Able Data – Reference Sites Able Data Installations Plc Tel: 01442 219580 www.abledata.co.uk Vizion Apartments, Milton Keynes Summary TV & Satellite System for 405 Apartments Contact Rob Barker, Electrical Services, BAM Construction. 01727 894 203 Centrum Business Park, Building 4, St Albans, Herts. AL1 2RD Location Part of the Abbey gate Sainsbury’s development, Milton Keynes Contract £350K Systems Fracarro IRS Equipment Timescales March 2007 - November 2008 Contractor BAM Project Description Able Data were contracted to build an IRS system for the new Abbey gate Sainsbury’s development in Milton Keynes. Over the large development, it was decided to build a separate aerial rig and head end on each main block, subdividing the project into smaller independent units. Each flat was provided with its own TV and Data patch cabinet to allow flexible re-configuration of the services. One of the challenges was to build temporary TV/Sat head ends to accommodate new tenants moving whilst the main development continued. Pictures
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Able Data – Reference Sites
Able Data Installations Plc Tel: 01442 219580 www.abledata.co.uk
Vizion Apartments, Milton Keynes Summary TV & Satellite System for 405 Apartments
Contact Rob Barker, Electrical Services, BAM Construction. 01727 894 203 Centrum Business Park, Building 4, St Albans, Herts. AL1 2RD
Location Part of the Abbey gate Sainsbury’s development, Milton Keynes
Contract £350K
Systems Fracarro IRS Equipment
Timescales March 2007 - November 2008
Contractor BAM
Project Description
Able Data were contracted to build an IRS system for the new Abbey gate Sainsbury’s development in Milton Keynes. Over the large development, it was decided to build a separate aerial rig and head end on each main block, subdividing the project into smaller independent units. Each flat was provided with its own TV and Data patch cabinet to allow flexible re-configuration of the services. One of the challenges was to build temporary TV/Sat head ends to accommodate new tenants moving whilst the main development continued.
Pictures
Able Data – Reference Sites
Able Data Installations Plc Tel: 01442 219580 www.abledata.co.uk
West Herts College Summary Cabling of new college campus
Contact Rob Barker BAM Construction Centrium Business Park, Building 4 St Albans, Herts. AL1 2RD Tel: 020 8879 1188
Location Watford
Contract £500K
Systems SYSTIMAX GigaSPEED X10D, Prism Cabinets
Start & Finish Jan 2010 – April 2010
Contractor BAM
Project Description
West Herts College has embarked on a long-term property strategy to modernise its facilities and transform campus life. As part of their plans they have built a new flagship Watford campus offering state-of-the-art facilities in an inspiring environment. Able Data were contracted to install a high performance campus wide structured cabling system. Over three months Able Data installed 7,000 SYSTIMAX Cat6a UTP outlets.
Pictures
Able Data – Reference Sites
Able Data Installations Plc Tel: 01442 219580 www.abledata.co.uk
Veolia Three Valleys Water Summary Cabling of building
Contact Bob Davis, Senior ICT Consultant Mace Atelier House, 64 Pratt Street London NW1 0LF Tel: 020 7554 8000
Location Hatfield Business Park, Hatfield
Contract £200K
Systems Molex PowerCat 6 UTP Cat6
Start & Finish Nov 2008 – Jan 2009
Consultant Mace
Contractor Como
Project Description
Veolia Water (formally Three Valleys Water) consolidated their offices into the new HUB building in Hatfield, a building to house 750 office staff. Able Data were contracted by Como to install a 3,000 outlet Cat6 data cabling system. Run over four floors, outlets were terminated in a grid of 8-way consolidation points installed under the false floor. Desk outlets were connected to the consolidation points through solid patch lead connections. The project was completed over a period of two months.
Pictures
Able Data – Reference Sites
Able Data Installations Plc Tel: 01442 219580 www.abledata.co.uk
South Thames College
Summary Cat6 Cable installation in to a refurbished part of the College Development.
Contact Rob Barker BAM Construction Centrium Business Park, Building 4 St Albans, Herts. AL1 2RD Tel: 020 8879 1188
Location Wandsworth London
Contract £85K
Systems Installed
Brand-Rex Cat6 & OM3 Fibre Backbone
Start & Finish
April 2010 to Oct 2010
Consultant None
Main Contractor
BAM
Project Description
Able Data installed 1200 Brand-Rex Cat6 Outlets and 288 Fibre Links. This was an extremely difficult installation due to the Building Restraints and the age of the Building An important scheduling consideration was the requirement to fit around the School Terms.
