Constructing an Automated Warehouse Primus Builders for Americold
Why build one?• Store more product in a smaller footprint
• Automate processes typically done with labor and MHE– Putaway and retrieving of pallets
– Replenishment
– Labeling and stretchwrapping
• Lower energy costs– Refrigeration and power
• Allows room for expansion
• Planning
• Construction and design considerations
• Refrigeration
• Schedule
• Questions?
Items to consider when building one
Planning
• Do you have the space?– Laydown – Do you have enough?
• Seismic– Independent structure
– Rack supported
• Building codes– City, State
– Are any variances required
Construction/design considerations
• Fire protection
• Roof access
• IMP
• Air doors/product openings
• Slab thickness
Refrigeration
• Penthouses
• Pipe routing
• Pipe attachment
• Different approaches– Penthouse vs suspended
Schedule
• Develop early
• Combine automation vendor and GC schedule
• Interleaving the tasks
• Ship dates vs. onsite– Transfer yards