T-0522A0 18th Street Pedestrian Improvements 50 T-160800 Advance Traveler Information System 120 T-090400 Affordable Housing Infrastructure 77 T-022000 Affordable Housing Land Banking Program 21 T-141600 Affordable Housing-Housing Development 108 T-021300 Alabama Street Reconstruction 19 T-031900 Allen Parkway Re-Construction 46 T-071800 Almeda Corridor Improvements - Phase IV 59 T-024100 Almeda/Crawford 35 T-090200 Amphitheater and Open Market 75 T-180300 Area Parks 140 T-180800 Arts and Culture 144 T-023600 Bagby Park 32 T-032500 Bagby Street Improvements 48 T-1715B0 Barryknoll West Drainage Imp. 133 T-151100 Bastrop Promenade 114 T-010900 Bering Drive US 59 - Westheimer 9 T-023900 Brazos Street Reconstruction 33 T-021400 Caroline Street Reconstruction 20 T-024300 Central Bank Plaza 37 T-010700 Chimney Rock 8 T-200400 Club Creek Detention Basin and Park 152 T-109900 Concrete Panel Program 92 COMPONENT UNITS 2021-2025 CAPITAL IMPROVEMENT PLAN CIP No. Project Page 1
172
Embed
COMPONENT UNITS 2021-2025 CAPITAL IMPROVEMENT PLANLocation Code:UA-00 Sub-Category: Project Justification Currently Hillcroft, Fountain View and Chimney Rock are the only three continuous
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
T-0522A0 18th Street Pedestrian Improvements 50
T-160800 Advance Traveler Information System 120
T-090400 Affordable Housing Infrastructure 77
T-022000 Affordable Housing Land Banking Program 21
T-141600 Affordable Housing-Housing Development 108
T-021300 Alabama Street Reconstruction 19
T-031900 Allen Parkway Re-Construction 46
T-071800 Almeda Corridor Improvements - Phase IV 59
T-024100 Almeda/Crawford 35
T-090200 Amphitheater and Open Market 75
T-180300 Area Parks 140
T-180800 Arts and Culture 144
T-023600 Bagby Park 32
T-032500 Bagby Street Improvements 48
T-1715B0 Barryknoll West Drainage Imp. 133
T-151100 Bastrop Promenade 114
T-010900 Bering Drive US 59 - Westheimer 9
T-023900 Brazos Street Reconstruction 33
T-021400 Caroline Street Reconstruction 20
T-024300 Central Bank Plaza 37
T-010700 Chimney Rock 8
T-200400 Club Creek Detention Basin and Park 152
T-109900 Concrete Panel Program 92
COMPONENT UNITS 2021-2025 CAPITAL IMPROVEMENT PLAN
CIP No. Project Page
1
COMPONENT UNITS 2021-2025 CAPITAL IMPROVEMENT PLAN
CIP No. Project Page
T-019900 Concrete Panel Replacement Program 14
T-029900 Concrete Panel Replacement Program 43
T-079900 Concrete Panel Replacement Program 66
T-089900 Concrete Panel Replacement Program 73
T-099900 Concrete Panel Replacement Program 83
T-119900 Concrete Panel Replacement Program 99
T-159900 Concrete Panel Replacement Program 119
T-179900 Concrete Panel Replacement Program 138
T-209900 Concrete Panel Replacement Program 162
T-239900 Concrete Panel Replacement Program 169
T-202100 Corporate Reconstruction 161
T-080200 Corridor Mobility Projects 67
T-091000 Curb & Sidewalk Repairs and Improvements 82
T-191900 Westpark Improvements - Kirby to Edloe 149
T-023000 Wheeler St. Pedestrian Enhancements 27
T-053000 White Oak Bayou and Memorial Park Trail 55
T-101200 Woodland Hills Extension 85
T-052900 Yale and Center Intersection 54
7
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Chimney Rock
Project No. T-010700ST. GEORGE TIRZ#1
Project DescriptionReconstruct Chimney Rock into a 6 lane boulevard roadway sectionwith a new storm sewer system that will provide additional in-linedetention, sidewalks on both sides, and replacement of publicutilities.
City Council District
Location G,J Address Descr 2: WESTHEIMER TO US59
Served: G,J Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationThis will provide needed additional north-south traffic capacity inthe area and additional in-line detention that would provide somerelief to the area. The sidewalks will also promote a pedestrianfriendly environment.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Bering Drive US 59 - Westheimer
Project No. T-010900ST. GEORGE TIRZ#1
Project DescriptionReconstruct existing two-lane open-ditch roadway as a three-lanecurb and gutter section with new storm sewer system. This systemwill tie into the new Schumacher Star Lane system.
City Council District
Location J Address Descr 2:
Served: J Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationExisting roadway section is open ditch. Area is prone to flooding. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: North South Connection
Project No. T-011000ST. GEORGE TIRZ#1
Project DescriptionConverting the existing open channel W142 into a curb and gutterroadway section with sidewalks from US-59 to Westheimer. Includes$150,000 provision for cleaning Bering Ditch.
City Council District
Location J Address Descr 2:
Served: J Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationCurrently Hillcroft, Fountain View and Chimney Rock are the onlythree continuous north south connectors in the entire district.Additional north-south connections will be needed to improvemobility in the zone and give some relief to the other north-southstreets.
Units: 0
Start Year:
RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Sub-Regional Detention
Project No. T-011200ST. GEORGE TIRZ#1
Project DescriptionMultiple detention basins within the TIRZ boundary. City Council District
Location J Address Descr 2:
Served: J Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationStorm water storage needed per drainage study recommendationsspecific to 100-year flood event to alleviate flooding problemswithin the TIRZ boundary.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Richmond Avenue Medians Beautification
Project No. T-011500ST. GEORGE TIRZ#1
Project DescriptionCreate landscaping beautification improvements to the medians alongRichmond Avenue between S Rice and Hillcroft.
City Council District
Location J Address Descr 2:
Served: J Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationThe existing conditions of the medians landscape are very degradedand imposes a detraction to the area. The new beautification willenhance the quality of life for the community.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Schumacher & Star Lane Reconstruction
Project No. T-012000ST. GEORGE TIRZ#1
Project DescriptionNew curb and gutter roadway from Chimney Rock to Fountain View.Underground drainage system. New sidewalks and landscape.
City Council District
Location J Address Descr 2:
Served: J Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationExisting roadway is open ditch. Area is prone to flooding. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: South East Neighborhood Street Reconstru
Project No. T-020600MIDTOWN TIRZ#2
Project DescriptionRoadway, infrastructure, and pedestrian improvements to localneighborhood streets bounded by Elgin, LaBranch, Holman, andChenevert.
City Council District
Location D Address Descr 2:
Served: D Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationMobility, infrastructure, and pedestrian improvements to createcomfortable and safe corridors that accommodate growing mobilityand infrastructure demands in underserved area which currentlydoes not have curb or gutter.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Operating of Zone & Project Facilities
Project No. T-020700MIDTOWN TIRZ#2
Project DescriptionAs a direct consequence of an expanding list of projects,particularly park and public space projects, the Zone must providefor operation of the Zone's existing and planned facilities in thenear term and in years to come beyond the duration of the Zone.(Operations and maintenance for parks, restaurants and garage).
City Council District
Location C,D Address Descr 2:
Served: C,D Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationIn order to adequately provide for the operation of thosefacilities, operation expenditures are included in the projectcosts in an amount of up to 5% of total project costs for the Zoneregardless of project cost category.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Main Street Enhancements
Project No. T-021000MIDTOWN TIRZ#2
Project DescriptionStreetscape enhancements between Pierce and heeler includingsidewalk improvements with landscaping, lighting, andpedestrian-related infrastructure.
City Council District
Location C,D Address Descr 2:
Served: C,D Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationEnhanced streetscapes increase safety and connectivity forpedestrians and encourage additional development along thisimportant corridor.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Alabama Street Reconstruction
Project No. T-021300MIDTOWN TIRZ#2
Project DescriptionRoadway, infrastructure, and streetscape enhancements to majorcorridor between Spur 527 and Chenevert. MRA - Spur 527 to Main; HCC- Main to Chenevert. (In FY15, T-0213 and T- 0224 were combined.)
