Top Banner
Community Impacts of Mariner East Pipelines Prepared for West Cornwall Public Meeting November 21, 2014 Presented by Sam Koplinka-Loehr, Clean Air Council
28

Community Impacts of Mariner East Pipelines Prepared for West Cornwall Public Meeting November 21, 2014 Presented by Sam Koplinka-Loehr, Clean Air Council.

Dec 15, 2015

Download

Documents

Jonas Bourn
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Community Impacts of Mariner East Pipelines Prepared for West Cornwall Public Meeting November 21, 2014 Presented by Sam Koplinka-Loehr, Clean Air Council.

Community Impacts ofMariner East Pipelines

Prepared for West Cornwall Public MeetingNovember 21, 2014

Presented by Sam Koplinka-Loehr, Clean Air Council

Page 2: Community Impacts of Mariner East Pipelines Prepared for West Cornwall Public Meeting November 21, 2014 Presented by Sam Koplinka-Loehr, Clean Air Council.

Presentation Overview

• Introduction• Mariner East 1 & 2• Pumping Station Specifics• Air Pollutants and Public Health

Photo Source: Bob Donnan: http://www.donnan.com/EPA_Air-Quality_92711.htm

Page 3: Community Impacts of Mariner East Pipelines Prepared for West Cornwall Public Meeting November 21, 2014 Presented by Sam Koplinka-Loehr, Clean Air Council.

Clean Air Council Marcellus Shale Program

• Track current rulemaking and write comments on regulations• Work with residents to comment and testify on natural gas infrastructure• Lawsuits against polluters or agencies• Community actions to achieve goals outside of regulatory pathways

Page 4: Community Impacts of Mariner East Pipelines Prepared for West Cornwall Public Meeting November 21, 2014 Presented by Sam Koplinka-Loehr, Clean Air Council.

64% of PA is above Marcellus Shale. In 2013, PA had over 6,000 wells with 3 trillion cubic feet of gas production. These gas products have flooded

regional markets and companies are trying to build pipelines to sell overseas.

Page 5: Community Impacts of Mariner East Pipelines Prepared for West Cornwall Public Meeting November 21, 2014 Presented by Sam Koplinka-Loehr, Clean Air Council.

Mariner East 1

Page 6: Community Impacts of Mariner East Pipelines Prepared for West Cornwall Public Meeting November 21, 2014 Presented by Sam Koplinka-Loehr, Clean Air Council.

• New Pipeline50 milesWestern PA

• Existing Pipeline 300 milesOver 80 years oldOldest pipelines 4%

Mariner East 1 Basics

Source: 4% of US gas transmission pipelines were built before 1940Canary LLC CEO Dan Eberhart http://canaryusa.com/aging-us-pipelines/

Page 7: Community Impacts of Mariner East Pipelines Prepared for West Cornwall Public Meeting November 21, 2014 Presented by Sam Koplinka-Loehr, Clean Air Council.

• Switch the pipeline direction to pump natural gas liquids from wells near Houston, PA to the Marcus Hook Refinery near Philadelphia

• Increase pressure from 800 pounds per square inch (PSI) to 1400 PSI

• 18 new pumping stations and 17 new valve control stations

• 70,000 barrels per day

Sunoco Logistics’ Plan

Page 8: Community Impacts of Mariner East Pipelines Prepared for West Cornwall Public Meeting November 21, 2014 Presented by Sam Koplinka-Loehr, Clean Air Council.

Natural Gas Liquids - Ethane

• Mariner East will transport 100% ethane as of 2015

• Extracted as gas, but under pressure becomes a liquid

• Used industrially for plastics, anti-freeze, and detergents

• Extremely flammable

Page 9: Community Impacts of Mariner East Pipelines Prepared for West Cornwall Public Meeting November 21, 2014 Presented by Sam Koplinka-Loehr, Clean Air Council.

• Sunoco Logistics is currently before the PUC requesting exemption from local zoning laws for pumping station buildings

• Current PUC process will determine whether or not pumping stations are “reasonably necessary for the convenience and welfare of the public” as well as whether Sunoco Logistics is a public utility

Public Utility Commission (PUC)

Page 10: Community Impacts of Mariner East Pipelines Prepared for West Cornwall Public Meeting November 21, 2014 Presented by Sam Koplinka-Loehr, Clean Air Council.
Page 11: Community Impacts of Mariner East Pipelines Prepared for West Cornwall Public Meeting November 21, 2014 Presented by Sam Koplinka-Loehr, Clean Air Council.

