CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE
38

CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.

Dec 29, 2015

Download

Documents

Esmond Pitts
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.

CON 2001 & CVE 4070

Construction Methods & Engineering

L-3 Construction Contracts & Controls

Prof. Ralph V. Locurcio, PE

Page 2: CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.

Outline for today…

Contract Types & Controls Work Breakdown Structure Homework due Sept 11

Page 3: CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.

Project Delivery Process…

Need for a projectIs recognized

Owner appointsProject Manager

Project Manager develops project

program: scope & cost parameters

Project is entered into an annual

capital program

Designer prepares concept design & preliminary cost

estimate

Designer completes plans &

specifications

Owner orders bid documents

Project Manager advertises for

construction bids

Contractors assemble team,

prepare & submit bid

Bids reviewed by owner

(with designer)

Builder’s credentials &

bonding approved

Owner approves program

Project Manager advertises for

designer

Owner hires designer

Owner authorizes final

design

Owner selectsbuilder

Notice to Proceed

Constructionbegins

Resident Engineeroversees

construction

Project phase(s)completed

All work completed final inspection

made

Progresspayment

Final paymentOwner accepts

facility

NextStep

Page 4: CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.

Const Contract =3 Documents

1. The “Legal” document

2. The Plans or Drawings

3. The Specifications

Page 5: CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.

The Project as a System…

Project

Site

Complex

Community

StateFederalGovernment

Page 6: CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.

Key steps in planning… Review the contract: look for critical dates,

deliverables, products, inspections & reviews & reports.

Consider the project environment and potential constraints.

Talk to the owner: be sure you understand the desired outcome, timing, cost and quality parameters.

Review the successful bid: to understand the nature of the contract, the approach, teaming, management and logistics.

Page 7: CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.

Construction Contracts

• Types of contracts used in construction

• What are the differences

• How & why they are used

Page 8: CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.

Contracts…

Essential to construction operations

What is a contract? Basically… it’s an offer and an acceptance between

two parties. In construction… it’s a promise made by the owner

and a reciprocal promise by the builder. Essentially a business tool to control risk. In our culture, it is a legal document that is

enforceable by law.

Page 9: CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.

The Agreement or Contract… Outlines: the terms under which the project will be built.

Includes: items such as cost, time, management,reports,

quality, penalties and all such details that define the owner’s “intent”.

Page 10: CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.

Contract Documents…

1. The Agreement or Legal document The Scope of Work Agreement to Pay The Terms & Conditions

2. The Specifications3. The Drawings

Important Note: Unless otherwise specified this list is the

“order of precedence” of the contract documents

Page 11: CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.

Two general types…

Fixed price contracts… Scope is known Price is fixed by competition Changes only by contract modification Easiest to award and administer

Cost-reimbursable contracts… Scope is variable or unknown Price varies with work accomplished Changes are frequent Difficult to award and administer

Page 12: CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.

Construction contracts… Fixed price or lump-sum Fixed-price with incentives Unit-price Indefinite quantity

Cost-reimbursable Time & materials (T&M) Cost-plus-fixed-fee (CPFF) Cost-plus-incentive fee Letter contract

Guaranteed Maximum Price (GMP) Design Build

Fixed Price

Cost Plus

Page 13: CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.

Fixed-price contracts…

=

Page 14: CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.

Fixed price or Lump-sum contract…

Most common… “low bidder” contract Price is “fixed” by the contractor’s bid A set scope of work for a set price Only changes are via change order Requires complete set of plans & specifications

… the “scope of work” Selection via competitive bidding Easiest to administer Final price is known at time of award A home run for the owner

Page 15: CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.

Fixed-price incentive contract… Same as fixed-price But… profit is based on performance Incentive formula must be clearly specified in

contract documents Requires a performance “rating” Requires close supervision to ensure

contractor hits performance target

Page 16: CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.

Unit-price contract… Modified form of “fixed-price” contract. Based on “measurable” construction units. Unit prices for tasks are fixed. Used when total scope is unknown. Contract scope is the total list of tasks. Specifications govern quality of items or materials. Unspecified tasks must be negotiated. Used for pipelines, roadways, tunneling, etc. Quantities purchased may be not be limited. Called “Indefinite Quantity” or IDQ contracts

Page 17: CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.

Cost-reimbursable contracts…

Page 18: CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.

Cost Plus contracts…

Used when scope is unknown or owner does not have plans & specs.

Contractor is paid his actual costs for labor & materials plus a mark-up for overhead (+15%)

Profit is specified +10% mark-up of actual costs Contractor must supply invoices for all expenses

and certified time sheets for labor; audit of costs & invoices is essential

Contract documents define eligible costs such as labor categories, travel, rentals, permits, fees, other expenses…

+

Page 19: CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.

Time & materials contracts… Used when scope is completely unknown and

there is no time to design

Owner assumes all of the risk

Easy to write; difficult to administer

End price is unknown

Sometimes includes “upset” amount

Contractor can make substantial profit

Home run for the contractor!

Page 20: CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.

