' -
6"
6' -
6"
6' -
6"
2
B
A
3' -
0"
1.0
3' - 6"
Open
NoFinishedCeiling
No finishedCeiling
Open
Open
Open
Open
OpenOpen
Open
acoustic ceiling tiles
GypsumBoard
acoustic ceiling tiles
GypsumBoard
GypsumBoard
GypsumBoard
Scale
Date
Drawn By
Checked By
Project Number
1/8" = 1'-0"
4/5/2013 4:10:30 PM
A105
Third/Fourth FloorReflected Ceiling
Plans
ProjectVanucur
CG
CLG
100
Pro
ject V
anucur
1 E
. H
igh S
tre
et O
xfo
rd O
H
1/8" = 1'-0"1
3rd Floor Reflected Ceiling Plan 1/8" = 1'-0"
24th Floor Reflected Ceiling Plan
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Page 9
1st Floor0' - 0"
2
A306
2nd Floor15' - 0"
3rd Floor28' - 0"
4th Floor41' - 0"
ROOF53' - 9"
A.5 C D E F G3
A306
B
Precast concrete
Light Red Brick Veneer
Red Brick Veneer
Travertine
Travertine
Copper Skin Roof
Travertine
Light Red Brick Veneer
Travertine
Light Red Brick Veneer
Concrete Column
Precast concrete
1st Floor0' - 0"
1
A302
2nd Floor15' - 0"
3rd Floor28' - 0"
4th Floor41' - 0"
ROOF53' - 9"
2
A301
1
A303 1.5345
1
A304
1.0
Precast concrete
Light Red Brick Veneer
Red Brick Veneer
Travertine
Travertine
Copper Skin Roof
Travertine
Light Red Brick Veneer
Travertine
Light Red Brick Veneer
Concrete Column
Scale
Date
Drawn By
Checked By
Project Number
1/8" = 1'-0"
4/5/2013 4:10:32 PM
A201
elevation north andwest
ProjectVanucur
CG
CLG
100
Pro
ject V
anucur
1 E
. H
igh S
tre
et O
xfo
rd O
H
1/8" = 1'-0"2
Elevation west side
1/8" = 1'-0"1
Elevation North Side
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Page 10
1st Floor0' - 0"
1
A302
2nd Floor15' - 0"
3rd Floor28' - 0"
4th Floor41' - 0"
ROOF53' - 9"
2
A301
1
A303
1.5 3 4 51.0
Light Red Brick Veneer
Concrete Masonry
Concrete
Travertine
Light Red Brick Veneer
Red Brick Veneer
Concrete masonry
1st Floor0' - 0"
2
A306
2nd Floor15' - 0"
3rd Floor28' - 0"
4th Floor41' - 0"
ROOF53' - 9"
foundation-8' - 3"
A.5CDEFG
3
A306
Concrete Masonry
LightBrick Veneer
Light Brick Veneer
Travertine
Scale
Date
Drawn By
Checked By
Project Number
1/8" = 1'-0"
4/5/2013 4:10:34 PM
A202
elevation southand east
ProjectVanucur
CG
CLG
100
Pro
ject V
anucur
1 E
. H
igh S
tre
et O
xfo
rd O
H
1/8" = 1'-0"2
Elevation south side
1/8" = 1'-0"1
Elevation east side
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Page 11
1st Floor0' - 0"
2
A306
2nd Floor15' - 0"
3rd Floor28' - 0"
4th Floor41' - 0"
ROOF53' - 9"
foundation-8' - 3"
A.5 C D E F G
3
A306
A402
2
A410
1
Scale
Date
Drawn By
Checked By
Project Number
1/8" = 1'-0"
4/5/2013 4:10:35 PM
A301
section lookingeast
ProjectVanucur
CG
CLG
100
Pro
ject V
anucur
1 E
. H
igh S
tre
et O
xfo
rd O
H
1/8" = 1'-0"2
Section looking east
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Page 12
1st Floor0' - 0"
2
A306
2nd Floor15' - 0"
3rd Floor28' - 0"
4th Floor41' - 0"
ROOF53' - 9"
C D E F G
3
A306
----
A
Scale
Date
Drawn By
Checked By
Project Number
1/8" = 1'-0"
4/5/2013 4:10:39 PM
A302
section 3 core
ProjectVanucur
CG
CLG
100
Pro
ject V
anucur
1 E
. H
igh S
tre
et O
xfo
rd O
H
1/8" = 1'-0"1
Section core looking east
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Page 13
1st Floor0' - 0"
2
A306
2nd Floor15' - 0"
3rd Floor28' - 0"
4th Floor41' - 0"
ROOF53' - 9"
A.5 C D E F G
3
A306
A407
2
Scale
Date
Drawn By
Checked By
Project Number
1/8" = 1'-0"
4/5/2013 4:10:42 PM
A303
Section East 2
ProjectVanucur
CG
CLG
100
Pro
ject V
anucur
1 E
. H
igh S
tre
et O
xfo
rd O
H
1/8" = 1'-0"1
Section lightwell
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Page 14
1st Floor0' - 0"
2
A306
2nd Floor15' - 0"
3rd Floor28' - 0"
4th Floor41' - 0"
ROOF53' - 9"
A.5 C
A408
1
Scale
Date
Drawn By
Checked By
Project Number
1/4" = 1'-0"
4/5/2013 4:10:43 PM
A304
Section corner ofbuilding
ProjectVanucur
CG
CLG
100
Pro
ject V
anucur
1 E
. H
igh S
tre
et O
xfo
rd O
H
1/4" = 1'-0"1
Section corner of building
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Page 15
1st Floor0' - 0"
1
A302
2nd Floor15' - 0"
3rd Floor28' - 0"
4th Floor41' - 0"
ROOF53' - 9"
2
A301
1
A303
foundation-8' - 3"
1.5 3 4 5
1
A304
1.0
1st Floor0' - 0"
1
A302
2nd Floor15' - 0"
3rd Floor28' - 0"
4th Floor41' - 0"
ROOF53' - 9"
2
A301
1
A303
foundation-8' - 3"
1.5 3 4 5
A402
1
1.0 A4071
Scale
Date
Drawn By
Checked By
Project Number
1/8" = 1'-0"
4/5/2013 4:10:46 PM
A306
section lookingnorth
ProjectVanucur
CG
CLG
100
Pro
ject V
anucur
1 E
. H
igh S
tre
et O
xfo
rd O
H
1/8" = 1'-0"2
Section looking north 1/8" = 1'-0"
3Section north lightwell
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Page 16
2
A301
2
A301
1
A303
1
A303
3
A306
3
A306
- ---
4 d
ee
p fry
ers
48
x 3
0 in g
rid
dle
with
ove
n o
n b
otto
m
72
in
co
okin
g r
ang
ew
ith
12
burn
ers
an
dtw
o o
ven
s o
n b
otto
m
2 3
0 x
30
co
nve
ctio
no
ven
s s
tacke
d
Wa
ter
he
ate
rs
Po
p C
oo
lers
/R
efr
ige
rato
rs
Po
p C
oo
lers
/R
efr
ige
rato
rs
Expre
sso
Machin
eB
