Top Banner
Confirmatory Surve y Building 413 3 Hazardous Material Treatment Facilit y (HMTF ) Santa Susana Field Laboratory Boeing - Rocketdyn e Ventura County, Californi a Prepared B y Roger K . Lupo, Health Physicis t Radiological Assessment Unit Radiologic Health Branch
11

Confirmatory Survey Building 4133 (HMTF)

Nov 24, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Confirmatory Survey Building 4133 (HMTF)

Confirmatory Survey

Building 4133Hazardous Material Treatment Facility

(HMTF)

Santa Susana Field LaboratoryBoeing - Rocketdyne

Ventura County, California

Prepared By

Roger K. Lupo, Health Physicis t

Radiological Assessment Unit

Radiologic Health Branch

Page 2: Confirmatory Survey Building 4133 (HMTF)

('onlirmatory Brine} of SSFt. BAR _A tV L'uilding 41 ; ;

Introductio n

The Department of Health Services . Radiologic Health Branch . received a verhal request from Boeing tosurvey the Building 41 33 located in Area IV of the Santa Susana Field I ahoratorv currently owned by

Boeing-Rocketdyne No written request for a confirmation survey has been received . Building 4133

(a.k .a. T1 33 . HWNIF . Hazardous Waste Management Facility) was built to treat non-radioactivitysodium and NaK (sodium potassium mix) fromnon -radioactive test loops and secondary sodium loops .

The 4133 site area and structures are a non-impacted area with no history of radioactive materials usage .A limited confirmatory survey was conducted by Radiologic Health Branch Staff on October 28 . 1999

with particular attention to be given to any elevated area found . The locations where elevated

measurements might be expected to be found would be inside the burn room and within the catch tank-, a sthese areas would be the primary location for any residue of material brought to the 4133 site fo rprocessing .

Survey

The limited confirmatory survey of Building 4133 consisted of gamma and exposure fate surveys of th e

majority of the site areas with an alpha/beta/gamma survey of the structures as described below :

• An exposure rate survey . one meter above the surface outside the site boundary fenced area an dextending 15 feet out from the fence .

.

An exposure rate survey . one meter from inside surfaces of the structures .

of the structures .An exposure rate survey . one meter above the surface area inside of the fenced area and outsid e

A gamma scan survey . using aNal 1 x 1 detector at no more than 12 inch above the surface of th e

area inside of the fenced perimeter and including 15 feet outside of the fenced perimeter,

inside the structures and the lower 2 meters of the interior and exterior surface of the walls .A gamma scan survey using a Nal lx 1 detector at no more than i/2 inch from the floor surface s

An Alpha-Beta- Gamma scanning survey, using a G-M pancake detector of the structures interio rfloor and 2 meter up the interior wall surface were performed .A soil sample collected down gradient from the site to determine the radioactive status of the soilthat would be impacted by any surface run off from the site .

Instruments

The instruments and detectors used du ring this survey are listed in Table 1 . The backgroundmeasurements collected for this survey are listed in Table 2 with the exception of an outsidemeasurement for the alpha /beta contamination scintillation detector used for direct measurements onsurfaces . Background measurements were made at Building 4039. an office building with no history ofradioactive materials usage .

Table 1 : Instruments Used in the Survey of Building 4133 .

Instrument /n ProbeModel

s/n ProbeType

CalibrationDate

Ludlum Model 3 158504 Ludlum 44-2 PR162272 1x1 Nal scint . 8/20/1999Ludlum Model 18 151891 Ludlum 44-9 PR163587 pancake G-M 8/19/1999Ludlum Model 2224 125592 Ludlum 43-89 PR123115 Alha/Beta scint . 9/17/1999Ludlum Model 19 80382 na na internal Nal 9/7/1999

HDMSe00235157

Page 3: Confirmatory Survey Building 4133 (HMTF)

('onfinnatury Sui e y of SSFL. :vl _\ lv Lwilding 4 1

Table 2 : Instrument Background measurements .

