Congratulations on a Great 2007 Summer Here is an update on work at the MIT Campus and an outline of urgent needs
14

Congratulations on a Great 2007 Summer Here is an update on work at the MIT Campus and an outline of urgent needs.

Jan 01, 2016

Download

Documents

Osborne Fleming
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Congratulations on a Great 2007 Summer Here is an update on work at the MIT Campus and an outline of urgent needs.

Congratulations on a Great 2007 Summer

Here is an update on work at the MIT Campus and an outline of

urgent needs

Page 2: Congratulations on a Great 2007 Summer Here is an update on work at the MIT Campus and an outline of urgent needs.

H building progress (Dorm)

Page 3: Congratulations on a Great 2007 Summer Here is an update on work at the MIT Campus and an outline of urgent needs.

H building progress

• Jeff Winston welding the metal beams on the H Building

• Pastor Joel and his crew assembled the main support beam and lifted the cross beams

Page 4: Congratulations on a Great 2007 Summer Here is an update on work at the MIT Campus and an outline of urgent needs.

H Building update

• The Block work on the North side of the building is nearly done

• Next we will put up the beams on the North side

Page 5: Congratulations on a Great 2007 Summer Here is an update on work at the MIT Campus and an outline of urgent needs.

Fall 2007 Security and Safety measures

• It is our goal to completely secure the property by the end of 2007!

• We will do this in four phases.

Page 6: Congratulations on a Great 2007 Summer Here is an update on work at the MIT Campus and an outline of urgent needs.

Phase 1 Metal Fence Construction along

the North Wall

• Priorities:

– Safe and Secure environment

– Open and inviting place for ministry

Page 7: Congratulations on a Great 2007 Summer Here is an update on work at the MIT Campus and an outline of urgent needs.

Phase 1 Metal Fence Construction along

the North Wall

• Each fence section costs $327.00

• All 13 sections cost a total of $4,252 (including material and labor)

Page 8: Congratulations on a Great 2007 Summer Here is an update on work at the MIT Campus and an outline of urgent needs.

Phase 1 Metal Fence Construction along

the North Wall

• The metal fencing will provide the necessary security!

• The metal fencing will allow for a transparent and inviting ministry environment

Page 9: Congratulations on a Great 2007 Summer Here is an update on work at the MIT Campus and an outline of urgent needs.

Phase 2Metal Gate

North Wall main entrance

• The main gate will be built to last!

• Two 15’ wide by 8’ high gates will span the 30’ opening

• 4” steel gate posts,• Solid steel beams• Built to take abuse even

from a 15 passenger van!

Page 10: Congratulations on a Great 2007 Summer Here is an update on work at the MIT Campus and an outline of urgent needs.

Phase 2Metal Gate

North Wall main entrance

• $710 USD• The price for

Materials and Labor for this 30 foot wide double gate!

Page 11: Congratulations on a Great 2007 Summer Here is an update on work at the MIT Campus and an outline of urgent needs.

Phase 3 Finish the Rest of the Block Wall

• We are nearly finished!!!!

• The block parts of the wall are 94% finished!

• We only need 900 more blocks to be done with the block wall FOREVER!!!

Page 12: Congratulations on a Great 2007 Summer Here is an update on work at the MIT Campus and an outline of urgent needs.

Phase 3 Finish the Rest of the Block Wall

• $1066 USD • For materials

and labor• This includes filling in

the block with cement for structural strength and replacing blocks that have fallen out

Page 13: Congratulations on a Great 2007 Summer Here is an update on work at the MIT Campus and an outline of urgent needs.

Phase 4South Wall gate and metal work

• 13 fence sections ($327 ea)

• South Metal Gate ($710)

Page 14: Congratulations on a Great 2007 Summer Here is an update on work at the MIT Campus and an outline of urgent needs.

Totals • Phase 1

– Metal fencing on North Wall = $4,252

• Phase 2– 30 foot front gate (double hinged) = $710

• Phase 3– Finish ALL Block work on Wall = $1066

• Phase 4– Finish South Wall (gate / sections) = $4,962

• Total = $10,992