Example of T&M contract…

Materials cost $40,000*Labor cost $60,000*

Sub-total $100,000Overhead 15% $15,000*Sub-total $115,000Profit 10% $11,500*Grand total $126,500

* These costs are VARIABLE!

Page 21: CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.

Cost-plus-fixed-fee…

Actual costs paid for labor & materials

Overhead rate generally fixed

Fee is a “fixed” dollar amount that is specified in contract documents

Generally used when scope of work is known but no time to design

Contractor shares some risk

Provides owner some control

Page 22: CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.

Cost-plus-incentive-fee…

Similar to cost-plus-fixed-fee Contractor is paid an additional fee or bonus if

certain specified conditions are met, such as time, cost or satisfaction of user

No bonus if conditions are not met

Incentive minimizes risk to owner

Intent is to “motivate” the contractor

Page 23: CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.

Guaranteed maximum price…

Generally used in design-build work

Contractor agrees to a fixed maximum price Contractor assumes all the risk

and keeps all the savings

Owner provides “performance” spec

Contractor has maximum flexibility

Good for known standards, industrial or commercial work

Page 24: CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.

Construction Controls

• Controls are used to keep project on track

• A set of tools… several are automated

• Essential to good Project Management

• Control Time, Cost, Quality

Page 25: CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.

Construction Planning Checklist…

1. Long-lead items 9. Interdependent tasks

2. Utility interruptions 10. Environmental controls

3. Temporary utilities11. Special regulations

4. Labor 12. Const equipment

5. Work/storage areas 13. Construction timing

6. Traffic 14. Owner’s operations

7. Temporary access 15. Building codes

8. Other contracts 16. Permits required

Page 26: CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.

How do you eat an elephant?

Page 27: CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.

One bite at a time!!!

You break the total project down into measurable tasks…

Page 28: CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.

Time Phased Budget Control

Page 29: CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.

Construction Scheduling…

Common methods:

1. Bar Charts

2. Velocity Charts

3. Network Diagrams: CPM/PERT

4. Line-of-Balance Charts

Page 30: CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.

Bar Chart Schedule…

Task Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9

Excavate xxxxxFoundation xxx xxxxx

Slab xxxxxStructure xxxxxxx

Roof xxxxxx Walls xxxxxxxxxxDoors xxxx

Windows xx xx xx xxInterior Walls xxxxxxxxx

Ceilings xxxxxxxxPaint xxxxx

Floor Tile xxxxxxPlumbing xxx xxx xxxx

Mechanical xxx xxxx xxxElectrical xxx xxxx xxxFurniture xxxxx

Punch List xxClose out xxxx

Simple Bar Chart Schedule

Page 31: CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.

Velocity Chart…

Excav Found Slab Struct Walls Roof Int Part Ceilings Paint FloorsSchedule 100 350 400 750 1200 1325 1775 1875 2275 2675Cum Hrs 88 337 337 637 837 837 837 837 837 837Plan Hrs 100 250 50 350 450 125 450 100 100 200Act Hrs 88 249 0 300 200

Simple Velocity Chart

0

500

1000

1500

2000

2500

3000Schedule

Cum Hours

Plan Hours

Act Hours

Page 32: CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.

CPM Chart…

Page 33: CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.

Management of Quality…

Definition of Quality Control

Definition of Quality Assurance

Designer’s responsibility

Contractor’s responsibility

Use of submittals to check quality

Page 34: CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.

Submittal Process…Inspecton

Work & Materials

Visual Or

Lab Test

Lab TestVisual Test

Compare w Plans & Specifications

Samples to lab

Lab Results

Conform? Test OK?Yes

No

Issue Non-Comp

Defective Mat Report

No Payment till corrected

Follow-upRecord in log

Reinspect When Corrected

No

Issue Non-Comp

Defective Mat Report

No Payment till corrected

Follow-upRecord in log

Resample When Corrected

Make FinalInspection

Work AcceptedPayment Authorized

Shop Drawing?

AE Review

Page 35: CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.

Key Estimating Activities

Read the Plans, Specs & Contract

Conduct Site Visit

Decide Construction

MethodPrepare Schedule

Plan for Subcontracts

Plan for EquipmentMaterial Take-Offs

Estimate costs

Determine contingency

Analyze Risk Factors

Finalize Bid

Page 36: CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.

That’s all for today…

Page 37: CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.

Class homework exercise: Do research in your text, on the internet or in the library

to describe these attributes for each of the 7 types of construction contracts:

a. Advantagesb. Disadvantagesc. Risks taken by the ownerd. Risks taken by the contractore. When should this contract be used

Page 38: CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.

Looking ahead…8/181 Introduction, course requirements; Pyramid Handout

8/202 Project Delivery System

8/253 Stakeholders & Construction Organizations

8/274 Contract Types & Construction Planning

9/1 5 Construction Contract Documents Pyramid Plan Pyramid Plan duedue

9/3 6 Preconstruction & Bidding Processes; Write Resume

9/8 7 Shop Drawings & Inspection Processes

9/108 Project Organization & Responsibilities Resume dueResume due

9/159 Tour Construction Project Site; Construction Handout

9/1710 Disaster Recovery Construction Construction Report dueConstruction Report due

9/2211 Test #1 & Critique