Construction and Demolition Waste Recycling; A legislative comparison for use in Queensland policy making. Presentation for BEB801 Capstone Project Tom Ahern – Bachelor of Civil Engineering Queensland University of Technology 10 th June 2016
22

Construction and Demolition Waste Recycling

Jan 18, 2017

Download

Engineering

Tom Ahern
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Construction and Demolition Waste Recycling

Construction and Demolition Waste Recycling;A legislative comparison for use in Queensland policy making.

Presentation for BEB801 Capstone ProjectTom Ahern – Bachelor of Civil EngineeringQueensland University of Technology10th June 2016

Page 2: Construction and Demolition Waste Recycling

Index

Introduction to construction and demolition (C&D) waste;

History of C&D waste management and recycling;

C&D Recycling in South-East Queensland; C&D Recycling in Denmark; C&D Recycling in Hong Kong;

Recommendations

Page 3: Construction and Demolition Waste Recycling

C&D Waste 50%+ waste generated worldwide is C&D;

Many European countries achieving 90%+ recycling;

Other developed countries struggling to improve;

~95% of waste on typical construction sites can be recycled;

Page 4: Construction and Demolition Waste Recycling

C&D Waste Waste management historically focused on hygienically

disposing waste;

Historically construction activities acquired ‘unlimited’ resources and produced ‘unlimited’ waste;

Now understood that limited resources should be conserved and waste should be reduced;

Ideal system uses ‘energy’ to reuse and recycle limited resources and extend life-cycle of materials.

Page 5: Construction and Demolition Waste Recycling

Current C&DW Recycling Climate Denmark/Netherlands/Germany world leaders in C&D

recycling practices;

Lack of awareness in many developed countries such as EU members and USA;

Australia achieving promising results in NSW & Victoria;

Queensland struggling with ~42% C&DW recycled.

Page 6: Construction and Demolition Waste Recycling

4R’s of Waste Management

Reduce

Reuse

Recycle

Recover

Dispose

Page 7: Construction and Demolition Waste Recycling

Construction Waste Recycling Typically consists of

concrete, rubble, asphalt, brick, plaster, wood, metal and plastic;

Source-separation

All materials are separated into respective stockpiles and reused or sent to recyclers/landfill

Page 8: Construction and Demolition Waste Recycling

Demolition Waste Recycling Includes aggregate, concrete, wood, metal, insulation and

glass;

Usually contaminated with paints, adhesives, dirt etc.

Selective demolition as an alternative to full demolition;

Allows components to be disassembled and recycled before core structure is destroyed.

Page 9: Construction and Demolition Waste Recycling

South-East Queensland C&D Recycling

SEQ is largest growth area in the state;

Only reports 42% recycling of C&D wastes where other states are achieving 70%+;

Many barriers including landfill fees, inferior recycled materials and general lack of experience;

Timber and concrete largest recycled products.

Page 10: Construction and Demolition Waste Recycling

Waste Management Legislation - SEQ

Lack of policy surrounding the reduction and recycling of construction waste;

Waste Reduction Recycling Act;

Waste Reduction and Recycling Strategy;

Landfill levy introduced at $35/t then repealed;

Page 11: Construction and Demolition Waste Recycling

Waste Management Legislation - SEQ

Only affects government subsidiaries and those under government owned contracts;

Sets target at 40% total weight of waste to be reused or recycled;

Requires source-separation techniques where practicable;

Only accounts for a small section of C&D taking place.

Page 12: Construction and Demolition Waste Recycling

Denmark C&D Recycling First developed after Copenhagen landfill exhaustion in

1985;

1989 first municipal solid waste management plan enforced;

1993 Estimated 50% of C&D waste recycled, 23% incinerated & 27% disposed in landfill;

By 2008 approximately 90% of C&D waste recycled, 2% via incineration (energy recovery) & 8% disposed in landfill.

Page 13: Construction and Demolition Waste Recycling

Denmark C&D Recycling Waste is managed at all levels of government;

Environmental Protection Agency, Ministry of Environment and Energy, County policies & Municipality governance.

Odense Waste Management Facilities; Municipal Solid Waste (MSW) collection throughout Odense, 8 Recycling stations, Landfilling, sorting and composting facilities.

Page 14: Construction and Demolition Waste Recycling

Waste Management Legislation – Denmark Statutory Orders

Source-separation, Hazardous waste separation, Recycling unpolluted C&DW

Landfill Ban Ban for all materials suitable

for incineration.

Waste-to-energy facilities accommodated influx of waste.

Page 15: Construction and Demolition Waste Recycling

Waste Management Legislation – Denmark Landfill and incineration tax

first introduced in 1987;

Dramatic drop in landfilling since introduction;

Generates over €120 million annually;

Revenue supports recycling processes and cleaner technology ventures.

Page 16: Construction and Demolition Waste Recycling

Hong Kong C&D Recycling Sovereign territory in China – 7.3 million residents;

Inert waste – rock, rubble, concrete, brick, sand soil – Sent to public filling facilities for land reclamation;

Non-inert waste – Organic material and contaminated inert waste – Disposed in landfill.

Approximately 20% non-inert, 80% inert

Page 17: Construction and Demolition Waste Recycling

Hong Kong C&D Recycling Adopted the 4R’s approach to construction waste

management;

Source-separation is not widely encouraged – Only used when contractually required;

Top-down demolition required due to lack of space;

Tseung Kwan O Fill Bank Recycling facilities; Crushing plant and sorting facilities; Daily capacity of 1200 tonnes of crushed aggregate.

Page 18: Construction and Demolition Waste Recycling

Waste Management Legislation – Hong Kong Waste disposal ordinance (1980) to reduce illegal dumping;

Waste Reduction Framework Plan (1998) to promote reuse and recycling of materials;

2006 Off-site construction waste sorting program; Led to the commissioning of the Tseung Kwan O Fill Bank.

Introduced in conjunction with Waste Charging Scheme

Page 19: Construction and Demolition Waste Recycling

Waste Management Legislation – Hong Kong Waste Charging Scheme

introduced in 2006;

Sets charges based on the quantity by weight of different wastes;

Encourages separation to dispose of inert wastes at public fill facilities.

Government Waste Disposal Facility

Type of Construction waste accepted

Charge per tonne ($HK)

Public Fill Entirely inert $27

Sorting Facilities

More than 50% inert

$100

Landfill Not more than 50% inert

$125

Outlying Island Transfer Facilities

Containing any percentage of inert waste

$125

Page 20: Construction and Demolition Waste Recycling

Recommendations for South-East Queensland Legislation Use of recycled materials in new construction;

Relax policy surrounding the use of recycled materials; Allow use in non-critical structural applications; Stringent testing procedures to ensure quality;

Landfill levy; Greatly reduce the amount of waste being landfilled; Boost business for local recyclers; Provide revenue to offer rebates to contractors for applying

reduction and reuse techniques.

Page 21: Construction and Demolition Waste Recycling

Recommendations for South-East Queensland Legislation Recycling awareness campaigns;

Increase awareness for recycling throughout the industry; Move away from a negative recycling mentality;

Recycling bans; Landfill ban on items suitable for recycling; Removes these items from waste streams destined for landfill; Requires contractors to source-separate recyclable materials.

Page 22: Construction and Demolition Waste Recycling

Conclusion Queensland waste legislation is years behind foreign

counterparts;

Through careful planning the recommendations offered in this presentation can be realised;

Updating policy now can encourage a philosophy of reuse within the construction industry in the future.