Picture
Able Data – Reference Sites
Able Data Installations Plc Tel: 01442 219580 www.abledata.co.uk
Misys Summary Cabling & moves into new headquarters building
Contact Phil Davies, IT Manager. Misys One Kingdom Street, Paddington. W2 6BL Tel: 020 8879 1188
Location Paddington, London
Contract £300K
Systems Brand-Rex Cat6 & OM3, Cooper B-Line Cabinets
Start & Finish Feb – Aug 2008
Consultant April Management
Contractor Mastercraft Design
Project Description
Misys were consolidating four regional offices into one new headquarters building. The new offices required 3,000 Brand Rex LSOH Cat6 outlets installed over three floors, each floor being cabled from two patch rooms. Able Data connected the patch rooms through diversely routed OM3 fibre and voice backbones. In the main computer room, Able Data installed Cooper B-Line cabinets, fitted with the Unite Hawki-2 intelligent power monitor and control products. Able Data also managed the movement of 500 users into the new building. Scheduled over five weekends, this included providing an asset register of all of their computer equipment and a full moves service into the new offices, including connection and test of all of the desktop equipment.
Pictures
Able Data – Reference Sites
Able Data Installations Plc Tel: 01442 219580 www.abledata.co.uk
HBG – Crawley Schools Summary Installation of Data/Voice & TV cabling in three Schools.
Contact Mr Steve Rooke HBG Construction Merit House, Edgware Road, Colindale, NW9 5AF. Tel: 020 8200 7070
Location Crawley, West Sussex
Contract £300K
Systems Data: 6,000 Brand-Rex Cat5e Outlets plus OM3 fibre. TV: 1,000 TV outlets. Fracarro K-series head end through Webro
CT167/CT100 cables.
Start & Finish Feb 2004 – Aug 2005
Consultant N/A
Contractor HBG Construction
Project Description
HBG have built three new secondary schools in West Sussex, Oriel, Ifield and Thomas Bennett. As part of this project, they contracted Able Data to design and install a data cabling and TV distribution system. The data cabling systems are based on the Brand Rex Millenium Cat5e system. In each school, Able Data installed 2,000 RJ45 outlets in class rooms, staff rooms and other locations. These outlets were run back to a number of local patch cabinets, which were in turn connected back to the main computer room via OM3 fibre. The TV distribution system includes 300 class room TV outlets per school. Within each school, these are fed from a single central head end, which is in turn fed from a single set of TV and radio aerials. The head end equipment includes a high quality Fracarro K-series processing system, which as well as providing high quality TV terrestrial analogue and digital channels, presents FM and DAB radio to all outlets. The school can also broadcast channels from their own video sources, such as DVD players, tapes or cameras.
Picture
Oriel School
Able Data – Reference Sites
Able Data Installations Plc Tel: 01442 219580 www.abledata.co.uk
FFiiddeelliittyy OOaakkhhiillll DDaattaa CCeennttrree Summary New Data Centre at the Fidelity HQ
Contact John Brogan, Project Manager Fidelity International Oakhill House, 130 Tonbridge Rd Hildenborough, Kent, TN11 9DZ Tel: 01732 361 144
Fidelity International is a world-wide leading investment provider. As part of their UK data centre consolidation strategy, Fidelity required a new Data Centre facility at its HQ facility at Tonbridge. Spread over two underground data halls and two office floors, the project required the installation of 30,000 Cat6 copper links and 11,000 OM3 duplex fibre links to 300 Rittal cabinets and used more than 700km of cable. All links connect to a patch field of 80 x CPI patch frames, each monitored with the iPatch Intelligent patch system. The Data Centre was cabled overhead on three levels of CPI ladder racking. One of the biggest challenges faced by Able Data was to deliver the required high quality of cabling. To work out the optimum cable routing schemes, Able Data built an offsite mock up of a row of patch frames and the associated cables. To speed up installation whilst minimising unsightly cable slack, Able Data single end pre-terminated all copper and fibre links. The entire installation was completed over a 14 week period. As well as building and configuring a 40,000 port iPatch system to manage patching and monitor network devices, Able Data implemented additional bespoke functionality tailored to Fidelity’s requirements, including auto server provisioning.