eve
rage
Dis
pen
se
rIc
e M
ach
ine
ga
rbag
ed
isposal
com
me
rcia
ld
ish
washer
Scale
Date
Drawn By
Checked By
Project Number
1/2" = 1'-0"
4/8/2013 3:48:17 PM
A401
Kitchen detail
ProjectVanucur
CG
CLG
100
Pro
ject V
anucur
1 E
. H
igh S
tre
et O
xfo
rd O
H
1/2
" =
1'-0
"1
Kitch
en o
f L
eve
l 1
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Page 17
1st Floor0' - 0"
2nd Floor15' - 0"
3rd Floor28' - 0"
4th Floor41' - 0"
ROOF53' - 9"
foundation-8' - 3"
1.5
A4042
A4052
metal studs 6"
Brick veneer
Storefront window, double paned
metal studs 6"
precast concrete panel 4"
travertine
5" rigid insulation
concrete column (background)
1.0
---
-
3' -
0"
1st Floor0' - 0"
2nd Floor15' - 0"
3rd Floor28' - 0"
4th Floor41' - 0"
ROOF53' - 9"
A.5
A4041
Brick Veneer
5 in rigid insulation
Metal stud 6"
Travertine stud wall
precast concrete stud wall
metal studs 6"
Storefront window doublepaned
concrete column(background)
A4051
---
-
Scale
Date
Drawn By
Checked By
Project Number
3/8" = 1'-0"
4/5/2013 4:10:49 PM
A402
wall sections
ProjectVanucur
CG
CLG
100
Pro
ject V
anucur
1 E
. H
igh S
tre
et O
xfo
rd O
H
3/8" = 1'-0"1
wall Section west
3/8" = 1'-0"2
wall section north
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Page 18
128 SF
Wbath
203
102 SF
Mbath
202
56 SF
Electrical
205
39 SF
Janitor
204
12
12
12
12
2
A306
2
A306
2
A301
2
A301
1
A303
1
A303
1.5 3 4
A.5
C
D
E
1
A304
2
B
A
Scale
Date
Drawn By
Checked By
Project Number
As indicated
4/7/2013 9:17:08 PM
A403
detail plans
ProjectVanucur
CG
CLG
100
Pro
ject V
anucur
1 E
. H
igh S
tre
et O
xfo
rd O
H
1/2" = 1'-0"4
bathroom 2
1/8" = 1'-0"5
1st floor furniture plan
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Page 19
2nd Floor15' - 0"
1.5
20K9 open web steel joist
3 in concrete floor
2 in corrugated metal decking
L 7.5x5x1/2 angle
5 in metal stud with batt insulation
travertine 9"
W 12 x 26 Wide Flange
L 9x3x1/2 angle
rigid insulation
metal soffit
concrete column (background)
5 inch metal stud w/ batt insulation
HP Bearing Column 10 x 42
L 8x6x1/2 angle
window
dark brick veneer
----
metal support b/w travertine and stud
L 6x4x1/2 angle
2nd Floor15' - 0"
A.5
metal soffit
5 inch metal stud
concrete column (background)
travertine 9"
5 in metal stud w/ batt insulation
W 12 x 26 Wide Flange
L 7.5 x 5 x 1/2 angle
2 in corrugated metal decking
3 inch concrete floor
dark brick veneer
L8x6x1/2 Angle
20K9 open web steel joist
0' - 11"
L 9 x 3 x 1/2 angle
1 in air space
HP 10 x 42 column
Storefront window double paned
Metal support b/w travertine and stud
L 6x4x1/2 angle
metal soffit
Rigid Insulation
Scale
Date
Drawn By
Checked By
Project Number
1 1/2" = 1'-0"
4/8/2013 3:47:51 PM
A404
details section floor2
ProjectVanucur
CG
CLG
100
Pro
ject V
anucur
1 E
. H
igh S
tre
et O
xfo
rd O
H
1 1/2" = 1'-0"2
wall section west floor 2 1 1/2" = 1'-0"
1wall section north floor 2
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Page 20
ROOF53' - 9"
A.5
moisture barrier
3 in metal stud brace
rigid insulation infill
stone ballast
metal deck
W 12 x 26
HP 10 x 42
L 8x6x1/2 angle
L 8x6x1/2 angle
rigid insulation
concrete 4 in
concrete parapet
concrete 9 in
metal support
metal stud 5 in
1 in air space
Roof Drain
ROOF53' - 9"
1.5
moisture barrier
3 in metal stud brace
ridid insulation infill
stone ballast
rigid insulation
metal deck
20K9 open web joist
W 12 x 26
HP 10 x 42
L 8x6x1/2
concrete parapet
concrete 9 in
metal support
metal stud 5 in
1in air space
concrete 4 in
L 8x6x1/2 angle
Roof drain
Scale
Date
Drawn By
Checked By
Project Number
1 1/2" = 1'-0"
4/5/2013 4:10:53 PM
A405
details section roof
ProjectVanucur
Checker
CLG
100
Pro
ject V
anucur
1 E
. H
igh S
tre
et O
xfo
rd O
H
1 1/2" = 1'-0"1
wall section north roof 1 1/2" = 1'-0"
2wall section west roof
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Page 21
GENERAL NOTES
RESIDENTIAL STEEL FRAME STRUCTURE w/ MASONRYVENEER
WINDOW HEAD DETAIL(HEATINGCLIMATE)
*SEAL ALL TYVEK JOINTS OR PENETRATIONS WITH APPROVED TAPE.
(ex. DUPONT CONTRACTOR TAPE)
*FASTEN TYVEK AND RIGID INSULATION TO STEEL STUDS
USING SCREWS W/ WASHERS.(ex. DUPONT WRAPCAPS)
* SEAL OR GASKET BRICK TIES AT THE FACE OF TYVEK
*LOCAL LAWS, ZONING, AND BUILDING CODES VARY AND
THEREFORE GOVERNS OVER MATERIAL SELECTION AND DETAILING SHOWN
BELOW.
LAP 6" & TAPE TYVEK
OVER THROUGH−WALL
FLASHING
TAPE THROUGH−WALL
FLASHING TO RIGID
INSULATION USING
TYVEK FLEXWRAP
CAULKING
MINIMALLY EXPANDINGPOLYURETHANE FOAMOR APPROVED CAULK
(AROUND WINDOW RSO)
WINDOW
TYPICAL WALL
MASONRY VENEER
1" AIR SPACE
TYVEK HOMEWRAP
1−1/2" RIGID INSULATION
4" STEEL STUDS
w/ R−13 BATT INSULATION
VAPOR RETARDER
1/2" GYPSUM BOARD
METAL LINTEL
WINDOW SILL DETAILRESIDENTIAL STEEL FRAME STRUCTURE w/ MASONRYVENEER
GENERAL NOTES
(HEATINGCLIMATE)
*SEAL ALL TYVEK JOINTS AND PENETRATIONS WITH APPROVED TAPE.
