Top Banner
Consolidated Rental Car Facility Financing Update March 5, 2009 ITEM NO. 6a-Supp DATE OF MEETING March 5, 2009
17

Consolidated Rental Car Facility Financing Update

May 03, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Consolidated Rental Car Facility Financing Update

Consolidated Rental Car Facility

Financing Update

March 5, 2009

ITEM NO. 6a-Supp

DATE OF

MEETING March 5, 2009

Page 2: Consolidated Rental Car Facility Financing Update

2

Briefing Overview

• Background

– Enplanement Forecast

– Financial Markets

• Financing Tools

– Bank Lines of Credit

– Fixed Rate Bonds

– Airport funds

• Finance Scenarios

• Next Steps

Page 3: Consolidated Rental Car Facility Financing Update

3

Background

• Project Suspended in December, 2008

– Without a clear means of economically financing continued

construction, Port Commission authorized project suspension

– Turner Construction is winding down site activity

– Project and Finance update provided on January 27, 2009

• Changes during January and February, 2009 warrant today’s briefing

– Thawing in financial markets

– Availability of additional financing tools

– Change in Airport passenger traffic forecast

Page 4: Consolidated Rental Car Facility Financing Update

4

Enplanement Forecast

• Airport is in the process of revising the enplanement growth forecast

– January enplanements decreased 6%, lower than forecast

– Airlines’ planned capacity indicates lower activity forecast

• For the purposes of today’s analysis a conservative forecast was used

Forecast in Budget Forecast for Analysis

2009 -3% -7%

2010 0% 0%

2011 0% 0%

2012 2.5% 5%

2013 until 45 MAP * 3% 3%

* MAP = million annual passengers

Page 5: Consolidated Rental Car Facility Financing Update

55

Update of Financial Markets

• Treasury yields near historically low rates

• Liquidity in the market as measured by TED Spread has returned to pre-September 2008 levels

• Market access for investment grade credits has unquestionably improved since the beginning of 2009

• Credit spreads have narrowed considerably since late 2008

– PepsiCo 10-year bonds sold at the end of October at +420 to Treasuries traded at +211 this week

– Challenges remain for lower rated investment grade credits

1.00%

2.00%

3.00%

4.00%

5.00%

6.00%

7.00%

8.00%

9.00%

10.00%

Feb

-89

Feb

-90

Feb

-91

Feb

-92

Feb

-93

Feb

-94

Feb

-95

Feb

-96

Feb

-97

Feb

-98

Feb

-99

Feb

-00

Feb

-01

Feb

-02

Feb

-03

Feb

-04

Feb

-05

Feb

-06

Feb

-07

Feb

-08

Feb

-09

Inte

rest

Ra

te

Historical Interest Rates

10 Year TSY

30 Year TSY

-1.00%

0.00%

1.00%

2.00%

3.00%

4.00%

5.00%

Jan

-07

Feb

-07

Ma

r-0

7

Ap

r-0

7

Ma

y-0

7

Jun

-07

Jul-

07

Au

g-0

7

Sep

-07

Oct

-07

No

v-0

7

Dec

-07

Jan

-08

Feb

-08

Ma

r-0

8

Ap

r-0

8

Ma

y-0

8

Jun

-08

Jul-

08

Au

g-0

8

Sep

-08

Oct

-08

No

v-0

8

Dec

-08

Jan

-09

Spre

ad (3-m

o L

ibor m

inus

3-m

o T

reaury

)

Historical TED Spread

Page 6: Consolidated Rental Car Facility Financing Update

6

Recent Taxable Bond Issuance

6

Issuer

Total Issue Size

($MM) Pricing Week Maturity Ratings Yield Treasury Spread

Corporate Issues:

Hewlett-Packard Co. 1,000,000,000$ 2/23/2009 2/24/2012 A2e/A/A+ 3.63% +295 bps

1,500,000,000$ 2/23/2009 6/2/2014 4.72% +285 bps

Western Union Co. 500,000,000$ 2/23/2009 2/26/2014 A3e/A-e/A-e 6.58% +475 bps

Noble Energy Inc. 1,000,000,000$ 2/23/2009 3/1/2019 Baa2e/BBB 8.12% +550 bps

Waste Management 350,000,000$ 2/23/2009 3/11/2015 Baa3/BBB/BBB 6.58% +462 bps

Arizona Public Service 500,000,000$ 2/23/2009 3/1/2019 Baa2/BBB-/BBBe 8.73% +595 bps

Municipal Issues:

Vanderbilt University 250,000,000$ 2/23/2009 4/1/2019 Aa2e/Aae/Aae 5.25% +250 bps

University of Minnesota 17,035,000$ 1/26/2009 4/1/2014 Aa2/AA 3.38% +180 bps

(Revenue Bonds) 4/1/2019 5.00% +240 bps

4/1/2029 6.00% +240 bps

Superior Sch District 9,020,000$ 2/2/2009 3/1/2014 AA- 3.65% +175 bps

(GO Bonds) 3/1/2019 5.00% +210 bps

3/1/2029 6.00% +220 bps

Page 7: Consolidated Rental Car Facility Financing Update

7

Financing Tools Appear Available

• The Port now has available to it:

