ISO 9001:2008 CERTIFIED COMPANY @ SADARA INDUSTRIAL SERVICES CONTRACTING & TRADING COMPANY PROFILE THERMAL INSULATION AND STANDING SEAM PANEL INSULATION SYSTEM FOR STORAGE TANKS
ISO 9001:2008 CERTIFIED COMPANY
@ SADARA
INDUSTRIAL SERVICES CONTRACTING & TRADING
COMPANY PROFILE
THERMAL INSULATION AND STANDING SEAM PANEL INSULATION SYSTEM FOR STORAGE TANKS
Introduction Letter
OUR PREVIOUS PROJECT REFERENCES
QC Policy
HS & E Policy
Our Client List
OUR STRENGTH & INFRA STRUCTURE
CONTENTS
Safety certificate
Client Appreciations
Fabrication & Erection
Office Exterior & Interior
Material Stock & Stock Yard
Our Location
Standing Seam Panel Insulation
COMPARISON BETWEEN CONVENTIONAL INSULATION & STANDING SEAM PANEL
CONVENTIONAL INSULATION STANDING SEAM PANEL SYSTEM
1 Scaffolding Required No Scaffolding Required
2 More Work Duration On Tank Less Duration Of Work On Tank
3 Job Safety Risk Is More Less Risk
4 Expensive Less Expensive
5 Maintenance Required Maintenance Free
6 Insulation Support Rings Required No Welded Part On The Shell
7 Moisture Entry After Long Use Tightly Sealed Seams Avoid Moisture Entry
8 Less Structural Strength Superior In Structural Strength
9 May Damage On Heavy Wind It Withstand Heavy Wind
10 Less Durability High Durability With Good Performance
11 Suitable For Small Tanks Suitable For Big Diameter Tanks
S.No PROJECT NAME
WORK SITE CLIENT CONTRACTOR DURATION No. Of Tanks
1Yanbu Export
Refinery Project
YASREF ARAMCO +
SINOPEC
ENPPI / YANBU STEEL
Oct ‘13 to may ‘14
4
2 SADARA Port & SASREF Tanks
Project
SASREF ARAMCO+
SHELL
ACBI May ‘14 toJune ‘14
1
3 AROMATICS SADARAARAMCO
+DOW
CORNING
JGC Sep ‘14 toNov ‘14
2
4 SADARAKing Fahd
Industrial Port, Jubail
ARAMCO+
DOW CORNING
ACBI Aug ‘14 toJan ‘15
13
5RABIGH PHASE II PETRO
CHEMICAL PROJECT
PETRORABIGHARAMCO
+ SUMITOMO CHEMICAL
PETROFAC / HIDADA
Dec’15 10
RECENTLY COMPLETED / ON GOING PROJECTS
Sl.# PROJECT NAME JOB COMPANY CLIENT CONTRACTORPROJECT
START DATE
PROJECT END DATE
1INSTALLATION OF HOT AIR DUCT INSULATION
SCAFFOLDING & INSULATION
AL-YAMAMA STEEL CO., YANBU
DANIELLE, ITALYALA
INTERNATIONAL CONTRACTING.
19-12-06 10-06-07
2
SUPPLY & INSTALLATION OF INSULATION OF COLD BOX PACKAGE, BOILER, ECONOMIZER, DUCT &
CHIMNEY
SCAFFOLDING & INSULATION
NATPET, YANBUAL-JOMAIH &
PETROBAU SA CO. LTD.
NASEER S AL-HAJRI CO.
02-07-07 18-09-08
3
INSTALLATION OF HOT & COLD INSULATION FOR
CRISTAL EXPANSION PROJECT
SCAFFOLDING & INSULATION
CRISTAL, YANBU AK-KIM KIMYA AK-KIM KEMYA 05-03-08 06-06-08
4SUPPLY & INSTALLATION
OF SCAFFOLDINGSCAFFOLDING
PETRORABIGH(JOINT VENTURE
OF SAUDI ARAMCO& SUMITOMO
CHEMICAL,JAPAN)
TECNICAS REUNIDAS (TR)
- 24-06-08 22-12-08
5SUPPLY & INSTALLATION
OF HOT INSULATION (PORT AREA)
SCAFFOLDING & INSULATION
YANSAB, YANBUYANSAB/FLUOR
ARABIA LTD.CAT CO. 25-02-08 01-05-08
6SUPPLY OF COLD
INSULATION & CLADDING MATERIALS
SCAFFOLDING & INSULATION
YANSAB, YANBUYANSAB/FLUOR
ARABIA LTD.- 10-05-09 10-10-09
7INSTALLATION OF COLD
INSULATIONSCAFFOLDING & INSULATION
YANSAB, YANBUYANSAB/FLUOR
ARABIA LTD.CAT CO. 08-01-09 30-07-09
8SUPPLY OF HDPUF
MATERIAL FOR COLD SHOE
SCAFFOLDING & INSULATION
YANSAB, YANBUYANSAB/FLUOR ARABIA LTD...
