Top Banner
Complying with the MUTCD in the Absence of Specific Compliance Dates Road & Street Supervisors Traffic Solutions October 15, 2013 James W. Ellison, P.E. Consulting Traffic Engineer Rick Mowlds, P.E. WSDOT Sign Engineer
31

Complying with MUTCD in Absence of Compliance Dates ... · PDF fileNational MUTCD as a part of the systematic ... Microsoft PowerPoint - Complying with MUTCD in Absence of Compliance

Mar 01, 2018

Download

Documents

dinhminh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Complying with MUTCD in Absence of Compliance Dates ... · PDF fileNational MUTCD as a part of the systematic ... Microsoft PowerPoint - Complying with MUTCD in Absence of Compliance

Complying with the MUTCD in the Absence of Specific Compliance Dates

Road & Street SupervisorsTraffic SolutionsOctober 15, 2013

James W. Ellison, P.E.Consulting Traffic Engineer

Rick Mowlds, P.E.WSDOT Sign Engineer

Page 2: Complying with MUTCD in Absence of Compliance Dates ... · PDF fileNational MUTCD as a part of the systematic ... Microsoft PowerPoint - Complying with MUTCD in Absence of Compliance

Complying With MUTCD Changes

• Achieving conformity with the MUTCD

• New installations

• Target compliance dates

• Before end of service lifeof a device

Page 3: Complying with MUTCD in Absence of Compliance Dates ... · PDF fileNational MUTCD as a part of the systematic ... Microsoft PowerPoint - Complying with MUTCD in Absence of Compliance

Complying With MUTCD Changes

• New installations

• New construction & reconstruction

• Resurfacing, restoration, or rehabilitation

• New sign locations on existing roads

Page 4: Complying with MUTCD in Absence of Compliance Dates ... · PDF fileNational MUTCD as a part of the systematic ... Microsoft PowerPoint - Complying with MUTCD in Absence of Compliance

Complying With MUTCD Changes

• Target compliance dates

• For implementation of particular devices

• Listed in MUTCD Table 1-2

• Discussed within context of a Standard (“shall” statement)

Page 5: Complying with MUTCD in Absence of Compliance Dates ... · PDF fileNational MUTCD as a part of the systematic ... Microsoft PowerPoint - Complying with MUTCD in Absence of Compliance

Complying With MUTCD Changes

• Target compliance dates – recent changes

• FHWA Final Rule – published May 14, 2012

• Most target compliance dates published in 2009 MUTCD have been eliminated

• Now only 12 target compliance dates

• Effective date of Final Rule – June 13, 2012

Page 6: Complying with MUTCD in Absence of Compliance Dates ... · PDF fileNational MUTCD as a part of the systematic ... Microsoft PowerPoint - Complying with MUTCD in Absence of Compliance

Complying With MUTCD Changes

• Target compliance dates – Revised Table 1-2

Page 7: Complying with MUTCD in Absence of Compliance Dates ... · PDF fileNational MUTCD as a part of the systematic ... Microsoft PowerPoint - Complying with MUTCD in Absence of Compliance

Complying With MUTCD Changes

• Target compliance dates – Revised Table 1-2

Page 8: Complying with MUTCD in Absence of Compliance Dates ... · PDF fileNational MUTCD as a part of the systematic ... Microsoft PowerPoint - Complying with MUTCD in Absence of Compliance

Complying With MUTCD Changes

• Target compliance dates – Revised Table 1-2• Footnotes to Table 1-2

Page 9: Complying with MUTCD in Absence of Compliance Dates ... · PDF fileNational MUTCD as a part of the systematic ... Microsoft PowerPoint - Complying with MUTCD in Absence of Compliance

Complying With MUTCD Changes

• Target compliance dates – recent changes

• Effectively 8 remaining in Table 1-2

• 4 other compliance dates in new Table 1-2 have come and gone (crashworthiness of sign supports & high visibility apparel)

Page 10: Complying with MUTCD in Absence of Compliance Dates ... · PDF fileNational MUTCD as a part of the systematic ... Microsoft PowerPoint - Complying with MUTCD in Absence of Compliance

Sign RetroreflectivityTarget Compliance Date

• Sign assessment or management method to be implemented byJune 13, 2014

• Former compliance date was January 22, 2012

• Specific target compliance dates forsign retro replacements removed in favor of systematic replacement approach

