Top Banner
High Integrity Valves at a Lower Cost and Reduced Delivery Time * *Compared to Engineer to Order Valves Engineer to Order: Size 2" thru 30" (Class 150#, 300#, 600#) 2" thru 18" (Class 900#) Temperature -45°C (-50°F) / 204°C (400°F) Body Material A350-LF2 Ball & Seats A182-F316 / A182-F51 / A351-CF8M / A995-Gr.4A (based on size/class) Stem Material 17-4PH Seat Insert Nylon or PEEK Seat Configuration SPExSPE (option with SPExDPE) Seals HNBR or PTFE+Elgiloy Lip seals Bolts & Nuts L7M/G7M Engineering Design Material Purchasing Machining Assembly & Testing 28 - 34 Weeks Configure to Order: Material Purchasing Machining Assembly & Testing 20 - 24 Weeks Configure to Order Ball Valve Preconfigured, Engineered Ball Valve Line [email protected] www.circorenergy.com/pibiviesse
2

Configure to Order Ball Valve - CIRCOR Energy€¦ · Reference Standards API 6D 24th Edition NACE MR0175 (last edition) (wetted parts) API 607 / ISO 10497 ASME B16.15 (NPS < 22”

May 17, 2018

Download

Documents

doquynh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Configure to Order Ball Valve - CIRCOR Energy€¦ · Reference Standards API 6D 24th Edition NACE MR0175 (last edition) (wetted parts) API 607 / ISO 10497 ASME B16.15 (NPS < 22”

High Integrity Valves at a Lower Cost and Reduced Delivery Time*

*Compared to Engineer to Order Valves

Engineer to Order:

Size2" thru 30" (Class 150#, 300#, 600#) 2" thru 18" (Class 900#)

Temperature -45°C (-50°F) / 204°C (400°F)

Body Material A350-LF2

Ball & Seats A182-F316 / A182-F51 / A351-CF8M / A995-Gr.4A (based on size/class)

Stem Material 17-4PH

Seat Insert Nylon or PEEK

Seat Configuration SPExSPE (option with SPExDPE)

Seals HNBR or PTFE+Elgiloy Lip seals

Bolts & Nuts L7M/G7M

Engineering Design

Material Purchasing Machining Assembly

& Testing28 - 34 Weeks

Configure to Order:

Material Purchasing Machining Assembly

& Testing20 - 24 Weeks

Configure to Order Ball ValvePreconfigured, Engineered Ball Valve Line

[email protected] www.circorenergy.com/pibiviesse

Page 2: Configure to Order Ball Valve - CIRCOR Energy€¦ · Reference Standards API 6D 24th Edition NACE MR0175 (last edition) (wetted parts) API 607 / ISO 10497 ASME B16.15 (NPS < 22”

Reference Standards API 6D 24th Edition

NACE MR0175 (last edition) (wetted parts)

API 607 / ISO 10497

ASME B16.15 (NPS < 22” & NPS = 24”)

ASME B16.47-Series A (NPS > 24”)

NDE’s 100% Visual and dimensional

100% MPI on Pressure Retaining Parts in Carbon Steel

100% DPI on ball, seats, stem

NDE operators are certified per EN 473/UNI EN ISO 9712 by CICPND, which is accredited by ACCREDIA (cert. N° 012C) per EN 45013/ISO 17024

NDE Instruments:1) Spectrometers 2) Wood lamps 3) Magnaflux 4) Photometers

Hardness Test Instruments (Vickers-Rockwell-Brinell-Shore)

Surface roughness Instruments

Gauge Radioactivity

Material Certification CTO valves will be made in Italy (Country of Origin), with Raw Materials procured globally through CIRCOR’s supply chain.

EN10204:2004 – 3.1– Body, Closures, Gland Plate / Body cover– Ball, Seats, Stem– Bolting

EN10204:2004 – 2.2 / 2.1– Other components

Final Testing & Painting Hydrostatic Shell Test per API 6D, 9.3– Pressure: 1.5 times the design pressure– Acceptance criteria: zero leakage

Hydrostatic Seat Test per API 6D, 9.4– Pressure: 1.1 times the design pressure– Acceptance criteria: zero leakage (ISO 5208-Rate A)

Low Pressure Pneumatic Air Seat Test per API 6D, H,3,3 Type II– Pressure: 5.5 barg– Acceptance criteria: zero leakage (ISO 5208-Rate A)

Our internal inspectors and operators for leak test are certified in accordance with ASNT-SNT-TC-1A and approved by a III level Examined ASNT.

Painting– Pibiviesse STD.001– First Coat: High Build Epoxy Paint, D.F.T 75μm– Final Color: RAL 7035 - Light Grey

Documentation Package– General Assembly Drawing– Name Plate Drawing– Bill of Material– Overall Dimension Drawing

– Torque Table– ITP Pibiviesse Standard Format– Painting Procedure– Test Reports

[email protected] www.circorenergy.com/pibiviesse