Material Management Org. Structures Organizational Structures Valuation Level You define the valuation level by specifying the level at which material stocks are valuated. You can valuate material stocks at either the company code level or at the plant level. If you want to use the Production Planning (PP) module or Costing, then you should set the valuation level to plant. The valuation level is valid for the entire client. Once the valuation level is set, then it cannot be changed except by a trained SAP consultant, and it requires a data conversion. To see the valuation setting, following the menu path Tools Customizing IMG Edit Project Enterprise Structure Definition Logistics - General Define valuation level (click clock icon ) You should get the following screen: Note that the valuation level is already set at the plant level. Also, the choices are "grayed-out," which means that they cannot be changed. Since the valuation level is set for the client and all students are in the same client, it has already been set and cannot be changed via this screen. 2- 1 02/09/09
17
Embed
Configuration Guide to Create Organizational Structures in Sap Mm
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Material Management Org. Structures
Organizational Structures
Valuation Level
You define the valuation level by specifying the level at which material stocks are valuated. You
can valuate material stocks at either the company code level or at the plant level. If you want to
use the Production Planning (PP) module or Costing, then you should set the valuation level to
plant. The valuation level is valid for the entire client. Once the valuation level is set, then it
cannot be changed except by a trained SAP consultant, and it requires a data conversion. To see
Double-click on Define Plant, which will produce the following screen:
Click on New Entries
2- 2 02/09/09
Material Management Org. Structures
Click on the New entries icon ( ), which will produce the following screen:
Enter:
##CP for plant
## University Cellular Plant
US for Factory Calendar
Then click on the address icon
The factory calendar defines which days are working days. The entry US is the standard US
factory calendar, which defines Monday through Friday as working days and Saturdays, Sundays
and Public Holidays as non-working days.
Click on the address icon ( ), which will produce the following screen:
2- 3 02/09/09
Material Management Org. Structures
Click Here
This screen is just like the screen for entering company code data. Enter the following
information for the plant:
Title:
Name:
Search Term:
Street:
House Number:
Postal Code:
Company
## University Cellular Plant
##
Business Court
83
49008
2- 4
02/09/09
Material Management Org. Structures
City: Kalamazoo
Country: US
Region: MI
Next, click on the more fields icon ( )in the address panel: This will bring up additional fields. Enter Tax Jurisdiction Code MI0000000 (MI followed by
seven zeros):
Enter Tax Jurisdiction Code
MI0000000 here (seven 0's)
Click the checkmark ( ) and then click on the save icon ( ). This will bring up the address screen again for some reason. Click on the checkmark ( ) again and the data will be
saved. Click on the back icon ( ) and confirm that your plant is now listed:
2- 5 02/09/09
Material Management Org. Structures
Click on the back icon ( ), and then click on the cancel icon for the Choose Activity window
to return to the IMG.
2. Define Storage Locations
A storage location is a subdivision of a plant where materials are managed. It may be a physical
location, or it may just be used as an organizational tool. For the University Cellular Company,
we will create three storage locations:
Sloc Description
100 Raw Materials
200 Production
300 Finished Goods
2- 6 02/09/09
Material Management Org. Structures
Where Sloc is the number assigned to the storage location. By using Sloc numbers 100, 200 and
300, we can add more detailed storage locations in the future and still have a rational numbering
scheme.
To create the storage locations, follow the menu path
Click on the save icon ( ), you should be able to see that the assignment has been made and then on the exit icon ( ) to complete the assignment of the purchasing organization to