Page 11: Complying with MUTCD in Absence of Compliance Dates ... · PDF fileNational MUTCD as a part of the systematic ... Microsoft PowerPoint - Complying with MUTCD in Absence of Compliance

New requirements for number and locations of One-Way signs

Target compliance date: December 31, 2019

Page 12: Complying with MUTCD in Absence of Compliance Dates ... · PDF fileNational MUTCD as a part of the systematic ... Microsoft PowerPoint - Complying with MUTCD in Absence of Compliance

Using horizontal alignment signs based upon curve differential speedTarget Compliance Date: December 31, 2019

Page 13: Complying with MUTCD in Absence of Compliance Dates ... · PDF fileNational MUTCD as a part of the systematic ... Microsoft PowerPoint - Complying with MUTCD in Absence of Compliance

LEFT plaques required for exits to the left

Target Compliance Date: December 31, 2014

Page 14: Complying with MUTCD in Absence of Compliance Dates ... · PDF fileNational MUTCD as a part of the systematic ... Microsoft PowerPoint - Complying with MUTCD in Absence of Compliance

Section 4D.26 – Yellow change intervals and red clearance intervals

• Durations shall be determined using engineering practices– Compliance date June 13, 2017 or when

timing adjustments are made (whichever occurs first)

• Former compliance date was December 31, 2014

Page 15: Complying with MUTCD in Absence of Compliance Dates ... · PDF fileNational MUTCD as a part of the systematic ... Microsoft PowerPoint - Complying with MUTCD in Absence of Compliance

Ped. Change Interval (FDW) shall end at least 3 seconds (“buffer”) before

release of conflicting trafficBuffer shall not begin later than the start of the red clearance interval, if used

Compliance date June 13, 2017 or when timing adjustments are made (whichever occurs first)

Page 16: Complying with MUTCD in Absence of Compliance Dates ... · PDF fileNational MUTCD as a part of the systematic ... Microsoft PowerPoint - Complying with MUTCD in Absence of Compliance

YIELD or STOP signs required at passive highway-rail grade crossings

by December 31, 2019

Retroreflective strip on crossbuck support & crossbuckby December 31, 2019

Page 17: Complying with MUTCD in Absence of Compliance Dates ... · PDF fileNational MUTCD as a part of the systematic ... Microsoft PowerPoint - Complying with MUTCD in Absence of Compliance

Complying With MUTCD Changes

• What if there is no specific target compliance date for an existing non-compliant device?• Replace before end of service life

• Non-compliant device damaged, missing, or no longer serviceable? Replace with a compliant device

• “No longer serviceable” = end of useful life

Page 18: Complying with MUTCD in Absence of Compliance Dates ... · PDF fileNational MUTCD as a part of the systematic ... Microsoft PowerPoint - Complying with MUTCD in Absence of Compliance

Complying With MUTCD Changes

• Option available to replace a non-compliant device in-kind, based on engineering judgment

• One compliant device in midst of series of non-compliant devices would be confusing

• The series of non-compliant devices is scheduled for replacement for timely compliance with the MUTCD

Page 19: Complying with MUTCD in Absence of Compliance Dates ... · PDF fileNational MUTCD as a part of the systematic ... Microsoft PowerPoint - Complying with MUTCD in Absence of Compliance

Complying With MUTCD Changes

• What if there is no specific target compliance date for an existing non-compliant device?• Replace before end of service life

• Use a systematic upgrading process

Page 20: Complying with MUTCD in Absence of Compliance Dates ... · PDF fileNational MUTCD as a part of the systematic ... Microsoft PowerPoint - Complying with MUTCD in Absence of Compliance

Complying With MUTCD Changes

• What if there is no specific target compliance date for an existing non-compliant device?

• “Unless a particular device is no longer serviceable, non-compliant devices on existing highways and bikeways shall be brought into compliance with the current edition of the National MUTCD as a part of the systematic upgrading of substandard traffic control devices...” (2009 MUTCD - Introduction)

Page 21: Complying with MUTCD in Absence of Compliance Dates ... · PDF fileNational MUTCD as a part of the systematic ... Microsoft PowerPoint - Complying with MUTCD in Absence of Compliance

Complying With MUTCD Changes

• “Systematic?” Webster uses words like...

