Expressway / Fly-Over Widening
Bridge Upgrading
A&A at Hospital
Expansion at Petrol-Chemical Plant
Quay Wall
Hotel at Airport Condominium Development
Lift Upgrading MRT Circle Line Stage 4 & 5
updated : Mar 20
COMPANY PROFILE
FOUNDATION ALLIANCE PTE LTD
Table of Contents
1. Introduction2. List of key / technical personnel & Company Organization Chart3. Track records4. BCA Registration/License, ISO OHSAS & bizSAFE Certificates and Award5. List of Major Plants & Equipments Owned 6. Selected project detail sheets
URL : http://www.foundation-alliance.com
FOUNDATION ALLIANCE PTE LTD28 Senang Crescent, #03-07 Bizhub 28
Bored PilesPre boring Soldier Pile & King Post Secant and Contiguous PilesBored and Driven MicropilesDriven Piles Test Pile by Reaction Ground Anchors Osterberg Cell Testing Method
Diaphragm WallsGround AnchorsSoil NailsToe Pins Sonic Logging Test
Jet and TAM GroutStone Columns Test Pile by Reaction Tension Piles Tension Test Pile
We take pride in the Quality of our works and are committed to offer competitive solutions to all your foundation problems involving :
FOUNDATION ALLIANCE was incorporated in Singapore in 2003 by a team of dedicated professionals with extensive experience in the field of Foundation Technology. Most of the Team Members have held senior positions in leading regional and international foundation Contractors. Hands-on involvement in numerous large-scale foundation projects as well as special requirement projects led us to develop innovative installation methodologies to overcome space and height constraints, difficult ground conditions, airfield environment, petrochemical environment, vibration free environment, etc.
Our current permanent monthly staff strength is more 66 staff & major specialist equipments owned include : 2 no Liebherr LB36 / LB44, 1 no Bauer BG39, 1 no Bauer BG36, 3 nos Bauer BG28, 2 nos Soilmec R618 / R16 bored pile boring rigs, 5 nos 5/90ton crawler cranes & 2 nos ICE 423 high frequency vibro hammers.
Position Name Qualification Working Experience
General Manager TAN Hock Seng BE. Civil (1988) Pilecon Engineering (Project Engineer):1988 to 1992(HP : 9621 6335) L&M Foundation (Operations Manager):1992 to [email protected] Resource Piling (Operations Director):2007 to 2017
Bachy Soletanche (Operations Manager):2017 to 2020Foundation Alliance (General Manager): 2020
Senior Project Manager Sam CHUA Kok Leong Dip. Civil & Env Engr Econ Corp (Assistant Engineer) : 2001 to 2003(HP : 9793 0707) (2001) Bauer (Site Engineer) : 2003 to [email protected] Foundation Alliance : since 2005
FOUNDATION ALLIANCE PTE LTDORGANIZATION CHART 2020
Director
(Tan Hock Seng)
Finance / HR / Admin
Accountant
AC / HR / Admin Exec
General Manager
(Tan Hock Seng)
Operations
Contract / Tender
Estimation / Finalisation
(Tan Hock Seng)