City Council District
Location C,D Address Descr 2:
Served: C,D Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationMobility, infrastructure, and pedestrian improvements to createcomfortable and safe corridor to better accommodate growing mobilityand infrastructure demands. Partnership between Midtown and HCC ispartially funded through a Federal Transit Administration (FTA)grant.
Units: 0
Start Year:
RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Caroline Street Reconstruction
Project No. T-021400MIDTOWN TIRZ#2
Project DescriptionRoadway, infrastructure, bicycle, and streetscape enhancementsbetween Pierce and Holman. Complete Streets project includes$4,000,000 TxDOT and will be bid and constructed by TxDOT.
City Council District
Location D Address Descr 2:
Served: D Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationMobility, infrastructure, and pedestrian improvements are part ofComplete Streets Program seeking to balance needs of all modes oftransportation including automobiles, pedestrians and bicycles withlocal businesses and on-street parking. Partnership betweenMidtown and HCC is partially funded through a TxDOT grant.
Units: 0
Start Year:
RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Affordable Housing Land Banking Program
Project No. T-022000MIDTOWN TIRZ#2
Project DescriptionLand assembly within a targeted area of the city limits to create adiversified inventory of property for development of affordablehousing units on such land.
City Council District
Location C,D Address Descr 2:
Served: C,D Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationFulfillment of obligation that one-third of the tax incrementrevenue be used to provide affordable housing within the city.Strategy to acquire vacant and blighted property to return theproperty to productive reuse and to preserve and protect existingcommunities.
Units: 0
Start Year:
RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Midtown Park (Superblock)
Project No. T-022100MIDTOWN TIRZ#2
Project DescriptionMixed-use project including public park and restaurant pads locatedon Superblock adjacent to the McGowen Street Metrorail Station atMain/McGowan intersection. Park will include large lawn, waterfeature, playground, dog run, and art wall, property including apublic park, retail and residential facilities and a public parkinggarage.
City Council District
Location C Address Descr 2:
Served: C Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationSuccessful parks are key component of sustainable infrastructure anda healthy vibrant quality of life. This upcoming development willenhance the quality of life for current Midtown residents andbusiness owners by providing new outdoor activity space. It willalso become a destination to attract visitors from surroundingcommunities.
Units: 0
Start Year:
RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Street Overlay Prog.(Partnership w COH)
Project No. T-022200MIDTOWN TIRZ#2
Project DescriptionAsphalt overlay of local streets (Tuam, LaBranch, Anita).Partnership with COH Right of Way Maintenance Department.
City Council District
Location C,D Address Descr 2:
Served: C,D Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationMobility improvements to extend service life of deteriorated roadwayand provide comfortable and safe corridor. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Safe Sidewalk Prog. (Partnership w COH)
Project No. T-022300MIDTOWN TIRZ#2
Project DescriptionRepair and replace of damaged and missing sidewalks andaccessibility ramps throughout the District. Partnership with COHRight of way Maintenance Department.
City Council District
Location C,D Address Descr 2:
Served: C,D Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationImprovement will increase safety and connectivity for pedestrians. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: HTC Building Maintenance
Project No. T-022400MIDTOWN TIRZ#2
Project DescriptionAnnual maintenance for Houston Technology Center. Property is ownedby MRA and managed by HTC as the master lease holder. 402 Pierceis approximately 10 years old and 410 Pierce is 8 years old.
City Council District
Location C Address Descr 2:
Served: C Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationContractual obligation to provide maintenance of property to protectquality of the asset. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Mobility & Pedestrian Improvements
Project No. T-022500MIDTOWN TIRZ#2
Project DescriptionPlanning for mobility and pedestrian improvements includes periodicmaintenance to streetscape enhancements.
City Council District
Location C,D Address Descr 2:
Served: C,D Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationMobility, infrastructure, and pedestrian improvements to create andmaintain comfortable and safe corridors which accommodate growingmobility and infrastructure demands.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Wheeler St. Pedestrian Enhancements
Project No. T-023000MIDTOWN TIRZ#2
Project DescriptionStreetscape enhancement between Spur 527 and US-59 includingsidewalk improvements with landscaping, lighting, andpedestrian-related infrastructure right-of-way acquisition provisionfor parking.
City Council District
Location C,D Address Descr 2:
Served: C,D Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationEnhanced streetscape will provide safer connection for pedestrianalong planned Metrorail expansion route. Project is partially fundedthe Federal Transit Administration (FTA) grant.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Public and Cultural Facilities
Project No. T-023200MIDTOWN TIRZ#2
Project DescriptionSelective grants to new, existing and emerging cultural facilitiesin Midtown. Past recipients include Buffalo Soldiers Museum, AsiaSociety, Houston Museum of African American Culture, and MATCH.
City Council District
Location C,D Address Descr 2:
Served: C,D Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationSupport of the development and redevelopment of public and culturalfacilities to serve as destination anchors and activity generatorsto increase community gathering opportunities and strengthen theCultural District as a true destination within Houston.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Parking Garage-Midtown Park
Project No. T-023300MIDTOWN TIRZ#2
Project DescriptionUnderground 400 space public parking garage located beneath Midtownpark project on the Superblock. Camden will fund construction of thepublic garage. MRA to provide construction management. MRA willpay interest only to Camden until completion of garageconstruction.
City Council District
Location C Address Descr 2:
Served: C Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationThe garage will support mixed-use Midtown Park project and willaddress significant existing parking demand as well as supportfuture retail and commercial developments.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Parks & Open Spaces
Project No. T-023400MIDTOWN TIRZ#2
Project DescriptionPlanning and development of plazas, public squares, and landscapingin public right-of-way.
City Council District
Location C,D Address Descr 2:
Served: C,D Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationCommunity open spaces to provide connectivity and mixed uses to keycorridors that increase community gathering opportunities andenhance quality of life. The development of these plazas and publicsquares will complement cultural arts facilities and offer uniqueidentity branding in Midtown.
Units: 0
Start Year:
RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Public Art
Project No. T-023500MIDTOWN TIRZ#2
Project DescriptionPlanning and development of public art to support Midtown CulturalArts and Entertainment District designation by the Texas Commissionof Arts.
City Council District
Location C,D Address Descr 2:
Served: C,D Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationStrengthen the Cultural Arts and Entertainment District as a truedestination within Houston. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Bagby Park
Project No. T-023600MIDTOWN TIRZ#2
Project DescriptionImprovements to MRA-owned located at Bagby/Gray intersection. Improvements include a performance stage, lighting, signage, water feature, dog run, and food kiosk.
City Council District
Location C Address Descr 2:
Served: C Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationThe continued development of new green spaces and the redevelopment of existing green spaces is vital for the creation of a cohesive and vibrant community. Parks and plazas help foster social interactions that define the public realm and urban culture.
Units: 0
Start Year:
RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Brazos Street Reconstruction
Project No. T-023900MIDTOWN TIRZ#2
Project DescriptionRoadway, infrastructure, and streetscape enhancements between St.Joseph and Elgin. Greenroads project incorporates Low ImpactDevelopment (LID) techniques and environmentally- friendly elementsin roadway construction.
City Council District
Location C Address Descr 2:
Served: C Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationMobility, infrastructure, and pedestrian improvements to createcomfortable and safe corridors that accommodate growing mobility andinfrastructure demands. LID techniques will extend useful life ofroadway and reduce long-term maintenance needs. Improvements willfacilitate additional redevelopment along corridor.
Units: 0
Start Year:
RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Real Estate Development
Project No. T-024000MIDTOWN TIRZ#2
Project DescriptionOperations and maintenance of Land Banking acquisition along MainStreet for redevelopment.
City Council District
Location C,D Address Descr 2:
Served: C,D Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationPurchase of land under the 380 economic development plan, asauthorized by Chapter 380 of the Texas Local Government Code. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Almeda/Crawford
Project No. T-024100MIDTOWN TIRZ#2
Project DescriptionRoadway, infrastructure, and streetscape enhancements between Pierceand Holman.
City Council District
Location D Address Descr 2:
Served: D Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationMobility, infrastructure, and pedestrian improvements to createcomfortable and safe corridors that accommodate growing mobility andinfrastructure demands.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Webster Street
Project No. T-024200MIDTOWN TIRZ#2
Project DescriptionRoadway, infrastructure, and streetscape enhancements between Bagbyand Chenevert.
