Top Banner
CONSTANT TEMPERATURE CONSTANT TEMPERATURE AIR BATH AIR BATH Team Members: •Mark Campbell •Peter Giles •Andrew Smith •Tom Strapps •Nickolay Suther Team Supervisor: Dr. Prabir Basu
20

CONSTANT TEMPERATURE AIR BATH Team Members: Mark Campbell Peter Giles Andrew Smith Tom Strapps Nickolay Suther Team Supervisor: Dr. Prabir Basu.

Dec 29, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CONSTANT TEMPERATURE AIR BATH Team Members: Mark Campbell Peter Giles Andrew Smith Tom Strapps Nickolay Suther Team Supervisor: Dr. Prabir Basu.

CONSTANT TEMPERATURE CONSTANT TEMPERATURE AIR BATHAIR BATH

Team Members:•Mark Campbell•Peter Giles•Andrew Smith•Tom Strapps•Nickolay Suther

Team Supervisor:Dr. Prabir Basu

Page 2: CONSTANT TEMPERATURE AIR BATH Team Members: Mark Campbell Peter Giles Andrew Smith Tom Strapps Nickolay Suther Team Supervisor: Dr. Prabir Basu.

Presentation OutlinePresentation Outline

•What are we doing?

•What are the options?

•How do thermoelectrics work?

•How are we going to solve the problem?

Page 3: CONSTANT TEMPERATURE AIR BATH Team Members: Mark Campbell Peter Giles Andrew Smith Tom Strapps Nickolay Suther Team Supervisor: Dr. Prabir Basu.

What is an Air Bath?What is an Air Bath?

•Controlled Environment

•Liquid Baths

•Research and Calibration

http://www.guildline.ca/Datasheet/Guildline503XDatasheet.pdf

Page 4: CONSTANT TEMPERATURE AIR BATH Team Members: Mark Campbell Peter Giles Andrew Smith Tom Strapps Nickolay Suther Team Supervisor: Dr. Prabir Basu.

Project RequirementsProject Requirements•Temperature Range

+5°C to +25°C

•Temperature Control +/- 0.2°C

•Noise <40 dB

•Minimize Vibration

Page 5: CONSTANT TEMPERATURE AIR BATH Team Members: Mark Campbell Peter Giles Andrew Smith Tom Strapps Nickolay Suther Team Supervisor: Dr. Prabir Basu.

Design Features ConsideredDesign Features Considered

Page 6: CONSTANT TEMPERATURE AIR BATH Team Members: Mark Campbell Peter Giles Andrew Smith Tom Strapps Nickolay Suther Team Supervisor: Dr. Prabir Basu.

Design SelectedDesign Selected

•Forced Convection

•Top Loading

•PID Control

•Thermistor Sensing

•Two Thermoelectrics

Page 7: CONSTANT TEMPERATURE AIR BATH Team Members: Mark Campbell Peter Giles Andrew Smith Tom Strapps Nickolay Suther Team Supervisor: Dr. Prabir Basu.

Air Bath ConstructionAir Bath Construction•Frame

Welded Steel

•InteriorFibreglass (25cm)3

•CaseFolded Sheet Metal

•InsulationStyrofoam™ SM (5cm Thick)

Page 8: CONSTANT TEMPERATURE AIR BATH Team Members: Mark Campbell Peter Giles Andrew Smith Tom Strapps Nickolay Suther Team Supervisor: Dr. Prabir Basu.

ThermoelectricsThermoelectrics•Pump heat•Small

40mm x 40mm x 4mm

•Efficiency COP Refrigerator ~ 4COP Thermoelectric < 1.5

•Reversible

http://www.electracool.com/

Page 9: CONSTANT TEMPERATURE AIR BATH Team Members: Mark Campbell Peter Giles Andrew Smith Tom Strapps Nickolay Suther Team Supervisor: Dr. Prabir Basu.

Peltier EffectPeltier Effect

Source:http://jchemed.chem.wisc.edu/Journal/Issues/1996/Oct/abs940.html

Page 10: CONSTANT TEMPERATURE AIR BATH Team Members: Mark Campbell Peter Giles Andrew Smith Tom Strapps Nickolay Suther Team Supervisor: Dr. Prabir Basu.