(Choo Jun Yi)
Technical / Design
Engineering
(Tan Hock Seng)
(Sam Chua)
(Choo Jun Yi)
Project Admin
Project Manager
(Sam Chua)
(Nancy Widjaja)
Operation Coordinator
(Sean Choo)
Project Engineer
(Choo Jun Yi)
Site/ Geo. Engineer
(John Lee)
(Han Zue Zan)
Yard
P&M Manager
(Kenny Yao)
Logistic & Training
(Sean Choo)
Tools
(Sarawanan)
QEHS
RM Team(Md. Noor)
(Sam Chua)
QA/QC
(Nancy Widjaja)(Han Zue Zan)
LIST OF CURRENT PROJECTS – FOUNDATION ALLIANCE PTE LTD, SINGAPORE
FROM TO
1 THOMSON LINE T220 GREAT WORLD STATION
TIONG SENG - DONGAH JV
LAND TRANSPORT AUTHORITY (LTA)
SAA ARCHITECTS PTE LTD
AECOM SINGAPORE PTE LTD
600 to 1500mm Bored Piles / King Posts - 169nos (lengths bet 30 & 50m with rock socket upto 6m into granite bedrock)
$3,842,245.00 Apr-15 Oct-20
2 CONTRACT N105 - NORTH SOUTH CORRIDOR BETWEEN SUFFOLK WALK & NOVENA RISE - Ultimate Test Piles
PENTA - BACHY SOLETANCHE JV
LTA MOTT MACDONALD 1000 to 1200mm Ultimate Test Piles - 5nos Compression Test by by Reactiion Pile Method, Tension Test Pile & Sat-Rapid
$2,264,105.00 May-19 Jun-20
3 $8,368,907.00 Sep-19 May-20
updated Feb 2020
MOUNT ALVERNIA HOSPITAL - NEW 10-STOREY BLOCK WITH TUNNEL TO EXISTING BLOCKS
SHIMIZU CORPORATION SINGAPORE
MOUNT ALVERNIA HOSPITAL
CIAP ARCHITECTS PTE LTD
BECA CARTER HOLLINGS & FERNER (SEA) PTE LTD
1000 to 1400mm Bored Piles with Plunged in Columns - 152 nos. (lengths bet 30 & 40m with rock socket) 600mm Secant Bored Pile - 333 nos. (lengths bet 10 to 15m)
SCOPE OF WORKS (contract)
CONTRACT SUM
PERIODNO DESCRIPTION OF CONTRACT CLIENT / MAIN CONTRACTOR OWNER ARCHITECT ENGINEER
Foundation Alliance, Singapore
LIST OF COMPLETED PROJECTS – FOUNDATION ALLIANCE PTE LTD, SINGAPORE
FROM TO
1 PROPOSED A & A TO EXISTING BLK S8, S15 & LT22 AT NUS
LOGISTIC CONSTRUCTION PTE LTD
NATIONAL UNIVERSITY SINGAPORE
CPG CORPORATION PTE LTD
CPG CORPORATION PTE LTD
250mm BORED MICROPILES - 8NOS (22m)
$50,000.00 Dec-03 Jan-04
2 PROPOSED RECONSTRUCTION OF 1 UNIT OF SEMI-DETACHED BUNGALOW AT NO. 7 SUNSET PLACE
OVERVIEW CONSTRUCTION PTE LTD
MR LEE JOO BAE KL THAM ENGINEERING CONSULTANT
250mm BORED MICROPILES - 17NOS (7m)
$38,610.00 Feb-04 Feb-04
3 RECONSTRUCTION AND EXPANSION OF VEHICULAR BRIDGE AT AYE, SUNGEI PANDAN
9 WIDENNING OF LOYANG AVENUE FROM LOYANG WAY TO CHANGI VILLAGE ROAD (engaged by M/C to complete the balance CBPs with multi layers very strong granite boulders)
ENG LAM CONTRACTORS CO (PTE) LTD
LAND TRANSPORT AUTHORITY (LTA)
- LAND TRANSPORT AUTHORITY (LTA)
1000mm CBP - 9nos (19 – 22m) with special rock coring tools for multi layers G2 granite boulders – boulder size upto 7m
$160,000.00 Dec-04 Jan-05
(excludes reinforcement steel)
10 DESIGN & CONSTRUCTION OF FORT CANNING TUNNEL & REALIGNMENT OF STAMFORD ROAD
SATO KOGYO CO LTD LAND TRANSPORT AUTHORITY (LTA)
- LAND TRANSPORT AUTHORITY (LTA)