InstrumentInstrument Background

( inside )Instrument Background

(outside )Ludlum Model 3 1800-2000 cpm 3000-3500 cpmLudlum Model 18 30-60 cpm 30-60 cpmLudlum Model 2224 1 alpha / 289 beta cpm naLudlum Model 19 6-8 R/hr 10-12 R/hr

Survey ResultsNo elevated radiation areas were found during the surveys of the structures . associated pits and catchtank. All measurements ere at similar levels as background measurements . The following figure sdocument the survey measurements in relation to the site andthe structures within .

Figure 1 Exposure Rate .

Figure 2 Gamma scan.Figure3 Surface contamination survey and exposure rate survey of the Control Room ,

Figure -4- Surface contamination survey and exposure rate survey of the Parts Spray /Burn Room ,

Tank .Figure 5 Surface contamination survey and exposure rate survey of the Scrubber Effluent Catch

One soil sample was collected down gradient from the site to determine theradioactive status of any soil

laboratory are similar to background soil samples co llected at various times prior to this survey .that may have been impacted by surface run off from the site . The soil concentrations reported by the

Soil Sample ResultsSample ID Gross Alpha Gross Beta Gamma SpecLocation pCi/g ± CE pCi/g ± CE Isotope pCilg ± CE

Down gradient 9.70 ± 1 .61 20. 8 ± 2.8 K-40 23 .07 ± 0.64from building Cs-137 0.145± 0.018

4133 U-238 1 ."_9 ± 0 .99Ra-226 0.691 ± 0 .050Th-232 0.990 ± 0 .106Th-228 0.944 ± 0 .086Ra-228 0.990 ± 0 .106U-235 N.D .

N.D. 4 Non Detect .

Summary/Conclusio nAfter reviewing Boeing survey data . ORISE survey results and associated data . and the results of thissurvey, it is determined that there are no elevatedareas of radioactive inside or outside the perimete r

fence of the site, no surface contamination of the structures within the site boundary and no soi l

residual contamination. The site known as Building 4133 is suitable for release for unrestricted use .contamination down gradient of the site . A dose assessment of the site was not done as there is no ne t

HDMSe00235158

Page 4: Confirmatory Survey Building 4133 (HMTF)

('onlirmator; Sur\c\ of SSFI . .~RL\ LV Building 4!

Dirt area

VW

I

r

T

Dirt area

13-15hBIh

10 - 12 gRih

10-12µR/ h

10- 1

Scrubber~fl~ati

uatul ta i

L~

2 pR/h

Control Roo m

8 pR/ h

Parts Spray

Roo m

8 iR1h

0 0

pit

10 - 12 ~tBl h

10-12µR/h

Ientrano~

10-12µR/ h

asphault are a

10-12µR/ h

10-12µR/h

10-12pR/h

10-12pR/hCrane

10-12µR/hconcret e

Nal<Tal k

10-12pR1h

13- 15pRih

10-12pR/ h

13 - 15µR/h 13 - 15 pR/ h

Dirt area Building 4133Exposure Rate Survey

Soil Sample Location

pac

10-12µR/h 10-12µR/ h

asphault area

-1

U)I o

N

I T

cc

T

Dirt area

Page 5: Confirmatory Survey Building 4133 (HMTF)

('onlirmator; Sur\c\ of SSFI . .~RL\ LV Building 4 !

EU

0 3000 - 35p0v 0w 3000 35 cpm

cpm

Co0LOCO

0O0CO

EQU

OOLOCo

Dirt area

sunp

Dirt are a

3000 - 3500 cpm

3000 - 3500 cpm

EQ

CoCoCoCo

Control Room

3000 - 3500 cpm

1000 - 2500 cpm

Parts Spray Roo m

1000 - 2500 cp m

OOu~Co

o0OCo

ScrLbbaifluen t

catch ta n

L-

pit

3000 3500 cpm

Crane

3000 - 3500 cp m

3000 - 3500 cpm

concretepad

Jal( Task

3000 - 35p0cpm

nuance - -'IMai n e

3000 - 3500 cpm

Asphault Are a

3000 - 3500 cpm

Asphault Are a

3000 - 3500 cpm3000 - 3500 cpm

3000 - 4000 Dirt areacpm

Soil Sample location

Building 4133Gamma Scan wi 1x1 Nal

3000 - 4000cpm

ooLOCo

0ooCo

LL

0 00CoCo

Dirt area

Page 6: Confirmatory Survey Building 4133 (HMTF)