City Council District
Location C,D Address Descr 2:
Served: C,D Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationMobility, infrastructure, and pedestrian improvements to createcomfortable and safe corridors that accommodate growing mobility andinfrastructure demands.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Central Bank Plaza
Project No. T-024300MIDTOWN TIRZ#2
Project DescriptionDevelopment of public plaza adjacent to new office redevelopment at2100 Travis.
City Council District
Location C Address Descr 2:
Served: C Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationRemediation of blight associated with existing 14 story building at2100 Travis. Plaza will increase community gathering opportunitiesand enhance quality of life.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Museum District - Main St. Enhancements
Project No. T-024400MIDTOWN TIRZ#2
Project DescriptionStreetscape enhancements along Main Street in annexed areas ofMuseum District including sidewalk improvements with landscaping,lighting, and pedestrian-related infrastructure.
City Council District
Location C,D Address Descr 2:
Served: C,D Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationEnhanced streetscape increases safety and connectivity forpedestrians and encourages additional development along thisimportant corridor.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Museum District - Pedestrian Enhancement
Project No. T-024500MIDTOWN TIRZ#2
Project DescriptionPedestrian improvements in annexed area of Museum District. City Council District
Location C,D Address Descr 2:
Served: C,D Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationPedestrian improvements to create and maintain comfortable and safecorridors which accommodate growing demands. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Museum District - Mobility Improvements
Project No. T-024600MIDTOWN TIRZ#2
Project DescriptionMobility improvements in annexed areas of Museum District. City Council District
Location C,D Address Descr 2:
Served: C,D Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationMobility improvements to create and maintain comfortable and safecorridors which accommodates growing demands. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Tuam Street
Project No. T-024800MIDTOWN TIRZ#2
Project Description4 Blocks of Tuam Street reconstruction. City Council District
Location C,D Address Descr 2:
Served: C,D Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationMobility, infrastructure and pedestrian improvements to createcomfortable and safe corridors that accommodate growing mobility andinfrastructure demands.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Southern Downtown Pocket Park
Project No. T-030700MAIN ST./MARKET SQUARE TIRZ#3
Project DescriptionAcquire 1/2-1 block at the southern end of the Central BusinessDistrict and develop a green public space that would serve thegrowing residential population, workers and the public.
City Council District
Location I Address Descr 2:
Served: I Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationDue to the growing residential population a green public space isneeded to serve the residents and stimulate economic growth. Thisproject will be a joint effort of the Downtown Management District,City of Houston Parks Dept. and TIRZ 3.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Jones Plaza
Project No. T-030800MAIN ST./MARKET SQUARE TIRZ#3
Project DescriptionThe first step is to develop a concept/design that reflects thevision and objectives of the stakeholder and major tenants of theTheatre District. This is an inclusive process and is vital to theeffective utilization of the facility.
City Council District
Location I Address Descr 2:
Served: I Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationThis is a centrally located, public facility in the heart ofHouston's Theatre District. In order to more effectively betterserve Houston residents and visitors, this facility requires someenhancements and/or reprogramming.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Allen Parkway Re-Construction
Project No. T-031900MAIN ST./MARKET SQUARE TIRZ#3
Project DescriptionDesign and Construction to reconfigure Allen Parkway. City Council District
Location C Address Descr 2:
Served: CITYWIDE Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationAllen Parkway need to be reconfigured to provide additional parkingfor Buffalo Bayou Park. Improve public safety and enhance pedestrianconnections to the park given the increase in public use the parkhas been completed.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Walker Street Improvements
Project No. T-032400MAIN ST./MARKET SQUARE TIRZ#3
Project DescriptionWalker Street from San Jacinto to Milam; align lanes, widensidewalks, pavement, lighting, and landscaping.
City Council District
Location I Address Descr 2:
Served: I Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationWalker Street is a main thoroughfare out of downtown and the road isin need of resurfacing and the lanes need to be realigned. It is ahazard with the lane shift. The sidewalks are in need of improvementand beautification.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Bagby Street Improvements
Project No. T-032500MAIN ST./MARKET SQUARE TIRZ#3
Project DescriptionBagby Street from Franklin to Dallas, roadway improvement,sidewalks, paver, lighting and landscaping. Potential improved bayouaccess.
City Council District
Location I Address Descr 2:
Served: I Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationBagby Street is the gateway to the Theater District and should be ashowcase for the west side of the city. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Local Connections NHHIP
Project No. T-032600MAIN ST./MARKET SQUARE TIRZ#3
Project DescriptionTxDOT will be moving forward with the realignment ofI-45/I-10/I-59/69 around downtown. Local streets connections willneed to be reconfigured to support the new freeway infrastructure.
City Council District
Location C,G,H,I Address Descr 2:
Served: CITYWIDE Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationTraffic flow and ease of transportation connections are critical tosupport the workforce and economic activity of the CentralBusiness District. TxDOT will not pay for the local streetconnections as part of the overall highway project.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: 18th Street Pedestrian Improvements
Project No. T-0522A0MEMORIAL HEIGHTS TIRZ #5
Project DescriptionConstruct pedestrian improvements to include sidewalks, pedestrianramps landscaping and midblock crossings to create an overall saferpedestrian environment.
City Council District
Location C Address Descr 2: BETWEEN DURHAM & 20TH STREET
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Shepherd Drive Reconstruction Project
Project No. T-0523A0MEMORIAL HEIGHTS TIRZ #5
Project DescriptionExisting conditions include discontinuous sidewalks segments, openditch, non-ADA compliance pedestrian environ Roadwayreconstruction between 11th St. and 610 Loop North, including hikeand bike lanes, storm water drainage systems, curb and guttersection, streetlights, sidewalks and Landscaping.
City Council District
Location C Address Descr 2:
Served: C Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationMajor north/south artery with poor to nonexistent drainage system,no sidewalks, no curb, unsafe for pedestrians and bicyclists. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
Total Funds 1,500 51,500 2,220 45,000 100,220 100,220
Adopted CIP Form A51
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Reconstruct Bridges Over White Oak
Project No. T-052500MEMORIAL HEIGHTS TIRZ #5
Project DescriptionReconstruct, remove or raise several bridges over White Oak Bayou. City Council District
Location C,H Address Descr 2:
Served: C,H Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationThis is part of the North Canal project. The bridges cause a rise inwater level during a storm event. When the North Canal iscompleted these bridges can be constructed, removed or raised toreduce the water back up.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Heights Blvd. Pedestrian/Bicycle Safety
Project No. T-052700MEMORIAL HEIGHTS TIRZ #5
Project DescriptionBicycle and Pedestrian facility improvements at the intersection ofHeights Blvd. and the MKT Trail and at the intersection ofWashington Avenue and Heights Blvd. Improve safety and wayfindingalong the MKT Trail. Small segment trail connections to improveoverall bicycle & pedestrian connectivity.
City Council District
Location C Address Descr 2:
Served: C Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationA number of near misses have been reported at these locations. Thisproject will evaluate the locations and the potential improvementsfor each of these areas and implement appropriate improvements.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Yale and Center Intersection
Project No. T-052900MEMORIAL HEIGHTS TIRZ #5
Project DescriptionReconstruct intersection, replace signal and improve pedestriancrossing at Yale Street at Center Street.
City Council District
Location C Address Descr 2:
Served: C Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationThe vehicle crash count for Yale at Center demonstrates the need forintersection improvements through enhanced and more visiblesignalization. The frequency of accidents for vehicle collision atthe intersection are evident with over half of the accidentsoverlooking the existing stop control measures.
Units: 0
Start Year:
RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: White Oak Bayou and Memorial Park Trail
Project No. T-053000MEMORIAL HEIGHTS TIRZ #5
Project DescriptionBuild a segment of the trail between White Oak Bayou trail andMemorial Park.
City Council District
Location C Address Descr 2:
Served: CITYWIDE Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationThere is currently no connection between White Oak Bayou andMemorial Park. A citizen group proposed a possible path for theconnector. Many portions of the trail were funded in the mostrecent TIP call and other entities are building several sections.There is one segment that is in TIRZ 5 that is not funded by othersources.
Units: 0
Start Year:
RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Real Property Land Assembly & Site Prep.
Project No. T-071000OST/ALMEDA TIRZ #7
Project DescriptionAcquisition, remediation, and site preparation of land for generalredevelopment, public, cultural and recreational facilitiesincluding adequate parking.