(ex. DUPONT CONTRACTOR TAPE)
*FASTEN TYVEK AND RIGID INSULATION TO STEEL STUDS
USING SCREWS W/ WASHERS.(ex. DUPONT WRAPCAPS)
* SEAL OR GASKET BRICK TIES AT THE FACE OF TYVEK
*LOCAL LAWS, ZONING, AND BUILDING CODES VARY AND
THEREFORE GOVERNS OVER MATERIAL SELECTION AND DETAILING SHOWN
BELOW.
CAULKING
THROUGH−WALL FLASHING
WRAP TYVEK INTO
OPENING & TAPE TO
SILL (ESP. @ CORNERS) &
OVER FLASHING
USING TYVEK FLEXWRAP
LAP & TAPE TYVEK
AT JOINTS (UPPER SHEET
OVER LOWER SHEET)
WINDOW
INSTALL TYVEK FLEXWRAP
AROUND PERIMETER OF OPENING
MINIMALLY EXPANDINGPOLYURETHANE FOAMOR APPROVED CAULK
(AROUND WINDOW RSO)
TYPICAL WALL
MASONRY VENEER1" AIR SPACE
TYVEK HOMEWRAP
1−1/2" RIGID INSULATION4" STEEL STUDSw/ R−13 BATT INSULATIONVAPOR RETARDER 1/2" GYPSUM BOARD
CONCRETE SILL w/ DRIP EDGE
FASTEN TYVEK FLEXWRAP
CORNER USING MECHANICAL
FASTENER
Scale
Date
Drawn By
Checked By
Project Number
4/7/2013 9:17:42 PM
A406
Details sectionwindows
ProjectVanucur
Checker
CLG
100
Pro
ject V
anucur
1 E
. H
igh S
tre
et O
xfo
rd O
H
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Page 22
ROOF53' - 9"
4
triple glazed roof
mullein
steel connection plate
steel MT 9x5
3 1/2 in metal studs
insulation
steel cladding
Hatch over Kitchen vent
moisture barrier
1 in air space
L 7x5x1/2 angle
W 12x26
Exhaust vent from kitchen
L 7x5x1/2 angle
4 7/8 int partition
gyp wall board
Stone ballast
rigid insulation
metal deck
W 12x26
ROOF53' - 9"
triple pane glazing
L 3x2x1/2
mullein
MT 9x5 Steel
3 1/2 in metal studs
1 in air space
gyp wall board
steel cladding
stone ballast
rigid insulation
metal deck
L 7x5x1/2 angle
W 12 x 26 (sloping)
L 7x5x1/2 angle
20K9 open web joist
Drop ceiling
curtain wall
Scale
Date
Drawn By
Checked By
Project Number
1 1/2" = 1'-0"
4/5/2013 4:10:53 PM
A407
Detail sectionlightwell
ProjectVanucur
Checker
CLG
100
Pro
ject V
anucur
1 E
. H
igh S
tre
et O
xfo
rd O
H
1 1/2" = 1'-0"1
Lightwell detail north 1 1/2" = 1'-0"2
Lightwell detail west
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Page 23
ROOF53' - 9"
A.5
A408
3
A4082
L6X4X1/2
W12X
26
W12X26
MC8X8.5
W12X
26
L6X4X1/2
MC8X8.5
MC
8X
8.5
MC8X8.5
MC8X8.5
L4X4X1/2 2 2
L5X4X1/4 2
L5X4X1/4 2
C5 1
/2
C5 1
/2
C5 1
/2
C5 1
/2
C5 1
/2
C5 1
/2
C5 1
/2
C5 1
/2
C5 1
/2
C5 1
/2
C5 1
/2
C5 1
/2
C5 1
/2
C5 1
/2
C5 1
/2
C5 1
/2
C5
1/2
C5 1/2
C5 1
/2
C5 1/2
C5 1
/2
C5
1/2
C5 1
/2
Metal Roof
rigid insulation
2 overlappinglayers plywood
Steel flat plate
ROOF53' - 9"
ROOF53' - 9"
W12X
26
C5 1
/2
MC8X8.5
L6X4X1/2
Scale
Date
Drawn By
Checked By
Project Number
As indicated
4/5/2013 4:10:54 PM
A408
Detail sectioncorner roof
ProjectVanucur
Checker
CLG
100
Pro
ject V
anucur
1 E
. H
igh S
tre
et O
xfo
rd O
H
3/4" = 1'-0"1
corner of building roof
1 1/2" = 1'-0"3
corner of building roof edge N
1 1/2" = 1'-0"2
Corner of building roof edge S
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Page 24
3
E
5
C
2nd Floor15' - 0"
3rd Floor28' - 0"
Scale
Date
Drawn By
Checked By
Project Number
As indicated
4/8/2013 3:52:59 PM
A409
details columnsand stairwell
ProjectVanucur
Checker
Author
100
Pro
ject V
anucur
1 E
. H
igh S
tre
et O
xfo
rd O
H
1 1/2" = 1'-0"1
detail of interior wet column
1 1/2" = 1'-0"2
detail of exterior column
8 in cmu
12 in cmu b/w elvator and stairwell
HP 10 x 42
concrete encased column
8 in cmu wall
Space for W 12x26 beam
HP 10 x 42
Various plumbing:roof drain
hot/cold water
3.5 in Metal stud
insulation maybe?