PeltierPeltier PerformancePerformance

Page 11: CONSTANT TEMPERATURE AIR BATH Team Members: Mark Campbell Peter Giles Andrew Smith Tom Strapps Nickolay Suther Team Supervisor: Dr. Prabir Basu.

Heat DissipationHeat Dissipation

•Passive Heat Loadq=kA(T2-T1)/L

q ~ 10W

•Joule HeatP=IVq ~ 70W

Page 12: CONSTANT TEMPERATURE AIR BATH Team Members: Mark Campbell Peter Giles Andrew Smith Tom Strapps Nickolay Suther Team Supervisor: Dr. Prabir Basu.

Heat Sink AssemblyHeat Sink Assembly

Page 13: CONSTANT TEMPERATURE AIR BATH Team Members: Mark Campbell Peter Giles Andrew Smith Tom Strapps Nickolay Suther Team Supervisor: Dr. Prabir Basu.

Measurement SystemsMeasurement Systems

•Temperature SensorsRTDThermistorThermocouple

•Overheat ProtectionEmbedded Thermocouple

http://www.veriteq.com/images/thermocouple-thermistor.jpg

Thermocouple ThermistorRTD

Page 14: CONSTANT TEMPERATURE AIR BATH Team Members: Mark Campbell Peter Giles Andrew Smith Tom Strapps Nickolay Suther Team Supervisor: Dr. Prabir Basu.

System ControlSystem Control•Requires sensing, analysis and power control

On/Off PID

•Lumped Parameter Model

Page 15: CONSTANT TEMPERATURE AIR BATH Team Members: Mark Campbell Peter Giles Andrew Smith Tom Strapps Nickolay Suther Team Supervisor: Dr. Prabir Basu.

System ModelSystem Model

5

Thermostat

Tout

Temperatures

Relay

Time

Qm

Qf

Qc

Clock

Tm

Tc

Ti

Thermostat1s

Main

Qout

Heat Flow

Ks

Kf

Ks

Kf

1/Cc

1/Ci

Gain1

1/Cm

25

Constant1

Clock1

Clock

1s

Basement

1s

Attic

Add9

Add8

Add7

Add4

Add3

Add2

Add1

Add

Qm

Qm

Tm

Tm

Tm

To

To

To

Tc

Tc

Tc

Tc

Tc

Qf

Qf

Ti

Ti

Ti

Ti

Qi

Thermostat

Thermostat

Qc

Qc

Clock

Time

Lumped Parameter ON/OFF Control Model

Page 16: CONSTANT TEMPERATURE AIR BATH Team Members: Mark Campbell Peter Giles Andrew Smith Tom Strapps Nickolay Suther Team Supervisor: Dr. Prabir Basu.

0 1 2 3 40

10

20

30T

em

p (

C)

TEMPERATURES

0 1 2 3 40

5

10

15

20

25

Time (hr)

Hea

t Flo

ws

(W)

HEAT FLOWS

CoolerInsulationSetpoint

To Cooler from Insulation

TEC Heat Removal

Simulink ResultsSimulink Results

25 minutes

On/Off Control 1°C Dead band

Page 17: CONSTANT TEMPERATURE AIR BATH Team Members: Mark Campbell Peter Giles Andrew Smith Tom Strapps Nickolay Suther Team Supervisor: Dr. Prabir Basu.

Mock-up TestingMock-up Testing

Page 18: CONSTANT TEMPERATURE AIR BATH Team Members: Mark Campbell Peter Giles Andrew Smith Tom Strapps Nickolay Suther Team Supervisor: Dr. Prabir Basu.

The Next Step…The Next Step…•Order necessary parts

•Start construction

•Continue Mock-up Testing

Page 19: CONSTANT TEMPERATURE AIR BATH Team Members: Mark Campbell Peter Giles Andrew Smith Tom Strapps Nickolay Suther Team Supervisor: Dr. Prabir Basu.

Special Thanks ToSpecial Thanks To

•Greenfield Research

•Greg Jollimore

•Dr. Prabir Basu

Page 20: CONSTANT TEMPERATURE AIR BATH Team Members: Mark Campbell Peter Giles Andrew Smith Tom Strapps Nickolay Suther Team Supervisor: Dr. Prabir Basu.