• “According to a system, method, or plan”

• “Regular; orderly planning; methodical”

• “Principles, rules, etc. arranged in a regular, orderly form so as to show a logical plan linking the various parts...”

• “An established way of doing something...”

Page 22: Complying with MUTCD in Absence of Compliance Dates ... · PDF fileNational MUTCD as a part of the systematic ... Microsoft PowerPoint - Complying with MUTCD in Absence of Compliance

Complying With MUTCD Changes

• “Existing devices in the field that do not meet the new MUTCD provisions are expected to be upgraded by highway agencies over time to meet the newprovisions via a systematic upgrading process...” (Federal Register,August 31, 2011)

Page 23: Complying with MUTCD in Absence of Compliance Dates ... · PDF fileNational MUTCD as a part of the systematic ... Microsoft PowerPoint - Complying with MUTCD in Absence of Compliance

Complying With MUTCD Changes

• Challenges to highway agencies

• Current economic climate

• Staffing levels

• Increase in material costs

• Labor & equipment costs to implement upgrades

• Budget cuts and/or no increases in M&O

Page 24: Complying with MUTCD in Absence of Compliance Dates ... · PDF fileNational MUTCD as a part of the systematic ... Microsoft PowerPoint - Complying with MUTCD in Absence of Compliance

Complying With MUTCD Changes

• Systematic upgrading process allows highway agencies to prioritize their traffic control device upgrades based on:

• Relative safety needs

• Costs

• Available resources

Page 25: Complying with MUTCD in Absence of Compliance Dates ... · PDF fileNational MUTCD as a part of the systematic ... Microsoft PowerPoint - Complying with MUTCD in Absence of Compliance

Systematic Upgrading Process

• Deferring certain upgrades

• Agencies can decide to defer upgrade of certain non-compliant devices until device wears out, is damaged or destroyed, or is replaced

• Before end of service life

Page 26: Complying with MUTCD in Absence of Compliance Dates ... · PDF fileNational MUTCD as a part of the systematic ... Microsoft PowerPoint - Complying with MUTCD in Absence of Compliance

Systematic Upgrading Process

• Where upgrades should not be deferred

• Construction projects

• Where there is a specific compliance date

• When a device isat the end of its service life

Page 27: Complying with MUTCD in Absence of Compliance Dates ... · PDF fileNational MUTCD as a part of the systematic ... Microsoft PowerPoint - Complying with MUTCD in Absence of Compliance

What if you don’t comply?

• No “MUTCD Police”

• Who enforces?

Page 28: Complying with MUTCD in Absence of Compliance Dates ... · PDF fileNational MUTCD as a part of the systematic ... Microsoft PowerPoint - Complying with MUTCD in Absence of Compliance

What if you don’t comply?

• Withholding of Federal funding?

• “Confirmed! Bureaucrats Have No Sense of Humor, Funny Stop Signs Nixed” (Source: David Lavrinc, Autoblog.com, May 2, 2008)

Page 29: Complying with MUTCD in Absence of Compliance Dates ... · PDF fileNational MUTCD as a part of the systematic ... Microsoft PowerPoint - Complying with MUTCD in Absence of Compliance

What if you don’t comply?

• Standards of good practice?• Professional ethics?• Doing the right thing?

• Uniformity

• Driver comprehension

• Safety considerations

Page 30: Complying with MUTCD in Absence of Compliance Dates ... · PDF fileNational MUTCD as a part of the systematic ... Microsoft PowerPoint - Complying with MUTCD in Absence of Compliance

What if you don’t comply?

• Tort liability and risk management

• Potential claims

• Potential lawsuits

• Damage awards

Page 31: Complying with MUTCD in Absence of Compliance Dates ... · PDF fileNational MUTCD as a part of the systematic ... Microsoft PowerPoint - Complying with MUTCD in Absence of Compliance

What if you don’t comply?

• Tort liability and risk management

• Kentucky Transportation Center University of Kentucky “Roadway-Related Tort Liability and Risk Management”

“The largest total dollar claim amounts were related to claims involving traffic control devices . The major types of claims in this category would be related to inadequate signs or markings, lack of a stop sign, or inadequate warning on a stop approach.”