Supply and install 2 nos reaction ground anchors for testing of working bored pile
$29,500.00 Dec-04 Jan-05
11 PROPOSED EXTENSION TO EXISTING SINGLE STOREY NUS CARE AT 7 JALAN PERAHU
PRELIMINARY TENSION TEST PILE 800mm diameter – 6125 kN test load
$18,000.00 Dec-05 Dec-05
(M/C : NCC-ECON JV)
18 PROPOSED C854 CIRCLE LINE 3 & 4 AT BUKIT BROWN STATION (without materials)
TAISEI CORPORATION LAND TRANSPORT AUTHORITY (LTA)
- LAND TRANSPORT AUTHORITY (LTA) / CPG CONSULTANTS
1000mm CONTIGUOUS BORED PILES - 62 nos (PILE LENGTH BETWEEN 24 & 28m socket 1m into granite bedrock) 350mm BORED MICROPILE FOR KING POST – 31 nos (upto 8m socket)
$422,000.00 Sep-05 Jan-06
Foundation Alliance, Singapore
LIST OF COMPLETED PROJECTS – FOUNDATION ALLIANCE PTE LTD, SINGAPORE
FROM TO SCOPE OF WORKS
(contract / final)CONTRACT / FINAL SUM
PERIODNO DESCRIPTION OF CONTRACT CLIENT / MAIN CONTRACTOR OWNER ARCHITECT ENGINEER
19 WIDENING OF PIE FROM KJE TO JALAN AHMAD IBRAHIM
1000mm BORED PILES – 87nos 600mm BORED PILES – 36 nos Length between 27 & 45m with rock socketing up to 3m into granite (due to sentive semiconductor plant, non vibration methods of socketing & casing installation were deployed)
$3,885,000.00 Mar-08 Aug-08
Foundation Alliance, Singapore
LIST OF COMPLETED PROJECTS – FOUNDATION ALLIANCE PTE LTD, SINGAPORE
FROM TO SCOPE OF WORKS
(contract / final)CONTRACT / FINAL SUM
PERIODNO DESCRIPTION OF CONTRACT CLIENT / MAIN CONTRACTOR OWNER ARCHITECT ENGINEER
41 MARINA BAY FINANCIAL CENTRE PHASE I (BUILDING CONTRACT)
KAJIMA OVERSEAS ASIA PTE LTD
KEPPEL LAND INTERNATIONAL LTD
ARCHITECT 61 PTE LTD
MEINHARDT (SINGAPORE) PTE LTD
700/1000mm dia PRE BORING FOR KING POST & DECK POST - 180 nos (PRE BORE LENGTH UPTO 16m)
$1,539,000.00 Oct-07 Sep-08
within MRT's 2nd & 3rd Reserves
42 MARINA BAY FINANCIAL CENTRE PHASE I (FOUNDATION CONTRACT)
TIONG SENG CONTRACTORS PTE LTD
KEPPEL LAND INTERNATIONAL LTD
ARCHITECT 61 PTE LTD
MEINHARDT (SINGAPORE) PTE LTD
700/1100mm CBP / SPW (PILE LENGTH UP TO 56m – overcome sea wall of thickness upto 3m)
$2,800,000.00 Oct-07 Oct-08
within MRT's 2nd & 3rd Reserves
43 12/18 STOREY RESIDENTIAL BLOCKS AT AH HOOD ROAD / JALAN RAJAH
1000, 1200 & 1500mm Bored Piles - 150nos (Length bet 40 & 62m) 500mm CBPs - 350nos Balance works : app $3,500,000 as Sep 14 (Novated Contract - from Sep 14)
$11,772,000.00 Sep-14 Apr-16
77 ER432 - WIDENING OF CLEMENTI ROAD & IMPROVEMENT TO COMMONWEALTH AVENUE WEST
ENG LEE ENGINEERING PTE LTD
LAND TRANSPORT AUTHORITY (LTA)
JY CONSULTANTS 800mm & 1200mm BORED PILES FOR BRIDGE EXTENSION 800mm to 1300mm CBPs
$1,446,674.00 Jun-15 Aug-16
78 IMPROVEMENT TO BUKIT TIMAH FIRST DIVERSION CANAL CONTRACT 3 (HOLLAND GREEN TO CLEMENTI RD)
UNITED SINGAPORE BUILDERS PTE LTD
PUBLIC UTILITIES BOARD
CH2MHILL / KTP CONSULTANTS PTE LTD