5/8 gyp board
shaft for ductwork
1/2" = 1'-0"3
callout of south staircase
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Page 25
1st Floor0' - 0"
2nd Floor15' - 0"
D E3
A306
3
A306
Scale
Date
Drawn By
Checked By
Project Number
1/2" = 1'-0"
4/5/2013 4:10:55 PM
A410
Interior elevations
ProjectVanucur
Checker
CLG
100
Pro
ject V
anucur
1 E
. H
igh S
tre
et O
xfo
rd O
H
1/2" = 1'-0"1
1st floor bathroom elevation
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Page 26
Scale
Date
Drawn By
Checked By
Project Number
4/5/2013 4:10:55 PM
A500
window schedule,Door Schedule
ProjectVanucur
CG
CLG
100
Pro
ject V
anucur
1 E
. H
igh S
tre
et O
xfo
rd O
H
Window Schedule
Family Type Height Level Count Type Mark
Fixed
Fixed 2 x 3.5 3' - 4" 1st Floor 4 121
Fixed 2 x 7.5 7' - 5" 1st Floor 4 122
Fixed 6 x 3 2' - 6" 1st Floor 17 161
Fixed 6 x 4 3' - 4" 1st Floor 2 162
Fixed 6x7 7' - 0" 1st Floor 15 163
Fixed 36" x 24" 2' - 0" 1st Floor 1 13
fixed window for spring studio
fixed window for spring studio 6 x 9 8' - 6" 4th Floor 2 16
fixed window for spring studio 3 panel
fixed window for spring studio 3 panel 2 x 10 10' - 0" 12 32
fixed window for spring studio 3 panel 5 x 10 10' - 0" 6 35
fixed window for spring studio 3 panel 6 x 10 10' - 0" 16 36
fixed window for spring studio 3 panel 7 x 10 10' - 0" 36 37
fixed window for spring studio other 2 panel
fixed window for spring studio other 2 panel 2 x 9 8' - 6" 4th Floor 2 22
fixed window for spring studio other 2 panel 5 x 9 8' - 6" 4th Floor 1 25
fixed window for spring studio other 2 panel 6 x 9 8' - 6" 4th Floor 1 26
fixed window for spring studio other 2 panel 8 x 9 8' - 6" 4th Floor 3 28
Skylight-Major_Industries-Ridge_End
Skylight-Major_Industries-Ridge_End Ridge withEnd Walls
6' - 10 9/32" ROOF 1 14
Grand total: 123
Door Schedule
Mark Family Height Width Type CountFrame
Material
11 Single-Flush 6' - 8" 2' - 0" 24" x 80" 1 metal
12 Single-Flush 6' - 8" 2' - 6" 30" x 80" 14 metal
13 Single-Flush 6' - 8" 3' - 0" 36" x 80" 6 metal
14 Single-Flush 7' - 0" 3' - 0" 36" x 84" 7 metal
15 Single-Flush 7' - 0" 4' - 0" 48" x 84" 1 metal
21 Double-Glass 1 7' - 0" 6' - 0" 72" x 84" 1 aluminumand glass
22 Double-Glass 1 7' - 4" 5' - 8" 68" x 84" 6 aluminumand glass
31 Double-Panel 1 6' - 8" 5' - 8" 68" x 80" 4 metal
41 Sliding-2 panel opaque 6' - 8" 4' - 2" 50" x 80" 9 metal
Grand total: 49
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Page 27
Scale
Date
Drawn By
Checked By
Project Number
4/5/2013 4:10:56 PM
A600
room finishschedule
ProjectVanucur
CG
CLG
100
Pro
ject V
anucur
1 E
. H
igh S
tre
et O
xfo
rd O
H
Room Schedule
Number Name Level Area Floor Finish Ceiling Finish Wall Finish Base Finish
101 Vestibule 1st Floor 126 SF Concrete Gypsum board ceiling gyp board rubber
102 Restaurant dining 1st Floor 2834 SF Hardwood Gypsum board ceiling wood wood no 1
103 elevator hall 1st Floor 415 SF Hardwood Gypsum board ceiling gyp board wood no 2
104 Office Lobby 1st Floor 242 SF Hardwood Gypsum board ceiling gyp board wood no 2
106 Back Hall 1st Floor 271 SF Concrete Gypsum board ceiling gyp board rubber
107 Kitchen 1st Floor 819 SF Rubber Tile Acoustic hung ceiling fiberglasswall panel
rubber
108 Retail 1st Floor NotEnclosed
Carpet Acoustic hung ceiling gyp board none
109 Wbath 1st Floor 198 SF CeramicTile
Acoustic hung ceiling fiberglasswall panel
rubber
110 Mbath 1st Floor 177 SF Tile Acoustic hung ceiling fiberglasswall panel
rubber
111 Restroom 1st Floor 35 SF Tile Acoustic hung ceiling fiberglasswall panel
rubber
112 Mechanical 1st Floor 305 SF Concrete Gypsum board ceiling gyp board rubber
113 elevator supply 1st Floor 48 SF Concrete Gypsum board ceiling gyp board rubber
200 Hallway 2nd Floor 721 SF Concrete Gypsum board ceiling gyp board wood no 2
201 Office 2nd floor 2nd Floor 7667 SF Hardwood Acoustic hung ceiling gyp board wood no 2
202 Mbath 2nd Floor 102 SF CeramicTile
Gypsum board ceiling fiberglasswall panel
rubber
203 Wbath 2nd Floor 128 SF CeramicTile
Gypsum board ceiling fiberglasswall panel
rubber
204 Janitor 2nd Floor 39 SF Concrete Gypsum board ceiling gyp board rubber
205 Electrical 2nd Floor 56 SF Concrete Gypsum board ceiling gyp board rubber
300 Hallway 3rd Floor 707 SF Concrete Gypsum board ceiling gyp board wood no 2
301 Office 3rd floor 3rd Floor 6863 SF Hardwood Acoustic hung ceiling gyp board wood no 2
302 Mbath 3rd Floor 102 SF CeramicTile
Gypsum board ceiling fiberglasswall panel
rubber
303 Wbath 3rd Floor 127 SF CeramicTile
Gypsum board ceiling fiberglasswall panel
rubber
304 Electric 3rd Floor 56 SF Concrete Gypsum board ceiling gyp board rubber
305 janitor 3rd Floor 39 SF Concrete Gypsum board ceiling gyp board rubber
400 Hallway 4th Floor 752 SF Concrete Gypsum board ceiling gyp board wood no 2
401 Office 4th floor 4th Floor 5681 SF Hardwood Acoustic hung ceiling gyp board wood no 2
402 Mbath 4th Floor 107 SF CeramicTile
Gypsum board ceiling fiberglasswall panel
rubber
403 Wbath 4th Floor 131 SF CeramicTile
Gypsum board ceiling fiberglasswall panel
rubber
404 Electric 4th Floor 56 SF Concrete Gypsum board ceiling gyp board rubber
405 janitor 4th Floor 39 SF Concrete Gypsum board ceiling gyp board rubber
