Top Banner
COMPANY PROFILE www.jec.qa T +974 4040 9600, F +974 4040 9797, P.O.Box 22801, Doha - Qatar | [email protected] COMMITTED TO EXCELLENCE
106

Company Proï¬le 2013 - AlJaber Engineering LLC

Feb 03, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Company Proï¬le 2013 - AlJaber Engineering LLC

COMPANY PROFILE

www.jec.qa T +974 4040 9600, F +974 4040 9797, P.O.Box 22801, Doha - Qatar | [email protected]

COMMITTED TO EXCELLENCE

Page 2: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 1

02

03

04

05

09

17

26

27

51

63

73

79

83

88

96

CHAIRMAN’S MESSAGE

VISION & MISSION

CEO’S MESSAGE

COMPANY PROFILE

CAPABILITIES

PROJECTS PORTFOLIO

SELECTED PROJECTS

HIGHWAYS, ROADS AND INFRASTRUCTURE

LANDMARK BUILDINGS

OIL & GAS, PETROCHEMICAL AND INDUSTRIAL

POWER GENERATION, SUBSTATIONS AND DESALINATION PLANTS

SEWAGE TREATMENT PLANTS, DISTRICT COOLING PLANTS AND PUMPING STATIONS

PIPELINE CONSTRUCTION

RESOURCES

AFFILIATES

CONTENTS

JEC_PRO_VER_6_JUNE_2018

Page 3: Company Proï¬le 2013 - AlJaber Engineering LLC

In response to our Nation’s Vision and enhanced economic growth, AlJaber Engineering has consistently been involved in the development of Qatar’s construction market and is proud to be recognized as one

of the largest general contractors in Qatar.

With diversified, yet distinguished, construction capabilities in the Qatari market, JEC has successfully completed several prestigious projects and continue to participate in large scale

projects; both independently or in joint venture with international companies.

JEC’s future challenge in this dynamic market, is to take full advantage of its competitiveness and available opportunities. From this perspective, JEC has been restructured to become

recognized with high competence in the market to the highest international standards.

We are all working together to support JEC’s Mission to deliver projects for the benefit of our clients, partners, employees and the society.

Mohamed Sultan Al JaberChairman

CHAIRMAN’S MESSAGE

Page 4: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 3

OUR VISION

JEC’s vision is to be Qatar’s premier general contractor always striving to deliver construction works to complex projects with excellence. Our track record has proven that regardless of all challenges, we deliver the work to the highest standards on time and within budget.

OUR MISSION

AlJaber Engineering endeavors to be the market leader and preferred general contractor, widely recognized for superior construction expertise. We achieve consistency in the delivery of high quality

services and add value for clients through proactivity, transparency in communication, timely completion of projects, and high quality performance. We practice sustainability to safeguard

our environment, and maintain the highest levels of professionalism, honesty, and trust in our relationships with clients, employees, and affiliates.

Page 5: Company Proï¬le 2013 - AlJaber Engineering LLC

From a modest beginning in 1995, to becoming a leading contractor in Qatar, the emergence of AlJaber Engineering evolved through a journey that has taken just over two decades of planning, hard work and

dedication. This commitment has made AlJaber Engineering a recognized brand for the successful delivery of numerous prestigious projects in the State of Qatar.

Under the leadership of His Highness The Emir, Sheikh Tamim bin Hamad Al Thani, together with Qatar National Vision 2030, our country is rapidly emerging as an international business and

travel hub, playing host to a variety of international conferences and sports events. This vision has culminated in Qatar’s successful bid to host the FIFA World Cup 2022. AlJaber Engineering

and its affiliates are proud to have been entrusted to participate in the construction of several venues and the country’s infrastructure.

AlJaber Engineering is firmly committed to Quality, Health, Safety and the Environment. We continue to invest in qualified talent and modern equipment to undertake large

and complex projects. Our management leads a workforce of over 12,000, who are trained to industry’s best practices and operate to fully accredited and ISO certified management systems. This enables us to achieve our goal of

successfully delivering large-scale projects and expanding our operations into the region, where we hope to replicate our local success.

We are proud of our achievements and are committed to further enhancing our capabilities to ensure that we remain at the forefront of the industry, responding to the needs of Qatar and the region.

Osama HadidChief Executive Officer

WELCOME MESSAGE

Page 6: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 5

AlJaber Engineering (JEC) is a leading general contractor based in the State of Qatar. Established in 1995 as part of Al Jaber Group - a major conglomerate with over 30 companies - JEC has successfully completed numerous large-scale turnkey

projects for many prestigious clients in different sectors including:

• Highways, Roads and Infrastructure

• Engineering, Procurement, Installation & Commissioning (EPIC)

• Oil, Gas, Petrochemical and Industrial

• Pipeline Construction

• Power Generation, Substations & Desalination Plants

• Sewage Treatment Plants and Pumping Stations

• Maintenance of Oil & Gas and Petrochemical Installations

• Landmark Buildings

Our commitment to execute projects with the highest quality, on schedule and within budget while adhering to excellent standards of health, safety and environmental positioned JEC to be recognized

as an icon in the construction community in Qatar. We have recently established an office in Oman, Kuwait and Somalia to undertake projects in contribution to the large ongoing developments.

In line with the growing demands to build Qatar’s infrastructure and new developments, JEC has invested in its resources to meet international standards and upgraded its fleet of equipment in

preparation to participate in upcoming diverse projects.

COMPANY PROFILE

Page 7: Company Proï¬le 2013 - AlJaber Engineering LLC

LEGAL & FINANCIAL STATEMENT

Certificate Document No. Expiry Date

Trade License 25964 03-06-2019

Commercial Registration 21753 10-08-2018

Contractor’s Classification Certificate 1602 28-01-2020

KAHRAMAA Grade “A” Contractors Certificate 1028 11-04-2019

Fire Alarm Certificate 1381 23-10-2018

Fire Protection (Defence) Certificate 1381 23-10-2018

2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

900

800

700

600

500

400

300

200

100

ANNUAL TURNOVER ( Million USD )

190

273

310

236

201

450

750e

712

685700

Page 8: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 7

Key Personnel

SL. Name Position

01 Osama Hadid Chief Executive Officer

02 Hisham Hadid Executive Director & Deputy CEO

03 Baris Nazlim Executive Director - Civil

04 Murad Dghaish Executive Director - MEP

05 Ayman Al Abbasi Corporate CFO

06 Amr Nadim Operations Director

07 Zaher Yahya Operations Director

08 Nedal Sinan Construction Support Director

09 Bedros Bidanian Projects Controls Manager

10 Ghaleb Sharaf Assets & logistics Manager

11 Carlos Haddad Estimation Manager

12 Mohamed Hegazy Procurement Manager

13 Yaser Abdallah Wahib Commercial Department Manager

14 Mohamed Al Smadi Engineering Manager

15 Thaer Abu Shaikha Finance & Accounts Manager

16 Anas Al Ereksousi HR Manager

17 Ahmed Hadid Corporate Finance Manager - Affiliates

18 Rafiq Tarhini PMV Manager

19 Yamen Abbas Business Development Executive

Page 9: Company Proï¬le 2013 - AlJaber Engineering LLC

Large Developers

Government Clients

Large International EPC Contractors

AlJaber Engineering has successfully associated with many prestigious clients from different industries such as:

Oil & Gas, Petrochemical & Industrial

CLIENTS

Page 10: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 9

CAPABILITIES

Page 11: Company Proï¬le 2013 - AlJaber Engineering LLC
Page 12: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 11

HIGHWAYS, ROADS AND INFRASTRUCTUREAlJaber Engineering is a leading general contractor executing Highways, Roads, Infrastructure and major earth moving projects.

JEC’S FOCUS AREAS ARE:• Highways and roads.• Underpasses, bridges and interchanges.• Major earth and reclamation works.• Turnkey Infrastructure Projects.• Site development works for industrial and petrochemical plants.• Pipeline construction (water, sewage and drainage).• Treated sewage effluent system (TSE).• Drainage and sewage systems.• Electrical and telecommunication networks.• Street lighting.• Signalization and traffic light systems.• Tunneling including related electrical and mechanical works.

JEC’S STRENGTH INCLUDES:• JEC owns the largest fleet of construction and earthmoving equipment in the State of Qatar.

• Concrete supply through JEC affiliated company Al Wataniya, total production capacity 100,000m3/ month in four different locations (Lusail, Doha, Mesaieed and Ras Laffan).

• Asphalt works through JEC affiliated company Al Jaber Makhlouf with own fleet of equipment for production and delivery of Asphalt, total capacity of 10,000 tons/day.

• JEC owns onsite crushing and screening plants utilized for production of fill, structural fill, sub base and other crushed products.

Page 13: Company Proï¬le 2013 - AlJaber Engineering LLC

PETROCHEMICAL, INDUSTRIALAND OIL AND GAS

AlJaber Engineering has been a key contractor for design, procurement and construction of turnkey projects related to the following:

• EPIC projects • Waste management facilities

• Oil & Gas facilities • Water treatment plants

• Power and desalination plants • Water transmission systems

• Petrochemical plants • Tanks and reservoirs

• Industrial plants• Maintenance of petrochemical and industrial installations

• Sewage treatment plants • HV substations

EngineeringJEC’s has a highly qualified technical team to manage the requirements and performance of design sub-contractors including any specialized services such as HAZOP.

ProcurementJEC’s Procurement team has extensive experience in managing and performing procurement activities for large EPIC contracts.

ConstructionJEC’s construction team has worked on complex projects, with technical experience to meet international contracting standards, capable to perform high-profile projects.

Page 14: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 13

CIVIL WORKS• Underground and elevated concrete structures• Silos• Cooling towers• Precast concrete pipe racks• Culverts• Structural steel works• Industrial buildings• Underground utility networks• Road works• Fencing

MECHANICAL WORKS• Supply, fabrication and erection of major process static equipment• Process piping and pipelines• Fire fighting systems• Pipe gantry’s and support systems• Cranes• Supply and erection of rotary equipment• HVAC systems• Insulation, painting and scaffolding works

ELECTRICAL & INSTRUMENTS• Supply and erection of major electrical equipment.• Power distribution systems• Lighting and power• Fire detection and alarm systems• Programmable logic control systems (PLC)• Scada systems• Structural cabling• Security systems• Instrumentation and control works• Telecommunication systems

Page 15: Company Proï¬le 2013 - AlJaber Engineering LLC
Page 16: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 15

LANDMARK BUILDINGSJEC have successfully executed various industrial buildings on design and build basis. In addition, JEC is currently executing the construction of landmark buildings as part of a Joint Venture with international companies.

JEC is a Kirby Certified Builder for supply and erection of Kirby Buildings in Qatar.