Source: PHMSA, Pipeline and Hazardous Materials Safety Administration. http://primis.phmsa.dot.gov/comm/ reports/operator/OperatorIM_opid_18718.html?nocache=259#_OuterPanel_tab_2

Sunoco Logistics Pipeline Incidents

Page 12: Community Impacts of Mariner East Pipelines Prepared for West Cornwall Public Meeting November 21, 2014 Presented by Sam Koplinka-Loehr, Clean Air Council.

Mariner East 2

Page 13: Community Impacts of Mariner East Pipelines Prepared for West Cornwall Public Meeting November 21, 2014 Presented by Sam Koplinka-Loehr, Clean Air Council.

Just the Beginning

Page 14: Community Impacts of Mariner East Pipelines Prepared for West Cornwall Public Meeting November 21, 2014 Presented by Sam Koplinka-Loehr, Clean Air Council.

Details

Sunoco Logistics Claims:• Mariner East 1 will be operational by Fall 2014

with 70,000 barrels per day of ethane and propane

• Mariner East 2 will be operational by 2016 with 275,000 barrels per day of natural gas liquids

Page 15: Community Impacts of Mariner East Pipelines Prepared for West Cornwall Public Meeting November 21, 2014 Presented by Sam Koplinka-Loehr, Clean Air Council.

West Cornwall Pumping Station

Page 16: Community Impacts of Mariner East Pipelines Prepared for West Cornwall Public Meeting November 21, 2014 Presented by Sam Koplinka-Loehr, Clean Air Council.
Page 17: Community Impacts of Mariner East Pipelines Prepared for West Cornwall Public Meeting November 21, 2014 Presented by Sam Koplinka-Loehr, Clean Air Council.

Previous Spill History

Page 18: Community Impacts of Mariner East Pipelines Prepared for West Cornwall Public Meeting November 21, 2014 Presented by Sam Koplinka-Loehr, Clean Air Council.
Page 19: Community Impacts of Mariner East Pipelines Prepared for West Cornwall Public Meeting November 21, 2014 Presented by Sam Koplinka-Loehr, Clean Air Council.

Emission Sources at Pumping Stations

• Electric Pump Motors• Flaring of gas during maintenance operations

and constant flaring of fugitive emissionsSource: Data and images from State-only operating permit filed with DEP

Page 20: Community Impacts of Mariner East Pipelines Prepared for West Cornwall Public Meeting November 21, 2014 Presented by Sam Koplinka-Loehr, Clean Air Council.

Flare Design

Page 21: Community Impacts of Mariner East Pipelines Prepared for West Cornwall Public Meeting November 21, 2014 Presented by Sam Koplinka-Loehr, Clean Air Council.

• Maximum expected annual flaring: – 312,800 standard cubic feet– Equivalent to 8,696 gallons– 23 gallons daily

• Could be more if there are maintenance issues

Flare Volume

Page 22: Community Impacts of Mariner East Pipelines Prepared for West Cornwall Public Meeting November 21, 2014 Presented by Sam Koplinka-Loehr, Clean Air Council.

• Flare will operate 24/7, igniting fugitive emissions from the motor and pipeline seals

Flare Frequency

Page 23: Community Impacts of Mariner East Pipelines Prepared for West Cornwall Public Meeting November 21, 2014 Presented by Sam Koplinka-Loehr, Clean Air Council.

• Equal to 5 constantly idling school buses

Fugitive Emissions: Volatile Organic Compounds (VOCs)

Page 24: Community Impacts of Mariner East Pipelines Prepared for West Cornwall Public Meeting November 21, 2014 Presented by Sam Koplinka-Loehr, Clean Air Council.

• 35.8 tons of carbon annually, equal to:– Annual carbon sequestration from 26 acres of forest– Burning 34,884 pounds of coal

Carbon Emissions

Page 25: Community Impacts of Mariner East Pipelines Prepared for West Cornwall Public Meeting November 21, 2014 Presented by Sam Koplinka-Loehr, Clean Air Council.

Taking Action to Protect our Communities

Page 26: Community Impacts of Mariner East Pipelines Prepared for West Cornwall Public Meeting November 21, 2014 Presented by Sam Koplinka-Loehr, Clean Air Council.

• Zoning Appeal• DEP Hearing– 500 requests– Follow-up with

Tom [email protected]

Zoning and Air Permit

Page 27: Community Impacts of Mariner East Pipelines Prepared for West Cornwall Public Meeting November 21, 2014 Presented by Sam Koplinka-Loehr, Clean Air Council.

Contact Info

• Sam Koplinka-Loehr, CAC Shale Gas [email protected]

Page 28: Community Impacts of Mariner East Pipelines Prepared for West Cornwall Public Meeting November 21, 2014 Presented by Sam Koplinka-Loehr, Clean Air Council.

Questions?