- 10-01-09 30-07-09
9SUPPLY & INSTALLATION
OF DUCT INSULATIONSCAFFOLDING & INSULATION
SWCC, YANBU KANOO PROJECTSYANBU STEEL
CO.01-03-10 20-06-10
10SUPPLY & INSTALLATION
OF SCAFFOLDING FOR TANK PAINTING
SCAFFOLDING & INSULATION
YANSAB, YANBU TECHNIPOLAYAN DESCON
18-01-08 23-03-08
11SUPPLY & INSTALLATION
OF INSULATION FOR THREE RE-BOILERS
SCAFFOLDING & INSULATION
YANPET, YANBU OLAYAN DESCON - 23-03-10 27-08-10
12SUPPLY & INSULATION OF
SEA WATER SNUBBER DUCT
SCAFFOLDING & INSULATION
SAMREF, YANBU(SAUDI ARAMCO
MOBILE REFINERY COMPANY)
SAMREF, YANBU(SAUDI ARAMCO
MOBILE REFINERY COMPANY)
JAMJOOM WESCON
15-05-10 23-10-10
13
FRP ANNULAR SPACE COVERS –SUPPLY FABRICATION & INSTALLATION
INSULATION YANSABYANSAB/FLUOR
ARABIA LTD.- 29-09-09
05-10-09
RECENTLY COMPLETED/ON GOING PROJECTS
Sl.# PROJECT NAME JOB COMPANY CLIENT CONTRACTORPROJECT
START DATE
PROJECT END DATE
14INSULATION WORK FOR TANK 242 F-1
SCAFFOLDING & INSULATION
SAMREF, YANBU(SAUDI
ARAMCO MOBILE
REFINERY COMPANY)
YANBU STEEL COM. YANBU
YANBU STEEL COM. YANBU
02-03-10 15-05-10
15
SUPPLY OF MATERIAL AND SERVICES FOR THE
INSTALLATION OF INSULATION &
CLADDING.
SCAFFOLDING & INSULATION
SAMREF, YANBU(SAUDI
ARAMCO MOBILE
REFINERY COMPANY)
OLAYAN DESCONOLAYAN DESCON
09-02-10 05-05-10
16
SUPPLY & INSTALLATION OF
BOILER INSULATION (7 BOILERS)
SCAFFOLDING, REFRACTORY&
INSULATIONSWCC, YANBU
HARRIS PYE MARINE LTD.
- 25-02-11 04-12-11
17
SUPPLY & INSTALLATION OF HOT
AIR DUCT & DUST COLLECTOR
INSULATION.
SCAFFOLDING & INSULATION
SWCC SWCC, YANBU -. 20-04-10 05-08-10
18SUPPLY &
INSTALLATION OF INSULATION
SCAFFOLDING, FIREPROOFING & INSULATION
CRISTAL CRISTAL EXPANSION - 16-08-11 03-03-12
19
SUPPLY & INSTALLATION OF INSULATION ON 3
TANKS
SCAFFOLDING & INSULATION
PETROMIN JEDDAH
OLAYAN DESCON - 30-03-11 12-07-11
20SUPPLY &
INSTALLATION OF INSULATION
SCAFFOLDING, FIREPROOFING & INSULATION
TAYSEER AL-SHAIK
PHOSPHATE
TAYSEER AL-SHAIK PHOSPHATE PLANT
- 03-01-11 07-05-11
21SUPPLY &
INSTALLATION OF INSULATION
INSULATIONACCL PLANT
JUBAILARABIAN ETIMAD - 20-05-11 20-11-12
22SUPPLY &
INSTALLATION OF INSULATION
INSULATION & FIREPROOFING
MADA GYPSUMKHALID ABDULLAH
ABU DUNQER (KAAD) -YANBU
- 20-07-11 03-10-11
23
RE-ROUTING OF ELECTRICAL &
INSTRUMENTATION CABLES
ELECTRICAL SWCC, YANBUBADAR A.