– Short-term bank lines of credit up to $200 million

– Long-term, fixed-rate bonds $200-400 million

– Option of issuing non-AMT bonds for airport project funding to

conserve cash, which could be loaned to project up to $100 million

– Total resources: $500-700 million

• Can combine these tools in most appropriate manner, based on exact

terms and market conditions available when ready to issue debt

• Combinations can help balance

Certainty

Flexibility

Cost

Page 8: Consolidated Rental Car Facility Financing Update

8

Short-Term Bank lines of credit

• Two banks each willing to provide $100 million

– 2 – 3 year term

– Issued as a line of credit or a loan

– Variable interest rate currently around 3%

– Debt held by the bank, so no remarketing risk

– Can be converted to letter-of-credit backed long-term variable rate

debt as market stabilizes

Page 9: Consolidated Rental Car Facility Financing Update

9

Long-term Fixed Rate Bonds

• Taxable market currently could support issuance of Port Revenue

bonds:

– Port’s First Lien likely to attract investors for

$200 - 400 million

30 year bonds

Rates of 8 – 8.5%

– Port’s Intermediate Lien is less attractive to investors

$200 - $250 million

10 year bonds (some 30 year bonds possible)

Rates of 8 – 9%

– Fixed rate taxable bonds cannot be called without a penalty

– Port Revenue would be pledged to these bonds and they would be

paid from CFCs

– Bonds with CFC-only pledge not currently supported by the market

Page 10: Consolidated Rental Car Facility Financing Update

10

Airport Development Fund Loan

• Federal stimulus package provides AMT debt “holiday”

• Significantly improves market access

• Can more economically finance airport projects with lower cost non-

AMT bonds

• Funds can be held in reserve to re-pay a bank line

• Could loan that cash to project or used to pay down bank lines/loans

with most flexible terms of any other option

• State legislature considering statutory change to facilitate such a loan

Page 11: Consolidated Rental Car Facility Financing Update

11

Scenarios

• Assumptions used in scenarios

– Updated enplanement forecast

– Transaction day growth based on enplanement forecast

– CFC rate increases 2% per year

– CFC revenue = CFC rate X transaction days

– Life cycle analysis: CFCs pay for

Debt service

Transportation operations and maintenance

Major maintenance costs

– Project re-starts in summer 2009

Approximately $64 million spent through 2008 – cash funded

Need for debt funding over the next two years (2009-2010) estimated to be less

than $200 million

Page 12: Consolidated Rental Car Facility Financing Update

12

Scenario One: Base Case

• 2009

– $200 million 10 year fixed rate bonds

– $200 million bank lines of credit

• 2010-2011

– Repay one bank line with $100 million 10-30 year fixed rate bonds

– Convert one bank line to long-term variable rate bonds

• By 2012 the finance structure will be:

– $300 million fixed rate bonds 10-30 yrs

– $100 million variable rate bonds

• By 2019, the 10 year bonds will be refinanced

Page 13: Consolidated Rental Car Facility Financing Update

13

Scenario One: Impacts

• Estimated opening CFC: $6.50 – 7.00

• Note: major projects are typically funded with multiple bond issues

• Advantages

– Debt is issued on Intermediate Lien that was designed to

accommodate CFC funded debt

– 10 yr maturities carry lower interest rates than long term and

provide flexibility in structuring debt when refinanced

– Variable rate debt provides lower interest rates and flexibility to

refund or pay off without penalty

• Disadvantages

– Refinancing risk when bonds mature – rates could be higher or

lower

– Variable rate debt has rate fluctuations and bank exposure (with

letter of credit structure)

Page 14: Consolidated Rental Car Facility Financing Update

1414

Variable Rate Debt Component of Structure

• The short-term market has historically provided borrowers with a lower

cost of capital

0.00%

1.00%

2.00%

3.00%

4.00%

5.00%

6.00%

7.00%

8.00%

Jan

-97

Jul-

97

Jan

-98

Jul-

98

Jan

-99

Jul-

99

Jan

-00

Jul-

00

Jan

-01

Jul-

01

Jan

-02

Jul-

02

Jan

-03

Jul-

03

Jan

-04

Jul-

04

Jan

-05

Jul-

05

Jan

-06

Jul-

06

Jan

-07

Jul-

07

Jan

-08

Jul-

08

Jan

-09

Inte

rest

Ra

te

Short-Term Borrowing Cost Relative to Fixed Rate Cost

20-Year Treasury

1-month LIBOR

Page 15: Consolidated Rental Car Facility Financing Update

15

Scenario Two: Maximize Certainty

• $425 million fixed rate

– 30 yr debt

– First Lien

– Note: negative carry of 100% fixed rate debt issued in 2009

requires greater use of capitalized interest and therefore more bond

proceeds

Page 16: Consolidated Rental Car Facility Financing Update

16

Scenario Two: Impacts and Issues

• Estimated opening CFC: $6.75 – 7.25

• Advantages

– Certainty of debt service over 30 years

• Disadvantages

– Uses First Lien capacity for long term

– Negative carry on full amount of debt

– No flexibility to restructure or take advantage of future market

opportunities

Page 17: Consolidated Rental Car Facility Financing Update

17

Process & Schedule

• Process

– Staff plans to begin documentation for a bond sale and for the bank lines

– Commission approval required for

Each line of credit – two readings of each resolution

Issuance of bonds – two readings of the bond resolution

Project restart

– Staff will provide updates on recommended approach to bond market prior to request for approval

• Schedule

– March – Commission briefing, begin document preparation

– April/May – Update Commission, seek approval for bonds issuance, bank line, establish Commission parameters

– May/June – initiate sale process for bonds based on Commission parameters

– June/July – receive proceeds and re-start project