COMPUTER PROGRAM FOR ANALYSIS AND DESIGN OF SIMPLE-SPAN PRECAST PRESTRESSED HIGHWAY OR RAILWAY BRIDGES Clifford L. Freyermuth Design Research Section Portland Cement Association Skokie, Illinois The Portland Cement Association is developing a comprehensive se- ries of computer programs for analy- sis and design of concrete structures and pavements. As these programs are developed, they will be made available to the engineering profes- sion. In addition to this program, others are presently available on concrete airport pavement design, design of reinforced concrete col- umns, and analysis and design of flat plates and continuous frames. The computer program for analy- sis and design of simple-span, com- posite and non-composite highway or railway bridges described in this paper is based on conventional design procedures(') and on appro- priate sections of the current high- way and railway standard specifica- tions d2 ' 3 ). The program provides a means of reducing design costs and time for the subject type of high- way or railway bridge. DESCRIPTION OF PROGRAM The program is written in Fortran IV language for the IBM 1130 Com- puter. Output may be by 1132 print- er or console printer. The program performs the analy- sis and design of simple-span, pre- cast, prestressed highway or railway bridges. The program will accom- modate the composite and non-com- posite sections included in Fig. 1, and will compute the following: sec- tion properties, dead load and live load shears and moments, stresses for various loading conditions, ulti- mate design moments and resisting moments, spacing of shear rein- forcement, horizontal shear stress between the composite slab and precast member, midspan elastic deflections for various loading con- ditions, and the number and center of gravity of prestressing strands re- quired. The program is operated in one of the following modes: Mode 1. Analysis and design of standard sections with a composite deck slab (Sections 1 through 5, Fig. 1). Mode 2. Analysis and design of non-composite standard sections (Sections 6, 7 and 8, Fig. 1). Mode 3. Analysis and design of non-composite single- and double-celled box beams (Sections 9 and 10, Fig. 1). 28 PCI Journal
12
Embed
COMPUTER PROGRAM FOR ANALYSIS AND DESIGN OF SIMPLE …
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
COMPUTER PROGRAM FORANALYSIS AND DESIGNOF SIMPLE-SPAN PRECASTPRESTRESSED HIGHWAY ORRAILWAY BRIDGES
Clifford L. FreyermuthDesign Research SectionPortland Cement AssociationSkokie, Illinois
The Portland Cement Associationis developing a comprehensive se-ries of computer programs for analy-sis and design of concrete structuresand pavements. As these programsare developed, they will be madeavailable to the engineering profes-sion. In addition to this program,others are presently available onconcrete airport pavement design,design of reinforced concrete col-umns, and analysis and design offlat plates and continuous frames.
The computer program for analy-sis and design of simple-span, com-posite and non-composite highwayor railway bridges described in thispaper is based on conventionaldesign procedures(') and on appro-priate sections of the current high-way and railway standard specifica-tions d2 '3 ). The program provides ameans of reducing design costs andtime for the subject type of high-way or railway bridge.
DESCRIPTION OF PROGRAM
The program is written in FortranIV language for the IBM 1130 Com-puter. Output may be by 1132 print-er or console printer.
The program performs the analy-sis and design of simple-span, pre-
cast, prestressed highway or railwaybridges. The program will accom-modate the composite and non-com-posite sections included in Fig. 1,and will compute the following: sec-tion properties, dead load and liveload shears and moments, stressesfor various loading conditions, ulti-mate design moments and resistingmoments, spacing of shear rein-forcement, horizontal shear stressbetween the composite slab andprecast member, midspan elasticdeflections for various loading con-ditions, and the number and centerof gravity of prestressing strands re-quired.
The program is operated in oneof the following modes:
Mode 1. Analysis and design ofstandard sections with acomposite deck slab(Sections 1 through 5,Fig. 1).
The computer program applies to either highway or railroad bridgeswith various types of prestressed units on simple spans, eitherwith or without a composite deck. Based on conventional designprocedures, the program mechanizes all the routine calculationsand provides a sizeable reduction in design time and cost.
Mode 4. Analysis and design ofall sections in Fig. 1when the number andlocation of prestressingstrands are included inthe input data.
The detailed capabilities of theprogram are as follows:
Section Properties. The programcalculates section properties for non-composite single- or double-celledbox beams (Sections 9 and 10, Fig.1). The other precast sections inFig. 1 are all standards with sectionproperties available. For designswith these sections, it is requiredthat the section properties of theprecast section be included in theinput data. When the standard sec-tions are used in a composite de-sign, the program computes thecomposite section properties.
