COMPANY PRESENTATION RD&S GROUP RD&S GROUP FOR SUSTAINABLE RESULTS
Certeco SR
RD&S group
Buro CITE NL 2 ChangeIT NL
Founded in 2002
Itailor2SRBuro CITE SR Scintillant NL
Total workforce is 35 engineers and consultants
Founded in 2006 Founded in 2013 Founded in 2008 Founded in 2004 Founded in 2006
RD&S GROUP FOR SUSTAINABLE RESULTS
TECHNOLOGY PARTNERS
Waste management
Drinking water solution
Sustainable parking solutions
Constructions Re-use of materials
Waste to Energy solutions
Waste water treatmentMobile drinking water installation
Bridges
ERP solutions
SERVICES
1. Structures
2. Engineering Public Space
3. Public Space Management
4. Employment Agency
5. Software Development & Business Intelligence
6. Urban Planning & Development
STRUCTURES
• Schedule of requirements
Defining the requirements with the client
• Sketching and Design
We optimize the design, strength and stability calculations.
• Technical drawings and contract specifications
Based on the technical design, contract specifications are drawn up
• Procurement and Construction
We organize the tender process up to the contract award
• Application, management and maintenance
To ensure functionality and structural integrity regular maintenance is
essential. We advise on managing construction maintenance and set up
maintenance plans.
• Bridges
Brigde over the Saramaccariver, in Suriname
• Type
Dutch class 60 bridge, with 5 spans of 34 meters
• Material
Concrete
34.00 34.00 34.00 34.00 34.00 34.00 34.00
238.00
ZIJAANZICHT
BOVENAANZICHT
1 2 3 4
6 %
30.00
OPRIT
52
0
6 %
OPRIT
Ref. + 2.00 m
Ref. + 1.80
Ref. + 4.04 mRef. + 6.08 m
H.H.W.
bestrating ( 50 .00 m )
zie blad no 17
bestrating ( 50 .00 m )
zie blad no 17
Ref. - 0.20
Ref. 0.00Ref. 0.00Ref. - 0.60
• Bridges
Brigde over the Saramacca canal, in Suriname
• Type
Dutch class 60 bridge, with 3 spans of 75 meters
• Material
Steel (galvanized)
H.K.P.5.5
0
75.00
6 % 6 %referentielijn
75.0030.00 75.00 30.00
• River dikes
Commewijne river, near Paramaribo
• Type
Rockfill and slope blocks. Length 900 m.
• Material
Concrete and natural stones
1:2,7
Stortsteen
Houten perkoen palen Ø15 cm
Lengte 300 cm , h.o.h. 30 cm
+0.75 NSP (ref.)
Teenschot 2 x 2"x 6" (hardhout). Planken in lengterichting aanbrengen met verspringende lassen.
Elke plank aan elke perkoenpaal nagelen met gegalvaniseerde draadnagels 3".
Spijkerlat 112 " x 2". Geotextiel tweemaal om deze lat wikkelen.
Betonblokken 40 x 40 x 20 cm
Geotextiel
Uitvullaag, min 5 cm en max. 7 cm dik.
+2.15 NSP
+2.35 NSP
Rivierzijde
Dwarsdoorsnede huidige oeververdedigingSchaal 1: 100
Betonnen opsluitband 18 x 25 x 100 cm
300 cm
IAan te vullen met klei (volgens de gestelde eisen in het bestek)
1: 2
Geotextiel
Schelpzand 10 cm dikklinkzand 10 cm dik
Herleggen betonblokken 40 x 40 x 20 cm
Aanbrengen steenbestorting volgens tekening 2
Which is a structural fiber and a plastic, this is known as Fiber Reinforced Plastics, or FRP for short. Like straw, the fiber provides the structure and strength to the composite, while a plastic polymer holds the fiber together. Common types of fibers used in FRP composites are:
• Fiberglass
• Carbon Fiber
• Aramid Fiber
• Retaining structures
Marowijne river near the border with French Guyana
• Type
Steel scheetpiles. Length 350 m
• Material
Steel
0.0
0 m
2.0
0 m
4.0
0 m
6.0
0 m
8.0
0 m
10.0
0 m
Profiel
Stalen damplank
+2.15 NSP
+2.35 NSP 300 cm
1: 2Schelpzand 10 cm dikklinkzand 10 cm dik
ankerstaafankerblok, 1 m³ beton
Blokken h.o.h. 5 m
-8.25 NSP
15,00 m
• Cruise terminal
Suriname river , near Paramaribo
• Type
Mooring platform
• Material
Concrete
M ONUM ENT
25 FEBTUARI
O P E N B A R E
PLATT EBRUG
LOODS EN
K.N.S.M
. STEIGER
S U R
I N
A M
E
R
I V I
E R
ENGINEERING PUBLIC SPACE
• Schedule of requirements
Defining the requirements with the client
• Research and Design
We investigate the project location, deliver surveys and
calculations. Based on the research data we make a design. We
optimize the design, strength and stability calculations.
• Technical drawings and contract specifications
Based on the technical design, contract specifications are
drawn up
• Procurement and Construction
We organize the tender process up to the contract award
• Application, management and maintenance
To ensure functionality regular maintenance is essential. We
advise on managing construction maintenance and set up
maintenance plans.
• Sewage works
Urban areas in Paramaribo
• Type
Concrete drain pipes .Length 16.000 m.
• Material
Concrete
• Road engineering
Highways and roads in urban areas. In different areas.
• Type
Soilcement base with an asphalt toplayer
• Material
Asphalt
• Potable water container
• Clean drinking water from:
• Polluted freshwater, brackish or saltwater, water
wells, waste water
• Production starting from 60.000 ltr per 24 hours
• Characteristics
• Mainly membrane technology
• Chemical free purification process
• Low maintenance costs
• Skid mounted in 20ft sea container
• Unique selling points
• User friendly and attractive parkingsystem
• Light weight & fast build construction (1-3 months)
• Less failure-cost due to integrated prefabrication
• High residual value, re-usable and recyclable
• Corrosion free and fire restistant coating
• Maintenance friendly and sustainable concept
• Tailor made design
PUBLIC SPACE MANAGEMENT
• We support clients in defining policy and
making management and maintenance plans
• Policy and organization• Vision on design, maintenance and community orientated
approach
• Integrated management systems for public space and
guidelines for public space design
• Analysis of maintenance costs and optimizing workflow
• Sustainable procurement
• Management and maintenance • Maintenance management plans
• Integrated maintenance plans
• Costs and funding of public space management
• Maintenance contracts and specifications
• Evaluation of management and maintenance plans
Design study industrial area The Hague, Netherlands Design study China Center Rotterdam, Netherlands