JEC’S FOCUS AREAS ARE• Landmark buildings• Structural steel buildings• Control rooms• Blast proof buildings• Temporary facilities

JEC’S STRENGTHS INCLUDECIVIL WORKS:• Enabling works• Concrete works• Curtain wall systems• Stone cladding• Steel structure• Architectural finishes

MEP WORKS:• Drainage• Plumbing• HVAC systems• Chilled water systems• Waste water treatment systems• Electrical (MV/HV/ELV networks)• Instrumentation• Telecommunication• Lifts• Fire fighting and fire alarm systems• Building Management System (BMS)

Page 17: Company Proï¬le 2013 - AlJaber Engineering LLC
Page 18: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 17

PROJECTSPORTFOLIO

Page 19: Company Proï¬le 2013 - AlJaber Engineering LLC

Project Client Value (USD) Status of Completion

Infrastructure & Boundary Wall for ISF (CPC02-14) Internal Security Force (ISF) 30,000,000 Ongoing

Engineering, Supply, Fabrication, Delivery, Installation, Testing, and Handing Over of North & Southbound, Viaduct Structures and Two Pedestrian Underpasses for Construction of East Industrial Road between Al Muntazah Street and West Corridor (P017 C2)

Tekfen Construction 58,000,000 Ongoing

Design & AL KHOR EXPRESSWAY:Construction of surface water drainage works, potable water and storm water drainage works

Tekfen Construction 92,000,000 Ongoing

Hamad Port Project - Strategic Food Security Facilities Hamad Port Project Steering Committee 456,000,000 Ongoing

CP12-E Additional Dredging of Southern Marina ChannelLusail Real Estate Development Company W.L.L

33,000,000 Oct. 2015

Roads & Infrastructure in Wadi Aba Seleel – Package 1A, Advanced Grading & Temporary Roads (QS004-P01A)

Public Works Authority 44,000,000 May. 2016

Camp at Abu Nakhlah Aljaber Engineering WLL 36,000,000 Oct. 2015

Construction of CP08-A3: Enabling Works - Qetaifan Islands Lusail Real Estate Development Co. W.L.L. 51,000,000 Feb. 2017

Doha Metro project - Gold Line (A Joint Venture with Aktor, Yapi Merkezi, STFA and Larsen & Toubro)

Qatar Rail 3,358,000,000 Ongoing

Design and Construct New Orbital Highway and Truck Route Mesaieed to Salwa Road (A Joint Venture with Leighton Contracting Qatar)

Public Works Authority 1,687,000,000 Ongoing

Site Preparation Works for GASAL Project GASAL Q.S.C 8,000,000 Sep. 2014

Construction of CP7A-1B waterfront commercial / Seef Lusail Infrastructure works Lusail Real Estate Development Co. W.L.L. 39,000,000 Dec. 2016

Rasgas flow assurance project - Site preparation works RasGas Company Ltd. 2,000,000 May. 2014

Construction of CP7C-1C, enabling works for Commercial Boulevard Lusail Real Estate Development Co. W.L.L. 48,000,000 Feb. 2015

Upgrading of Mesaieed Town RPSQatar Electricity & Water Corporation-KAHRAMAA

28,000,000 Feb. 2018

Development of new camp for Internal Security Forces (ISF) at Al Duhail (A Joint venture with AKTOR).

Internal Security Force (ISF) 663,000,000 Ongoing

Coast Guard Base - Expansion of the main navigational channel & turning basin Urbacon General Contracting 20,000,000 Aug. 2014

The Base Project in North Lusail - The Island Bridge Works UrbaCon General Contracting 8,000,000 Jan. 2014

HIGHWAYS, ROADS AND INFRASTRUCTURE

Page 20: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 19

Project Client Value (USD) Status of Completion

EPIC for wet utilities distribution network (Potable water supply, fire water and sewage) for support services for an area of approximately 3000 Hectares complete with auxiliary facilities, sub-systems and mains network at West End extension, Ras Laffan Industrial City

Qatar Petroleum 151,000,000 Dec. 2014

EPIC for southern perimeter industrial fence, security patrol access and other roads in Ras Laffan City

Qatar Petroleum 24,000,000 Dec. 2013

Al-Jawhara “Oasis of Life” Infrastructure in Al Erkyah District, Lusail. Infrastructure works consists of earthworks, asphalt works, surface drainage, foul sewerage, primary irrigation, portable water networks and street lighting

Jawhara Greens Company SPC

20,000,000 Nov. 2013

The Base Secondary Chanel Excavation and Disposal Works in Semisima. UrbaCon General Contracting 7,000,000 Apr. 2013

Reconstruction of existing roads and construction of new roads with all associated services and infrastructure including upgrade of existing utilities and installation of new utilities at Mesaieed Community Area

Qatar Petroleum 190,000,000 Feb. 2012

Early site earth works for Barzan onshore project at Ras LaffanRasGas- Main Contractor: CCC /Teyseer JV

36,000,000 Jul. 2011

Construction of road paving at Pearl GTL plant area Strabag Qatar W.L.L. 1,000,000 Jan. 2011

West Bay project. Zone 66: Construction of roads and infrastructure services such as foul sewage, surface water, potable water, TSE lines, pump stations and storm water system in New Diplomatic area

Public Works Authority (ASHGHAL)

55,000,000 Dec. 2010

EPIC for new support services and site development of 3,000,000 m2 land at Ras Laffan Industrial City

Qatar Petroleum 82,000,000 Nov. 2010

Construction of underground piping systems consist of installation of GRP sea water pipelines, firewater, process, potable water lines and major infrastructure civil works at Aluminium Smelter in Mesaieed

SNC-Lavalin 96,000,000 Aug. 2010

Site development of service areas and potroom building area including earth works, construction of roads, surface drainages supply and installation of potable water lines for Qatar Aluminium Smelter in Mesaieed

Qatar Aluminium Co. (Qatalum)

18,000,000 Oct. 2009

Site preparation and earth works for Elsewedy Cables factory at Mesaieed. Elsewedy Cables 4,000,000 Feb. 2009

Salwa International Highway interchanges and installation of water pipelines and street lighting

Public Works Authority (ASHGHAL)

86,000,000 Jan. 2009

Site preparation and road works for QAFCO 5 project in MesaieedHyundai Engineering & Construction Co

8,000,000 Dec. 2008

Page 21: Company Proï¬le 2013 - AlJaber Engineering LLC

Project Client Value (USD) Status of Completion

Site preparation, ground improvement by dynamic compaction and installation of 8000 Im new security paliside fence for Qatar Aluminium Smelter and Power Plant in Mesaieed

Qatar Aluminium Co. (Qatalum)

34,000,000 Dec. 2008

Gas pipeline crossings for service area and potroom building at Qatar Aluminium Smelter in Mesaieed

SNC-Lavalin 2,000,000 Apr. 2008

Construction of land water drain outfall at Ras Laffan Port Jan De Nul / Boskalis JV 1,000,000 Feb. 2008

Soil Improvement for Boiler and Demin units in Qatar Vinyl Company Qatar Vinyl Company 1,000,000 May. 2007

Al Khaleej gas project Phase 2 (AKG2): Site preparation for camp and waste water treatment area

Chiyoda /Technip JV 3,000,000 Mar. 2007

Ras Laffan port expansion project: Excavation and site preparation to construct a lake within Ras Laffan port expansion and construction of access road and street lighting

Jan De Nul / Boskalis JV 7,000,000 Feb. 2007

QatarGas 3 & 4 project: Site preparation for camp and wastewater treatment (WWT) areas at Ras Laffan, in connection with Qatar Gas 3 project

Chiyoda / Technip JV 30,000,000 Feb. 2007

Hamad Medical City surface and ground water scheme: Construction of surface and groundwater pipelines by microtunneling and construction of reinforced concrete outfall structure

Public Works Authority (ASHGHAL)

13,000,000 Sep. 2006

Design and construction of central sewage collection system and construction of precast concrete boundary wall

Boom Construction Co. 4,000,000 Oct. 2006

Excavation and stockpiling of hard material at Ras Laffan Cracker II project site Qatar Petroleum 10,000,000 May. 2006

Ras Laffan Olefin project: Site preparation and installation offence Technip 8,000,000 Apr. 2006

Environmental clean-up for Hamad International Airport project site including excavation and removal of waste, transportation from Airport site and placement at engineered landfill site in Mesaieed

Hamad International Airport 38,000,000 Oct. 2005

Underpass and access roads for Doha 2006 Asian Games Village and Hamad Medical City

Public Works Authority (ASHGHAL)

19,000,000 Oct. 2005

Construction of paved walk ways, unpaved track road, landscaping and new boundary wall at Dukhan Township

Qatar Petroleum 3,000,000 Mar. 2004

Page 22: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 21

Project Client Value (USD) Status of Completion

Hamad Port Project - Strategic Food Security FacilitiesHamad Port Project Steering Committee

456,000,000 Ongoing

Fabrication and installation of above ground metal piping, installation of water supply pumps, emergency cooling towers, compressed air piping system and closed cooling medium system at Qatar Aluminium Smelter in Mesaieed

SNC-Lavalin 20,000,000 Sep. 2010

Mechanical and electrical works for Doha cable factory at Mesaieed Industrial City Doha Cables 3,000,000 Jun. 2010

Major ground and civil works for rectifier stations at Qatar Aluminium Smelter in Mesaieed

Qatar Aluminium Co. (Qatalum)

24,000,000 Feb. 2010

EPIC for two new kangaroo cranes and upgrading of existing gabbro berths crane facilities including all mechanical and electrical works at Mesaieed Port

Qatar Petroleum 31,000,000 Mar. 2009

Installation of cathode roding equipment and induction furnace including supply and erection of all mechanical, electrical and instrumentation works at Qatar Aluminium Smelter in Mesaieed

SNC-Lavalin 8,000,000 Jan. 2009

Al Khaleej Gas Project Phase 2 (AKG2): Civil, infrastructure and electromechanical works for camps and other facilities including underground piping networks, road works, installation of treated effluent tanks, waste water treatment units and sludge treatment units

Chiyoda / Technip JV 33,000,000 Nov. 2007

OIL & GAS, PETROCHEMICAL AND INDUSTRIAL PROJECTS

Project Client Value (USD) Status of Completion

Al Thumama Stadium (A Joint Venture with Tekfen)Supreme Committee for Delivery & Legacy (SC)

342,000,000 Ongoing

Qatar Petroleum District. (A Joint Venture with Bouygues and Midmac Contracting) Barwa Real Estate Company 1,301,000,000 Jun. 2017

Dubai Tower in Doha Meraas Development L.L.C 400,000,000Suspended - Design

Changes

Alwaha Club RasGas 7,000,000 Mar. 2002

AlJaber Engineering Headquarters - Fox Hills Plot No. MU-B04, Lusail-Qatar AlJaber Holding 44,000,000 Sep. 2015

LANDMARK BUILDINGS

Page 23: Company Proï¬le 2013 - AlJaber Engineering LLC

Project Client Value (USD) Status of Completion

Engineering, procurement, fabrication and installation of dust collection towers and sunshades

General Electric (GE) 2,000,000 Aug. 2007

EPIC of desalinated water network including installation, testing and commissioning of 14 km GRP pipelines at Ras Laffan

Qatar Petroleum 10,000,000 Jul. 2006

EPIC of potable water transmission system and landscaping mains to distribute water produced by RLPC to various facilities within Ras Laffan

Qatar Petroleum 14,000,000 Oct. 2005

Construction of new access platforms and walkways in Dukhan oil fields Qatar Petroleum 1,000,000 Jun. 2004

Construction of dry storage sunshades at Camp As Sayliyah US Army 1,000,000 Jan. 2004

EPIC of waste management facility including construction of new landfill cells, HDPE membrane, access roads, weigh scale and concrete land treatment unit with a total capacity of 2800 m3 of biodegradable waste at Ras Laffan Industrial City (RUC)

RasGas 5,000,000 Dec. 2002

Extension of central control room building at QAFCO. Qatar Fertilizer Co. (QAFCO) 2,000,000 Mar. 2002

Project Client Value (USD) Status of Completion

Umm Al Houl Power Project - Package A (Civil & Building Works) & Package B (HVAC Works)

Hitachi Zosen Corporation 100,000,000 Ongoing

Ras Abu Fontas A1 new water plant- Onshore civil works execution related to the construction of distillers and boilers areas, intake structure and potable water reservoirs for 45 MIGD water desalination plant at Ras Abu Fontas

Fisia Italimpianti 76,000,000 Mar. 2010

RAFB2 - site - 0001, Ras Abu Fontas B, expansion project: Fabrication of pipe rack and large bore pipes (CS & SS)

General Electric (GE)

4,000,000 Dec. 2006

Qatar transmission system - Phase VI, Substations: Civil works associated with various substations

VATECH 5,000,000 Mar. 2006

Ras Laffan power and desalination project - Water plant island desalination unit and auxiliaries: Civil works related to the construction of 40 MIGD desalination plant at Ras Laffan