('onlirmator; Sur\c\ of SSFI . .~RL \ LV Building 4I ; ;

Model 18 w/ pancake G-M : 40-80 cpmModel 2224 w/ 43-89 : a o cpm & (3 250-350 cp mMoedl 19 :8 pR/h

Building 413 3

Control Room

00

00

Interior Surface Scan Measurement sModel 3 : 1500 - 2500 cpm

Page 7: Confirmatory Survey Building 4133 (HMTF)

('onlirmator; Sur\c\ of SSFI . .~RL \ LV Building 4I ; ;

E

NI ♦ ► S

Interior Surface scan Measurement sModel 3 : 1500 2500 cp mModel 18 w/ pancake G-M : 40-80 cpmModel 2224 w/ 43-89 : Cl o cpm & (3 250-350 cp mMoedl 19: 8 pR/h

tsuilarng 413 3Parts Spray Room / Burn Room

Page 8: Confirmatory Survey Building 4133 (HMTF)

('c,uliriuatury Sui e y o1 SSFL. :\I _\ LV Luildiug 4 1

Interior Surface Scan MeasurementsModel 3 w! Nal 1x1 : 2000 cp mModel 18 w/ pancake G-M : 40-80 cpmModel 2224 w/ 43-89 : a 0 cpm & R 250-350 cp mModel 19`x8 liRlh

Scrubber Effluent Catch Tank

HDMSeOO235163

Page 9: Confirmatory Survey Building 4133 (HMTF)

('Otlflfiualury Sui c y of SSFL. :\1 _\ LV Luildiug 4 1

TLkmDCH.E-'4iL{ A,1- k -NALISIS IiEPOWI''tfitc of c:Jlifaaaia-0 JarnneDt :Hta1ti &i il:

a :i it r : 4Tn & Radial >m Laboi *TS1 .51 B¢-kc]cy W41}'

Fnt)T4 :clcg , CA 947 4

C' [[?mot,?r' ~ Name : Rogcr Lupo

AQ-iic,,lt3dres5 Ra4_'iolcrgvHea1Lh Hransh.fl.,LN .' Sr=t3'E-7samcoto CA- 07 .5 ; 4

Ph.=No_ 16-K4-17 i 1

4ArlIf.,I Irlc Joint Boeng Rsr:ke[ ' ru-

roauuo o f Sam plc ( . Bldg, ]33 ;.w_iidc

;ycori Nr . :17DVir, '

T, pc of Sanlplt

[ ] .fir Filici. : : ] etor Dale,'7iln e

Firl4chltlg '

5t lrting :

N t IMi} :

[ l A.IT si_han 01121 Carttidcc

14+{ till 5iHt r

Date & Time Smp1edOctolcl 23, 099 14,2 1

Da1i Rcccivc;lNpvenihcr 4i 1991

Stm Rey--ii. Ti i :

Agcncr Addnms5

Ptrn [qo

Scea1 No .I:'614 F

La1i tau .9-207'1 .1

SGc ;'t H931

E. ~1I lll ; i H= ;1141 Tirarr hum. ta_ 7" Stci tS . rantianto , CA 4591 4

g r 6-3i^-liT

I :1RJiLI isJ iJODWi . ; []EhtBI... k

[11'1}B I: 'I [lD\VR{'I []CDFCiI I

[ I f11her!ci SI

[1RWQCl 3

I.fCusryHD

C] LrinkiTte.1{rote1 [ J e',.'sf'L, c i

[ ] Gra 1n l ~'ab r [ J Sc'n't+..ge t'fflent [ ] Fich .1ii.Ufi h

[ ] ]~.lrfar;: Vrr3trC [:il Svi]i $ slirixnl [ ] NC'T' Lnfhx. ii Eff .