MOHAMMED AL-MULIHI
- 30-03-12 19-05-12
24
DISMANTLING & REINSTALLATION OF NEW CO2 RECOVERY
PLANT
MECHANICAL JOB
SWCC, YANBU BUSE - 25-03-12 02-09-12
25
DISMANTLING & REINSTALLATION OF NEW CO2 RECOVERY
PLANT
MECHANICAL JOB
SWCC, SHOAIBHA
BUSE - 28-12-11 08-04-12
RECENTLY COMPLETED/ON GOING PROJECTS
Sl.# PROJECT NAME JOB COMPANY CLIENT CONTRACTORPROJECT
START DATE
PROJECT END DATE
26 THIRD BOILER PROJECT
INSULATION JOB FOR
EQUIPMENTS & PIPE
NATPET LURGI
ABDULLA FALEH AL-
DOSSARY & PARTNER CO.
15-03-12 03-08-12
27
SUPPLY & INSTALLATION OF
INSULATION & REFRACTORY JOB FOR
BOILER
INSULATION & REFRACTORY
LUBEREF(SAUDI
ARAMCO LUBRICATING OIL REFINING AND PETRO
CHEMICAL CO.)
HARRIS PYE MARINE LTD.
- 22-05-12 18-09-12
28BOILER SHUT DOWN
JOB
INTERNAL SCAFFOLDING FOR BOILERS
(5NOS), PHASE I SWCC
SWCC , YANBU GEMS - 02-08-12 25-05-13
29PIPE LINE REPAIR
WORKINSULATION
SABIC GAS, YANBU
AL-SAMAMAT CO. - 20-09-12 25-10-12
30STEAM LINE & VALVE REPLACEMENT JOB
INSULATION & SCAFFOLDING
JOB
ROYAL COMMISSION
HOSPITAL YANBU
AL-SAMAMAT CO. - 30-04-12 03-07-12
31MANIFA CO-
GENERATION & MAIN SUBSTATION PROJECT
INSTALLATION OF INSULATION WORK FOR PIPE & EQUIPMENTS
ARAMCOTECNICAS REUNIDAS
GULF CO. LTD (TR)- 10-01-13 23-03-13
32MARAFIQ STG UNITS 5
& 6 PROJECT
INTERNAL SCAFFOLDING
FOR HFO STORAGE TANKS
(2NOS)
MARAFIQ , YANBU
JACOBS / HANWHA ENGINEERING & CONSTRUCTION
GLOBAL SUHAIMI CO.
10-10-12 25-12-12
33 KLIN REPAIR WORKREFRACTORY LINING JOB
PCC MICROWHITE,
YANBU- - 22-12-12 19-01-13
34PIPE LINE FROM
SATORP TO JUBAIL INDUSTRIAL PORT
PIPE & EQUIPMENT
INSULATION JOB
SATORP(SAUDI
ARAMCO TOTAL REFINING AND
PETRO CHEMICAL CO.)
PENTAIR THERMAL MANAGEMENT.
- 08-02-13 12-05-13
35PIPE INSULATION AT
TANK FARM AREAPIPE
INSULATIONYANBU CEMENT
CO.YANBU STEEL CO. - 15-01-13 19-04-13
36CIVIL WORK &
ROOFINGCIVIL WORK& ROOFING JOB
MADA CARPET MADA CARPET - 15-01-13 16-02-13
37CABLE REPLACEMENT
FOR BOILER 7
ELECTRICAL CABLE
REPLACEMENT
SWCC PHASE II YANBU
SWCCBADAR A.
MOHAMMED AL-MULIHI
22-12-12 24-12-12
RECENTLY COMPLETED/ON GOING PROJECTS
Sl.# PROJECT NAME JOB COMPANY CLIENT CONTRACTORPROJECT
START DATE
PROJECT END DATE
38SATORP-JUBAIL
EXPORT REFINERY PROJECT
FABRICATION & INSTALLATION
OF HAVC DUCTING &
PIPING
SATORP(SAUDI
ARAMCO TOTAL REFINING AND
PETRO CHEMICAL CO.)