Fisia Italimpianti / Enel Power 20,000,000 May. 2003

POWER GENERATION, SUBSTATIONS AND DESALINATION PLANTS

Page 24: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 23

Project Client Value (USD) Status of Completion

Engineering, Procurement, Construction, Testing & Commissioning of the District Cooling Plant - 3 in West Bay

Qatar District Cooling (Q.C.S.C)

89,000,000 May. 2016

Refurbishment and upgrading works for various foul and storm water pumping stations including civil, mechanical, electrical and HVAC works

Public Works Authority (Ashghal)

53,000,000 Jun. 2016

Construction of treated sewage effluent permanent disposal system including 21 km of HDPE pipeline at Ras Laffan

Chiyoda Technip JV -QGE (CTJV)

11,000,000 Feb. 2009

Civil works and upgrading of pumping stations Torishima Pump Mfg. Co. Ltd. 2,000,000 May. 2008

Design and construction of sewage treatment plant and labour compound infrastructure including boundary wall, roadworks and chainlink fence

New Doha International Airport (NDIA)

13,000,000 Feb. 2006

Upgrade of sewage network and refurbishment of pumping stations and relocation of TSE distribution mains

Qatar Petroleum 5,000,000 Jun. 2005

Construction of treated sewage effluent network (TSE) T5 to T7 including 14 km of TSE mains

Ministry of Municipal Affairs Agriculture (MMAA)

4,000,000 Nov. 2004

Construction of treated sewage effluent network (TSE) T6 to T7 including 48 km of TSE mains

Ministry of Municipal Affairs Agriculture (MMAA)

13,000,000 Apr. 2004

Construction of additional sludge drying beds and other labour accommodation facilities including one storey building

Ministry of Municipal Affairs Agriculture (MMAA)

1,000,000 Feb. 2002

SEWAGE TREATMENT PLANTS, DISTRICT COOLING PLANTS AND PUMPING STATIONS

Page 25: Company Proï¬le 2013 - AlJaber Engineering LLC

Project Client Value (USD) Status of Completion

GTC/600/2013, Pipelines for Mega Reservoirs Corridor Main 1 Package C & GTC/599/2013, Pipelines for Mega Reservoirs Corridor Main 2 Package A

Qatar Electricity & Water Co. (KAHRAMAA)

437,000,000 Nov. 2017

Design and construction of 1200 mm of 30 Km transmission main from Doha West STW to Al Rakhiya farm

Public Works Authority (ASHGHAL)

44,000,000 Dec. 2011

Upgrading of New and Old Salwa distillate and rising mains (22km of pipes)Qatar Electricity & Water Co. (KAHRAMAA)

32,000,000 Sep. 2007

EPIC of potable water pipeline to west side camp area at Ras Laffan in connection with RasGas expansion project

CHIYODA - TECHNIP JV 21,000,000 Feb. 2007

Supply and lay the extension of water distribution mains (58 km) in north Duhail Phase C & D

Qatar Electricity & Water Co. (KAHRAMAA)

5,000,000 Jan. 2006

Supply and lay the extension of water distribution mains (57 km) in north Duhail Phase A & B.

Qatar Electricity & Water Co. (KAHRAMAA)

4,000,000 Nov. 2005

Extension of approx. 12 km of 600 mm diameter HDPE pipes to supply water to motor cycle race track

Qatar Electricity & Water Co. (KAHRAMAA)

13,000,000 Jul. 2004

PIPELINE CONSTRUCTION

Page 26: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 25

Project Client Status of Completion

Shutdown associated works for Qatar Aluminium Smelter in Mesaieed SNC - Lavalin Completed

Long term fabrication and maintenance support on call off basis Qatar Vinyl Company (QVC) Completed

Civil work for rolling mill major repair Qatar Steel Company (QASCO) Completed

Refurbishment of administration building ground floor corridor flooring tiles Qatar Fertilizer Co. (QAFCO) Completed

Revamp of closed cooling water cycle and civil works Qatar Fertilizer Co. (QAFCO) Completed

Surface protection of buried sealine O.S.B.L. at Ras Laffan QatarGas Completed

Repair of transformer DHTS 90000/140 ANSALDO Industrial Completed

MAINTENANCE OF OIL & GAS, PETROCHEMICALAND INDUSTRIAL INSTALLATIONS

Project Client Value (USD) Status of Completion

Central warehouse at Mesaieed Qatar Steel Co. 3,000,000 Jul. 2005

EPIC of 2600 m² pre-engineered steel structure store building with all associated electrical and mechanical works at QAFCO 4 expansion project in Mesaieed

Qatar Fertilizer Co. (QAFCO) 2,000,000 Nov. 2003

EPIC of 3240 m² new office building with all associated roads and external works including MEP, telecommunications, HVAC and fire fighting systems at Ras Laffan

RasGas 3,000,000 Oct. 2003

EPIC of steel frame structure bagging and storage warehouse at Q-CHEM petrochemical complex including complete civil and Electro - mechanical works at Mesaieed

KBR / Technip 5,000,000 Jan. 2002

Design, supply, installation and commissioning of Q-Chem prefab temporary training facility, with all associated civil and MEP works

Q-CHEM 1,000,000 Jul. 2001

EPIC of temporary facilities consist of prefabricated office with all associated power supply,mechanical and electrical works for Q-Chem project at Mesaieed

KBR / Technip 2,000,000 Apr. 2000

OTHER BUILDINGS

Page 27: Company Proï¬le 2013 - AlJaber Engineering LLC

SELECTEDPROJECTS

Page 28: Company Proï¬le 2013 - AlJaber Engineering LLC

HIGHWAYS, ROADS & INFRASTRUCTURE

27ALJABER ENGINEERING | CORPORATE PROFILE

1

Page 29: Company Proï¬le 2013 - AlJaber Engineering LLC
Page 30: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 29

Public Works Authority

1,687,000,000

The project is located west and south of the Doha city and providing the new orbital highway connecting Mesaieed to Salwa road.The major elements are:• 57 Km of road works with 5 main interchanges - 30 Km of 14 lanes Orbital Highway - 27 Km of 8-16 lane side roads• 4 no. grade separated clover leaf type Interchange and 1 no. grade separated junction comprising 24 no. bridge structures• 18 no’s braiding and emergency exists• Pedestrian & Bicycle paths with appropriate underpass structures• New utilities such as surface drainage works, TSE Line, electrical works, street lighting works, Q-Tel, QAF, ITS Ducts• Diversion and protection of existing utilities (including QP gas pipelines)• Crossing points of EHV pylons• Landscaping (within interchange)

Ongoing

Client

Value (USD $)

Project Scope

Completion Date

DESIGN AND CONSTRUCT NEW ORBITAL HIGHWAY AND TRUCK ROUTE - MESAIEED TO SALWA ROAD - MRPSC/014/2012 2013/L (A JOINT VENTURE WITH LEIGHTON CONTRACTING QATAR).

Page 31: Company Proï¬le 2013 - AlJaber Engineering LLC

Tekfen Construction

92,000,000

The Main Scope of Works consists of:• Storm water line• Potable water line• TSE Network• Twin Foul Sewer Network• Laying of Pipelines and Manhole• Soakaway Trench and Catch Pit• Infiltration Ditch• Chute• Half Trapezoidal Channel• Earth Berm• Mass Concrete Berm• Rectangular Channel• Manholes• Catch Basin• Top Inlet Gully with Connection Pipe

Ongoing

Client

Value (USD $)

Project Scope

Completion Date

DESIGN & BUILD OF AL KHOR EXPRESSWAY:

CONSTRUCTION OF SURFACE WATER DRAINAGE WORKS, POTABLE WATER AND STORM WATER DRAINAGE WORKS

Page 32: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 31

Lusail Real Estate Development Company W.L.L

33,000,000

The Scope of Works included deepening the Southern Marina (By Dredging) from -3.00 ONHD to -4.50 QNHD as well as dredging additional isolated areas, including deepening of the Central Lagoon entrance.

The major work elements are:Dredging operation – average dredging productivity 60,000 m3/Day. Transportation of dredged material to a multi-cell spoil pit. Pumping of sea water from the spoil pit to the existing sedimentation ponds 1 & 2. Removal of the wet silty material from the spoil pit to the “drying multi-cell pit” for drying process. Transportation of the dried material off site to an approved municipality disposal site.

October, 2015

Client

Value (USD $)

Project Scope

Completion Date

CP12-E ADDITIONAL DREDGING OF SOUTHERN MARINA CHANNEL

Page 33: Company Proï¬le 2013 - AlJaber Engineering LLC

Qatar Petroleum

151,000,000

Engineering, procurement and construction of major Civil, Mechanical, Electrical, Instrumentation and SCADA control works detailed as follows:Various utility pipeline networks 230 KmSewage pumping stations 29 Nos.Civil Works:• Excavation 873,300 m3

• Imported fill material 111,000 Ton• Precast concrete paving 28,000 m2

• Major RCC/Steel structure works & Road crossing (Microtunneling)Major Mechanical Works: • Potable water/fire water pumping station• Potable water and fire water tanks 9 Tanks• Overhead cranes and manual hoist cranes 31 CranesElectrical Installations:• Power network(Transformers with panels, ups, etc) 30 KmControl System and Instrumentation:• Telecommunication and SCADA control system• Fire alarm system/Fiber optic network (25 km)

December, 2014

Client

Value (USD $)

Project Scope

Completion Date

EPIC FOR WET UTILITIES DISTRIBUTION NETWORK (POTABLE WATER SUPPLY, FIRE WATER AND SEWRAGE) FOR SUPPORT SERVICES FOR AN AREA OF APPROXIMATELY 3000 HECTARES COMPLETE WITH AUXILIARY FACILITIES, SUB-SYSTEMS AND MAIN NETWORK AT RAS LAFFAN INDUSTRIAL CITY.

Page 34: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 33

Qatar Petroleum

190,000,000

The project scope included all associated Civil, Mechanical, Electrical, Instrumentation and telecommunication works.

Design Works:- Coordination of existing and future utility services- Traffic management strategy and traffic phasing- Reinforced concrete protection slab and culverts• Road Works and street lighting: 39 Km• Conversion of existing Mesaieed main and Police roundabout to traffic signal junction• Electricity and Power Network(LV/MV/HV/EHV) 187 Km• Potable Water Network 9 Km• Telecommunication Network 34 Km• Utility Duct Network 29 Km• Treated Sewer Effluent Network(TSE) 18 Km• Surface Water Drainage Network 70 Km• Foul Sewer Network 5 Km• Landscaping Network & Irrigation Network 250 Km

February, 2012

Client

Value (USD $)

Project Scope

Completion Date

RECONSTRUCTION OF EXISTING ROADS AND CONSTRUCTION OF NEW ROADS WITH ALL ASSOCIATED SERVICES AND INFRASTRUCTURE INCLUDING UPGRADE OF EXISTING UTILITIES AND INSTALLATION OF NEW UTILITIES AT MESAIEED COMMUNITY AREA.

Page 35: Company Proï¬le 2013 - AlJaber Engineering LLC
Page 36: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 35

Lusail Real Estate Development Company W.L.L

51,000,000

The Major Scope of the Project included:

• Design & Construction of the civil works and associated MEP works for two large diameter utility tunnels for bridges 8 and 9 • Construction of the Marafeq - designed 7 Nos. gasline crossings. • Removal of a section of the existing sea wall (198m) and construction of new realigned sea walls (152m).• Widening of the five (5) existing temporary earth bunds with pipe culverts • Raising the finished level of the existing sea wall on Qetaifan Islands from 2.0m to 2.5m QNHD by the installation of precast reinforced concrete capping blocks.• Construction of concrete block staircases adjacent to the sea wall at five (5) locations providing restricted access from the promenade to the tidal lagoon basin.