Loads. The standard AASHO load-ings are used to calculate shearsand moments as described below.The magnitude of highway live load(HS20-44, HS15-44, HS10-44, H20-44, H15-44, or H10-44) is indicatedby an input code number.
For railway bridges, the programuses Cooper's E-Loading. Live loadbending moments are required in-
put data. The magnitude of railwaylive load (E-72, E-60, etc.) is indi-cated by an input code number.
Shear and Moment due to Loads.For all standard AASHO loadingsthe program computes shears atthree locations (reaction, 1/4 span,1/3 span) and moments at up tofour specified locations. Truck load-ing and equivalent lane loading areconsidered, and the program selectsthe type that governs the design.Dead load shears and moments arecalculated at the sections specifiedfor live load. The program computesultimate moments and shears due toloads for highway bridges by multi-plying service load moments andshears by specified load factors.
For railway bridges, design mo-ments due to Cooper's loading atone to four locations are requiredinput data. The values are availablefrom moment tables. The programcomputes shears due to the speci-fied Cooper's loading at the 1/4-and 1/3-span points. Dead loadshears and moments are calculatedat the same sections as for live load.The program computes ultimate mo-ments and shears due to loads forrailway bridges by multiplying theservice load values by specified load
June 1968 29
factors.
Prestressing Force. In Modes 1 2and 3, the program calculates thenumber and center of gravity ofprestressing strands necessary to sat-isfy stress limitations, and to pro-vide an ultimate internal resistingmoment equal to, or greater than,the ultimate moment due to loads.The input data specifies the stress
limitations and the size and ulti-mate strength of the individual pre-stressing strand.
In Mode 4, the number and loca-tion of the prestressing strands areincluded in the input data, and theportions of the program used to cal-culate these values in the first threemodes are bypassed.
In any mode, the profile of thecenter of gravity of the prestressing
[i]
SPREADBOX
6. CHANNEL
2. 11 BOX 7. SLAB
8. Q 0 0 VOIDED
AASHO-PCI• TYPES I -IY
0 - PCI3YSYI
9. BO
[ LI I DOUBLE10' BOX
5. TEE
COMPOSITE SECTIONS NON-COMPOSITE SECTIONS
Fig. 1. Sections analyzed in computer program30 PCI Journal
force may be specified as straightparallel strands with constant eccen-tricity, or as depressed strands witha maximum of two hold-downpoints. The program will also ac-commodate post-tensioned designsand, for this case, the center of grav-ity of the prestressing force is con-sidered to be parabolic.
For pretensioned designs, part ofthe prestress losses occur due tostrand relaxation and elastic mem-ber shortening prior to developingthe stress in the section under the"initial" prestressing force. The pre-liminary loss due to strand relaxa-tion prior to release can be eval-uated from the formula^r):
; 1 1bt — 0.55(jf,
for fj 0.55
where fs = the remaining stress atany time, t, after pre-stressing
f the initial stressf, = 0.1 percent offset stresst = time in hours
For 270k strand stressed initially to0.70 f;, the ratio of f/ f Ri is about0.975 after 48 hours. In other words,the strand relaxation in this periodof time is about 21/2 percent.
The loss due to elastic shorteningand bending of the member can beconsidered to have occurred prior tocalculating stresses due to the initialprestressing force, because the mem-ber shortens as it is stressed. Thisloss can be calculated by the fol-lowing procedure:
1. Calculate concrete stress at re-lease at the level of the pre-stressing steel.
June 1968
f^ = Pti (1.0 — elastic loss) 1 + e—(_A I
where f, — concrete stress at levelof prestressing steel.
Pi = initial prestressingforce.
A = area of precast section.e = eccentricity of strands
(a weighted averagevalue may be used fordesigns with depressedstrands).
1= moment of inertia ofprecast section.
Elastic loss is a value to bedetermined. A value fromthe table in the operating in-structions can be used forthis calculation.
2. Percentage loss due to elastic
Es x f,,shortening = E°
fs^
where Eb = modulus of elasticity ofthe prestressing steel(usually 28 X 106 psi).
E, = modulus of elasticity ofthe concrete in the pre-cast section at the timeof prestressing (E=w1 X 33V7, wherew = weight of the con-crete and f,a = compres-sive strength of the con-crete at release).
fs = initial prestressing steelstress.
Table 1 contains approximate valuesfor the elastic shortening loss forthe 10 sections in Fig. 1.