DAYIM PUNJ LLOYD - 11-02-13 17-04-13
39
COLD INSULATION & PAINTING ON
AMMONIA TANK-AL-BAIRUNI
INSULATION, PAINTING &
SCAFFOLDINGSABIC OLAYAN DESCON - 13-03-13 25-08-13
40
EXTERNAL & INTERNAL SCAFFOLDING FOR
TANKS AT IBN RUSHD II U & O PROJECT & SAB-
TANK AREA
SCAFFOLDING IBN RUSHD CTCI CORPORATION - 25-05-13 29-09-13
41COLD INSULATION OF
CO2 TANKS SWCC, YANBU
INSULATION SWCC BUSE GASTEK - 01-04-13 08-07-13
42SCAFFOLDING WORK-
YASREF FOR FIRE PROOFING
SCAFFOLDING
YASREF(YANBU
ARAMCO SINOPEC
REFINERY)
GLOBAL SUHAIMI - 25-02-13 30-09-14
43FIRE PROOFING WORK
– YERP (EPC-3 )FIRE PROOFING
YASREF(YANBU
ARAMCO SINOPEC
REFINERY)
DEALIM KCC 28-06-13 05-12-13
44
FIRE PROOFING WORK – YERP INTER
CONNECTING SYSTEM SP6 PACKAGE
FIRE PROOFING
YASREF(YANBU
ARAMCO SINOPEC
REFINERY)
MMG - 02-06-13 10-05-14
45
SUPPLY OF SCAFFOLDING
MATERIALS YERP -SP3 PROJECT
SCAFFOLDING MATERIALS
SUPPLY
YASREF(YANBU
ARAMCO SINOPEC
REFINERY)
SAUDI TECHINT - 20-02-13 18-04-13
468” PARA XYLENE LINE &
20” FUEL OIL LINE AT PACKAGE 8 IN SATORP
HOTINSULATION
SATORP(SAUDI
ARAMCO TOTAL REFINING AND
PETRO CHEMICAL CO.)
AYTB - 25-08-13 10-01-14
47CABLE TERMINATION &
GLANDING AT PACKAGE 9 IN SATORP
ELECTRICAL WORK
SATORP(SAUDI
ARAMCO TOTAL REFINING AND
PETRO CHEMICAL CO.)
DAYIM PUNJ LLOYDPENTAIR
THERMAL MANAGEMENT
08-09-13 25-12-13
48
STANDING SEAM PANEL INSULATION
FOR 4 TANKS AT ENPPI-YASREF SITE
INSULATION WITH
STANDING SEAM PANEL
SYSTEM
YASREF(YANBU
ARAMCO SINOPEC
REFINERY)
ENPPI YANBU STEEL 25-11-2013 25-05-2014
RECENTLY COMPLETED/ON GOING PROJECTS
Sl.# PROJECT NAME JOB COMPANY CLIENT CONTRACTORPROJECT
START DATE
PROJECT END DATE
49INSULATION JOB-IBN RUSHD SHUTDOWN
YANBUINSULATION IBN RUSHD OLAYAN DESCON - 25-02-13 25-04-13
50CIVIL WORK- RABIGH
POWER PLANT
POTA FOUNDATION
SUPPORT
RABIGH POWER PLANT
GE ENERGY - 27-03-13 04-04-13
51SCAFFOLDING WORK-
RABIGH POWER PLANTSCAFFOLDING
RABIGH POWER PLANT
GE ENERGY - 02-03-13 25-06-13
52INSULATION MATERIAL
SUPPLY-DPL SITE-SATORP
INSULATION MATERIAL
SUPPLY
SATORP(SAUDI
ARAMCO TOTAL REFINING AND
PETRO CHEMICAL CO.)
PENTAIR - 30-06-13 04-07-13
53INSULATION-PIPE LINE-
YERPINSULATION
YASREF(YANBU
ARAMCO SINOPEC
REFINERY)
AL-SHALAWI INTL. HOLDING CO.
