Concrete removal Concrete cutting area shrink wrapped to prevent dust. Concrete cutting starts Tuesday 25 th March, approx 4 - 6 weeks.
5

Concrete removal

Jan 13, 2016

Download

Documents

decker

Concrete removal. Concrete cutting area shrink wrapped to prevent dust. Concrete cutting starts Tuesday 25 th March, approx 4 - 6 weeks. South and North Magnetic steel walls. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Concrete removal

Concrete removalConcrete cutting area shrink wrapped to prevent dust.

Concrete cutting starts Tuesday 25th March, approx 4 - 6 weeks.

Page 2: Concrete removal

South and North Magnetic steel walls• Steel tender awarded Tuesday 25th March (OJEC requires a 10 day period to

give unsuccessful tenders the right to appeal).

• 3D model of shield walls to– Label the steel plates for ease of installation.

– identify plates in each staged delivery.

– Make sure everything fits together.

Page 3: Concrete removal

False Floor

Provisional design from contactor

Page 4: Concrete removal

False floor

False floor in 3 sections

1. Frame (brown)

2. Cover plates (red)

3. Intermediate piece (green)

Page 5: Concrete removal

False floor intermediate piece

Hole pattern is either done in one plate (one size fits all, shown here) or in several modular plates to suit each stage of the build.