City Council District
Location D Address Descr 2:
Served: D Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationEnhance the quality of life for residents, businesses and otherstakeholders in the zone. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Emancipation Ave. Reconstruction Project
Project No. T-0711A0OST/ALMEDA TIRZ #7
Project DescriptionDesign and construct resilient and sustainable improvements toEmancipation Ave. from Southmore to Elgin and McGowen to Pierce.Construction of pavement reinforce concrete curb and gutter, minimum6’ ADA sidewalks, wheelchair ramps, driveways, speciallandscaping, public utilities, pavement markings, enhanced streetand pedestrian lighting.
City Council District
Location D Address Descr 2:
Served: D Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationThe project facilitates upgrade to roadways, utilities, andpedestrian realm that is currently in poor condition which hinderssafe pedestrian, cyclist, business and economic activity. The ThirdWard Complete Communities Plan, Walkable Places Ordinance andTexas Historical Commission designation as the first urban MainStreet.
Units: 0
Start Year:
RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Emancipation Park and Community Center
Project No. T-071200OST/ALMEDA TIRZ #7
Project DescriptionConstruction and design of proposed outdoor performance stage andevent lawn, Emancipation Park 4 Corner Founders Monuments artenhancements, public parking garage (Elgin at Emancipation) andEmancipation Park facilities, infrastructure, and splash padsassessments and modifications.
City Council District
Location D Address Descr 2:
Served: D Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationProject will artistically display history of the park and serve as adestination for visitors. The garage will support mixed usedevelopment in Third Ward and Emancipation Park and will addresssignificant existing parking demand as well as support futureretail and commercial developments along Emancipation Ave.
Units: 0
Start Year:
RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Almeda Corridor Improvements - Phase IV
Project No. T-071800OST/ALMEDA TIRZ#7
Project DescriptionPlan, design, construct and install pedestrian amenities, decorativepedestrian lights, upgrade public parking lots, lighted signs,streetscape enhancements including sidewalk improvements withlandscaping and pedestrian-related infrastructure along Almeda fromIH69 to Holcombe Blvd.
City Council District
Location D Address Descr 2:
Served: D Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationInstallation of pedestrian improvements on the Almeda Corridor willenhance the pedestrian realm along a major transit corridor andfacilitate safe access to and from destinations in the area. Thiswill support the overall redevelopment of the area and promotebusiness and economic development.
Units: 0
Start Year:
RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Greater Third Ward Neighborhood Project
Project No. T-072200OST/ALMEDA TIRZ #7
Project DescriptionDesign and construct resilient improvements to Anita, Rosalie, Tuam,Drew, Francis, Stuart, Division, Dennis, Charles, and/or BastropStreets. Construction of pavement reinforced concrete curb andgutter, minimum 6’ ADA sidewalks, wheelchair ramps, driveways,landscaping, public utilities, street and pedestrian amenities, andlighting.
City Council District
Location D Address Descr 2:
Served: D Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationAdequate infrastructure will increase multi modal transitopportunities for retail/commercial development. Street segments,public utilities and sidewalks are in poor condition in residentialarea adjacent to major activity centers.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: MacGregor Park and Tennis Center
Project No. T-072300OST/ALMENDA TIRZ#7
Project DescriptionPlanning and design refinement of MacGregor Park master plan trafficcirculation for the park on Old Spanish Trail between MLK andCalhoun (near the Metrorail station and Brays Bayou).
City Council District
Location D Address Descr 2:
Served: D Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationProvide traffic and pedestrian circulation within MacGregor Park toserve as a catalyst for redevelopment of the adjacent economicdevelopment corridors. Efforts will support the impending growthfrom the University of Houston Medical School and housing complexand Metrorail expansion along Old Spanish Trail and MLK.
Units: 0
Start Year:
RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Live Oak St. Improvement Project
Project No. T-072400OST/ALMEDA TIRZ #7
Project DescriptionPlanning and design refinement of Live Oak St. from Pierce toTruxillo to include new pavement, reinforced concrete curb andgutter, ADA 6' sidewalks, wheelchair ramps, driveways, speciallandscaping, waterline, drainage, sanitary, traffic signals,crosswalk striping, ped. lights, sodding, tree planting andprotection.
City Council District
Location D Address Descr 2:
Served: D Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationRoadway, utilities and sidewalks are in poor condition. Theseimprovements will also enhance neighborhood vitality, the visualimage of the City's neighborhoods and improve its livability andeconomic development. Improvement of area streets is a mobilityand infrastructure goal in the Third Ward Complete CommunitiesAction Plan.
Units: 0
Start Year:
RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Hutchins Street Improvements Project
Project No. T-072500OST/ALMEDA TIRZ #7
Project DescriptionDesign and const improvements to Hutchins Street from Pierce toTruxillo to include ADA 6' sidewalks, reinforced concrete curb andgutter, wheelchair ramps, driveways, special landscaping, crosswalkstriping, sodding, tree planting and protection shall be added topromote pedestrian activity.
City Council District
Location D Address Descr 2:
Served: D Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationSidewalks are in poor condition. These improvements will alsoenhance neighborhood vitality, the visual image of the City'sneighborhoods and improve its livability and economic development.Improvement of area streets is a mobility and infrastructure goal inthe Third ward Complete Communities Action Plan.
Units: 0
Start Year:
RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Scottcrest Drive Improvements Project
Project No. T-072700OST/ALMEDA TIRZ#7
Project DescriptionPlan, design, and construct resilient and sustainable improvementsto Scottcrest between Griggs Road to OST. Construction of pavementreinforced concrete curb and gutter, minimum 6" ADA sidewalks,wheelchair ramps, driveways, bike lanes, landscaping, publicutilities, pavement markings, enhanced street and pedestriandecorative lighting.
City Council District
Location D Address Descr 2:
Served: D Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationImplement treatment for traffic and pedestrian safety, mobility,infrastructure, and pedestrian improvements to create comfortableand safe corridors that accommodate growing multi-modal access andinfrastructure demands. Roadway utilities and sidewalks arecurrently in poor condition.
Units: 0
Start Year:
RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Griggs and MLK Corridor Improvements
Project No. T-072900OST/ALMEDA TIRZ#7
Project DescriptionPlan, design, and construct resilient and sustainable improvementsto Griggs Road from Calhoun to Mykawa. Construction of pavementreinforced concrete curb and gutter, minimum 6' ADA sidewalks,wheelchair ramps, driveways, enhanced street and pedestriandecorative lighting, special landscaping (sodding, tree planting)and pedestrian amenities.
City Council District
Location D Address Descr 2:
Served: D Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationImplement treatment for traffic and pedestrian safety, mobility,infrastructure, and pedestrian improvements to create comfortableand safe corridors that accommodate growing multi-modal access andinfrastructure demands. Roadway utilities and sidewalks arecurrently in poor condition.
Units: 0
Start Year:
RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Corridor Mobility Projects
Project No. T-080200GULFGATE TIRZ #8
Project DescriptionMobility projects in various corridors in coordination with the Cityof Houston Public Works Department. Projects at this time mayinclude panel replacements, street reconstruction and overlays.
City Council District
Location D,I Address Descr 2:
Served: D,I Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationMany of the streets throughout each of the development corridors arein need of repair or replacement. Until increment increases, thiswork will be done through initial bonds funds and annualincrement.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Short Term Corridor Mobility Improvement
Project No. T-0802A0GULFGATE TIRZ #8
Project DescriptionShort-term will include implementing improvements that will provideimmediate impacts to the zone, such as panel replacements, upgradingsidewalks & non-compliant ramps, etc.
City Council District
Location D,I Address Descr 2:
Served: D,I Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationMany of the streets throughout each of the development corridorsneed repair or replacement. Until increment increases, this workwill be done through initial bond funds and annual increment.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Mykawa Road & Centerpoint Easement
Project No. T-080400GULFGATE TIRZ #8
Project DescriptionImprovements will provide greater community access to Sims BayouGreenway and nearby police station. Improving Center Point right ofway would provide for better community connectivity to Law Parkand Sims Bayou.
City Council District
Location D Address Descr 2:
Served: D Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationProvide very populated area with greater and safer access to parksand bayou trail systems. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Telephone Rd & Reveille Rd Connections
Project No. T-080600GULFGATE TIRZ #8
Project DescriptionProvide community connections to area retail centers, along withlandscape improvements and amenities.