February, 2017

Client

Value (USD $)

Project Scope

Completion Date

CONSTRUCTION OF CP08-A3: ENABLING WORKS - QETAIFAN ISLANDS

Page 37: Company Proï¬le 2013 - AlJaber Engineering LLC

RasGas

CCC / Teyseer JV

36,000,000

Earth works for Barzan onshore early site project total area of 1,560,000 m2 detailed as follows:

• Grubbing, removal and transport vegetation 1,560,000 m2

• Remove, transport and depose marine deposit 1,512,000 m3

• Remove, transport and stockpile dune sand 400,000 m3

• Excavation (suitable soil, soft rock and hard rock) 940,000 m3

• Fill material 698,600 m3

• Imported fill 1,521,000 m3

July, 2011

Client

Main Contractor

Value (USD $)

Project Scope

Completion Date

EARLY SITE EARTH WORKS FOR BARZAN ONSHORE PROJECT AT RAS LAFFAN.

Page 38: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 37

Public Works Authority (ASHGHAL)

55,000,000

• Electrical work, storm drainage, telecommunication services, service water, TSE lines, irrigation and landscape works• Security wall, CCTV cameras, gates, fiber optic cables, road blocks, security rooms, special signage and other necessary security items.• Hard and soft landscaping and irrigation system.• Construction of roads (12.1 km)

December, 2010

Client

Value (USD $)

Project Scope

Completion Date

CONSTRUCTION OF ROADS AND INFRASTRUCTURE SERVICES SUCH AS FOUL SEWAGE, SURFACE WATER, POTABLE WATER, TSE LINES, PUMP STATIONS AND STORM WATER SYSTEM IN THE NEW DIPLOMATIC AREA.

Page 39: Company Proï¬le 2013 - AlJaber Engineering LLC

Lusail Real Estate Development Company W.L.L.

48,000,000

The scope included early enabling works project consisting of dewatering works, bulk excavation and temporary support of excavation systems etc.

• Work site Clearance• Temporary Fencing• Temporary Access Roads• Design, installation, operation and maintenance of temporary dewatering systems and handed over to the permanent works contractor• Excavation in the dry with mechanical means and the transport of excavated materials to an authorized off-site landfillThe Excavation consisted of: - Car Park 2 141,587 m3 - Car Park 3 124,613 m3 - Car Park 4 105,576 m3 - Car Park 5 15,1622 m3 - Underpass Tunnel 996,973 m3• Lowering of Western Marina 386,000 m3• Widening of Earth Bridge 2A 30,000 m3 (Filling with selected excavated material)• Monitoring ground movements around and within the excavations• Provision for the disposal of 3,000,000 m3 of excavated material from the stockpile generated by LREDC

February, 2015

Client

Value (USD $)

Project Scope

Completion Date

CONSTRUCTION OF CP7C-1C, ENABLING WORKS FOR COMMERCIAL BOULEVARD

Page 40: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 39

Public Works Authority

44,000,000

The purpose of this project was to provide both single lane and dual lane temporary roads in Wadi Aba Seleel within the project limits. This included advance grading and levelling of specific sections of the roadways within the main project boundary, including the construction of temporary roads, over an area of aproximately 19.7 km as follows;

Dual carriageway - 9.00km (approx.) Single Carriageway - 11.00km (approx.)

The Major quantities were: • Site Clearance - 147 Ha • Excavation - 533,200 m3 • Filling - 786,300 m3 • Roadworks (Sub-Base, Base Course & Wearing Course) - 323,500 m2 • 14m Street light Columns - 1,262 Nos. • Swales for Surface Water Drainage - 39,365 m • Gulleys & Soakaways • Road Marking & Road Signs • Kerb Stone & Precast Concrete Barricades

May, 2016

Client

Value (USD $)

Project Scope

Completion Date

ROADS & INFRASTRUCTURE IN WADI ABA SELEEL – PACKAGE 1A, ADVANCED GRADING & TEMPORARY ROADS (QS004-P01A)

Page 41: Company Proï¬le 2013 - AlJaber Engineering LLC
Page 42: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 41

Qatar Rail

3,358,000,000

The Doha Metro is part of the Qatar Integrated Railways Program (QIRP). The Gold Line Underground section of the network runs East/West through the heart of Doha City, starting to the East at Ras Abu Aboud and continuing through Al Sharq, Doha Souq, Msheireb and Al Adhawaa, before following both Al Sadd Street and Al Waab Street to the West of Doha and terminating at Sports City in the Al Aziziyah area.

The major elements consist of:

• 10 Nos. stations• 11.7 km of twin bored tunnels

Ongoing

DOHA METRO PROJECT - GOLD LINE(A JOINT VENTURE WITH AKTOR, YAPI MERKEZI, STFA AND LARSEN & TOUBRO)

Client

Value (USD $)

Project Scope

Completion Date

Page 43: Company Proï¬le 2013 - AlJaber Engineering LLC

Qatar Petroleum

82,000,000

Design, procurement and construction of storm water drainage system, duct banks, road grading and sabkha treatment and construction of internal and external roads detailed as follows:

• Excavation 435,000 m3

• Imported fill 2,060,000 m3

• Concrete 42,000 m3

• Concrete culverts (600 & 1000 mm diameter) 13 Km• Construction of roads 145,000 m2

November, 2010

Client

Value (USD $)

Project Scope

Completion Date

EPIC FOR NEW SUPPORT SERVICES AND SITE DEVELOPMENT OF 3,000,000 M2 LAND AT RAS LAFFAN INDUSTRIAL CITY.

Page 44: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 43

Qatar Aluminium Company (Qatalum)

SNC - Lavalin

96,000,000

This project included underground piping works and major civil works for Qatar Aluminium plant detailed as follows:

• Total excavation 325,000 m3

• Dewatering 74,000 m3

• Sheet piling 38,500 m2

• Concrete works 15,500 m3

• Piping works 73 Km• Ducting works 58 Km

August, 2010

Client

EPC Contractor

Value (USD $)

Project Scope

Completion Date

CONSTRUCTION OF UNDERGROUND PIPING SYSTEMS CONSIST OF INSTALLATION OF GRP SEA WATER PIPELINES, FIREWATER, PROCESS, POTABLE WATER LINES AND MAJOR INFRASTRUCTURE CIVIL WORKS AT ALUMINIUM SMELTER IN MESAIEED.

Page 45: Company Proï¬le 2013 - AlJaber Engineering LLC

UrbaCon General Contracting

20,000,000

The scope of the subcontract works included excavation, bunds creation, bunds removal and disposal of all excavated materials:

• Complete excavation of estimated quantity 1,055,000 m3

• Creation and complete removal of the bounds to seabed level or original grade level• Supply, install and operate complete dewatering system ensuring working in dry ambient surface conditions• Pre and post survey works• Removal of excavated material from the excavated areas for drying purposes• Dispose all excavated materials off site to an approved local authorities disposal location

August, 2014

Client

Value (USD $)

Project Scope

Completion Date

COAST GUARD BASE - EXPANSION OF THE MAIN NAVIGATIONAL CHANNEL & TURNING BASIN

Page 46: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 45

ENGINEERING, SUPPLY, FABRICATION, DELIVERY, INSTALLATION, TESTING, AND HANDING OVER OF NORTH & SOUTHBOUND, VIADUCT STRUCTURES AND TWO PEDESTRIAN UNDERPASSES FOR CONSTRUCTION OF EAST INDUSTRIAL ROAD BETWEEN AL MUNTAZAH STREET AND WEST CORRIDOR (P017 C2)

Tekfen Construction

58,000,000

The scope of the structural works consists of the construction of:

• 2 Carriageways Viaduct Bridge with three lanes each: 1,300m length for each carriageway• 2 Pedestrian Underpasses

Ongoing

Client

Value (USD $)

Project Scope

Completion Date

Page 47: Company Proï¬le 2013 - AlJaber Engineering LLC
Page 48: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 47

ENVIRONMENTAL CLEAN-UP FOR HAMAD INTERNATIONAL AIRPORT PROJECT SITE INCLUDING EXCAVATION AND REMOVAL OF WASTE, TRANSPORTATION FROM AIRPORT SITE AND PLACEMENT AT ENGINEERED LANDFILL SITE AT MESAIEED.

Hamad International Airport

38,000,000

• Excavation and removal of 8,000,000 m3 waste from the Airport site and placement at engineered landfill site at Mesaieed.• Demolition and removal of all direct structures.• Removal of stagnant water from the northern lagoon and leachate from the made ground with all associated environmental aspects.• Stock piling of the waste removed.• Fencing for stock piling areas and wheel washing systems for transporting trucks.

October, 2005

Client

Value (USD $)

Project Scope

Completion Date

Page 49: Company Proï¬le 2013 - AlJaber Engineering LLC

Qatar Aluminium Company (Qatalum)

34,000,000

• Site clearance (180 Hectares), scarification and compaction of existing ground (179 Hectares).• Placing and compaction of fill materials for the platform construction of the aluminium and power plant (4,540,000 m3).• Ground improvement for the power plant area (25 Hectares) using wick drains and surcharge loading (placing and relocating to power plant area) of (750,000 m3).• Ground improvement for the carbon plant (12 Hectares), using dynamic compaction.• Removal of existing security fence (3,000 M) and installation of new security palisade fence (8,000 M) to the perimeter of the aluminium and power plant.

December, 2008

Client

Value (USD $)

Project Scope

Completion Date

SITE PREPARATION, GROUND IMPROVEMENT BY DYNAMIC COMPACTION AND INSTALLATION OF 8000 LM NEW SECURITY PALISIDE FENCE FOR QATAR ALUMINIUM SMELTER AND POWER PLANT IN MESAIEED.

Page 50: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 49

Public Works Authority (ASHGHAL)

86,000,000

Water Pipes:

• Laying of D.I Pipes from 200 mm to 400 mm diameter 2300 LM• Removal of existing water D.I pipes 400 mm & 500 mm diameter 15,000 LM

Street lighting columns foundation: 1200 sets• Cable trenches 34,000 LM

Construction works for ten (10) interchanges:• Site clearance, demolition and earthworks• Sub-base and road base• Flexible surfacing• Road marking• Bridge structure works

January, 2009

Client

Value (USD $)

Project Scope

Completion Date

SALWA INTERNATIONAL HIGHWAY INTERCHANGES AND INSTALLATION OF WATER PIPELINES AND STREET LIGHTING.

Page 51: Company Proï¬le 2013 - AlJaber Engineering LLC

UrbaCon General Contracting

7,000,000

• Pre & Post excavation bathymetric surveys• Island channel excavation 537,000 m3

• Diposal of excavated material on land off-site 537,000 m3

April, 2013

Client

Value (USD $)

Project Scope

Completion Date

THE BASE SECONDARY CHANNEL EXCAVATION AND DISPOSAL WORKS.

Page 52: Company Proï¬le 2013 - AlJaber Engineering LLC

LANDMARK BUILDINGS

2

ALJABER ENGINEERING | CORPORATE PROFILE 51

Page 53: Company Proï¬le 2013 - AlJaber Engineering LLC
Page 54: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 53

Supreme Committee for Delivery & Legacy (SC)

342,000,000

AlJaber Engineering and Tekfen for Qatar’s Al Thumama Stadium

AlJaber Engineering (JEC) together with Tekfen Construction, as joint-venture partners, have been awarded the construction contract for the stadium in the Al Thumama district of Doha, Qatar.

Al Thumama Stadium – one of the proposed venues for the 2022 FIFA World Cup Qatar – is the seventh stadium for which the main construction contract has been awarded.The venue, located just minutes from Hamad International Airport and in the center of Doha, is scheduled for completion by 2020 and will host matches up to the quarter-final stage.The 40,000 seat stadium will have a reduced capacity of 20,000 seats in its post tournament legacy mode as part of the SC’s modular stadium legacy plans.