1000mm Contiguous Bored Piles - 100nos 800 to 1200mm Pre-Bore Deck / King Posts - 85nos (lengths bet 15 & 25m with rock socket upto 5m into sandstone / granite)
800 & 1500mm Bored Piles with King Posts - 158nos (lengths bet 26 & 40m)
$957,416.00 Jul-17 Nov-17
80 THOMSON LINE T219 ORCHARD STATION
PENTA OCEAN - BACHY SOLETANCHE JV
LAND TRANSPORT AUTHORITY (LTA)
SAA ARCHITECTS PTE LTD
AECOM SINGAPORE PTE LTD
600 to 1500mm Bored Piles / King Posts - 285nos (length bet 30 & 65m with rock socket upto 10m into granite bedrock) Removal of 400mm RC piles
$4,586,263.00 Jan-15 Dec-17
X1A0H
Foundation Alliance, Singapore
LIST OF COMPLETED PROJECTS – FOUNDATION ALLIANCE PTE LTD, SINGAPORE
FROM TO SCOPE OF WORKS
(contract / final)CONTRACT / FINAL SUM
PERIODNO DESCRIPTION OF CONTRACT CLIENT / MAIN CONTRACTOR OWNER ARCHITECT ENGINEER
81 18 STOREY MIXED DEVELOPMENT AT BIDEFORD ROAD
DRAGAGES SINGAPORE PTE LTD
SC AETAS HOLDING PTE LTD
RSP ARCHITECTS PLANNERS & ENGINEERS
RSP ARCHITECTS PLANNERS & ENGINEERS
600 to 1600mm Bored Piles with Plunged in Columns - 56nos & 400mm Micropile - 3nos (lengths bet 30 & 70m) 600 & 800mm CBPs - 217nos (lengths bet 18 & 23m with rock socket into granite bedrock)
$2,098,957.00 May-17 Jan-18
82 CONSTRUCTION OF SERVICE TUNNELS, ACCESS SHAFTS IN JURONG ISLAND
ED ZUBLIN AG JTC CORPORATION SURBANA JURONG INFRASTRUCTURE PTE LTD
800/880mm Secant Bored Piles - 300 nos (lengths bet 24 & 26m)
$1,731,712.00 Nov-17 Mar-18
83 PROPYLENE PURIFICATION UNIT, SRC, JURONG ISLAND
SCAN-BILT PTE LTD SINGAPORE REFINING COMPANY (SRC)
JGC 600mm to 800mm Bored Piles - 132nos (PILE LENGTHS BET 25 & 35m)
$2,762,523.00 Feb-19 May-19
84 PROJECT GLORY : 51-STOREY COMMERCIAL DEVELOPMENT WITH A BASEMENT AT CHULIA STREET / CHURCH STREET
DRAGAGES SINGAPORE PTE LTD
RSP ARCHITECTS PLANNERS & ENGINEERS (PTE) LTD
MEINHARDT (SPORE) PTE LTD
1000 to 2500mm Bored Piles with Plunged in Columns - 106nos (lengths bet 40 & 85m socket up to 30m into FCBB) 600 to 1000mm Secant Bored Piles - 322 nos (lengths bet 12 & 16m)
$10,594,291.00 Dec-17 Jun-19
85 RIFLE RANGE ROAD CAMP SEMBCORP DESIGN & CONSTRUCTION PTE LTD
MINDEF FONG CONSULT PTE LTD
700mm to 1500mm CBPs - 236nos (PILE LENGTHS BET 12 & 25m)
$3,313,452.00 Jun-19 Aug-19
86 THOMSON EAST-COAST LINE T303 - TANJONG RHU STATION
BACHY SOLETANCHE - WAI FONG JV
LAND TRANSPORT AUTHORITY (LTA)
ARUP SINGAPORE PTE LTD / MOTT MACDONALD
800 to 1800mm Bored Piles with Plunged in Columns - 223nos (lengths bet 50 & 80m) Removal/Coring of Underground Box Drain
$9,034,723.00 May-16 Oct-19
updated Feb 2020
Foundation Alliance, Singapore
4. BCA Registration/License, ISO, OHSAS & bizSAFE Certificates and Award
List of Major Plants & Equipments Owned
CAPACITYYEAR OF
MANUFACTUREDQUANTITY
Liebherr LB36 #115827 41 ton-m 2013 1 no
Bauer BG39 #2824 39 ton-m 2013 1 no
Bauer BG36 #2088 36 ton-m 2009 1 no