City Council District
Location I Address Descr 2:
Served: I Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationProposed USACE trail from Stuart Park to Reveille Park will bypassthe neighborhood below the bridges. New trail connections will allowbetter community access to area retail centers.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Westover Gateway Trailhead & Connection
Project No. T-080700GULFGATE TIRZ #8
Project DescriptionProvides a safe link between Hartman Middle School & Stuart Park.Provides direct & safe access route to Sims Bayou Greenway fromsurrounding neighborhoods & school traffic modifications & parkdevelopment.
City Council District
Location I Address Descr 2:
Served: I Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationExisting open space, parks & trails are underutilized. New trailhead& connections would better maximize area greenspace potential.Existing traffic conditions are very hazardous. Provides stimuluseconomic development & affordable housing.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Park Place Entry Pre-Ticketed Area
Project No. T-080900GULFGATE TIRZ #8
Project DescriptionProvide amenities and improvements in the pre-ticketed area outsidethe Houston Botanical Gardens including picnic grove area landscape,stormwater wetlands, pedestrian lighting, educational, signage, andinfrastructure.
City Council District
Location I Address Descr 2:
Served: I Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationProvide amenities for general public in the pre-ticketed areaoutside the Houston Botanical Gardens. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: S. Post Oak & W. Orem Intersection Imp.
Project No. T-090100SOUTH POST OAK TIRZ #9
Project DescriptionThree intersections located on S. Post Oak at Orem, Hiram Clarke,and Post Oak. Improvements consist of new signalization,pedestrian havens, related sidewalk and median tip improvements,striping and graphics.
City Council District
Location K Address Descr 2:
Served: K Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationEnhance safety and mobility. Promote area economic development. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: West Orem Corridor Beautification
Project No. T-090300SOUTH POST OAK TIRZ #9
Project DescriptionLandscaping and other improvements to five esplanades west of SouthPost Oak on West Orem.
City Council District
Location K Address Descr 2:
Served: K Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationThere are currently five large medians along West Orem not beingfully utilized. New beautification to attract economic developmentto the area.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Affordable Housing Infrastructure
Project No. T-090400SOUTH POST OAK TIRZ #9
Project DescriptionInfrastructure improvements including roadway, landscaping,drainage, water, and sewer improvements that support affordablehousing projects.
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Thoroughfare and Roadway Improvements
Project No. T-090500SOUTH POST OAK TIRZ #9
Project DescriptionCorridor improvements including roadways, bike lanes, sidewalks,intersections, associated utilities and other rights-of-wayenhancements.
City Council District
Location K Address Descr 2:
Served: K Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationEnhance safety and mobility. Promote economic development. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Greenspace and Landscape Improvements
Project No. T-090600SOUTH POST OAK TIRZ #9
Project DescriptionImprovements to existing Public greenspace, landscaping andamenities.
City Council District
Location K Address Descr 2:
Served: K Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationEnhance community quality of life and promote economic development. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Street Signage and Wayfinding Graphics
Project No. T-090700SOUTH POST OAK TIRZ #9
Project DescriptionUpgrades, improvements, and repairs to street signs. Providewayfinding graphics for area attractions and amenities.
City Council District
Location K Address Descr 2:
Served: K Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationEstablish community identity. Promote economic development. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Hiram Clarke Rd Bus Stop-Crossing Imp.
Project No. T-090800SOUTH POST OAK TIRZ #9
Project DescriptionNew safe crosswalks to connect METRO bus stops and Center Pointtrails along three stops on Hiram Clarke Rd. This project is part ofthe Houston Parks Sims Bayou Greenways program.
City Council District
Location K Address Descr 2:
Served: K Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationThe new Center Point trail will directly connect to the three METRObus stops on the west side of Hiram Clarke. Currently, there arelimited safe pedestrian crossing points across Hiram Clarke.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Curb & Sidewalk Repairs and Improvements
Project No. T-091000SOUTH POST OAK TIRZ#9
Project DescriptionRepairs and improvements to existing curbs, sidewalks, and ramps. City Council District
Location K Address Descr 2:
Served: K Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationCommunity beautification and enhanced walk ability and publicsafety. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Mill Branch Dr. Reconst. at NorthPark
Project No. T-101100LAKE HOUSTON TIRZ #10
Project DescriptionReconstruction of Mills Branch Dr. from Kingwood Dr. to NorthParkincluding traffic signals at the intersections of Mills Branch Dr.and Kingwood Dr., ADA compliant crosswalks, sidewalks andlighting.
City Council District
Location E Address Descr 2:
Served: E Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationSubstantially increased residential densities have resulted insignificant delays, pedestrians/bicycle safety and vehicularcapacity issues.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
TIRZ10 2,012 2,012 2,012TIRZ10 Other 18,824 18,824 18,824
Total Funds 2,012 18,824 20,836 20,836
Adopted CIP Form A84
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Woodland Hills Extension
Project No. T-101200LAKE HOUSTON TIRZ #10
Project DescriptionPlanning and project development process needed for preparation forH-GAC's Transportation Improvement Program (TIP) call for projects.
City Council District
Location E Address Descr 2:
Served: E Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationKingwood lacks adequate access and egress connections to theregional transportation grid creating an unsafe environment forapproximately 75,000 City of Houston residents.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
TIRZ10 COH Contrib. 9,455 9,455 9,455TIRZ10 Other 23,346 23,346 23,346
Total Funds 32,801 32,801 32,801
Adopted CIP Form A86
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Northpark Drive Reconstruction
Project No. T-101400LAKE HOUSTON TIRZ #10
Project DescriptionReconstruction of Northpark Drive from Russell Palmer Rd to WoodlandHills Drive including elevation of roadway at Briar Branch above 500year flood elevation and a pedestrian underpass at Plum ValleyDrive.
City Council District
Location E Address Descr 2:
Served: E Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationExcessive vehicular congestion combined with regular roadwayinundation at Briar Branch prohibits emergency access to Kingwoodresidents during high water events.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Kingwood Drive at Woodland Hills Drive
Project No. T-101500LAKE HOUSTON TIRZ #10
Project DescriptionKey intersection and pedestrian/bicycle safety improvements at keyintersections identified by the Kingwood Mobility Study.
City Council District
Location E Address Descr 2:
Served: E Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationProject will reduce of congestion, decrease delay/travel time andenhance quality of life for kingwood residents. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Kingwood Drive at Royal Forest Drive
Project No. T-101600LAKE HOUSTON TIRZ #10
Project DescriptionKey intersection and pedestrian/bicycle safety improvements at keyintersections identified by the Kingwood Mobility Study.
City Council District
Location E Address Descr 2:
Served: E Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationProject will reduce congestion, decrease delay/travel time andenhance quality of Kingwood residents. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Kingwood Diversion Ditch & Drainage
Project No. T-101800LAKE HOUSTON TIRZ #10
Project DescriptionModification to Kingwood diversion ditch to address frequent andreoccurring flooding.
City Council District
Location E Address Descr 2:
Served: E Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationAdoption of Atlas 14 standards by Harris County require modificationto existing cross section of the Kingwood Diversion Ditch. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Greenspoint Area Streetscape Improvement
Project No. T-110300GREENSPOINT TIRZ #11
Project DescriptionProject consists of the construction of additional sidewalks,crosswalks, street lights, landscaping, equipment and public artthroughout the TIRZ.
City Council District
Location B Address Descr 2:
Served: B Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationTo enhance streetscape, public areas and improve pedestrian safetythrough Zone; creating a sense of place through the use of similartreatments.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: North Houston Skate Park & Without Limit
Project No. T-111900GREENSPOINT TIRZ #11
Project DescriptionSkate park and Park Without Limits on 10.3 acres acquired by theTIRZ. Skate park will be world class; complementary to the City'sdowntown park. Houston will have two major skate parks free and opento the public.
City Council District
Location B Address Descr 2:
Served: B Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationArea needs public parks and recreational areas. It will provide freerecreation to area residents and will be a destination for visitorsand skaters from all parts of the county, promoting use of arearestaurants and hotels.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Gears, Greens Crossing & Ella Improvemnt
Project No. T-112700GREENSPOINT TIRZ #11
Project DescriptionPavement replacement and drainage improvements for Ella betweenBeltway 8 and Greens Road; Gears Road between I-45 and Greens Road;and Greens Parkway between Beltway 8 and Greens Road.
