Top Banner
Construction & Demolition Recycling Seminar Illinois Recycling Association April 13, 2011 Champaign Illinois
32

Construction & Demolition Recycling Seminar Illinois Recycling Association April 13, 2011 Champaign Illinois.

Apr 01, 2015

Download

Documents

Nicole Sizer
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Construction & Demolition Recycling Seminar Illinois Recycling Association April 13, 2011 Champaign Illinois.

Construction & Demolition Recycling Seminar

Illinois Recycling Association

April 13, 2011 Champaign Illinois

Page 2: Construction & Demolition Recycling Seminar Illinois Recycling Association April 13, 2011 Champaign Illinois.

Illinois Environmental Protection Agency

• PAUL PURSEGLOVE – Manager• Field Operation Section – Bureau of Land• 217/524-5597• [email protected]

Page 3: Construction & Demolition Recycling Seminar Illinois Recycling Association April 13, 2011 Champaign Illinois.
Page 4: Construction & Demolition Recycling Seminar Illinois Recycling Association April 13, 2011 Champaign Illinois.

The Mission of the Bureau of Land

• Ensure that hazardous and non-hazardous

wastes are managed in an environmentally sound manner;

• Encourage the recycling and recovery of waste materials through suitable incentive/disincentive efforts;

• Provide remedial responses and/or provide oversight to the uncontrolled releases of hazardous and petroleum substances into the environment.

Page 5: Construction & Demolition Recycling Seminar Illinois Recycling Association April 13, 2011 Champaign Illinois.

SAFE

WASTE

MANAGEMENT

Page 6: Construction & Demolition Recycling Seminar Illinois Recycling Association April 13, 2011 Champaign Illinois.

Illinois EPA’s Objective

COMPLIANCE

Page 7: Construction & Demolition Recycling Seminar Illinois Recycling Association April 13, 2011 Champaign Illinois.
Page 8: Construction & Demolition Recycling Seminar Illinois Recycling Association April 13, 2011 Champaign Illinois.

Waste … discarded materialSec 3.53 (1986)

Municipal Waste …. “means garbage, general household and commercial waste, landscape waste….and CONSTRUCTION OR DEMOLITION DEBRIS

Section 3.290 (1986)

Page 9: Construction & Demolition Recycling Seminar Illinois Recycling Association April 13, 2011 Champaign Illinois.

MANAGEMENT OF GENERAL C&D DEBRIS

Page 10: Construction & Demolition Recycling Seminar Illinois Recycling Association April 13, 2011 Champaign Illinois.

ILLINOIS ENVIRONMENTAL PROTECTION ACT

• Prohibitions of the “Act”

–NO open dumping of C&D waste

–NO open burning of C&D waste

Page 11: Construction & Demolition Recycling Seminar Illinois Recycling Association April 13, 2011 Champaign Illinois.
Page 12: Construction & Demolition Recycling Seminar Illinois Recycling Association April 13, 2011 Champaign Illinois.

MANAGEMENT OF GENERAL C&D DEBRIS

• Landfill• Transfer Station• C&D Transfer, Storage or Treatment Facility

(operated pursuant to 22.38 of the Act)• Recycling Center (not regulated by IEPA)

Page 13: Construction & Demolition Recycling Seminar Illinois Recycling Association April 13, 2011 Champaign Illinois.
Page 14: Construction & Demolition Recycling Seminar Illinois Recycling Association April 13, 2011 Champaign Illinois.
Page 15: Construction & Demolition Recycling Seminar Illinois Recycling Association April 13, 2011 Champaign Illinois.

C&D Recycling

415 ILCS 5/22.38

Facilities accepting exclusively C&D for Transportation, Storage or Treatment

22.38 sites must comply with local Zoning

In the absence of zoning – 1300 ft. from a residence

Page 16: Construction & Demolition Recycling Seminar Illinois Recycling Association April 13, 2011 Champaign Illinois.