- 20-09-13 04-11-13
54SCAFFOLDING & INSULATION-IBN
RUSHD (CTCI-PROJECT
SCAFFOLDING & INSULATION
IBN RUSHD AL SAMAMATH - 08-08-13 12-09-13
55SCAFFOLDING
COLUMN-IBN RUSHD YANBU
SCAFFOLDING COLUMN
IBN RUSHD YANBU
OLAYAN DESCON - 23-04-13 30-07-13
56INTERNAL
SCAFFOLDING-SWCC YANBU
INTERNAL SCAFFOLDING
SWCC YANBU GEMS - 01-06-13 18-06-13
57PIPE INSULATION-
YANPETINSULATION YANPET OLAYAN DESCON - 25-03-13 30-06-13
58
TURBINE REPAIRING WORK- TIHAMA POWER PLANT,
QUNFUDAH
SCAFFOLDINGTIHAMA
POWER PLANTGENERAL ELECTRIC
INTERNATIONAL INC.- 11-09-13 12-03-14
59INSULATION &
SCAFFOLDING-LUBREF JEDDAH
INSULATION & SCAFFOLDING
LUBEREF JEDDAH(SAUDI
ARAMCO LUBRICATING OIL REFINING AND PETRO
CHEMICAL CO.)
HARRIS PYE - 02-09-13 18-11-13
60INSULATION WORK-SAUDI KAYAN JUBAIL
INSULATIONSAUDI KAYAN
JUBAILOLAYAN DESCON - 10-09-13 06-10-13
61INSULATION WORK-IR-II AROMATIC PROJECT
INSULATION IBN-RUSHD CTCI - 13-09-13 04-11-13
RECENTLY COMPLETED/ON GOING PROJECTS
RECENTLY COMPLETED/ON GOING PROJECTS
Sl.# PROJECT NAME JOB COMPANY CLIENT CONTRACTORPROJECT
START DATEPROJECT
END DATE
62HADEED
STRAIGHTENING SHOP PROJECT-JUBAIL
INSULATIONHADEED (SABIC)
TAMIMI INDUSTRIAL SERVICE
- 08-12-13 03-03-14
63AL YER HYDROGEN PLANT PROJECT -
YANBUINSULATION
YASREF(YANBU
ARAMCO SINOPEC
REFINERY)
MMG - 20-12-13 13-11-14
64
UPGRADING HOUT ONSHORE CRUDE
FACILITIES, KJO-AL-KHAFJI
TANK INSULATION
KHAFJI JOINT OPERATION
(KJO)
HIDADA CONTRACTING CO.
LTD.- 26-01-14 27-04-14
65 SHINX PROJECT, JAZAN INSULATIONNATIONAL TITANIUM
DIOXIDE CO.OUTOTEC - 13-04-14 21-11-14
66SADARA AROMATICS,
PROJECT, JUBAIL
STANDING SEAM
INSULATIONSADARA JGC - 23-09-14 12-11-14
67SCAFFOLDING-C604
HAIL SECSCAFFOLDING SEC-HAIL
ISCOSA INDUSTRIES & MAINTENANCE
LTD.- 21-02-14 12-06-14
68ELASTOMER INDUSTRIES
CLADDING JOB ELASTOMER INDUSTRIES
HASHIM AL-MUBARAK EST
- 01-29-14 18-2-14
69SUPPLY AND INSULATION
PIPE INSULATION
JOB LUBREF ARABIAN ETIMAAD - 02-1-14 25-4-2014
70SWCC YANBU BOWAREGE 2
DUCT FABRICATION
&INSTALLATION OF DUCT
SWCC YANBU
GOLTENH - 30-08-14 04-09-14
71FIRE PROOFING
(YANPET) FIRE PROOFING YANPET AYTB - 11-11-14 28-12-14
72MP STEAM LINE
INSULATION(YANPET) INSULATION YANPET AL-DOSSARY - 03-12-14 30-12-14
73SALT HEATER UNIT
INSULATION INSULATIONCRISTAL-YANBU
NASSER AL HAJRI - 03-12-14 06-12-14
74INSULATION
(ARABIAN CBI) INSULATION YANPET AYTB - 05-11-14 29-12-14
75REMOVAL AND
INSULATION (SWCC JEDDAH)
INSULATION SWCC
JEDDAH HARRIS PYE - 23-10-14 ONGOING
76SADARA
METERING-RACK INLET FACILITY
INSULATION SADARA FLOUR CAT 06-05-14 14-06-14
Sl.# PROJECT NAME JOB COMPANY CLIENT CONTRACTORPROJECT
START DATEPROJECT
END DATE
