Presentation Overview
• Introduction• Mariner East 1 & 2• Pumping Station Specifics• Air Pollutants and Public Health
Photo Source: Bob Donnan: http://www.donnan.com/EPA_Air-Quality_92711.htm
Clean Air Council Marcellus Shale Program
• Track current rulemaking and write comments on regulations• Work with residents to comment and testify on natural gas infrastructure• Lawsuits against polluters or agencies• Community actions to achieve goals outside of regulatory pathways
64% of PA is above Marcellus Shale. In 2013, PA had over 6,000 wells with 3 trillion cubic feet of gas production. These gas products have flooded
regional markets and companies are trying to build pipelines to sell overseas.
• New Pipeline50 milesWestern PA
• Existing Pipeline 300 milesOver 80 years oldOldest pipelines 4%
Mariner East 1 Basics
Source: 4% of US gas transmission pipelines were built before 1940Canary LLC CEO Dan Eberhart http://canaryusa.com/aging-us-pipelines/
• Switch the pipeline direction to pump natural gas liquids from wells near Houston, PA to the Marcus Hook Refinery near Philadelphia
• Increase pressure from 800 pounds per square inch (PSI) to 1400 PSI
• 18 new pumping stations and 17 new valve control stations
• 70,000 barrels per day
Sunoco Logistics’ Plan
Natural Gas Liquids - Ethane
• Mariner East will transport 100% ethane as of 2015
• Extracted as gas, but under pressure becomes a liquid
• Used industrially for plastics, anti-freeze, and detergents
• Extremely flammable
• Sunoco Logistics is currently before the PUC requesting exemption from local zoning laws for pumping station buildings
• Current PUC process will determine whether or not pumping stations are “reasonably necessary for the convenience and welfare of the public” as well as whether Sunoco Logistics is a public utility
Public Utility Commission (PUC)
Source: PHMSA, Pipeline and Hazardous Materials Safety Administration. http://primis.phmsa.dot.gov/comm/ reports/operator/OperatorIM_opid_18718.html?nocache=259#_OuterPanel_tab_2
Sunoco Logistics Pipeline Incidents
Details
Sunoco Logistics Claims:• Mariner East 1 will be operational by Fall 2014
with 70,000 barrels per day of ethane and propane
• Mariner East 2 will be operational by 2016 with 275,000 barrels per day of natural gas liquids
Emission Sources at Pumping Stations
• Electric Pump Motors• Flaring of gas during maintenance operations
and constant flaring of fugitive emissionsSource: Data and images from State-only operating permit filed with DEP
• Maximum expected annual flaring: – 312,800 standard cubic feet– Equivalent to 8,696 gallons– 23 gallons daily
• Could be more if there are maintenance issues
Flare Volume
• Flare will operate 24/7, igniting fugitive emissions from the motor and pipeline seals
Flare Frequency
• 35.8 tons of carbon annually, equal to:– Annual carbon sequestration from 26 acres of forest– Burning 34,884 pounds of coal
Carbon Emissions
• Zoning Appeal• DEP Hearing– 500 requests– Follow-up with
Zoning and Air Permit