Why automate construction?
Labor efficiency is alarmingly low
Skilled workforce is vanishing
Work quality is low
Control of the construction site is insufficient and difficult
Accident rate at construction sites is high (> 400,000 / year in US)
Waste and trims are high (3 To 7 tons per average home; 40% of all materials used
worldwide are for construction)
Low income housing and emergency shelters are critical
Construction is the largest sector of almost all economies
All other products are fabricated automatically construction is still
largely a manual task
5/27/2018 Construction Application
3/35
USC
Viterbi School of Engineering .
Construction productivity decline
Labor productivity comparison for non-farm industries and construction industry
developed by Paul Teicholz
ConstructionProductivity index
Non-farm productivity index
5/27/2018 Construction Application
4/35
USC
Viterbi School of Engineering .
Edisons concrete houses
$175,000 for molds
More than 2000 pieces
500,000 pounds
5/27/2018 Construction Application
5/35
USC
Viterbi School of Engineering .
Automated construction in Japan
89 single task construction robots
11 different automated construction systems
Concrete Surface Treatment Robot
This robotabsorbsthe waterwhichremainsafterconcretehas beenset.
5/27/2018 Construction Application
6/35
USC
Viterbi School of Engineering .
Big-Canopy high-rise pre-cast concrete construction system.Used to construct the 26 storey pre-cast concrete 30,726m2Yachiyodai Condominium building in Japan.The system realized a60% reduction in labor requirementsfor the frame erection.
5/27/2018 Construction Application
7/35
USC
Viterbi School of Engineering .
Form work cost structure
Ties
Wales
Studs
Sheathing
Concrete footing
Brace
Reinforcement
53%
30%
10% 7% Formwork Labor
Concrete Materials
Formwork Materials
Concrete Labor
5/27/2018 Construction Application
8/35
USC
Viterbi School of Engineering .
ICF Homes
5/27/2018 Construction Application
9/35
USC
Viterbi School of Engineering .
5/27/2018 Construction Application
10/35
USC
Viterbi School of Engineering .
Concrete filling
5/27/2018 Construction Application
11/35
USC
Viterbi School of Engineering .
Insulation
5/27/2018 Construction Application
12/35
USC
Viterbi School of Engineering .
SC
5/27/2018 Construction Application
13/35
USC
Viterbi School of Engineering .
Construction by Contour Crafting
USC
5/27/2018 Construction Application
14/35
USC
Viterbi School of Engineering .
What constitutes construction cost?
Portion Due to If Automated by CC
20%-25%Financing Short project length and control of
time to market will dramaticallyreduce this cost
25%-30% Materials Will be a wasteless process
45%-55% Labor Will be significantly reduced
USC
5/27/2018 Construction Application
15/35
USC
Viterbi School of Engineering .
Cavities made with CC and filled with concrete
USC
5/27/2018 Construction Application
16/35
USC
Viterbi School of Engineering .
Creating hollow depositions
USC
5/27/2018 Construction Application
17/35
USC
Viterbi School of Engineering .
Embedding Reinforcement
USC
5/27/2018 Construction Application
18/35
USC
Viterbi School of Engineering .
A straight wall builder
USC
5/27/2018 Construction Application
19/35
USC
Viterbi School of Engineering .
Full scale wall sections
USC
5/27/2018 Construction Application
20/35
USC
Viterbi School of Engineering .
USC
5/27/2018 Construction Application
21/35
USC
Viterbi School of Engineering .
USC
5/27/2018 Construction Application
22/35
USC
Viterbi School of Engineering .
USC
5/27/2018 Construction Application
23/35Viterbi School of Engineering .
Conventional and CC forms
Form tie
Concrete
form
Tie washer
Sheathing Studs
Wales
Tie rod
Cone Spreader
Tie nut
USC
5/27/2018 Construction Application
24/35Viterbi School of Engineering .
Conventional Structure Construction
USC
5/27/2018 Construction Application
25/35Viterbi School of Engineering .
AdobestructuresAgeless comfort and beauty
House ofBrojerdiKashan
USC
5/27/2018 Construction Application
26/35Viterbi School of Engineering .
Interior of anAdobe houseCalEarth Design
USC
5/27/2018 Construction Application
27/35Viterbi School of Engineering .
House made with vaults and domes
Interior of anAdobe houseCalEarth Design
USC
5/27/2018 Construction Application
28/35
Viterbi School of Engineering .
Ingenious methods
Manual construction of adobe form structures
using clay bricks (Source: Khalili, 2000)A vault structure made of clay bricks
(Source: Khalili, 2000)
USC
5/27/2018 Construction Application
29/35
Viterbi School of Engineering .
Free-standing Objects / Industrial parts
USC
5/27/2018 Construction Application
30/35
Viterbi School of Engineering .
Supportless structures created byCC
USC
5/27/2018 Construction Application
31/35
Viterbi School of Engineering .
Adobe house Construction
USC
5/27/2018 Construction Application
32/35
Viterbi School of Engineering .
Extraterrestrial Construction
USC
5/27/2018 Construction Application
33/35
Viterbi School of Engineering .
Deployable CC
USC
5/27/2018 Construction Application
34/35
Viterbi School of Engineering .
Lunar Construction
USC
5/27/2018 Construction Application
35/35
Road construction