Ongoing

AL THUMAMA STADIUM

Client

Value (USD $)

Project Scope

Completion Date

Page 55: Company Proï¬le 2013 - AlJaber Engineering LLC
Page 56: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 55

Barwa Real Estate Company

1,301,000,000

The Barwa Financial District (BFD) is situated in Doha’s new business district in West Bay with approximate built-up area of 700,000 m2 as detailed below:

• Elevated car parking• 15 Podiums: Retail + Technical• 10 Towers: Offices - Shell & Core• Hotel & Convention Center• Primary substation• Energy Center

June, 2017

QATAR PETROLEUM DISTRICT (A JOINT VENTURE WITH BOUYGUES AND MIDMAC CONTRACTING).

Client

Value (USD $)

Project Scope

Completion Date

Page 57: Company Proï¬le 2013 - AlJaber Engineering LLC
Page 58: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 57

Meraas Development L.L.C

400,000,000

Construction of a new mixed-use corporate tower in the West Bay district of Doha. It will contain world-class retail, offices, hotel, serviced apartments and residential units. It has been envisioned that upon completion, the project will be the tallest building in Doha housing both residential and commercial establishments.

The scope consists of a 84 - storey tower with total built-up area of 295,000 m2 detailed as below:

• Residential space 31 floors• Office space 29 floors• Five-star boutique hotel 13 floors• Retail space 2 floors• Ballroom• Meeting facilities• Business center• Swimming pool and Spa• Associated facilities

Suspended - Design Changes

Client

Value (USD $)

Project Scope

Completion Date

DUBAI TOWER IN DOHA

Page 59: Company Proï¬le 2013 - AlJaber Engineering LLC
Page 60: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 59

AlJaber Holding

44,000,000

The site situated at Fox-Hills District, Lusail, is being developed into an office building. The projectworks included the following:

• Mobilization, Fencing, Excavation, Shoring and Dewatering.• Construction, completion, handover and maintenance of an office building consisting of three• basements, ground, mezzanine, five floors and roof to a total built-up area of 14,000-m2 with required electro-mechanical services.• Hard and soft landscaping including external services.

September, 2015

Client

Value (USD $)

Project Scope

Completion Date

ALJABER ENGINEERING HEADQUARTERS - FOX HILLS PLOT NO. MU-B04, LUSAIL-QATAR

Page 61: Company Proï¬le 2013 - AlJaber Engineering LLC

ALWAHA CLUB

RasGas

7,000,000

Construction of one storey concrete structure building with a total buit up area of 7300 m2 including a metal decking roofing for the multipurpose hall with all associated MEP, telecommunications, HVAC and fire fighting system.

• Restaurant, snack bar and private dining room• Lounge and meeting rooms• Recreational rooms• Multi- purpose hall that functions as a theatre• Gymnasium• Children’s nursery• Administration offices• External swimming pool• Shaded paddling pools• Play areas and mini golf course

March, 2002

Client

Value (USD $)

Project Scope

Completion Date

Page 62: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 61

Aljaber Engineering WLL

36,000,000

Construction of new Worker’s Accommodation Facility as per the latest welfare standards. The facility was estimated for a capacity of 4,500 workers with all the welfare & recreation facilities. The major elements consisted of:

Labour Accommodation, Mess Hall & Kitchen, Camp Office & Training Room, Grocery & Retail Barber Shop, Clinic, Mosque, Guard Room, Delivery Area & Parking Money Exchange, Delivery Area & Parking, Car & Bus parking Lots, Garbage Collection Sewerage Treatment Plant, Generator Farm & Diesel Farm, Cricket Ground, Basket Ball Ground, Foot Ball GroundExternal Works & Utilities:• Road Works, Road Marking & Sign Boards • Hard Scaping works • Hoarding / Fencing, Gates & Barriers • Street Lighting • Drainage Network • Water Network • Fire Fighting Network • Electrical Works

October, 2015

Client

Value (USD $)

Project Scope

Completion Date

CAMP AT ABU NAKHLAH

Page 63: Company Proï¬le 2013 - AlJaber Engineering LLC
Page 64: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 63

OIL & GAS, PETROCHEMICAL AND INDUSTRIAL

3

Page 65: Company Proï¬le 2013 - AlJaber Engineering LLC
Page 66: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 65

HAMAD PORT PROJECT - STRATEGIC FOOD SECURITY FACILITIES

Hamad Port Project Steering Committee

456,000,000

The Strategic Food Security Facility (SFSF), located in Hamad Port; will support the Qatar National Food Security Program as:• Fully Functional Stand-Alone Terminal.• Providing Storage Facility for three Main Commodities (Rice, Sugar and Oil).• Food Commodities shall arrive in both bulk and breakbulk.• Securing the consumption for each commodity for a population of 3 Million.The major elements of the project shall consist of the following:• Planning of Strategic Food Security Facility conceptual facility arrangement options which are consistent with client, stakeholders and end-user.• Design and Construction of Strategic Food Security Facility - Storage of Edible Commodities. - Facility’s Networks and Utilities.• Design and Construction of all Facility’s Buildings including FF&E.• Design, Specification, Procurement, Installation and T&C of Operational Handling Equipment for Handling, Re- Loading and Transportation of Edible Commodities.• Design, Specification, Procurement and Installation of Marine Supplies and Equipment.• Preparation of Tender Documents for the Procurement of O&M Services and Facility Management Services for Strategic Food Security Facility.

Ongoing

Client

Value (USD $)

Project Scope

Completion Date

Page 67: Company Proï¬le 2013 - AlJaber Engineering LLC

FABRICATION AND INSTALLATION OF ABOVE GROUND METAL PIPING, INSTALLATION OF WATER SUPPLY PUMPS, EMERGENCY COOLING TOWERS, COMPRESSED AIR PIPING SYSTEM AND CLOSED COOLING MEDIUM SYSTEM AT QATAR ALUMINIUM SMELTER IN MESAIEED.

Qatar Aluminium Company (Qatalum)

SNC - Lavalin

20,000,000

• Fabrication and erection of pipes and connection to potable, process and fire water tanks.• In water supply area.• Installation of water supply pumps.• Installation of emergency cooling tower.• Fabrication and erection of compressed air piping system.• Fabrication and erection of closed cooling medium system.

September, 2010

Client

EPC Contractor

Value (USD $)

Project Scope

Completion Date

Page 68: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 67

Qatar Aluminium Company (Qatalum)

24,000,000

• Excavation for foundations• Filling to structures and embankment• Fire rated concrete works and surface painting• Water proofing, and fencing works• Miscellaneous metal works

March, 2010

Client

Value (USD $)

Project Scope

Completion Date

MAJOR GROUND AND CIVIL WORKS FOR RECTIFIER STATIONS AT QATAR ALUMINIUM SMELTER IN MESAIEED.

Page 69: Company Proï¬le 2013 - AlJaber Engineering LLC
Page 70: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 69

EPIC FOR TWO NEW KANGAROO CRANES AND UPGRADING OF EXISTING GABBRO BERTHS CRANE FACILITIES INCLUDING ALL MECHANICAL AND ELECTRICAL WORKS AT MESAIEED PORT.

Qatar Petroleum

31,000,000

The Scope included engineering, procurement, construction and commissioning of two kangaroo cranes with a rated capacity of 1,100 ton/hour each including all related electrical and mechanical works as follows:

• Two kangaroo crane with a rated capacity of 1,100 ton/hour• HV electrical power supply for the new kangaroo cranes• Four new grabs and ropes for the two existing kangaroo cranes• Fresh-water based dust suppression systems for the two existing kangaroo cranes• Video camera system

The scope also included all related mechanical and electrical works to upgrade the following:

• A mobile harbour crane• A hopper• LV electrical power supply and sockets for mobile hopper

March, 2009

Client

Value (USD $)

Project Scope

Completion Date

Page 71: Company Proï¬le 2013 - AlJaber Engineering LLC

Qatar Aluminium Company (Qatalum)

SNC - Lavalin

8,000,000

All associated mechanical, piping, electrical and instrumentation works to install the following:

• Cathode roding equipment• Induction furnace• Overhead cranes• Emergency water pumps

January, 2009

Client

EPC Contractor

Value (USD $)

Project Scope

Completion Date

INSTALLATION OF CATHODE ROADING EQUIPMENT AND INDUCTION FURNACE INCLUDING SUPPLY AND ERECTION OF ALL MECHANICAL, PIPING, ELECTRICAL AND INSTRUMENTATION WORKS AT QATAR ALUMINIUM SMELTER IN MESAIEED.

Page 72: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 71

CIVIL, INFRASTRUCTURE AND ELECTROMECHANICAL WORKS FOR CAMPS AND OTHER FACILITIES INCLUDING UNDERGROUND PIPING NETWORKS, ROAD WORKS, INSTALLATION OF TREATED EFFLUENT TANKS, WASTE WATER TREATMENT UNITS AND SLUDGE TREATMENT UNITS.

Chiyoda - Technip J.V.

33,000,000

This project consisted of the following:

Civil and Infrastructure works:• Underground networks (HDPE 40 to 410 mm)• GRP pipeline 10” diameter• Foundations for the waste water treatment, potable water/ firewater and power generation units• Road works and street lighting• Sludge building Galvanized fence• Construction of secondary substations and diesel generators buildingsMechanical, Electrical and Instrumentation works:• Installation of secondary package substations• Cable laying Instrumentation works• Diesel storage tanks Structural steel works• Above ground galvanized steel piping• Supply & installation of 2 Nos. vertical, GLS bolted potable water tanks (3200 m3) with aluminium dome cover• Supply & Installation of 4 Nos. vertical, GLS bolted treated effluent tanks (1600 m3) with aluminium dome cover• Installation of the waste water treatment units• Installation of sludge treatment unit

November, 2007

Client

Value (USD $)

Project Scope

Completion Date

Page 73: Company Proï¬le 2013 - AlJaber Engineering LLC

EPIC OF POTABLE WATER TRANSMISSION SYSTEM AND LANDSCAPING MAINS TO DISTRIBUTE WATER PRODUCED BY RLPC TO VARIOUS FACILITIES WITHIN RAS LAFFAN.

Qatar Petroleum

14,000,000

Detailed engineering, procurement, construction, installation, testing and commissioning of:

• Water potable (WP) transmission system (FRP) to distribute the water produced by Ras Laffan power company to existing reservoirs in Ras Laffan City, with all associated control and monitoring systems.

• Water Landscaping (WL) transmission system (FRP, UPVC & CS) to distribute water from Ras Laffan power company, Oryx GTL plant, Ras Laffan City camp waste water treatment plant and the JGC waste water treatment plant to various facilities.

October, 2005

Client

Value (USD $)

Project Scope

Completion Date

Page 74: Company Proï¬le 2013 - AlJaber Engineering LLC

POWER GENERATION, SUBSTATIONSAND DESALINATION PLANTS

4

ALJABER ENGINEERING | CORPORATE PROFILE 73

Page 75: Company Proï¬le 2013 - AlJaber Engineering LLC
Page 76: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 75

Hitachi Zosen Corporation

100,000,000

For Package A (Civil & Building Works)MSF Plant Area• MSF Switchgear Building – 3,540 m2• Demister Acid Cleaning Unit• MSF Unit – 1 Nos.• Roads & PavingPWT (Remine) Plant Area• Remine Switchgear Building - 1,747 m2 Cable Trenches Equipment Foundations• Generator System Building - 168 m2 Underground PipelinesRO Plant AreaCivil WorksDAF - 7,648 m2 DAF Sunshades HVAC WorksCable Trenches Underground Piping Roads & PavingBuilding WorksUF Building – I & II - 3,837 m2 each RO Building - 9,264 m2 RO Electrical Building - 4,737 m2Control Building - 305 m2 Chemical Building - 1,075 m2Waste Water Treatment Building - 450 m2 Ongoing

Client

Value (USD $)

Project Scope

Completion Date

UMM AL HOUL POWER PROJECT - PACKAGE A (CIVIL & BUILDING WORKS) & PACKAGE B (HVAC WORKS)

Page 77: Company Proï¬le 2013 - AlJaber Engineering LLC
Page 78: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 77

MAJOR CIVIL WORKS RELATED TO THE CONSTRUCTION OF DISTILLERS AND BOILERS AREAS, INTAKE STRUCTURE AND POTABLE WATER RESERVOIRS FOR 45 MILLION GALLONS PER DAY WATER DESALINATION PLANT AT RAS ABU FONTAS.