Some economy can usually begained by considering the twolosses discussed above to have oc-curred prior to the initial stress dueto prestress. In the subject program,
31
this is achieved by an input vari-able (designated in the program asESR) representing the ratio ofwhere f $ is the stress immediatelyafter release and member shorten-ing. In general, a satisfactory valuefor this ratio is obtained by assum-ing a 2½ percent relaxation loss andan elastic shortening loss as indi-cated in Table 1. When the strandmanufacturer supplies relaxationloss data, it should be used in lieuof values in Table 1 or values com-puted from the above relaxation lossformula.
Tab e
For post-tensioned designs, wherethe steel elements are not tensionedsimultaneously, the value of theelastic shortening loss varies de-pending on the number of tendonsand the tensioning procedure. Therelaxation loss for post-tensioned de-signs before calculating stresses dueto the initial prestressing force isessentially zero. For most post-ten-sioned designs, it will be sufficientlyaccurate (and conservative) to entera value of 1.0 for the input variablerepresenting elastic shortening andpreliminary strand relaxation loss.
,.
1 2 3 4 5 6Approxi-
Sec- Type of Approxi- mate Strand Approxi-tion Section Approxi- mate Elas- Relaxation mate Value
Num- mate Value tic Shorten- Loss @ of ESRber for EMIN ing Loss 48 hr 0 _ (4 + 5)
Use of the program requires thatthe designer enter a value for theminimum eccentricity of the pre-stressing force from the bottom ofthe precast section (designated inthe program as EMIN). Suggestedvalues for this input item are alsoincluded in Table 1.
Stresses. The program calculates topand bottom fiber stresses due toloads (beam weight, non-compositedead load, composite dead load, andlive load) and then calculates thestresses due to three combinationsof loads and prestress force (beamweight plus initial prestress, beamweight plus non-composite deadload plus final prestress, and allloads plus final prestress). Thesestresses are calculated at the loca-tions specified in the input data.
Ultimate Moments. The ultimate re-sisting moment provided is com-puted and compared to the ultimatemoment due to loads which is calcu-Iated as described above. If ultimatemoment governs the required areaof steel, the comparable number ofstrands are used by the program tocalculate stresses, etc.
Shear. The program computes thestirrup spacing required to meetspecifications at the 1/4- and 1/3-span points, which generally are thecritical locations for shear. Themaximum spacing permitted by spe-cifications is also calculated andcompared to the spacing determinedby stress considerations.
For composite highway bridgedesigns, the ultimate horizontalshear stress between slab and pre-cast member is calculated at thesupport.
Reaction. For highway bridge de-
signs, the program calculates thereaction due to live load plus im-pact, and the total reaction due todead load plus live load and impact.
Deflections. Instantaneous midspandeflections are calculated for threeloading conditions (beam weightplus prestressing force, total deadload plus prestressing force, and liveload).
INPUT
Standard input data sheets are in-cluded with the operating instruc-tions that may be reproduced fordesign office use. Fig. 2 presents thedesign data for one of the sampleproblems forwarded with the ob-ject or source deck and Fig. 3 is thecompleted input data sheet for thisdesign. Fig. 5 presents the designdata for the second sample prob-lem, and Fig. 6 is the completed in-put data sheet.
OUTPUT
Output may be specified in twolevels. The first level includes nearlyall of the significant design valuescomputed. The second level con-tains the minimum data required toprovide an adequate description ofthe design.
Figs. 4 and 7 contain sample out-put sheets. Fig. 4 is the output (firstlevel) for the sample problem andinput data presented in Figs. 2 and3. Fig. 7 is the output (second level)for the sample problem and inputdata presented in Figs. 5 and 6.
GENERAL COMMENTS ON USE OFTHE PROGRAM
The subject computer program isessentially a mechanization of con-ventional design procedures. Thedesigner selects and inputs the mainstructural parameters and the corn-
June 1968 33
puter makes the routine calcula-tions. In some instances, the pro-gram may not find a mutuallysatisfactory solution to the variousdesign requirements. This usuallymeans that the section is beyond itscapacity for the input design cri-teria. In these cases, an overstressindicator is printed in the output.If the overstress is significant andcannot be accommodated by in-creasing the design concretestrengths, some revision of the de-
sign criteria is necessary to enablethe program to find an acceptablesolution. In the initial design proc-ess, it may be desirable to inputseveral decks, varying some of thecontrolling design criteria. Usuallyone of these designs will be satis-factory. If not, it will generally bepossible to inspect the output andselect final design criteria for a sec-ond computer run.