Bauer BG28 #2520 28 ton-m 2011 1 no
Bauer BG28 #1094 28 ton-m Dec 2006 1 no
28 ton-m 2005 1 no
900mm 1990s 1 no
1500mm 1990s 2 nos
90 ton 2009 1 no
80 ton Dec 2008 1 no
65 ton 2004 1 no
65 ton 1995 1 no
55 ton 2011 1 no
6 ton 1995 2 nos
20 ton 2009-2013 3 nos
20 ton 2008 1 no
5 ton 2013 1 no
96m
27m
63m
102m
Kobelco Mini SK50P
500mm to 1800mm
500mm to 1800mm
Soil / rock augers, soil / rock buckets, core barrels, rock roller bit core barrels, cleaning buckets & chisels
Round Shrank Core Barrel (for medium hard to hard rocks)
Project Title : REPLACEMENT OF QUAY WALL AT KABIL, BATAM,INDONESIA
Owner : PT SMOE (SUBSIDIARY OF SEMBCORP INDUSTRIES, SPORE)
Engineer : POSFORD HASKONING SDN BHD / ENGINEER 9000
Main Contractor : LOH & LOH CONSTRUCTION (PTE) LTD / PT JUTA ADI USAHA
Contract Sum : S$ 6,100,000.00
Period : Dec 2005 to Jul 2006
Scope of Works : 211 nos of 1500mm diameter SECANT PILE (lengths between 23 & 43m)- secondary pile G40 concrete & primary pile G30/40 concrete- over cutting between primary & secondary pile : 200mm
135 nos of 1000mm anchor bored piles (lengths between 18 & 40m)
Rock socket for both secant piles & anchor bored piles up to 3m
Sub soil condition : 0 to 5m m dense sandy fill 5 to10/16m soft to stiff clayey silt 10/16 to 12/25m v stiff to hard clayey silt 12/25 to 13/30m hard clayey silt > 13/30m siltstone / sandstone /
Scope of Works : 34 nos of 700mm & 14 nos of 800mm diameter bored piles
a non vibration casing installation method (by rotary method) had to be deployed
16 nos of the bored piles require “debonding casing” of lengths between 2.5m & 7m
Pile lengths approximately 43m
Sub soil condition : 0 to 6m Loose Clayey Sand6 to 8m Jet Grout Pile (JGP)8 to 15m Soft Marine Clay15 to 18m Stiff Silty Clay18 to 24m Soft Marine Clay24m to 26m V Stiff Clayey Silt> 26m V Hard Clayey Silt / V Dense clayey Sand
As the project site was within MRTC's 2nd & 3rd Reserves & next to conservation building,
Project Title : RETAINING STRUCTURE TO OFFICE BUILDING FOR UNIVERSAL TERMINAL FACILITIES, JURONG ISLAND
Owner : Universal Terminal (S) Pte Ltd
Architect : Ong & Ong Architects
Engineer : P Teo Consultants Pte Ltd
Client : Or Kim Peow Contractors (Pte) Ltd (M/C : Rotary Engineering Ltd)
Contract Sum : S$ 1,600,000.00 (excludes S$1,400,000.00 of Steel Tubular Pipe Pile)
Period : Sep 2006 to Aug 2007
Scope of Works : Admin Building :44 nos x 600mm x 30m steel tubular pipe piles in contiguous arrangement asretaining wall for building protection against quay wall's tie back movementSubstation 5 & Pipe Corridor 1 :33 nos x 600mm x 36m steel tubular pile piles(method of installation : by preboring & vibro hammer)
Berths 8, 9 & 10 and Substation 230 nos x 600mm x 40m raked (1 in 10) and 26 nos x 600mm x 40m steel tubular pipe piles(method of installation : by preboring & rotary in view of sensitive quay wall)