77SADARA PORT TANK
FARM PROJECT
STANDIND SEAM PANEL INSULATION
SADARA CHEMICAL
COMPARABIAN CBI - 19-05-14 13-12-14
78PIPING REPLACEMENT FOR GAS DRYER, FDP-1
FACILITYINSULATION KJO OLAYAN - 20-08-14 14-09-14
79SUPPLY AND REFRACTORY
WORK(SEC RABIGH
REFRACTORY SEC RABIGH
POWER PLANT BABCOCK BORIS SERVICE ARABIA
- 10-11-14 21-01-15
80 HGU PROJECT INSULATION YASREF AIR LIQUIDE GLOBAL
E&C SOLUTIONS- 01-01-15 1-19-15
81SUPPLY &INSTALL STEAM JACKETING
STEAMJACKETING
YASREF ENPPI - 05-01-15 24-01-15
82SWEC, SHUAIBAH,
Boiler MaintenanceSCAFFOLDING SEC THERM SERVICE - 21-01-15 28-05-2015
83LIN TANK PROJECT,
PETRORABIGHINSULATION PETROJET PETROFAC PETROJET 11-02-15 4-04-2015
84 SWCC, YANBU PHASE-3 CIVIL SWCC SAMSUNG RCC 05-03-2015 08-05-2015
85 SOYA SHUTDOWN MECHANICAL,
SCAFFOLDING&PAINTING
SOYA - - 7-03-2015 16-05-2015
86 SIIMCO INSULATION SIIMCO AMANA CAD 21-03-15 01-07-2015
87AL-BAYRONI AMMONIA
TANK PROJECT
INSULATION,SCAFFOLDING&
PAINTING
AL-BAYRONI(SABI
C)
OLAYAN DESCON- 12-04-15 ONGOING
88SWCC SHUTDOWNPROJECT, YANBU
INSULATION SWCC BELLELI - 05-05-15 15-06-15
89 SWCC , YANBUINSULATION&SCAFFOLDING
SWCC NOMEC - 03-06-15ONGOING
90 JAZAN -SPHINXREFRACTORY
WORK- OUTOTEC - 13-07-2013 27-08-2015
91SOYA BEAN CRUSHING
CO.ELECTRICAL SOYA - - 02-08-15 ONGOING
RECENTLY COMPLETED/ON GOING PROJECTS
Sl.# PROJECT NAME JOB COMPANY CLIENT CONTRACTORPROJECT
START DATEPROJECT
END DATE
92JEDDAH UNITED SUGAR
CO.
REFACTORY, INSULATION & SCAFFOLDING
- BAB COCK - 08-08-2015 03-09-2015
93SOYA BEAN CRUSHING
CO.
STEEL STRUCTURE ERECTION
SOYA - - 25-08-2015 ONGOING
94SOYA BEAN CRUSHING
CO.CIVIL WORK SOYA - - 26-08-15 02-09-15
95LUBEREF EXTENSION
PROJECTTANK BOTTOM
INSULATIONLUBEREF YANBU STEEL - 08-09-2015 21-09-2015
96YANSAB CHIMNEY
MODIFICATION HOT
INSULATIONYANSAB DESCON ENGG. -
ABOUT TO START
97YANSAB DRINIKING
WATER LINE REPLACEMENT
COLD INSULATION
YANSAB AL DOSSARY -ABOUT TO
START
98YANSAB DRINIKING
WATER LINE
STANDINGSEAM
INSULATION PETRORABIGHPETROFAC HIDADA ABOUT TO
START
99SUPPLY AND
INSTALLATION OF INSULATION FOR PIPES
HOT INSULATION PETRORABIGH
JGCOLAYAN DESCON
24-10-2015
100REFURBISHMENT WORK@ CRISTAL
ECNOMIC CITY
MAITENANCE WORKS
CRISTAL - - 17-11-2015
RECENTLY COMPLETED/ON GOING PROJECTS
NATIONAL GUARD
MITSUBISHI SHOWROOM
NAMLA SIGNAL
TOYOTA SIGNAL
Google Map Location -24.061395,38.126590
Head OfficePB No. 6329Dammam 31442Tel : +966(0) 13 834 0371Fax : +966(0) 13 833 4594
Operating OfficePB No. 1697Yanbu Al-Bahr 41911Tel : +966(0) 14 390 7250Fax : +966(0) 14 390 7260
Email : [email protected] : www.clearvisionarabia.com
INDUSTRIAL SERVICES, CONTRACTING & TRADING