After a satisfactory design is ob-tained, the designer must check to
140' C.TO C. BEARINGS
ELEVATION
31'– 6"
14'–O" 14'–O"
7" SLAB TYPE = AASHOGIRDER
3'— 4 EQUAL SPACES c 6'-3" • 25'–O"
SECTION
Loading: HS20-44
Prestressing tendons: 1/2"C/ 270k strands
Concrete strength:
Girders at release f. t = 4000 psiGirders at Z8 days fa = 5000 psiComposite slab f, = 4500 psiE composite slab/E girder = 0.8
Fig. 2. Design data for sample problem No. 134 PCI Journal
MODES I and 2 — Standard sections with or without a composite slob. PORTLAND CEMENT ASSOCIATIONINPUT FORM FOR PRESTRESSED BRIDGE PROGRAM
MAX LL + I MOMENT • 1516.9 FT. KIPSLL + I SHEAR AT 1/4 PT • 34.0 KIPSLL + I SHEAR AT 1/3 PT • 30.2 KIPSLL +1 REACTION • 47.8 KIPS
STRESSES IN EXTREME FIBERS DUE TO EXTERNAL LOADS - KIPS PER SO.IN.DIST BEAM WT 50L CDL LIVE LOAD TOTAL
TOP SOT TOP 801 TOP SOT TOP BOT TOP BOT0.500 L 1.613 -1.651 0.668 -0.684 0.000 0.000 0.375 -0.719 2.657 -3.0550.330 L 1.426 -1.460 0.591 -0.605 0.000 0.000 0.335 -0.643 2.354 -2.7090.250 L 1.210 -1.238 0.501 -0.513 0.000 0.000 0.288 -0.552 1.999 -2.3040.000 L 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000COMPOSITE STRESS IN SLAB • 0.481 KIPS PER SO.IN.
MINIMUM STRANDS • 49.462 YM • 5.400 IN. YE • 21.370 IN.
STRESSES DUE TO EXTERNAL LOADS AND PRESTRESS - KIPS PER SQ. IN.
DIST INITIAL PRESTRESS
TOP SOT0.500 1. -0.776 3.2730.330 L -0.776 3.2730.250 L -0.547 3.0390.000 L 0.253 2.218ULTIMATE MOMENT REQUIREDULTIMATE MOMENT PROVIDED
DEPTH OF COMP BLOCK MORE THAN TCS+ ITS. UMP CALC APPROXIMATEFOR FCPC • 3.000 PSI AND 50. STRANDS UMP • 10985. FT.KIPS
CASE 1 STRESSES 50. STRANDS YM • 5.400 IN. YE • 21.370 IN.
Girders at release fit = 4000 psiGirders at 28 days f' = 5000 psi
Fig. 5. Design data for sample problem No. 2
see that a strand pattern can be pro-vided with the number and centerof gravity of strands indicated inthe output. Use of the EMIN valuesin Table 1 generally assures that asuitable strand pattern can beachieved. However, the EMIN val-ues in Table 1 were developed spe-cificially for %-in dia. 270k strand.Use of another size or strengthstrand may require some adjustmentof EMIN. If an adjustment is indi-cated, this can be accomplished byre-punching EMIN in card number
4 in the input deck, and making asecond computer run.
Values of EMIN and ESR aregiven for the extremes of the usualspan range for various sections inTable 1. For intermediate span val-ues, EMIN and ESR can be inter-polated from the values given.
ACKNOWLEDGMENT
The computer program describedhere is an enlarged and revised ver-sion of a program for non-compositesingle- and double-celled box beams
developed by the Southern PacificCompany. The cooperation and as-sistance of the Southern PacificCompany in making the originalprogram available is gratefully ac-knowledged.
REFERENCES
1. "Design of Highway Bridges in Pre-stressed Concrete," Portland CementAssociation, Old Orchard Road, Sko-kie, Ill. 60076.
2. "Standard Specifications for Highway
Bridges," Ninth Edition, American As-sociation of State Highway Officials,341 National Press Building, Washing-ton, D.C. 20004.
3. "Manual of Recommended Practice,"American Railway Engineering Associ-ation, 59 East Van Buren St., Chicago,.I11. 60605.
4. Magura, Donald D., Sozen, Mete A.and Siess, Chester P., "A Study ofStress Relaxation in Prestressing Rein-forcement," Journal of the PrestressedConcrete Institute, Vol. 9, No. 2, April1964, pp. 13-57.
Discussion of this paper is invited. Please forward your discussion to PCI Headquarters.by September 1 to permit publication in the December 1968 issue of the PCI JOURNAL.