Rock socket upto 8m into sandstone
Sub soil condition : 0 to 24/28m Loose to Medium Dense fill sand (sand fill)25/40m Hard Clayey Silt / V Dense Clayey Sand / siltstone>32/40m Sandstone
Scope of Works : 10 nos 600mm diameter bored piles12 nos 1000mm diameter bored piles20 nos 1200mm diameter bored piles
Pile lengths between 4m & 19m with base grouting- Rock socket into granite bedrock between 0.6m & 2.5m. - Granite boulders of up to 1m
Sub soil condition : 0 to 1/2m Backfill (clayey silt with hardcore & granite rock pieces)1/2 to 4/18m Silty Clay / Clayey Silt with granite boulders> 4/18m Granite Bedrock
granite boulder cored byrock roller bit core barrel
Project Title : ONE SHENTON WAY 42 & 50 Storey Mixed Commercial & Residential Development
Owner : City Development Limited
Architect : Architect 61 Pte Ltd
Engineer : Meinhardt (Singapore) Pte Ltd
Main Contractor : Hyundai Engineering & Construction Co. Ltd
Final Sum : S$ 4,430,00.00 (excludes concrete, steel & spoil disposal)
Period : Aug 2007 to Jan 2008
Scope of Works : 17 nos 1000mm diameter bored piles17 nos 1200mm diameter bored piles91 nos 1500mm diameter bored piles28 nos 1600mm diameter bored pilesPile lengths between 55mm & 65m socketing up to 10m into boulderly clay layers
Sub soil condition :
0 to 3/7m Loose to Medium Dense fill sand (sand fill)3/7 to 23/39m Marine Clay23/39 to 39/51m Sandy Clayey Silt (SPT < 100)39/51 to 50/72m Sandy Clayey Silt (SPT < 100)> 50/72m Fort Canning Boulderly Bed
Scope of Works : 87 nos of 1000mm & 36 nos of 600mm diameter bored piles with base grouting
As the project site is next to semiconductor manufacturing plant, a non vibrationcasing installation method (by rotary method) and rock socketing without chiseling have to be deployed
Pile lengths approximately 25 & 45m with rock socketing into granite bedrock upto3m for 1000mm & 0.6m for 600mm diameter bored piles
Sub soil condition :
0 to 3/4m M Stiff to Stiff Clayey Silt3/4 to 14/18m Loose Silty Sand /
Stiff Clayey Silt14/18 to 19/45m V Stiff to Hard Clayey Silt> 19/45m Granite Bedrock of GI/GII
MRT Station to City Square Mall (within 1st & 2nd Reserves)
Project Title : UPGRADING OF ROAD SYSTEM AT SENTOSA GATEWAY-HABOURFRONT (ER 251)
Owner : Land Transport Authority
Engineer : T Y LIN INTERNATION PTE LTD
Client : SAMWOH CORPORATION PTE LTD
Contract Sum : S$ 602,214.50
Period : Dec 2008 to Mar 2009
Scope of Works : 1no of 700mm, 14 nos of 800mm & 5nos of 1000mm diameter bored piles
Pile lengths approximately 10 & 25m with rock socketing into siltstone /sandstone Casing installation with rotary method as project site was within MRT's Reserves
Sub soil condition :0 to 2/3m M Dense Clayey Sand2/3 to 5/6m Soft Sandy Silt with Peat5/6 to 7/10m V Stiff SandySilt7/10 to 10/14m Hard Sandy Silt> 10/14m Siltstone / Sandstone