Fisia Italimpianti

76,000,000

Distillers area and intake structure• Intake and outfall structures & Equipment and pipe rack foundations• Road works / Pipe trenches• Local control room, Chlorination building and C02 production building• Water basins and pumps well• Seawater screening and pumping stationBoilers area• Storage tanks• Local control rooms, switchgear and control room buildings• Pipe rack and equipment foundations, boilers and stack foundationsPotable water reservoirs• Potable water reservoirs 102,000 m2 (2 Nos.)• Potable water pumping station• Equipment foundations & Flow meters and valve pits

March, 2010

Client

Value (USD $)

Project Scope

Completion Date

Page 79: Company Proï¬le 2013 - AlJaber Engineering LLC

Fisia Italimpianti and Enel Power

20,000,000

All associated civil works to build 40 million gallons per day, desalination, blending and demineralization plants.

• Installation of temporary facilities and lay down area for this project and future expansion• Bulk earth works• Concrete foundations for 4 main desalination units• Supply and discharge stations including U.G. GRP pipe works• Onsite GRP pipelines of various diameters• Main pumps structure and chemical dosing units• Re-mineralization structure including water tight structure• Main switchgear and control buildings (3 Nos.)• Electro - chlorination building (1 No.)• New roads and walkways with all associated civil works• Construction of cooling tower• Construction of 220 KVA cable corridor involves 80,000 m3 of excavation

May, 2003

Client

Value (USD $)

Project Scope

Completion Date

CIVIL WORKS RELATED TO THE CONSTRUCTION OF 40 MILLION GALLONS PER DAY WATER DESALINATION PLANT AT RAS LAFFAN.

Page 80: Company Proï¬le 2013 - AlJaber Engineering LLC

SEWAGE TREATMENT PLANTS, DISTRICT COOLING PLANTSAND PUMPING STATIONS

5

ALJABER ENGINEERING | CORPORATE PROFILE 79

Page 81: Company Proï¬le 2013 - AlJaber Engineering LLC
Page 82: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 81

Qatar District Cooling Q.C.S.

89,000,000

The Works included the design, supply, delivery, erection and installation on site of a district cooling plant with a guaranteed capacity of 35,000tons of mechanical refrigeration plus 5,000 tons thermal energy storage tank (TES) capacity, serving the West Bay area including architectural and civil works and all necessary mechanical, electrical, plumbing and fire (“MEPF”) equipment and installations, associated structures, and the civil works of Kahramaa substation.The major elements were: • Construction of plant building including all civil and architectural works• MEP services complying with the final plant capacity• District Cooling Process work serving 35,000 RT plus 5,000 RT TES tank• Construction of Primary Substation

May, 2016

Client

Value (USD $)

Project Scope

Completion Date

ENGINEERING, PROCUREMENT, CONSTRUCTION, TESTING & COMMISSIONING OF THE DISTRICT COOLING PLANT-3 IN WEST BAY

Page 83: Company Proï¬le 2013 - AlJaber Engineering LLC

REFURBISHMENT AND UPGRADING WORKS FOR VARIOUS FOUL AND STORM WATER PUMPING STATIONS INCLUDING CIVIL, MECHANICAL ELECTRICAL AND HVAC WORKS.

Public Works Authority (Ashghal)

53,000,000

The refurbishment and upgrading of four (4) foul pumping stations and two (2) storm water pumping stations including:

• Civil works• Temporary bypass works, wet and dry well works• Rising main works and mechanical works

June, 2016

Client

Value (USD $)

Project Scope

Completion Date

Page 84: Company Proï¬le 2013 - AlJaber Engineering LLC

PIPELINE CONSTRUCTION

6

ALJABER ENGINEERING | CORPORATE PROFILE 83

Page 85: Company Proï¬le 2013 - AlJaber Engineering LLC
Page 86: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 85

Qatar General Electricity & Water Co. (KAHRAMAA)

437,000,000

The scope of this Contract provides and completes the corridor pipelines (Corridor Mains) and fibre optic cable ducts within the southern length of the Qatar Utility Corridor (QUC) between PRPS 3 (Rawdat Rashed) and PRPS 4 (Abu Nakhla), transmission mains and corridor main pipework and connections at both PRPS 3 and 4 for Package A and northern length of the Qatar Utility Corridor (QUC) between the Dukhan Road and PRPS 3 (Rawdat Rashed) for Package B

The Major Quantities:Main Utility Corridor from Rawdat Rashed ( PRPS3) to Abu Nakhla ( PRPS4):23.95km of twin 1600 mm diameter water corridor main | 10.40km of single 1200mm diameter transmission main0.35km of twin 1600 mm diameter branches water corridor mainNorthern length between the Dukhan Road and PRPS 3 (Rawdat Rashed):1600 mm dia.: 22.9 km of twin pipeline from the Dukhan Road to PRPS 3.1200 mm dia.: 10.7 km of pipeline from the Dukhan Road to PRPS 3.900 mm dia.: 1.5 km of pipeline from the QUC water corridor to the west edge of the QUC.Construction of all washout, air valve and other chambers.Design and construction of trenchless road and utility crossings.Supply, installation & testing of the ducts in parallel with the pipelines for FOC.

The pipeline (DI) quantities are: 1600 mm dia Pipes - 94,292 m 1400 mm dia Pipes - 32,866 m 1200 mm dia Pipes - 33,970 m 900 mm dia Pipes - 1,5361 m

November, 2017

Client

Value (USD $)

Project Scope

Completion Date

GTC/600/2013, Pipelines for Mega Reservoirs Corridor Main 1 Package C &GTC/599/2013, Pipelines for Mega Reservoirs Corridor Main 2 Package A

Page 87: Company Proï¬le 2013 - AlJaber Engineering LLC

DESIGN AND CONSTRUCTION OF 1200 MM OF 30 KM TRANSMISSION MAIN FROM DOHA WEST STW TO AL RAKHIYA FARM.

Public Works Authority (Ashghal)

44,000,000

The project included of design, procurement and construction of 1200 mm diameter GRP mains detailed as follows:

• 1200 mm diameter GRP main 30 Km• 500 mm diameter GRP main 720 M• Air valves, washout and connection chambers• Flow control valves and flow meters.

December, 2011

Client

Value (USD $)

Project Scope

Completion Date

Page 88: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 87

Qatar Electricity & Water Co. (KAHRAMAA)

32,000,000

Replacement of 1200 mm, 900 mm rising mains and associated pipe works from old Salwa Reservoir Station and New Salwa Reservoir Station.

Replacement of existing 1200 and 1400 mm pipe works and construction of new 1400 mm distillate main segment including all associated pipe works from New Salwa to Immigration Interchange.

Extension of new 600 mm rising main and associated pipe works along Waab Street, from Fourosiyah to Khalifa Stadium.

September, 2007

Client

Value (USD $)

Project Scope

Completion Date

UPGRADING OF NEW AND OLD SALWA DISTILLATE AND RISING MAINS (22 KM OF PIPES)

Page 89: Company Proï¬le 2013 - AlJaber Engineering LLC

RESOURCES

Page 90: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 89

OFFICESJEC’s headquarters are located in Fox Hills, Lusail. Our offices are equipped with the latest IT infrastructure meeting international standards and requirements in order to fulfill local and international clients’ expectations.

FABRICATION WORKSHOPJEC’s philosophy is to achieve maximum efficiency of fabrication productivity. JEC has established state of art fabrication workshop facilities equipped with new machines, equipment and tools.

JEC’s fabrication workshop is situated in Al Khor Industrial Area close to the Ras Laffan Industrial City, where all the major clients are located.

PMV FACILITIESJEC has heavily invested in purchasing new equipment enabling high standard execution for the upcoming mega projects. In addition, JEC has established two central PMV workshops located in Salwa Industrial Area and Al Khor Industrial Area. Our continuous preventative maintenance is carried out by a dedicated and professional team. JEC has the largest fleet count in the State of Qatar exceeding 1,800 pieces of machinery.

Page 91: Company Proï¬le 2013 - AlJaber Engineering LLC
Page 92: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 91

Description No. Description No.

Heavy Equipment 493 Light Vehicle 480

Articulated Dump Truck (40 Tons) 32 Bus - Light 14

Backhoe Loader (JCB/CAT) 30 Car 188

Bulldozer (D8 / D9 /D10) 30 Pickup 278

Crane All Terrain (25 to 160 Tons) 8 Tipper 192

Crane Rough Terain (25 to 90 Tons) 15 Tipper (6X4) (19 CBM) 10

Crane Truck Mounted (25 - 50 Tons) 3 Tipper (8X4) (20 to 22 CBM) 182

Excavator (05 to 90 Tons) 169

Forklift (03 to 12 Tons) 12 Tipping Trailer 45

Manlift (13 to 18 M) 11 Tipping Trailer (22 CBM) 45

Motor Grader 22 Auxiliary 1380

Roller (10 to 20 Tons) 34 Compressor 79

Skid Steer Loader 33 Concrete Mixer 11

Telescopic Handler (04 to 12 Tons) 14 Concrete Mixer Pump 2

Tower Cranes 6 Drum Cutter 10

Trencher (Drum) 5 Generator 154

Trencher (Boom) 2 Hand Jack Hammer 76

Wheel Loader (04 to 5.5 CBM) 67 Hydraulic Breaker 185

Heavy Vehicle 195 Plate Compactor 39

Bus (26 to 66 PAX) 134 Power Float 6

Highbed Trailer 14 Roller (1 to 2 Tons) 51

Lowbed Trailer (40 to 150 Tons) 11 Tower Light 362

Recovery Van 3 Vibrator 50

Self Loader (3 to 8 Tons) 26 Water Pump 114

Water Tanker 3 Welding Machine 65

Road Sweeper 2 Line Boring Machine 1

Ambulance 1 IF, PE, RT, SE, WE, ZZ 175

Fire Foam Truck 1

Grand Total 2,785

EQUIPMENT FLEET

Page 93: Company Proï¬le 2013 - AlJaber Engineering LLC
Page 94: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 93

Description No

Management Staff 214

Executive 8

Business Development 3

Estimation Department 28

Procurement Department 25

Commercial and Contracts Department 44

Planning & Cost Control Department 26

Technical Department 5

Finance & Accounts Department 25

Information Technology 15

Human Resources Department 31

Document Control 4

Projects Staff 9,422

Operation Civil 962

Operation ME 842

Quality, Health, Safety & Environment 345

Project Technical Staff 42

HR Department Support Staff (Site Admin & Camps) 54

Project Workforce (Skilled & Unskilled Labor) 3,749

Drivers & Operators 2,189

Plant, Machinery & Vehicles (PMV) 1,041

Crusher Operations 60

Main Store Operations 50

Security Department 88

Grand Total 9,636

STAFF & MANPOWER

Page 95: Company Proï¬le 2013 - AlJaber Engineering LLC

SUSTAINABILITY

INTEGRATED MANAGEMENT SYSTEM (IMS)

Quality, Health, Safety and EnvironmentJEC places emphasis on internally improving the physical and social environments in which employees operate in. We constantly perform risk management techniques to identify the dangers employees can encounter in the workplace. Preventing these problems are highly beneficial and results have shown that a safe and hygienic environment has led to a higher productivity. Our standards of procedures and policies are implemented to ensure employees safety and health is an action taken proactively and controlled by the top management.

In QHSE (Quality, Health, Safety and Environment), JEC continues to be one of the leading performers within the industry sectors.

JEC is striving to continually improve the performance in the QHSE management system which is one of our key strategic objectives. AlJaber Engineering’s QHSE objectives are given equal value with other business objectives and being monitored by the executive management.

The quality of everything we do brings value to our customers and justifies their decision to entes into a business relationship with us.