Pictures
Able Data – Reference Sites
Able Data Installations Plc Tel: 01442 219580 www.abledata.co.uk
Fidelity Investments Summary Cabling of Fidelity’s Date Centres
Location Acton Colt Data Centre, London Global Switch 2 Data Centre, London
Contract £650K (Total)
Systems SYSTIMAX GigaSPEED XL Cat6 SYSTIMAX LazrSPEED OM2, OM3
Start & Finish
Jan 2003 – May 2003 Nov 2005 – Dec 2005 Jul 2006
Project Description
In three separate projects, Able Data have cabled Fidelity’s London based Data centres. In the first project Able Data supplied and installed thirty data cabinets and the required cabling infrastructure. The initial installation of 4,000 copper links was completed within four weeks. All RJ45 patch panels are of the Avaya Fleximax variety, where standard outlet modules are clipped into the panel. The second and third projects were similar, but on a larger scale. The third project at Global Switch involved 10,000 links, installed over a period of one month, made possible by the use of off site pre-termination, As part of the initial project, Able Installed also 1,000 10Gbit OM2 fibre links, terminated onto SC connector outlets. The later projects used LC connectors.
Pictures
Able Data – Reference Sites
Able Data Installations Plc Tel: 01442 219580 www.ablecable.co.uk
Debenhams Summary Data Cabling for new and refurbished Department Stores
Contact Peter Craven, Project Manager. Bedford Road, Park Street, Taunton, Somerset, TA1 4DB Tel: 01823 364 303
Location Various retail sites including Hemel Hempstead, Thanet, Woking, Portsmouth & Slough.
Contract £150K
Systems SYSTIMAX PowerSUM Cat5e & Excel Cabinets
Start & Finish
November 2004 (Thanet) March 2005 (Portsmouth, Woking, Sough) April 2005 (Hemel Hempstead)
Consultant N/A
Contractor Various
Project Description
Debenhams has an ongoing program of opening new stores. In each they install a structured cabling system to serve the shop floor tills and pay points as well as the general offices. It is Debenhams policy to use SYSTIMAX PowerSUM cabling throughout. By the nature of shop premises, most of the cabling work is in the ceiling void, requiring the extensive use of platforms. Each store floor will normally have its own cabling cabinet. These cabinets are joined to the master cabinet via either fibre or copper interlinks, depending on the distances involved. Part of this project involved the fast track conversion of three Alders stores to Debenhams in March 2005. This involved the use of three separate cabling teams working on the different sites.
Pictures
Able Data – Reference Sites
Able Data Installations Plc
Tel: 01442 219580
www.abledata.co.uk
Church Commissioners
Summary Installation of Data & Voice Cabling over 6 floors
Contact Martyn Chadaway
CBI, ‘The Gherkin’, 30 St Mary Axe, London, EC3A 8AD.
Location The Corporation of Church House, Church House, Great Smith Street,
London. SW1P 3AZ.
Contract £180K
Systems Tyco Amp Cat6 STP & Quantum Cat5e UTP
Timescales September 2006 – March 2007
Consultant CBI
Project
Description
The Corporation of The Church House was founded in 1888 as the Church
of England's permanent tribute to Queen Victoria's Golden Jubilee. The
Church House, a grade II listed building, is the headquarters of the
Archbishops' Council and all its Boards and Councils as well as of the
Church of England Pensions Board and the National Society. It is the
meeting-place, twice each year, of the General Synod of the Church of
England.
Church House also contains a Conference Centre that provides
accommodation and facilities for a vast variety of events from AGMs,
conferences, dinners and receptions to exhibitions.
Able Data were contracted to install 1500 outlets over 6 floors and the
conference centre. The key challenge of delivering this project was the
complexity of the cable routes. The building is listed and most of the
original features of the conference centre, meeting & conference rooms on
the Ground and Lower Ground floors could not be changed or put in any
risk of being damaged.