Scope of Works : 100 nos 1200mm diameter Tension & Compression Bored Piles with Plunged in Steel Columns15 nos 1200mm diameter Pre-Bore Soldier Piles23 nos 1000mm, 1200mm & 1500mm diameters Hard Hard Secant Pile WallWorking within MRTC's Reserves (North East Line) – chiseling & vibro not allowed
Pile lengths between 25m & 40m socketing up to 5m into siltstone, sandstone & boulderly clay layers
Project Title : WIDENING OF CTE FROM PIE TO BRADELL INTERCHANGE(CONTRACT ER 288)
Owner : Land Transport Authority
Engineer : CPG Corporation Pte Ltd
Client : Or Kim Peow Contractors (Pte) Ltd
Contract Sum : S$ 7,300,000.00
Period : Jul 2009 to Dec 2010
Scope of Works : 73nos of 600mm diameter bored piles (Across Kallang River)210nos of 700mm diameter bored piles 39nos of 700mm diameter bored piles (some piles debonding due to DTSS tunnels)
Pile lengths approximately 35 & 50mSub soil condition :0 to 2/4m Fill2/4 to 8/20m V Soft Marine Clay / Peaty Clay8/20 to 12/20m Loose Silty Sand12/20 to 20/35m M Dense to Dense Silty Sand> 20/35m V Dense Silty Sand / Hard Sandy Silt
Scope of Works : 119 nos of 600mm, 900mm, 1100mm & 1200mm diameters bored piles for Admin BuildingPile lengths between 18m & 38m socketing upto 4m into granite bedrock & upto 4m of boulders
50 nos 800mm diameter Pre-Bore Soldier Piles for Cut & Cover TunnelPile lengths between 10m & 15m socketing upto 9m into granite bedrock & upto 2m of boulders
Installing CBPs (Little India Station Entrance) – Next to LTA Installing CBP (Rochor Station – Rochor Canal) HQ office
11 nos of 1100mm Prebore Soldier Piles at Little India Station within MRT's 1st Reserve (18m)
Project Title : IMPROVEMENT OF ALEXANDRA CANAL (Between Zion Road & Kim Seng Road)- Canal Improvement, Bridges Upgrading & Provision for Future MRT Tunnels
Owner : Public Utilities Board (PUB)
Engineer : Surbana International Consultants Pte Ltd
Client : Eng Lam Contractors Co (Pte) Ltd
Contract Sum : S$ 8,729,087.00
Period : Feb 2012 to Dec 2012
Scope of Works : 135nos of 600/1000mm diameter bored piles70nos of 1500mm diameter bored piles 18nos of 1800mm diameter bored piles Pile lengths between 30m & 55m with socket into granite bedrock between 1 & 7.5m(1m for 600/1000mm, 4.5m for 1500mm & 7.5m for 1800mm) - permanent casings for 1500 & 1800mm piles; 15m length from 8m below platform level installed by rotary method with a 9m drive adapter extension to push top of permanent casing to 8m below working platform within 100mm accuracy
Sub soil condition :0 to 2/4m Fill platform level2/4 to 8/12m V Soft Marine Clay / Peaty Clay8/12 to 20/26m Soft to V Stiff Sandy Silt / Silty Sand 10m length 8m20/26 to 28/45m Dense to Dense Silty Sand casing drive> 28/48m Granite Bedrock adapter 15m permanent