City Council District
Location B Address Descr 2:
Served: B Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationStreets are in need of repair. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: North Houston Skate Park Maintenance
Project No. T-113000GREENSPOINT TIRZ #11
Project DescriptionTrack maintenance for the North Houston Skate Park and Park WithoutLimits.
City Council District
Location B Address Descr 2:
Served: B Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationSpring ISD increment is pledged to the maintenance of the SkatePark. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Hemphill Road Improvements
Project No. T-131000OLD SIXTH WARD TIRZ#13
Project DescriptionSubstitute sanitary sewer service, sidewalk improvements, stormwater collection, excavation and paving of Hemphill Road.
City Council District
Location H Address Descr 2:
Served: H Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationConverting the existing 17’ wide street with roadside ditches to a27’ wide curb and gutter road will allow sidewalk paths on bothsides, improve the existing drainage and widen the existing streetby 10-ft.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Streetscape Improvements
Project No. T-131400OLD SIXTH WARD TIRZ#13
Project DescriptionImprovements to various streets within the entire zone to improvepedestrian access, walkability, bicycle access, visibility(lighting) and ADA improvements.
City Council District
Location H Address Descr 2:
Served: H Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationWalkability, bikeability and access for all users is impaired due topoor condition of pedestrian and bicycle infrastructure. Many areaslack ADA accessible sidewalks. Lighting in some areas is inadequate.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Washington Ave. Pedestrian Improvement
Project No. T-131700OLD SIXTH WARD TIRZ #13
Project DescriptionRe-construction of broken curbs, gutters, broken sidewalks andremoval of unnecessary gravel or concrete along Washington Avenuebetween Oliver and Houston Avenue.
City Council District
Location H Address Descr 2:
Served: H Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationSidewalk is not ADA compliant and does not provide a safe pedestrianpathway. Unnecessary gravel and concrete are safety hazards.Replacing the broken curbs and gutters would improve drainage andadd beatification to Washington Avenue.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Sawyer Street Re-Construction
Project No. T-131900OLD SIXTH WARD TIRZ #13
Project DescriptionPhase 1 - Reconstruction of Sawyer Street from Crocket to south ofWashington Avenue.
City Council District
Location H Address Descr 2:
Served: H Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationRe-constructing Sawyer Road will give better traffic circulation,pedestrian circulation and help spur new economic development alongthe road way.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Historical Monuments
Project No. T-141200FOURTH WARD TIRZ#14
Project DescriptionTo develop and construct historical monuments in the Freedman's Townarea.
City Council District
Location C Address Descr 2:
Served: C Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationThe Fourth Ward area has lost most of its historical heritage and amonument would serve as a reminder and educational tool of theAfrican American heritage of the Fourth Ward area.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Affordable Housing-Housing Development
Project No. T-141600FOURTH WARD TIRZ#14
Project DescriptionAcquire property to develop new affordable housing. City Council District
Location C Address Descr 2:
Served: C Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationThe Authority receives 1/3 of its affordable housing set aside todevelop affordable housing within the Fourth Ward Reinvestment Zone. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Phase 2 Roadway & Utility Reconstruction
Project No. T-150400EAST DOWNTOWN TIRZ#15
Project DescriptionRoadway, public utilities and sidewalks reconstruction/replacement,streetscape/pedestrian amenities, Low Impact Development andlandscaping using context sensitive design. Project is located onSt. Emanuel Street (between Leeland and Polk and Clay (betweenChartres and Hutchins).
City Council District
Location I Address Descr 2:
Served: I Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationStreet segments, public utilities and sidewalks are in poorcondition and undersize. Upsized utilities should spurredevelopment. Improvements will benefit existing area businessesand provide safe pathways for pedestrians.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Phase 3 Roadway & Utility Reconstruction
Project No. T-150500EAST DOWNTOWN TIRZ#15
Project DescriptionRoadway, public utilities and sidewalk reconstruction/replacement,streetscape/pedestrian amenities, low impact development andlandscaping using context sensitive design. Project is located onHutchins Street (between Leeland and Polk).
City Council District
Location I Address Descr 2:
Served: I Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationStreet segments, public utilities and sidewalks are in poorcondition and undersize. Upsized utilities should spurredevelopment. Improvements will benefit existing area businessesand provide safe pathways for pedestrians.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Phase 4 Roadway & Utility Reconstruction
Project No. T-150600EAST DOWNTOWN TIRZ#15
Project DescriptionRoadway, public utilities and sidewalk reconstruction/replacement,streetscape/pedestrian amenities, low impact development andlandscaping using context sensitive design. Project is located onBell Street (between Chartres and Dowling).
City Council District
Location I Address Descr 2:
Served: I Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationStreet segments, public utilities and sidewalks are in poorcondition and undersize. Upsized utilities should spurre-development. Improvements will benefit existing area businessesand provide safe pathways for pedestrians.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Phase 5 Roadway & Utility Reconstruction
Project No. T-150900EAST DOWNTOWN TIRZ#15
Project DescriptionRoadway, public utilities and sidewalks reconstruction/replacement,streetscape/pedestrian amenities, low impact development andlandscaping using context sensitive design. Project is located onMcKinney and Leeland Street (between Chartres and Dowling).
City Council District
Location I Address Descr 2:
Served: I Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationStreet segments, public utilities and sidewalks are in poorcondition and undersize. Upsized utilities should spurre-development. Improvements will benefit existing area businessesand provide safe pathways for pedestrians.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Bastrop Promenade
Project No. T-151100EAST DOWNTOWN TIRZ#15
Project DescriptionRecreational and pedestrian improvements to undeveloped portions ofBastrop Street right-of- way between McKinney Street and BellStreet.
City Council District
Location I Address Descr 2:
Served: I Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationEast Downtown hosts the Houston Dynamo Stadium, which is located atthe northern end of the Bastrop Promenade. Betterment of the linearpark would provide for proximate & multi-functional festival space.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Pocket Parks
Project No. T-151200EAST DOWNTOWN TIRZ#15
Project DescriptionPocket parks located throughout the Zone to provide recreationalopportunities to residents.
City Council District
Location I Address Descr 2:
Served: I Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationHigh density residential developments with young families haveincreased the need for green space and recreational opportunities inthe area.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Polk Street Reconstruction
Project No. T-151500EAST DOWNTOWN TIRZ#15
Project DescriptionRoadway, public utilities and sidewalk reconstruction/replacement,streetscape/pedestrian amenities, low impact development andlandscaping using context sensitive design. Project is located onBell Street (between Chartres and Dowling).
City Council District
Location I Address Descr 2:
Served: I Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationStreet segments, public utilities and sidewalks are in poorcondition and undersize. Upsized should spur re-development.Improvements will benefit existing area businesses and provide safepathways for pedestrians.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Pedestrian Realm Improvements (by Block)
Project No. T-151900EAST DOWNTOWN TIRZ#15
Project DescriptionIncludes improvements of sidewalks, ADA ramps, striping,notification, trees, pedestrian lighting, bicycle racks,benches, and other items.
City Council District
Location I Address Descr 2:
Served: I Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationSidewalks, ADA ramps, proper lighting are inadequatearound many of the clocks. Increased walkability andsafety will benefit area businesses.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Traffic Notification Improvements
Project No. T-152000EAST DOWNTOWN TIRZ#15
Project DescriptionConstruct new signage for street locations, area identification,pedestrian safety.
City Council District
Location I Address Descr 2:
Served: I Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationMinimal signage is available for notification for access to the areathat will be impacted during reconstruction of the NHHIP I-69Project. Additional striping and signage needed for pedestriancrossing and safety.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Advance Traveler Information System
Project No. T-160800UPTOWN TIRZ#16
Project DescriptionInstall new traffic surveillance and incident management program.Connect traffic signal network for use in public information system.
City Council District
Location G Address Descr 2:
Served: G Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationResolve traffic congestion caused by roadway and traffic signaldeficiencies through better information from real-time trafficconditions.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Uptown Area Intersection & Signalization
Project No. T-160900UPTOWN TIRZ#16
Project DescriptionArea-wide signalization and intersection improvements including laneassignments, turn bay modification, geometric modifications andrevised signal timing.