The protection of human health, personal and environmental safety rank at the highest level of importance to JEC. We operate in a diligent and responsible manner consistent with other world-class corporations and aligned with our stated QHSE business goals and policies.

JEC empowers and supports the associates in their ongoing efforts to prevent accidents of all kinds and to promote a safe environment where ever they go. We use comprehensive management systems to demonstrate our commitment to Quality, Health, Safety and the protection of our Environment and to the principles of our QHSE Policy, bringing value to our associates, customers and the community.

Responsibility for Quality, Health, Safety and Environment rests at the executive management level of AlJaber Engineering and is transferred down to the line for implementation. Everyone in our organization is accountable for QHSE performance in their respective area. JEC embarked upon a number of behavioral safety initiatives to complement our procedures and to seek assurance that everyone engages all in matters.

Page 96: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 95

CERTIFICATIONS• ISO & OHSAS Certifications• Quality & HSE Policies• Safety Certifications & Achievements• 2 Million Man Hours without a lost time incident. Presented By NDIA.• 20,000,000 Man Hours with no lost time incidents. Presented by CTJV.• 1,000,000 Man Hours without lost time accident at NDIA. Presented by NDIA.• 5,000,000 Man Hours without LTI at Ras Abu Fontas - A1 Project.Presented by Fisia Italimpianti• 1,000,000 Man Hours without LTI & with outstanding Safety Performance. Presented By LUSAIL.• 250,000 Man-Hours without LTI under Onshore Flow Assurance Project Contract. Presented by RasGas.• 6,200,000 Man-Hours without LTI. Presented by KAHRAMAA - Water Project Department.• Appreciations

Page 97: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER & MAKHLOUF

AL JABER & MAKHLOUF W.L.L. is a Grade A Contractor for Road Works and Infrastructure in Qatar.

The Company has a proven track record of executing large scale, multi-dimensional projects, of expressways, development of urban & rural infrastructure, road maintenance & safety improvements, infrastructure and road works for airports, educational institutions, real estate developments, industrial & petro-chemical plants, sports stadium, commercial and residential communities.

Al Jaber & Makhlouf’s core business activities comprise of earth works, Infrastructure works , road works , road marking works , asphalt texturing and coating works and landscaping works .

The Company owns large fleet of the latest equipment and qualified workforce to deliver the works to the highest quality and safety standards.

Al Jaber & Makhlouf motto is satisfaction of its clients while adopting safe working practices and protection of environment.

Contact details:ROGER MAKHLOUFManaging DirectorMob. : +974 5525 8558 Tel. : +974 4040 9600 Fax : +974 4040 9797Email : [email protected]. : www.jabmak.com

AL WATANIYA CONCRETE

Al Wataniya Concrete is the first company in the market to receive certification from the National Ready Mix Concrete Association (NRMCA) and from Qatar General Organization for Standard and Metrology (QGSM).

The Al Wataniya Concrete corporate strategy is to integrate processes and services to ensure delivery of high quality, customer-centric timely products.

Al Wataniya prides itself for being the first company in the market to acquire NRMCA and QGSM certifications. Al Wataniya’s commitment to excellence and quality is sustained by the dedication of its team-oriented, highly qualified and experienced team of engineers and professionals who utilize their know-how of the gulf market to deliver concrete efficiently and in a timely manner.

To this effect, Al Wataniya Concrete, established in July 2005, has positioned itself as one of the leading producers and suppliers of ready-mix concrete in Qatar. Al Wataniya currently operates 13 plants that are spread across the State of Qatar to fulfill the country’s escalating construction and infrastructure needs.

Contact Details:LOAI GHARAIBEHGeneral ManagerMob. : +974 6685 7341Tel. : +974 4483 8751Fax : +974 4483 2334Email : [email protected]. : www.watancon.com

Page 98: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 97

ARABIAN SPECIALIZED MATERIALS

Arabian Specialised Materials Company ASMA is part of the AlJaber Group and specializes in trading, supply and manufacture of a wide range of quality products and services to a diverse sphere of sectors and industries.

ASMA has the ability to deliver the right product from the right supplier. ASMA achieve this through many partnerships and associations with world-class companies in Europe, America, Canada and India. ASMA has been serving the market since 1996. ASMA provided construction materials and solutions to numerous clients in several industries including infrastructure, buildings, railway, water, electricity, Oil & Gas, and petrochemicals.ASMA provides a wide range of products such as:• Formwork & Scaffolding• GRP & Steel Sectional Water Tanks• Garbage & Linen Chute System• General Fabrication Works• HVAC Ducts• Aluminum access covers• Power Cables• Street Lighting Poles, Fixtures, Luminaries• Granite curbs and pavers• GRP access covers• GRP pipes• HDPE Lining• Passive Fire Stopping system• Ironmongery & High security Locks

Contact Details:KHALIFA AL JAJA - General ManagerMob. : +974 5583 0496Tel. : +974 4421 3636 Fax: +974 4421 3737Email : [email protected]. : www.asmaqatar.com

ARABIAN SUPPLY CENTER

Established in 2008, Arabian Supply Center (ASC) supplies heavy equipment & quality spare parts to the Qatari markets as well as accessories and related products for the construction industry. Initially providing only its affiliates with a limited range of spare parts for trucks and trailers, it soon expanded as it obtained exclusive distributor rights for world-class brands and equipment.

By 2012, within only four years of its founding, ASC became the exclusive dealer for AKSA generators in Qatar, followed by Sandvik rock tools (Rammer and Bretec) in 2013. One year later ASC acquired exclusive dealership for its flagship product: Hitachi construction equipment.

ASC’s reputation is based on three principles: providing quality products, at the right price, and following it with excellent customer service.

Our team of experts has extensive experience with our products and is fully prepared to meet all customer needs. With continued investment in people, processes and resources, ASC is well positioned to remain one of the leading suppliers of construction, industrial and transport equipment, spare parts and related products in both the Qatari market and throughout the region.

Contact Details:HISHAM HADID - Chief Executive OfficerTel. : +974 4458 0623, +974 4458 0635Fax : +974 4458 0562Email : [email protected]. : www.asc.com.qa

ISNAD AL-KHALEEJ FACILITY MANAGEMENT

ISNAD offers complete facility management solutions, from property consultancy to day-to-day operations. Our professional expertise is well suited for any kind of market. No matter what your business is or do. We provide best facility management solutions to your specific industry. We assure our clients a peace of mind as their operations run seamlessly in their business environment. Our service solutions stem from a culture of continuous improvement where all our people are encouraged to challenge our methods at every opportunity. These allow us to be innovative in all our services. We are a leading facility management provider in Qatar. We also ensure that our customers receive the best services that is appropriate for their building and the requirements of its occupies. Our Management teams take clear ownership of service deliver and look to work closely with our client to ensure that all the requirements are fully meet.

Our Services:• Facility Management Services• Provision of Labor Accommodation Services• Maintenance Services• Cleaning Services• Laundry Services

Contact Details:Dr. Mohammad Abul-OlaGeneral ManagerMob. : +974 5552 3812Tel. : +974 4455 4309 Fax : +974 4493 8940Email : [email protected]. : www.isnad-qatar.com

Page 99: Company Proï¬le 2013 - AlJaber Engineering LLC

ZAD CATERING

ZAD CATERING SERVICES is one of the leading Catering and related Support Services Companies in Qatar. In just a short period, ZAD Catering has become one of the Qatar’s leading independent Contract Catering Companies, serving three times meals/day in Remote Site and Industry Sectors, to whom we offer various Catering packages. ZAD Catering’s culture is one of pride in performance and integrity plus a level of commitment that comes from employee satisfaction and motivation. Our professionals are dedicated to providing clients with value-focused service and results. ZAD will design the Menu and Serve you with Taste Quality, Hygiene and your Budget Requirements.ZAD is all about great food and great service! It’s about listening to what our clients and customers need. It’s about making people feel cared for and looked after. Because we believe service is an honorable profession.It’s what we love and it’s what we are good at!

Services Offered• Remote Site Catering• Industrial Catering• Institutional Catering• Cafetarias • Retail Shops • Manpower Supply

Contact Details:MOHAMMED SHEKHOUNResources ManagerMob. : +974 5597 2291Tel. : +974 4465 9432 / 4443 8104Email : [email protected] [email protected]. : www.zad-qatar.com

BUILDING INFORMATION MODELINGTECHNOLOGIES (BIMTEC)

Engineering Management is a specialized form of management that is concerned with the application of engineering principles to business practice. It is the ability to bring together in house engineering, value engineering, information management, site construction management and process management into a unified BIM environment. This will yield the most efficient and cost effective outcome that benefits the construction operations’ lifecycle. BIMTEC has shaped this platform to cater to the local and international regions and has excelled to become one of the most sought after EMO companies in the region.

Our offering range within the BIM/EMO Environments from

• Virtual design Construction• Vertical Planning • Project Management• Health and Safety Simulation • 3D Laser Scanning• 3D Mobile Mapping• Data Management for Facilities Management

Contact Details:RAMZI ABU QAMARGeneral ManagerMob. : +974 5546 6669Email : [email protected]. : www.bimtec-eng.com

CONFIDENCEEQUIPMENT & TRANSPORTATION

Confidence Equipment and Transportation (CET) offers solutions for water tankers, sewage removal, garbage material as well as the transportation of these activities. With more than 320 employees at their disposal, CET is one of the market leaders in catering to various sectors and providing assistance for any rental of equipment that aid companies in their operations.

CORE COMPETENCE:Confidence Equipment and Transportation (CET) offers solutions for the supply of sweet water and Treated Water (TSE), tanker rentals, removal of Sewage water, Garbage material, construction waste, Hazardous & non-hazardous waste as well as the transportation of these activities since its inception in 2002, operating 150 plus vehicles in all corners of the State of Qatar with more than 320 plus employees at their disposal, we are a well known name in the waste management industry & equipment rental Business.NATURE OF SERVICES:• Rental of Treated water tankers (TSE)• Rental of Sweet water tankers• Supply of Sweet water• Removal of Sewage water• Removal of Garbage Material, Construction waste, mixed waste and other wastes.• Supply of 7m3 Skip boxes

Contact Details:TAREK BARGHOUTHIGeneral ManagerMob. : +974 5503 8876Tel. : +974 4469 0714 Fax: +974 4469 0735Email : [email protected]. : www.cetqatar.com

Page 100: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 99

DELMON SCAFFOLDING

Delmon Scaffolding & Formwork has been operating in the Gulf for more than 30 years. It manufactures, supplies and hires various types of scaffolding and formwork systems. Over the years Delmon has established a name in the market place for its technical expertise, quality products and ability to deliver. It has branches in the U.A.E, Oman, Qatar, and Saudi Arabia.

In addition to D-Lock systems for Scaffolding, Delmon is the exclusive distributor of ULMA products in Qatar, UAE, Oman, Kuwait and Bahrain which can provide solutions to client in order to achieve their targets in a timely manner and within budget, for any type of structure, any geometry for any kind of construction project.

Delmon’s scaffolding & formwork system are manufactured according to specifications of the International Construction Standards, Health & Safety in Workplace, Environment Management System and the Engineering Council.

Delmon has a reputation for providing a reliable and dependable service backed up by its vast products range, its management and sales teams, experienced design engineers, supervisors and inspectors.Please contact us so we can become part of your team.

Contact Details:RAM RAGHAVAN RAMANUJANExecutive Director Tel. : +974 4435 3131Fax : +974 4435 3232Email : [email protected]

EMCON TRADING & CONTRACTING

Emcon Trading & Contracting (EMCON) was established in 1978 and started its Painting and Special Coating Division in 1987.

EMCON has over 300 highly qualified employees with access to additional workforce in Qatar/UAE.

EMCON has a fleet of Airless Spray equipment, Injection Equipment, Floor Grinders, Shot Blasting Machines, Water Jetting equipment, Compressors, Sand Blasting equipment, Guniting and Shotcreting equipment.