406 Balcony 4th Floor 1069 SF Concrete none none none
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Page 28
2
A306
2
A306
1
A302
1
A302
2
A301
2
A301
1
A303
1
A303
1.5
1.5
3 4 5
A.5A.5
C
D
E
F
G
3
A306
1
A304
5' - 0" 22' - 0" 27' - 0" 17' - 6"
21
' - 6
"2
6' -
0"
26
' - 0
"2
6' -
0"
21
' - 0
"5
' - 0
"
3' - 6"
2
B
A
3' -
0"
1.0
Scale
Date
Drawn By
Checked By
Project Number
1/8" = 1'-0"
4/5/2013 4:11:06 PM
S101
foundation
ProjectVanucur
CG
CLG
100
Pro
ject V
anucur
1 E
. H
igh S
tre
et O
xfo
rd O
H
1/8" = 1'-0"1
foundation
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Page 29
2
A306
2
A306
1
A302
1
A302
2
A301
2
A301
1
A303
1
A303
1.5
1.5
3 4 5
A.5A.5
C
D
E
F
G
3
A306
3
A306
1
A304
5' - 0" 22' - 0" 27' - 0" 17' - 6"
21
' - 6
"2
6' -
0"
26
' - 0
"2
6' -
0"
21
' - 0
"5
' - 0
"
W12X26 W12X26
W12X26 W12X26 W12X26
W12X26 W12X26 W12X26
W12X26 W12X26
W12X26 W18 X26 2
W12X
26
W12X
26
W12X
26
W12X
26
W12X
26
W12X
26
W12X
26
W12X
26
W12X
26
W12X
26
W12X
26
W12X
26
W12X
26 W
12X
26
W12X
26
W12X26
W12X26
W12X
26
W12X
26
W12X
26
W12X
26
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
2
B
A
3' -
0"
1.03' - 6"
W12X26
W12X
26
W6X9
W12X
26
20K9
20K9
20K9
20K9
L6X
4X
1/2
W12X
26
W12X26
W12X26
20K
9
20K
9
12K1
12K1
12K1
12K
120K
9
12K1
12K1
12K1
12K1
12K1
12K1
12K1
8K
1
8K
1
8K
18K
1
8K
1
8K
1
W6X9
W6X9
W12X
26
W12X
26
W12X26
MT
6X
5.9
MT
6X
5.9
MT
6X
5.9
MT
6X
5.9
20K
9
20K
9
20K
9
20K9
20K9
20K9
20K9
20K9
20K
920K
9
2
A306
2
A306
1
A302
1
A302
2
A301
2
A301
1
A303
1
A303
1.5
1.5
3 4 5
A.5A.5
C
D
E
F
G
3
A306
3
A306
1
A3045' - 0" 22' - 0" 27' - 0" 17' - 6"
21
' - 6
"2
6' -
0"
26
' - 0
"2
6' -
0"
21
' - 0
"5
' - 0
"
W12X26
W12X26
W12X26 W12X26
W12X26
W12X26
W12X26
W12X26
W12X26
W12X
26
W12X
26
W12X
26
W12X
26
W12X
26
W12X
26
W12X26
W12X
26
W12X
26
W12X
26
W12X
26
W12X
26
W12X
26
W12X26
W12X26
W12X26
W12X
26
W12X
26
W12X
26
W12X
26
W12X
26
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
W12X26
W6X9
W12X
26
W12X26
W12X
26
MT
6X
5.9
MT
6X
5.9
MT
6X
5.9
MT
6X
5.9
L6X
4X
1/2
W12X
26
2
B
A
3' -
0"
1.0 3' - 6"
W12X26
W12X
26
20K
9
12K1
12K1
12K1
12K
1
W12X26
W12X26
20K
9
12K1
12K1
12K1
12K1
12K1
12K1
12K1
8K
1
8K
1
8K
18K
1
8K
1
8K
1
W6X9
W6X9
W12X
26
W12X
26
20K
9
20K
9
20K
9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K
9
20K9
20K9
20K9
20K9
20K9
20K9
20K
9
Scale
Date
Drawn By
Checked By
Project Number
1/8" = 1'-0"
4/5/2013 4:11:07 PM
S102
framing plan floors2 and 3
ProjectVanucur
CG
CLG
100
Pro
ject V
anucur
1 E
. H
igh S
tre
et O
xfo
rd O
H
1/8" = 1'-0"2
2nd Floor 1/8" = 1'-0"
13rd Floor
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Page 30
2
A306
1
A302
1
A302
2
A301
2
A301
1
A303
1
A303
1.5
1.5
3 4 5
A.5A.5
C
D
E
F
G
3
A306
1
A3045' - 0" 22' - 0" 27' - 0" 17' - 6"
21
' - 6
"2
6' -
0"
26
' - 0
"2
6' -
0"
21
' - 0
"5
' - 0
"
W12X26
W12X26 W12X26 W12X26
W12X26 W12X26
W12X26 W12X26
W12X26 W18 X26 2
W12X
26
W12X
26
W12X
26
W12X
26
W12X
26
W12X
26
W12X
26
W12X
26
W12X
26 W
12X
26
W12X
26
W12X
26
W12X
26
W12X
26
W12X26
W12X
26
W12X
26
W12X
26
W12X
26
W12X26
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
2
B
A
3' -
0"
1.0
3' - 6"
W12X26
W12X
26
W12X26
W12X26
W12X26
W12X
26 W6X9
20K9
MT
6X
5.9
MT
6X
5.9
MT
6X
5.9
MT
6X
5.9
L6X
4X
1/2
20K
9
20K
9
12K1
12K1
12K1
12K
120K
9
12K1
12K1
12K1
12K1
12K1
12K1
12K18K
1
8K
1
8K
18K
1
8K
1
8K
1
W12X26
W6X9
W6X9
W12X
26
W12X
26
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
W12X
26
W12X26
20K
9
20K
9
20K
9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K920K9
20K9
20K9
20K
920K
9
20K9
Scale
Date
Drawn By
Checked By
Project Number
1/8" = 1'-0"
4/5/2013 4:11:07 PM
S103
framing plan floor 4
ProjectVanucur
CG
CLG
100
Pro
ject V
anucur
1 E
. H
igh S
tre
et O
xfo
rd O
H
1/8" = 1'-0"1
4th Floor
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Page 31
2
A306
1
A302
1
A302
2
A301
2
A301
1
A303
1
A303
1.5
1.5
3 4 5
A.5A.5
C
D
E
F
G
3
A306
3
A306
1
A3045' - 0" 22' - 0" 27' - 0" 17' - 6"
21
' - 6
"2
6' -
0"
26
' - 0
"2
6' -
0"
21
' - 0
"5
' - 0
"
W12X
26
W12X
26
W12X
26
W12X
26
W12X26
W12X26
W12X26
W12X
26
W12X
26
W12X
26
W12X
26
W12X
26
W12X
26
W12X
26
W12X
26
W12X
26
W12X
26 W
12X
26
W12X
26
W12X
26
20K9
20K9
12K1
W12X26
20K9
2
B
A
3' -
0"
1.03' - 6"
W12X26
W12X
26
W12X
26 W6X9 W12X26
W12X26
20K
912K
120K
9
8K
1
8K
1
8K
1
W6X9W12X
26
W12X26
12K1
W12X26
W12X26
W12X26
W12X26
W12X26
W12X
26
20K
9
20K
9
20K
9
20K
9
20K
9
20K
9
20K
9
20K
9
20K
9
W12X26
12K1
12K1
12K1
12K1
12K1
20K9
20K9
20K9
20K9
20K9
20K9
20K9
12K1
12K1
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K9
20K
9
W12X
26
W12X
26
W12X
26
W12X
26
W12X26
W12X26
W12X26
W12X26
W12X26
W12X26
L6X4X1/2
W12X
26
W12X
26
Scale
Date
Drawn By
Checked By
Project Number
1/8" = 1'-0"
4/5/2013 4:11:08 PM
S104
Roof Framing Plan
ProjectVanucur
Checker
CLG
100
Pro
ject V
anucur
1 E
. H
igh S
tre
et O
xfo
rd O
H
1/8" = 1'-0"1
ROOF
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Page 32
Scale
Date
Drawn By
Checked By
Project Number
4/5/2013 4:11:13 PM
S200
3D axon
ProjectVanucur
CG
CLG
100
Pro
ject V
anucur
1 E
. H
igh S
tre
et O
xfo
rd O
H
1Iso web joists
2Iso foundation
3Iso columns and beams