Operating Requirements

• Within 48 hours sort/separate material that can be recycled from the waste that must be disposed

• Within 72 hours transport off site all non-recyclable wastes

• Limit non-recyclables to 25% -- wood recovered for the secondary fuel market counts toward the 75%

Page 17: Construction & Demolition Recycling Seminar Illinois Recycling Association April 13, 2011 Champaign Illinois.

Operating Requirements

• Non-putrescibles can accumulate for 6 months• Putrescibles items must move off site in 45

days• Keep Records to demonstrate compliance and

identify the generator and transporter• CONTROL – odors, noise, vectors, dust, litter,

access • Take precautions against fire

Page 18: Construction & Demolition Recycling Seminar Illinois Recycling Association April 13, 2011 Champaign Illinois.
Page 19: Construction & Demolition Recycling Seminar Illinois Recycling Association April 13, 2011 Champaign Illinois.

Operating Requirements

• Storm water runoff must be controlled• Leachate properly managed• ASBESTOS – comply with all applicable laws• NOTIFY – the Illinois EPA• If operations commence after 8-24-2009 you

must obtain and Illinois EPA issued permit prior to commencing operations [ILCS 5/21(d)]

Page 20: Construction & Demolition Recycling Seminar Illinois Recycling Association April 13, 2011 Champaign Illinois.

Local Siting Requirements

• ILCS 5/3.330 Pollution Control FacilityDefinition -- Any waste storage site, waste transfer

station, waste treatment facility

• ILCS 5/39.2 The county Board or governing body shall approve

or disapprove requests for local siting for each pollution control facility

Page 21: Construction & Demolition Recycling Seminar Illinois Recycling Association April 13, 2011 Champaign Illinois.

ILCS 5/22.15 Solid Waste Management Fund

• $2.00/ton collected at the landfill• A unit of local government can collect

$1.27/ton• However ILCS 5/22.15(k) exempts the SWMF

fees from recyclers (22.38 sites) provided 50% of the waste received is reusable

• Processors must have written approval from the Illinois EPA

Page 22: Construction & Demolition Recycling Seminar Illinois Recycling Association April 13, 2011 Champaign Illinois.

ILCS 5/22.44 Subtitle D Management Fund

• $0.22/ton collected at the landfill• However ILCS 5/22.44(c) exempts the SDMF

fees from recyclers (22.38 sites) provided 50% of the waste received is reusable

• Processors must have written approval from the Illinois EPA

Page 23: Construction & Demolition Recycling Seminar Illinois Recycling Association April 13, 2011 Champaign Illinois.
Page 24: Construction & Demolition Recycling Seminar Illinois Recycling Association April 13, 2011 Champaign Illinois.
Page 25: Construction & Demolition Recycling Seminar Illinois Recycling Association April 13, 2011 Champaign Illinois.
Page 26: Construction & Demolition Recycling Seminar Illinois Recycling Association April 13, 2011 Champaign Illinois.

Management of CCDD

• Section 3.160 of the Act(2005 & 2007 amendments)

• Uncontaminated concrete with protruding rebar and reclaimed asphalt pavement is NOT “waste” if separated or processed and returned to the economic mainstream within 4 years

• 25% removed each year

Page 27: Construction & Demolition Recycling Seminar Illinois Recycling Association April 13, 2011 Champaign Illinois.
Page 28: Construction & Demolition Recycling Seminar Illinois Recycling Association April 13, 2011 Champaign Illinois.
Page 29: Construction & Demolition Recycling Seminar Illinois Recycling Association April 13, 2011 Champaign Illinois.
Page 30: Construction & Demolition Recycling Seminar Illinois Recycling Association April 13, 2011 Champaign Illinois.
Page 31: Construction & Demolition Recycling Seminar Illinois Recycling Association April 13, 2011 Champaign Illinois.
Page 32: Construction & Demolition Recycling Seminar Illinois Recycling Association April 13, 2011 Champaign Illinois.

QUESTIONS