Pictures
Able Data – Reference Sites
Able Data Installations Plc Tel: 01442 219580 www.abledata.co.uk
BBuucckkss NNeeww UUnniivveerrssiittyy ((BBNNUU)) Summary Installation of Data & Voice Cabling over 13 Floors
Contact Andy MacFarlane BAM Construction Centrium, Griffiths Way St Albans, Herts. AL1 2RD
Location High Wycombe
Contract £150K
Systems Excel Cat6
Installed Apr 2009 – Dec 2009
Contractor BAM
Project Description
Buckinghamshire New University’s camp has undergone an extensive £60m programme of rebuilding in 2009. A new, high-tech learning resources centre, known as the Gateway, forms the focal point of the University’s technology-led learning experience. Able Data were contracted by BAM to install an 1,800 Excel Cat6 UTP cabling system, spread over the six patch rooms on the six floors of the new Gateway building extension. Able Data also installed an Blown Fibre (OM3) & a voice link backbone cabling infrastructure between each patch room and the main computer room on the 4th floor.
Able Data Installations Plc Tel: 01442 219580 www.abledata.co.uk
AAsshhmmoolleeaann MMuusseeuumm Summary Cabling of Major New Building Extension
Contact Dr Jonathan Moffett Ashmolean Museum, Beaumont Street, Oxford OX1 2PH
Contract £200K
Systems Molex Cat6
Installed Dec 2008 - Oct 2009
Builder BAM
Project The Ashmolean Museum, dating from the 17th century, is the oldest public museum in the UK. Award-winning architect Rick Mather created a new building that has doubled the Ashmolean’s gallery space and state-of-the-art facilities. In November 2009, the £61M redevelopment opened to the public. Able Data installed a structured cabling system, consisting of nearly a thousand outlets, spread over 6 floors of the new building extension. Each of the 13 remote patch cabinet locations had a fibre & copper backbone linking to the Basement computer room. As well as the provision of the computer cabinets at each location Able Data supplied & installed an APC UPS & 3Comm Switch. The biggest challenge was the complexity and range of cable routes. Whilst some outlets are located in low floor boxes, others for high gallery points (overhead projectors etc) are at more than eight metres high. Another challenge was fitting cabling around a complex building program; many outlets could not be terminated or tested until after the exhibition cabinets had been installed.
Pictures
Able Data – Reference Sites
Able Data Installations Plc Tel: 01442 219580 www.abledata.co.uk
Ashburton Court Summary Hampshire County Council Office HQ & Data Centre
Contact Bob Davis, Senior ICT Consultant Mace Atelier House, 64 Pratt Street London NW1 0LF Tel: 020 7554 8000
Location Winchester City Centre
Contract £850K
Systems Nexans Lanmark-6 10G F/UTP, Nexans LANsense System, Excel Cat6
Installed Sep 2007 – May 2009
Consultant Mace
Contractor BAM
Project Description
In 2009 Hamshire County Council (HCC) completed a major office refurbishment of its HQ building at Ashburton Court. The conversion of this 1960’s council office building to a naturally ventilated, low energy facility included a heat recovery from the internal Data Centre as a source of heat to service the office areas. Able Data were contracted by BAM to install a data cabling system providing 4,000 Cat6 outlets to the new offices and meeting rooms. Able Data also won the contract to build the new Data Centre facility, completed over eight weeks in Spring 2009. With 70 Prism server cabinets, 5,000 copper links and 2,000 fibre links, this new data centre has become HCC’s primary Data Centre. The facility incorporates leading edge Data Centre technologies to maximise space and power usage and to enable remote operation. Functionality installed by Able Data included a Nexans 10G Ca6a copper cabling system, a Nexans Intelligent Infrastructure Management (IIM) system, Nexans remotely control Intelligent PDU’s and a Data Centre wide Austin Hughes KVM system.
Pictures
Able Data – Reference Sites
Able Data Installations Plc Tel: 01442 219580 www.abledata.co.uk
APAX Summary Molex Cat 6 – OM3
Contact Stephen Grabiner 020 7872 6300
Location 33 Jermyn Street London SW1Y 6DN
Contract 130k
Systems Molex
Start & Finish
6 Month Project
Consultant CBI
Contractor ISG
Project Description
Able Data Installations installed a Molex Cat 6 & OM3 Fibre Optic cabling systems over 6 floors of the new London headquarters Building of Apax and Partners in Jermym Street. Apax Partners is a global private equity group that invests in five industry sectors. Founded more than 30 years ago, the firm uses its sector expertise, deep local presence and broad global platform to create value for its stakeholders. The history of Apax is Interwoven with the development of the private equity assest class on both sides of the Atlantic.