t]S a Wier []deg,a',,n []Sca,," d

[ j Rairu' SnoW L ] 'ti5'Lycs [ ] c.7M7ir81<- 3

[] ( i]ir IS1crii r )

k hr Lrely- azn p- rur¢ed 3iLiL _. rt:f '-enrttl F'[n iH a .-rib m C:'r IL't1` raCd}5% W-Te ~trrminri t<, ff al:m{cit4u .

R Ni-iSRL Na Sri ple Ldralliiic=d[I i

7 U1lLlJ'=2fr?'?

0Raysi3. RnLdls' f C E MDA ;1' Lrnilt Drv wt .i'Wrrot'i! •

l; roso . l~a1 !.?!1 1,r,1 %'i

C.iir]SS ~rCS&{ I ? 2_h e~. .? p:xK

13t?i`.S IC". Oun ]he r,1 _-rrnuro T}_1ertil :le #i:ltYtrf :. iuA .'. in LTrrm l o! . nT dreca_ T . U .

: C'E a3 Lt 4:rii vita trn-r .u the S4 r:or[fi3~rcc L--.rI1 as 1i: [La: 11 JL ['iC'4f Ii :d tfir e!duz r :4fe ]:1LTe ni .-.f p1,LLL Li U.t iu DuOdn R

s-;Ixo4-04 i32 ,Ai.qLLr I 1111 _

3 . k]D,d6„ - ILr ie rl l pLt tp%r LM. naa:+Fn d'6_t-bb artivitr at b' 95% : la LItix, ~tdch I :; th Ll.D.n di d. 1R 211, 11Y_ 6-y . en3 ttx rinILL :n3

mn'; D: hni W[` il,- LL' IJ 1l-; . 11cy'i aT.i I n .LTiiin , dCp'mdtJF aarb' uit11Lullf ILdivi.Oi :14 , LL[jr 13 11 _t tpni in ;eamn 71il iurdard Merho,1S dcl:

the fxr ruiehon £ P .'i Ln yr.] Rif:1 :'Nr." : . p. mrrin Rlrer Wcrrll .ISS a Ii If]] fl, ::~,Y, ii. Q1c S'1U,it : i i c rlw. IJ I'rcu ib'ilr To %1 ru,nPI

t

4 . 130'?r ro thnd M.: .), ^rer !+::1 F[ua:du[t C!I [r1 ca ;{i,cn,5r .., r R . clh,irr In LrIn}: L. Rue L PA-tS5 .%- -JO2, ~1 [SEi rny3iEril H-0

f..

I'w ? 91 ~. r Q T3 1 fiAr.o SC'& adinc hemis. Tn1:: Lrad :}kra S4m+isor Det=:

HDMSe00235164

Page 10: Confirmatory Survey Building 4133 (HMTF)

('c,uliriuatury Sul ey of SSF1. .\RLA 1V Building 41

Page 11: Confirmatory Survey Building 4133 (HMTF)

('onlirmatury Brine} of SSFt. BAR _A 1V L'uilding 41 *

References

and associated Tennelec analysis results for various portions of the 4133 building site area andand miscellaneous radiation survey reports (form 732A) ~-vith maps detailing survey locationsBoeing . received 1999 . "Preliminary Draft Procedure for Building 4133"" . (R21 -RF)RS-0001 1

structures supplied by Boeing at the time of the survey .

~ . Boeing. 2004. "Building 4133 Radiation Survey Report ." (RS-00015 )

3 . ORISE" 2000. "Verification Survey of Building 4133 . Santa Susanna Field Laboratory th e

Boeing Company . Ventura County . California ."

HDMSe00235166