City Council District
Location G Address Descr 2:
Served: G Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationProject will resolve congestion problems caused by street andtraffic signal deficiencies. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Secondary Roadways
Project No. T-161600UPTOWN TIRZ#16
Project DescriptionDesign and preliminary engineering for secondary roadway systemincluding dedication of right-of way.
City Council District
Location G Address Descr 2:
Served: G Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationProject will address traffic congestion caused by street and trafficsignal deficiencies. Provide relief to primary roadway network. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Parks
Project No. T-162200UPTOWN TIRZ#16
Project DescriptionWater Wall provision for facility operation and capital maintenance.Also includes other area parks in Uptown: Tanglewood and San FelipePocket park and Grady Park.
City Council District
Location G Address Descr 2:
Served: G Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationAcquisition of Water Wall by a public entity will preserve thelandmark feature as a public park. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Memorial Park Connectivity
Project No. T-1635A0UPTOWN TIRZ#16
Project DescriptionDevelopment of a Master Plan for Memorial Park and Conservationrelated improvements including HANC and Uptown/Memorial Parkconnectivity.
City Council District
Location C,G Address Descr 2:
Served: CITYWIDE Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationConnectivity for Hike/Bike trails to connect Downtown and Uptownareas providing for a cohesive trail and amenity for the Houstonarea.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Memorial Park Infrastructure Phase I
Project No. T-1635B0UPTOWN TIRZ#16
Project DescriptionDevelopment of a Master Plan for Memorial Park and conservationrelated improvements. Includes the infrastructure for East MemorialLoop Project.
City Council District
Location C,G Address Descr 2:
Served: CITYWIDE Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationOne of the projects in the Master Plan which includes relocating aportion of the East Memorial Loop Road extending the SeymourLieberman Trail and adding parking, providing drainageinfrastructure and a new restroom.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Frostwood Dr. & Kingsride Drainage Impr.
Project No. T-171400MEMORIAL CITY TIRZ#17
Project DescriptionStorm sewer improvements on Frostwood Drive and Kingsride betweenIH-10 and Gessner. Improvements are intended to provide benefit tostudy area and adjacent neighborhood.
City Council District
Location G Address Descr 2:
Served: G Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationDrainage improvement needed to adequately convey storm sewer waterto a regional detention basin. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Detention Basin A
Project No. T-173500MEMORIAL CITY TIRZ#17
Project DescriptionDetention Basin A. Project may involve multiplephases. City Council District
Location G Address Descr 2:
Served: G Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationStorm water storage needed for Regional Drainage Studyrecommendations specific to 100-year flood event. Mitigate floodingin surrounding residential and commercial areas.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Detention Basin B
Project No. T-1735A0MEMORIAL CITY TIRZ#17
Project DescriptionDetention Basin B. Project may involve multiple phases. City Council District
Location G Address Descr 2:
Served: G Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationStorm water storage needed for Regional Drainage Studyrecommendations specific to 100-year flood event. Mitigate floodingin surrounding residential and commercial areas.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Memorial Dr. Drainage and Mobility Impr.
Project No. T-1738B0MEMORIAL CITY TIRZ#17
Project DescriptionFlooding and drainage improvements based on recommendations of theRegional Drainage Study to address flooding on the W153-00 andimprove mobility and pedestrian safety on Memorial Drive within theboundaries of the TIRZ.
City Council District
Location G Address Descr 2:
Served: G Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationProject will improve storm water drainage system and reconstructMemorial Drive (Tallowood to Bunker Hill City Limits). Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Land Acquisition - Affordable Housing
Project No. T-180100FIFTH WARD TIRZ#18
Project DescriptionConversion of vacant and deteriorating properties to AffordableHousing.
City Council District
Location B,H Address Descr 2:
Served: B,H Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationLack of adequate Affordable Housing stock constrains the ability todevelop and redevelop the neighborhood. Without assistance thecommunity will continue to fall behind other sectors of the City.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Area Parks
Project No. T-180300FIFTH WARD TIRZ#18
Project DescriptionFifth Ward Jam, Legacy Park, Jensen and Lyons are public pocketparks. The parks provide recreational and performance venues thatoffer green space and allows for the assembly of family andresidents in creating a place to live, work and play in thecommunity. The parks require improvements related to safety,utilities, and beautification.
City Council District
Location B Address Descr 2:
Served: B Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationThe parks are located within the Lyons Ave. corridor, the majorartery of the Fifth Ward. Planned use for the corridor includes amix of residential, commercial and public facilities. The parks willenhance area youth activities and improve pedestrian accessibility.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Environmental Remediation
Project No. T-180500FIFTH WARD TIRZ#18
Project DescriptionEnvironmental Remediation deals with the removal of contaminants, orpollution from environmental media such as soil, groundwater,sediment, surface water or other hazardous waste.
City Council District
Location B,H Address Descr 2:
Served: B,H Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationFifth Ward and the Lyons corridor has historically been home to manybusinesses that presented environmental hazards. The presence ofsuch hazardous material impedes the potential to attract newdevelopment in the area.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Historic Preservation
Project No. T-180600FIFTH WARD TIRZ#18
Project DescriptionThe goal is to support development and revitalization that preservesthe character and history of the Fifth Ward neighborhood; whichincludes the buildings and landscape in and around the community.
City Council District
Location B,H Address Descr 2:
Served: B,H Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationHistoric Preservation is a strategy to thwart off the fears ofgentrification in a rapidly redeveloping area. Fifth Ward is one ofHouston's oldest wards and contains several landmarks thatcontribute greatly to the growth and success of the city andcommunity.
Units: 0
Start Year:
RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Sidewalks & Mobility
Project No. T-180700FIFTH WARD TIRZ#18
Project DescriptionImproved walkability supports safer healthier communities andimproves access to critical opportunities such as jobs, open space,transit and education.
City Council District
Location B,H Address Descr 2:
Served: B,H Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationFifth Ward TIRZ has a number of recommendations in the bike andpedestrian study completed with H-GAC that will enhance safety andwalkability throughout the community.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Arts and Culture
Project No. T-180800FIFTH WARD TIRZ#18
Project DescriptionArts and Culture is used as both an economic development strategyand a community beautification strategy. Arts and culture will beincorporated into both the development of new and existing landmarksfor public enjoyment.
City Council District
Location B,H Address Descr 2:
Served: B,H Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationCurrent plans to support arts and culture include the establishmentof Lyons Avenue as a cultural arts district. This would create asense of destination for the residents and visitors alike and boosteconomic development in the Fifth Ward.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Greenbriar Drainage System Improvements
Project No. T-191300UPPER KIRBY TIRZ#19
Project DescriptionImprovements include replacement of main trunk line, existinglaterals, and roadway reconstruction on Greenbriar, W. Alabama, SulRoss, W. Main, Richmond, and Lexington.
City Council District
Location C Address Descr 2:
Served: C Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationExisting trunk line and storm sewer laterals that lead to trunk lineare either undersized or in bad condition. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Shepherd Drainage System Improvements
Project No. T-191400UPPER KIRBY TIRZ#19
Project DescriptionA parallel 60" RCP will be constructed, replacement of existingtrunk line, laterals, and roadway reconstruction on Shepherd,Harold, Marshall, Richmond, McDuffie, Portsmouth, Norfolk andLexington.
City Council District
Location C Address Descr 2:
Served: C Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationExisting trunk line and storm sewer laterals that lead to trunk lineare either undersized or in bad condition. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Westpark Improvements - Kirby to Edloe
Project No. T-191900UPPER KIRBY TIRZ#19
Project DescriptionProject provides for the engineering, ROW acquisition, andreconstruction of a bikeway and existing roadway with concretepaving, curbs, sidewalks, street lighting and underground utilitiesas needed.
City Council District
Location C Address Descr 2:
Served: C Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationProject will move the bikeway away from the roadway and reconstructa street that has deteriorated beyond economic repair and normalmaintenance.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: West Alabama Reconst. Buffalo Spdwy
Project No. T-192000UPPER KIRBY TIRZ#19
Project DescriptionProject provides for the engineering and reconstruction of existingroadway with concrete paving, curbs, sidewalks, street lighting andunderground utilities as needed.
City Council District
Location C Address Descr 2:
Served: C Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationProject will reconstruct a street that has deteriorated beyondeconomic repair and normal maintenance. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Kirby Dr. Improvement-US 59 to Bissonnet
Project No. T-192600UPPER KIRBY TIRZ#19
Project DescriptionReconstruction of Kirby Drive including roadway, storm sewer, water,wastewater and burying of private utilities.