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Page 33
L4X4X1/2 2 2
MC8X8.5
MC8X8.5
L5X4X1/4 2
L5X4X1/4 2
C5 1
/2
C5 1
/2
L6X4X1/2
C5 1
/2
C5 1
/2
MC
8X8.5
MC
8X
8.5
MC8X
8.5
L6X4X1/2
MC
8X
8.5
L6X4X1/2
C5 1/2
C5
1/2
C5 1
/2
C5 1/2
C5 1/2
C5
1/2
C5 1
/2
C5 1/2
C5 1/2
C5 1
/2
C5 1/2
C5 1/2
C5 1/2
C5 1
/2
C5 1/2
C5 1/2
C5 1/2
MC8X
8.5
MC8X8.5
MC8X8.5
MC
8X
8.5
MC8X
8.5
MC8X8.5
MC8X8.5
L4X4X1/2 2 2
L5X4X1/4 2
L5X4X
1/4 2
C5
1/2
C5 1
/2
C5 1/2
C5 1/2
C5
1/2
C5 1
/2
C5 1/2
25' - 7 31/32"
R 1' - 4 7/16"
R 5' - 1 25/32"
R 9' - 1 25/32"
R 12' - 9 31/32"
Scale
Date
Drawn By
Checked By
Project Number
4/5/2013 4:11:14 PM
S201
Detail axon ofcorner roof
ProjectVanucur
Checker
CLG
100
Pro
ject V
anucur
1 E
. H
igh S
tre
et O
xfo
rd O
H
13d detail of roof peak
23d detail of roof peak top
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Page 34
Scale
Date
Drawn By
Checked By
Project Number
4/5/2013 4:11:14 PM
S300
Framing schedulecolumns
ProjectVanucur
Checker
CLG
100
Pro
ject V
anucur
1 E
. H
igh S
tre
et O
xfo
rd O
H
Structural Column Schedule
Family Type Base Level Length
ColumnLocation
Mark
HP-Bearing Pile-Column HP10X42 4th Floor 12' - 1 1/2" C-1.5
HP-Bearing Pile-Column HP10X42 4th Floor 12' - 1 1/2" D-1.5
HP-Bearing Pile-Column HP10X42 4th Floor 12' - 1 1/2" E-1.5
HP-Bearing Pile-Column HP10X42 4th Floor 12' - 1 1/2" F-1.0
HP-Bearing Pile-Column HP10X42 4th Floor 12' - 1 1/2" G-1.0
HP-Bearing Pile-Column HP10X42 4th Floor 12' - 1 1/2" B-1.5
HP-Bearing Pile-Column HP10X42 4th Floor 12' - 1 1/2" A.5-2
HP-Bearing Pile-Column HP10X42 4th Floor 13' - 0" C-3
HP-Bearing Pile-Column HP10X42 4th Floor 13' - 0" D-3
HP-Bearing Pile-Column HP10X42 4th Floor 13' - 0" E-3
HP-Bearing Pile-Column HP10X42 4th Floor 13' - 0" F-3
HP-Bearing Pile-Column HP10X42 4th Floor 13' - 0" A.5-3
HP-Bearing Pile-Column HP10X42 4th Floor 13' - 4 1/2" G-3(-9' - 3")
HP-Bearing Pile-Column HP10X42 4th Floor 13' - 10" C-4
HP-Bearing Pile-Column HP10X42 4th Floor 13' - 10" D-4
HP-Bearing Pile-Column HP10X42 4th Floor 13' - 10" F-4
HP-Bearing Pile-Column HP10X42 4th Floor 13' - 10" A-4
HP-Bearing Pile-Column HP10X42 4th Floor 13' - 11" E-4
HP-Bearing Pile-Column HP10X42 4th Floor 14' - 5" C-5
HP-Bearing Pile-Column HP10X42 4th Floor 14' - 5" D-5
HP-Bearing Pile-Column HP10X42 4th Floor 14' - 5" E-5
HP-Bearing Pile-Column HP10X42 4th Floor 14' - 5" F-5
HP-Bearing Pile-Column HP10X42 4th Floor 14' - 5" A-5
Structural Column Schedule
Family Type Base Level Length
ColumnLocation
Mark
HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" C-3
HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" C-1.5
HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" C-4
HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" C-5
HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" D-3
HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" D-1.5
HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" D-4
HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" D-5
HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" E-3
HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" E-1.5
HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" E-4
HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" E-5
HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" F-3
HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" F-1.0
HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" F-4
HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" F-5
HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" G-5
HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" A-4
HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" A-5
HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" A.5-3
HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" G-3
HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" G-1.0
HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" B-1.5
HP-Bearing Pile-Column HP10X42 3rd Floor 13' - 0" A.5-2
Structural Column Schedule
Family Type Base Level Length
ColumnLocation
Mark
HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" C-3
HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" C-1.5
HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" C-4
HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" C-5
HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" D-3
HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" D-1.5
HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" D-4
HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" D-5
HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" E-3
HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" E-1.5
HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" E-4
HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" E-5
HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" F-3
HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" F-1.0
HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" F-4
HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" F-5
HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" G-3
HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" G-5
HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" A-4
HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" A-5
HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" A.5-3
HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" G-1.0
HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" B-1.5
HP-Bearing Pile-Column HP10X42 2nd Floor 13' - 0" A.5-2
Structural Column Schedule
Family Type Base Level Length
ColumnLocation
Mark
Structural Column Schedule
Family Type Base Level Length
ColumnLocation
Mark
HP-Bearing Pile-Column HP10X42 foundation 19' - 2" B-1.5
HP-Bearing Pile-Column HP10X42 foundation 19' - 2" A.5-2
HP-Bearing Pile-Column HP10X42 foundation 19' - 2" A-4
HP-Bearing Pile-Column HP10X42 foundation 19' - 2" A-5
HP-Bearing Pile-Column HP10X42 foundation 19' - 2" A.5-3
HP-Bearing Pile-Column HP10X42 foundation 20' - 0" C-3
HP-Bearing Pile-Column HP10X42 foundation 20' - 0" C-1.5
HP-Bearing Pile-Column HP10X42 foundation 20' - 0" C-4
HP-Bearing Pile-Column HP10X42 foundation 20' - 0" C-5
HP-Bearing Pile-Column HP10X42 foundation 20' - 10" D-3
HP-Bearing Pile-Column HP10X42 foundation 20' - 10" D-1.5
HP-Bearing Pile-Column HP10X42 foundation 20' - 10" D-4
HP-Bearing Pile-Column HP10X42 foundation 20' - 10" D-5
HP-Bearing Pile-Column HP10X42 foundation 21' - 9" E-3
HP-Bearing Pile-Column HP10X42 foundation 21' - 9" E-1.5
HP-Bearing Pile-Column HP10X42 foundation 21' - 9" E-4
HP-Bearing Pile-Column HP10X42 foundation 21' - 9" E-5
HP-Bearing Pile-Column HP10X42 foundation 22' - 7" F-3
HP-Bearing Pile-Column HP10X42 foundation 22' - 7" F-1.0
HP-Bearing Pile-Column HP10X42 foundation 22' - 7" F-4
HP-Bearing Pile-Column HP10X42 foundation 22' - 7" F-5
HP-Bearing Pile-Column HP10X42 foundation 23' - 3" G-3
HP-Bearing Pile-Column HP10X42 foundation 23' - 3" G-1.0
HP-Bearing Pile-Column HP10X42 foundation 23' - 3" G-5
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT
Page 35
Scale
Date
Drawn By
Checked By
Project Number
4/5/2013 4:11:15 PM
S301
Framing schedule
ProjectVanucur
CG
CLG
100
Pro
ject V
anucur
1 E
. H
igh S
tre
et O
xfo
rd O
H
Structural Framing Schedule
Family Type LengthReference
Level Count
W-Wide Flange W12X26 27' - 0" 3rd Floor 8
W-Wide Flange W12X26 28' - 9 15/32" 3rd Floor 1
W-Wide Flange W12X26 29' - 0" 3rd Floor 1
W-Wide Flange W12X26 31' - 0" 3rd Floor 2
W-Wide Flange W12X26 44' - 9" 3rd Floor 1
W-Wide Flange W6X9 5' - 0" 4th Floor 1
W-Wide Flange W12X26 5' - 5" 4th Floor 1
W-Wide Flange W6X9 11' - 5 7/8" 4th Floor 1
W-Wide Flange W6X9 11' - 6" 4th Floor 1
W-Wide Flange W12X26 17' - 5" 4th Floor 4
W-Wide Flange W12X26 17' - 6" 4th Floor 1
W-Wide Flange W12X26 21' - 0" 4th Floor 1
W-Wide Flange W12X26 21' - 6" 4th Floor 2
W-Wide Flange W12X26 21' - 7 1/4" 4th Floor 2
W-Wide Flange W12X26 22' - 0" 4th Floor 1
W-Wide Flange W12X26 26' - 0" 4th Floor 14
W-Wide Flange W12X26 26' - 0" 4th Floor 1
W-Wide Flange W12X26 26' - 11 3/4" 4th Floor 2
W-Wide Flange W12X26 27' - 0" 4th Floor 6
W-Wide Flange W12X26 29' - 0" 4th Floor 2
W-Wide Flange W12X26 30' - 6" 4th Floor 2
W-Wide Flange W18 X26 2 44' - 5" 4th Floor 1
W-Wide Flange W6X9 5' - 0" ROOF 1
W-Wide Flange W12X26 5' - 5" ROOF 1
W-Wide Flange W12X26 6' - 4 27/32" ROOF 2
W-Wide Flange W12X26 6' - 8" ROOF 1
W-Wide Flange W12X26 6' - 9" ROOF 1
W-Wide Flange W6X9 11' - 2 1/4" ROOF 1
W-Wide Flange W12X26 17' - 2 1/2" ROOF 1
W-Wide Flange W12X26 17' - 5" ROOF 3
W-Wide Flange W12X26 17' - 6" ROOF 1
W-Wide Flange W12X26 17' - 6 3/32" ROOF 3
W-Wide Flange W12X26 17' - 6 3/32" ROOF 1
W-Wide Flange W12X26 20' - 5 9/32" ROOF 1
W-Wide Flange W12X26 21' - 0" ROOF 1
W-Wide Flange W12X26 21' - 3" ROOF 1
W-Wide Flange W12X26 21' - 6" ROOF 1
W-Wide Flange W12X26 21' - 6 25/32" ROOF 1
W-Wide Flange W12X26 25' - 9 15/16" ROOF 1
W-Wide Flange W12X26 25' - 11 17/32" ROOF 1
W-Wide Flange W12X26 26' - 0" ROOF 11
W-Wide Flange W12X26 26' - 0 1/32" ROOF 1
W-Wide Flange W12X26 27' - 0" ROOF 2
W-Wide Flange W12X26 27' - 0 3/32" ROOF 4
W-Wide Flange W12X26 27' - 0 1/8" ROOF 1
W-Wide Flange W12X26 27' - 0 1/8" ROOF 5
W-Wide Flange W12X26 29' - 0" ROOF 2
W-Wide Flange W12X26 30' - 6 5/32" ROOF 1
Grand total: 695
Structural Framing Schedule
Family Type LengthReference
Level Count
MT-Structural Tee MT6X5.9 3' - 4" 2nd Floor 2
MT-Structural Tee MT6X5.9 3' - 11 3/4" 2nd Floor 2
MT-Structural Tee MT6X5.9 3' - 4" 3rd Floor 2
MT-Structural Tee MT6X5.9 3' - 11 3/4" 3rd Floor 2
MT-Structural Tee MT6X5.9 3' - 4" 4th Floor 2
MT-Structural Tee MT6X5.9 3' - 11 3/4" 4th Floor 2
MT-Structural Tee MT9X5 10' - 0" ROOF 1
MT-Structural Tee MT9X5 39' - 5 3/32" ROOF 2
W-Wide Flange W6X9 5' - 0" 2nd Floor 1
W-Wide Flange W12X26 5' - 5" 2nd Floor 1
W-Wide Flange W6X9 11' - 5 7/8" 2nd Floor 1
W-Wide Flange W6X9 11' - 6" 2nd Floor 1
W-Wide Flange W12X26 17' - 5" 2nd Floor 4
W-Wide Flange W12X26 17' - 6" 2nd Floor 3
W-Wide Flange W12X26 21' - 0" 2nd Floor 1
W-Wide Flange W12X26 21' - 6" 2nd Floor 1
W-Wide Flange W12X26 21' - 7 1/4" 2nd Floor 3
W-Wide Flange W12X26 22' - 0" 2nd Floor 1
W-Wide Flange W12X26 26' - 0" 2nd Floor 13
W-Wide Flange W12X26 26' - 0" 2nd Floor 2
W-Wide Flange W12X26 27' - 0" 2nd Floor 8
W-Wide Flange W12X26 29' - 0" 2nd Floor 2