EMCON is a leader in Qatar & UAE in the following fields:

• Fireproofing• Protective Coating for Concrete & Steel• Pipe Coating• GRP Lining• Surface Preparation• Epoxy & Traffic Floor Coating• Special Effect Paint, Calligraphy and Multicolor Paint• Tank Coating• Concrete Repair• Crack/Leakage Injection• Structural Strengthening• Guniting/Shotcrete• Polyurea• Liquid Applied Flooring Solutions

Contact Details:MOHAMMED HAMZEHGeneral ManagerMob. : +974 5510 2006Tel. : +974 4476 1417Fax : +974 4466 2170Email : [email protected] / [email protected]

STREAM ACOUSTIC & THERMAL

Stream Acoustic & Thermal (SAT) was established in 2005 as reliable providers of acoustic and insulation solutions. By applying their vast experience and support of first class manufacturers, SAT became one of the major solution providers in the state of Qatar in no time.

In 2013, SAT became a member of AlJaber Group of companies, one of the most reputable business groups in Qatar, which helps strengthen our presence in the market.

SAT is a specialized solution provider of sound absorption, sound insulation, and isolation for both vibration and structural born noise. It is also specialized in thermal and Water Proofing for International Contractors as well as grade A local contractors targeting high end / prestigious projects.

We offer our clients solutions empowered by the latest standards and technologies and in compliance with international standards and building codes.

Our products and solutions cover:

• Sound Absorption• Sound & Impact Insulation• Thermal Insulation• Vibration Isolation• Water Proofing Insulation

Contact Details:MOHAMMED HAMZEHGeneral ManagerMob. : +974 5510 2006Tel. : +974 4038 7201 Fax : +974 4038 6824Email : [email protected]. : www.sat.qa

Page 101: Company Proï¬le 2013 - AlJaber Engineering LLC

HYDROSERV

HYDROSERV is a leading name in dewatering and specialized in ground water treatment, pumping services for fluid handling applications. With vast knowledge and experience of the complex hydrogeological conditions encountered, Hydroserv can engineer a solution to safely manage the risks associated for any dewatering project. Hydroserv offers a complete line ground water treatment, water pumps and related equipment for a range of applications, including diesel, hydraulic and electric powered centrifugals, electric submersibles, light towers and diesel generators.The principle that we can support the growth of industry, infrastructure and community while protecting the integrity of the natural environment is highly important to us. Our approach, our equipment and our services cater to site specific environmental sensitivities.Hydroserv is also providing the services below in Oman, UAE, Kuwait as well as Qatar.Services:• Dewatering• Over Pumping Works• Sewage Works• Emergrncy Pumping• Pipe Laying• Rental and Sales• Pressure Washers & Wheel Washers• Ground Water Treatment• Hydro-Dynamic Flushing or pipeline commissioning

Contact Details:TOM DOYLEGeneral ManagerMob. : +974 6671 5873 Tel. : +974 4421 1325, Fax : +974 4472 7315Email : [email protected]. : www.hydroserv.qa

SITESERV

Event & Worksite Equipment Hire, throughout Middle East

Siteserv is a rental and services company specialising in the supply of both mechanical & non-mechanical products to the event, construction and oil & gas industries.

We hire out the equipment you need when you need it, and we make sure it’s fully maintained, serviced and fit for purpose immediately, efficiently and safely.

At Siteserv we pride ourselves on our reliable equipment – designed to make a real difference to our clients’ budget, deadlines and their impact on the environment – and our emphasis on efficient and quality service.

Contact Details:PAUL DURCAN General ManagerMob. : +974 6644 7553Tel. : +974 6644 7553Email : [email protected]. : www.siteservint.com

DRILLSERV

Drillserv provides top quality drilling services for the construction, oil, utility and domestic sectors here in Qatar and across the GCC. With our world-class drilling rigs and experienced team, we aim to provide our clients with cost effective drilling solutions. We are committed to customer service, client requirement and regional specification with a focus on safety. Drillserv is dedicated to becoming the preferred contractor of choice. Services include:

• Water Source Wells• Design & Drilling of Aquifer Testing Programs• Rehabilitation of Existing Wells• Top-hole Drilling• Drilling of Seismic Up Holes• Capability to drill down to 1,500m

Contact Details:BARRY O’ SULLIVANGeneral ManagerMob. : +974 6671 5873Tel. : +974 3350 6962Email : [email protected] Web. : www.drillservint.com

Page 102: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 101

TMS FORMWORK

TMS Formwork Qatar is a complete provider of formwork, shoring and scaffolding systems. We offer an advanced range of product lines, which is supported by a large group of skilled engineers, who excel in the quality of service offered. This is what underpins TMS’s standing in international markets.

TMS is aware of all the increasing challenges of the modern construction, which continuously raise the bar in building higher, wider and faster. Thus our aim is to cope with all these engineering & planning challenges to provide the best and most cost-effective solutions through developing stronger, faster but even safer systems to our valuable customers.

TMS was one of the main formwork technology exhibitors at Bauma 2016 – Munich, Germany. Our ambitions and continuous efforts to excel have led us to success in winning and delivering on signature Projects such as the Qatar Metro & Muscat Airport.

Since we position ourselves as an engineering company more than just a supplier, we make use of all our engineering capabilities in order to sustain innovation in our products and services. Hence, every new TMS product or service comes out with some innovative detail. We believe this is our key differentiator in the market.

Contact Details:KAAN ATIKGeneral ManagerMob. : +974 6693 1923Tel. : +974 4493 8940Fax : +974 4493 8940Email : [email protected] Web. : www.tms.tc

URBAN CONCEPT W.L.L.

Urban Concept W.L.L. is a Design and Build Contractor of Landscape and Urban Spaces.It has a long history in designing large scale landscape and urban projects, such as the New Doha International Airport, Barwa City, Oxyen Park Qatar Foundation, Ras Abou Abboud Interchange.Presently we are building a horse race track and all the facilities around it for the Ministry of Youth and Sports in Qatar.We have a plant nursery for outdoor plants.

Our primary activities are:

• Landscape design and construction.• Hardscape design and construction• Irrigation Design and construction• Garden lighting design and construction.• Green roof gardening supply and construction• Turf track specialist contractor• Supplier and installer of turf reinforcement products

Contact Details:FOUAD HANNA FRANGIEHManaging DirectorMob. : +974 5556 6480Tel. : +974 4450 9815Fax : +974 4450 9815Email : [email protected]

VIJAY ARABIA FIRE & SECURITYSYSTEMS W.L.L.

Vijay Arabia Fire & Security Systems WLL (VASS) is one of the fastest growing integrated Fire & Security Specialist Companies. Established in Qatar in 2007, VASS specializes in turnkey industrial and commercial projects. From conceptualizing, design, supply, installation, testing, commissioning & maintenance – complete array of solutions are offered to the customers through a professional team of more than 250 personnel.

Solution Constellation offered by VASS includes:

• Fire Detection System – Addressable, Conventional, Enterprise Solutions• Fire Protection System – Hydrant, Sprinkler, Foam, Gas Suppression (FM200, Novec), Pre-action & Deluge Systems• Passive Fire Protection Contractor & Supplier of Fire Door, Sealant, Cable coating, Mortar. • Security Systems - Access Control, CCTV, Intruder Alarm & AV systems.• Annual Maintenance for Fire Fighting and Fire Alarm Systems.

Contact Details:HEMAL SALOTGeneral ManagerMob. : +974 5521 5486Tel. : +974 4019 2900 Fax : +974 4019 2929Email : [email protected] Web. : www.vijayarabia.com

Page 103: Company Proï¬le 2013 - AlJaber Engineering LLC

GENERAL SYNDICATE

General Syndicate W.L.L. is a leading company on the Tensile Fabric Membrane Structures in Qatar since more than 15 years.General Syndicate providing Design, Engineering, Fabrication, Supply & Installation of Tensile fabric Structures (PVC/PTFE Membrane), Steel Structures & Metal Fabrication, Shading Solutions (K-span / HDPE shades)Our vision is to lead the way in developing manufacturing of tensile structures / covering systems / awning and shades.General Syndicate provides wide range of Products specially the Tensile Membrane Structures such as:PVC / PTFE Tensile Membrane Structures• PTFE Tensile Membrane Structures • FAÇADE membrane structures• Covering / Sailing / Shading Structures• Façade Membrane Structures• Public Parks Covering Membrane Structures• Play fields / Play Areas covering membrane structures• Car Parking Shades / Walkways• Sail / Canopies shades• Other different applications of membrane structures application: Stadiums, Wind Breakers, Swimming Pools, Seating Areas, walkways, ………. etc.Other Structural Steel & Metal Fabrication• Steel Structures• Steel Floors Metal Decking• Pipes Rolling / FabricationOther Shading Systems / Solutions• K-SPAN Systems• HDPE Shades

Contact Details:KHALID TUBAILAHCEOMob. : +974 5555 9686Tel. : +974 4460 4447 / 4040 9855Fax : +974 4040 9899Email : [email protected]. : www.generalsyndicate.com

MARKAZ BUSINESS CENTER

Markaz, at Fox Hills, in the heart of Lusail City, consists of fully Serviced Offices providing an ideal solution for companies to start smooth operations instantly. Markaz, a state of the art Business Center, is located where the future of Doha will be built. With over 60 furnished and fully serviced units, our clients feel at home with their own personalized office space, giving them the flexibility to operate their daily business, in their own way, instantaneously.

Whether your partners and associates are in New York or Hong Kong, at Markaz your operations will carry on easily around the clock and throughout the week. Our luxurious conference and meeting rooms are internet-enabled, allowing your business partners around the world to join you within minutes.

Markaz is based at AlJaber Engineering Head Office, where warm and professional environments encourage growth and prosperity.

Markaz offers a variety of services:

• High Speed Internet Network• 24/7 Office Access• Daily Office Cleaning• High-tech Fully Equipped Conference/Meeting Rooms• Administrative Services• Printing & Scanning services• Business Lounge• On site IT support• CCTV• Fitness Center• Parking• Café Restaurant

Contact Details:Markaz ManagementMob. : +974 5082 1708Tel. : +974 4040 9898 Fax : +974 4040 9899Email : [email protected] Web. : www.markaz.qa

Page 104: Company Proï¬le 2013 - AlJaber Engineering LLC

ALJABER ENGINEERING | CORPORATE PROFILE 103

ALJABER INFRASTRUCTURE

JABER INFRASTRUCTURE COMPANY – JIS was founded over a decade ago as an integral member of Al Jaber Group to provide and maintain infrastructural Construction Services in the State of Qatar. JIS specializes in provision of quality Civil Engineering using Trenchless Technology - Micro Tunneling - Tunnel Boring Machine (TBM) from recognized and renowned manufacturers and professionals in infrastructural works of construction and maintenance of Foul Sewer, Surface Water and Treatment Water Effluent – TSE networks throughout the State of Qatar.JIS’s ‘State of the Art’ approach is second to none as we continually support and listen to the need of the clients in upholding the standards and specification and in providing optimum engineering services and solutions in our operations.Our Environmental-friendly approach in operations has benefitted and sustained our recognition in acquiring various projects nationwide of substantial values since inception.JIS provides Quality and Timely Job Delivery Services to our valuable customers nationwide. As a Main Contractor and Subcontractor backed we vastly experienced professionals, we have grown to become an icon of quality and timely job delivery which are our most cherished hallmark.

Our Services are:• MICRO TUNNELING WORKS• MANHOLE CONSTRUCTION• PRESSURE GROUTING

Contact Details:ADEL GALALOperation ManagerMob. : +974 5582 9538Tel. : +974 4418 2036 Fax : +974 4486 2422Email : [email protected]. : www.jis-qa.com

Page 105: Company Proï¬le 2013 - AlJaber Engineering LLC

COMMITTED TOEXCELLENCE

Page 106: Company Proï¬le 2013 - AlJaber Engineering LLC

www.jec.qa