City Council District
Location C Address Descr 2:
Served: C Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationRoadway pavement is in really bad shape. City of Houston hasoverlaid as a temporary fix. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Club Creek Detention Basin and Park
Project No. T-200400SOUTHWEST HOUSTON TIRZ#20
Project DescriptionLand acquisition, planning, design and construction for roaddrainage/detention mitigation facilities. Detention for future cityinfrastructure improvements. Project will include detention basin,park facilities and connectivity to Brays Bayou trail system. Thisproject is jointly funded by the TIRZ and the City of Houston.
City Council District
Location J Address Descr 2:
Served: J Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationTo relieve and mitigate street flooding for City of Houston roadprojects within the area; provide park and hike/bike facilities foran underserved area.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Sharpstown Park Redev.(Pool & Golf Cor.)
Project No. T-200700SOUTHWEST HOUSTON TIRZ#20
Project DescriptionDemolition and reconstruction of swimming pool in a differentlocation within park. Demolition and reconstruction of golf courseclub house, locker room and other amenities.
City Council District
Location J Address Descr 2:
Served: J Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationSharpstown Park facilities are in severe disrepair due to aging.Park usage has declined and the number facilities available to thecommunity has been reduced.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Mall Redevelopment Project
Project No. T-200900SOUTHWEST HOUSTON TIRZ#20
Project DescriptionRepositioning of the old Sharpstown Mall property is a majorcomponent of the TIRZ Plan. Includes planning, design and partialdemolition and construction of new infrastructure, repositioningcertain owners and providing for a higher valued development.
City Council District
Location J Address Descr 2:
Served: J Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationEnhance economic development in the area. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Harwin Access Management Project
Project No. T-201000SOUTHWEST HOUSTON TIRZ#20
Project DescriptionMultiple median closures and modifications on Harwin, from Hillcroftto Fondren. The addition of a westbound lane and includesmodifications to existing signals and provide improved drainage.
City Council District
Location J Address Descr 2:
Served: J Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationImprove mobility along the Harwin Corridor; assist in the mitigationof area flooding. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Lee LeClear Tennis Center Reconstruction
Project No. T-201100SOUTHWEST HOUSTON TIRZ#20
Project DescriptionDetention to support Lee LeClear Tennis Center andsurrounding property.
City Council District
Location J Address Descr 2:
Served: J Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationProvide detention in the area. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Fondren South
Project No. T-201900SOUTHWEST HOUSTON TIRZ#20
Project DescriptionReconstruction of Fondren from 59 to Beechnut. The proposed pavementtypical section will include a 6 lane divided concrete curb & gutterwith storm sewer system. The project will also modernize theexisting traffic signal at Beechnut.
City Council District
Location J Address Descr 2:
Served: J Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationEnhance mobility and safety along the corridor and promote economicdevelopment. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Harwin Hillcroft Intersection Access
Project No. T-202000SOUTHWEST HOUSTON TIRZ#20
Project DescriptionEvaluation of the existing intersection and approaches geometriclayout for adequate storage, turning radii's, traffic signalhardware, and implementation of safe driveway access at allapproaches. Optimization of traffic signal phasing and timing tominimize excessive delays and improve intersection LOS.
City Council District
Location J Address Descr 2:
Served: J Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationImprove the intersection safety of mobility and intersection Levelof Service (LOS). Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Corporate Reconstruction
Project No. T-202100SOUTHWEST HOUSTON TIRZ#20
Project DescriptionReconstruction of Corporate Drive from Beechnut to Bellaire, paving& partial storm sewer. The future pavement typical section will be45’ F-F concrete curb & gutter comprised of 2-11' travel lanes, a13' wide continuous center turn lane (2WCTL), 2- 5' wide bikelanes in addition to 2-5' wide sidewalks.
City Council District
Location J Address Descr 2:
Served: J Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationThe 2015 study of the street system pavement condition determinedthat more than 80% of the existing concert panels along CorporateDrive from Bellaire to Beechnut are in a state of disrepair and mustbe replaced. It was determined that it would be beneficial toreconstruct the corridor rather than concrete panel replacementonly.
Units: 0
Start Year:
RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Hernandez Tunnel Mural
Project No. T-210200HARDY YARDS TIRZ#21
Project DescriptionMural for Hernandez Tunnel at 50% cost sharing with near NorthsideManagement District.
City Council District
Location H Address Descr 2:
Served: H Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationHernandez Tunnel on Main Street is the primary pedestrian pathwaybetween near Northside communities and downtown Houston. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Eastwood Park
Project No. T-230700HARRISBURG TIRZ#23
Project DescriptionMaster plan, design and improvements for Eastwood Park. City Council District
Location H Address Descr 2:
Served: H Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationSupport needed improvements to the park, including the swimmingpool, community center, and athletic facilities; spurrevitalization of Harrisburg corridor in association with lightrail.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Harrisburg Trail Improvements
Project No. T-230800HARRISBURG TIRZ#23
Project DescriptionImprovements along Harrisburg Trail including lighting, benches,pocket parks, cross walk amenities and incorporation of CrimePrevention Through Environmental Design (CPTED)design/improvements.
City Council District
Location H Address Descr 2:
Served: H Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationImprove safety, amenities, and programming along this underutilizedtrail. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Intersection Improvements
Project No. T-230900HARRISBURG TIRZ#23
Project DescriptionIntersection improvements at Lawndale and Wayside includingmonumentation, signage, lighting, murals, and potential roadwaytreatments.
City Council District
Location I Address Descr 2:
Served: I Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationEnhance commercial viability of the intersection in coordinationwith enhancements to Gus Wortham Golf Course. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Mobility & Infrastructure Improvements
Project No. T-231000HARRISBURG TIRZ#23
Project DescriptionMobility infrastructure improvements including roadways,bike lanes, sidewalks, trails, streetscape enhancements,intersections, associated utilities and other rights-of-wayenhancements.
City Council District
Location I Address Descr 2:
Served: I Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationEnhance safety, mobility (all modes) and beautificationthroughout zone, priming the area for private investment. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Parks, Recreation, Cultural Facilities
Project No. T-231100HARRISBURG TIRZ#23
Project DescriptionImprovements to existing or development of new parks,recreation and cultural facilities.
City Council District
Location I Address Descr 2:
Served: I Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationEnhance community quality of life and promote economicdevelopment. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Thoroughfare & Roadway Imp.
Project No. T-250300HIRAM CLARKE TIRZ#25
Project DescriptionImprovements and repairs to existing public infrastructure includingroadways, bike lanes, curbs and sidewalks, associated utilities, andother ROW enhancements.
City Council District
Location K Address Descr 2:
Served: K Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationEnhance public safety and increase area mobility. Promote economicdevelopment and quality of life in the community. Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Waugh Commonwealth Project
Project No. T-270200MONTROSE TIRZ#27
Project DescriptionImprove mobility, bicycle and pedestrian safety conditions alongboth corridors by upgrading corridor to be ADA compliant. Projectwill include milling and overlay of existing deteriorated asphaltpavement, signing and restriping and full sidewalk replacement withADA compliant ramps along both corridors.
City Council District
Location C Address Descr 2:
Served: C Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationAsphalt in poor condition, bicycle lanes are inadequate (3-FT wide),which is unsafe for bicyclists. Sidewalks and in very poor conditionand inadequate. The ped ramps are not ADA compliant.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous
2021-2025 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - TIRZ - TAX INCREMENT REINVESTMENT ZONESProject: Stormwater Management Project
Project No. T-270400MONTROSE TIRZ#27
Project DescriptionThis is a project to address localized stormwater drainage issuesand identify capital improvement projects with critical stormwatermanagement components.
City Council District
Location C Address Descr 2:
Served: C Zip Codes:
Key Map: Category:
Location Code: UA-00 Sub-Category:
Project JustificationImprove drainage, safety, mobility, and quality of life. Drainageimprovements will safely convey overland sheet flow to reducefrequent flooding in the area. The roadway will be replaced to meetcurrent standards to improve safety and mobility.
Units: 0
Start Year:RCC Total $ RCA Total $
Fiscal Year Planned AppropriationsProject Allocation Previous