W-Wide Flange W12X26 30' - 6" 2nd Floor 2
W-Wide Flange W18 X26 2 44' - 5" 2nd Floor 1
W-Wide Flange W6X9 5' - 0" 3rd Floor 1
W-Wide Flange W12X26 5' - 5" 3rd Floor 1
W-Wide Flange W6X9 11' - 5 7/8" 3rd Floor 1
W-Wide Flange W6X9 11' - 6" 3rd Floor 1
W-Wide Flange W12X26 17' - 4 31/32" 3rd Floor 1
W-Wide Flange W12X26 17' - 5" 3rd Floor 2
W-Wide Flange W12X26 17' - 6" 3rd Floor 1
W-Wide Flange W12X26 17' - 9" 3rd Floor 3
W-Wide Flange W12X26 21' - 0" 3rd Floor 1
W-Wide Flange W12X26 21' - 6" 3rd Floor 1
W-Wide Flange W12X26 21' - 7 1/4" 3rd Floor 2
W-Wide Flange W12X26 21' - 8 17/32" 3rd Floor 1
W-Wide Flange W12X26 22' - 0" 3rd Floor 1
W-Wide Flange W12X26 26' - 0" 3rd Floor 13
W-Wide Flange W12X26 26' - 0" 3rd Floor 1
Structural Framing Schedule
Family Type LengthReference
Level Count
L-Angle face up L9X3X1/2 0' - 8" 2nd Floor 2
L-Angle face up L7X5X1/2 2 7' - 9" 2nd Floor 5
L-Angle face up 8' - 2 1/2" 2nd Floor 2
L-Angle face up L6X4X1/2 41' - 0 5/8" 2nd Floor 1
L-Angle face up L9X3X1/2 0' - 8" 3rd Floor 2
L-Angle face up L7X5X1/2 2 7' - 9" 3rd Floor 5
L-Angle face up L7X5X1/2 2 8' - 2 1/2" 3rd Floor 1
L-Angle face up L6X4X1/2 41' - 0 5/8" 3rd Floor 1
L-Angle face up L9X3X1/2 0' - 8" 4th Floor 1
L-Angle face up L7X5X1/2 2 7' - 9" 4th Floor 5
L-Angle face up L7X5X1/2 2 8' - 2 1/2" 4th Floor 1
L-Angle face up L7X5X1/2 2 16' - 7" 4th Floor 1
L-Angle face up L6X4X1/2 41' - 0 5/8" 4th Floor 1
L-Angle face up L9X3X1/2 0' - 5" ROOF 1
L-Angle face up 7' - 9" ROOF 4
L-Angle face up L7X5X1/2 2 20' - 0 5/16" ROOF 2
L-Angle face up L7X5X1/2 2 25' - 9 1/8" ROOF 1
L-Angle face up L5X4X1/4 2 32' - 3 23/32" ROOF 1
L-Angle face up L7X5X1/2 2 39' - 5 3/32" ROOF 1
L-Angle face up L7X5X1/2 2 39' - 6" ROOF 1
L-Angle face up L5X4X1/4 2 57' - 4 31/32" ROOF 1
L-Angle face up L6X4X1/2 78' - 5 5/16" ROOF 1
L-Angle face up L6X4X1/2 79' - 4 3/16" ROOF 2
L-Angle thin L3X2X1/2 0' - 6" 2nd Floor 10
L-Angle thin face up L3X2X1/2 10' - 0" ROOF 1
Light Gauge-Joists C3 1/2 1' - 10 3/4" ROOF 1
Light Gauge-Joists C3 1/2 2' - 0 3/4" ROOF 1
Light Gauge-Joists C5 1/2 3' - 5 3/4" ROOF 32
Light Gauge-Joists C5 1/2 8' - 3 11/16" ROOF 1
Light Gauge-Joists C5 1/2 8' - 3 23/32" ROOF 1
Light Gauge-Joists C5 1/2 8' - 3 3/4" ROOF 2
Light Gauge-Joists C5 1/2 8' - 3 27/32" ROOF 1
Light Gauge-Joists C5 1/2 8' - 3 29/32" ROOF 1
Light Gauge-Joists C5 1/2 8' - 4" ROOF 1
Light Gauge-Joists C5 1/2 8' - 4 1/16" ROOF 1
Light Gauge-Joists C5 1/2 8' - 4 3/16" ROOF 1
Light Gauge-Joists C5 1/2 8' - 4 1/4" ROOF 1
Light Gauge-Joists C5 1/2 8' - 4 11/32" ROOF 1
Light Gauge-Joists C5 1/2 8' - 4 13/32" ROOF 1
Light Gauge-Joists C5 1/2 8' - 4 9/16" ROOF 1
Light Gauge-Joists C5 1/2 8' - 4 9/16" ROOF 1
Light Gauge-Joists C5 1/2 8' - 4 5/8" ROOF 1
Light Gauge-Joists C5 1/2 8' - 4 5/8" ROOF 1
Light Gauge-Joists C5 1/2 8' - 6 5/32" ROOF 2
Light Gauge-Joists C5 1/2 8' - 6 3/16" ROOF 2
Light Gauge-Joists C5 1/2 8' - 6 3/16" ROOF 2
Light Gauge-Joists C5 1/2 8' - 6 7/32" ROOF 2
MC-Miscellaneous Channel MC8X8.5 13' - 4" ROOF 8
Structural Framing Schedule
Family Type LengthReference
Level Count
K-Series Bar Joist-Angle Web 12K1 17' - 6" 2nd Floor 11
K-Series Bar Joist-Angle Web 20K9 23' - 10 3/4" 2nd Floor 8
K-Series Bar Joist-Angle Web 20K9 26' - 0" 2nd Floor 8
K-Series Bar Joist-Angle Web 20K9 27' - 0" 2nd Floor 63
K-Series Bar Joist-Angle Web 20K9 30' - 6" 2nd Floor 7
K-Series Bar Joist-Angle Web 12K1 17' - 6" 3rd Floor 11
K-Series Bar Joist-Angle Web 20K9 26' - 0" 3rd Floor 7
K-Series Bar Joist-Angle Web 20K9 27' - 0" 3rd Floor 53
K-Series Bar Joist-Angle Web 20K9 30' - 6" 3rd Floor 7
K-Series Bar Joist-Angle Web 20K9 32' - 6" 3rd Floor 8
K-Series Bar Joist-Angle Web 12K1 17' - 6" 4th Floor 11
K-Series Bar Joist-Angle Web 20K9 26' - 0" 4th Floor 8
K-Series Bar Joist-Angle Web 20K9 27' - 0" 4th Floor 53
K-Series Bar Joist-Angle Web 20K9 30' - 6" 4th Floor 7
K-Series Bar Joist-Angle Web 20K9 32' - 3" 4th Floor 8
K-Series Bar Joist-Angle Web 12K1 1 8' - 4" ROOF 4
K-Series Bar Joist-Angle Web 12K1 17' - 9" ROOF 4
K-Series Bar Joist-Angle Web 12K1 21' - 3" ROOF 6
K-Series Bar Joist-Angle Web 20K9 26' - 0" ROOF 12
K-Series Bar Joist-Angle Web 20K9 27' - 0" ROOF 45
K-Series Bar Joist-Rod Web 8' 8K1 9' - 0" 2nd Floor 3
K-Series Bar Joist-Rod Web 8' 8K1 10' - 6 7/16" 2nd Floor 3
K-Series Bar Joist-Rod Web 8' 8K1 9' - 0" 3rd Floor 3
K-Series Bar Joist-Rod Web 8' 8K1 10' - 6 7/16" 3rd Floor 3
K-Series Bar Joist-Rod Web 8' 8K1 9' - 0" 4th Floor 3
K-Series Bar Joist-Rod Web 8' 8K1 10' - 6 7/16" 4th Floor 3
K-Series Bar Joist-Rod Web 8' 8K1 9' - 0" ROOF 3
L-Angle face down 7' - 9" 2nd Floor 3
L-Angle face down L6X4X1/2 20' - 0 9/16" 2nd Floor 2
L-Angle face down L8X6X1/2 2 7' - 9" 3rd Floor 2
L-Angle face down L8X6X1/2 2 7' - 9" 4th Floor 2
L-Angle face down L8X6X1/2 2 7' - 9" ROOF 2
L-Angle face down L4X4X1/2 22
8' - 7 7/32" ROOF 1
L-Angle face down L6X4X1/2 35' - 9 3/4" ROOF 1
L-Angle face down L6X4X1/2 39' - 6" ROOF 3
PRODUCED BY AN AUTODESK STUDENT PRODUCTP
RO
DU
CE
D B
Y A
N A
UT
OD
ES
K S
TU
DE
NT
PR
OD
UC
TPRODUCED BY AN AUTODESK STUDENT PRODUCT
PR
OD
UC
ED
BY
AN
AU
TO
DE
SK
ST
UD
EN
T P
RO
DU
CT