7/26/2019 Commnity Hall Muthukrishanapuram
1/209
ANDIPATTI PANCHAYAT UNION
Name of work:
Name of scheme and Year: MLA 2014-2015
Estimate Amount:Rs 1!"0!000#-
A$% No and &ate:
'$% No and &ate:
(onstruction of (ommunit) *a++ ,')e-./ atMuthukrishanuram
7/26/2019 Commnity Hall Muthukrishanapuram
2/209
THENI DISTRICT
7/26/2019 Commnity Hall Muthukrishanapuram
3/209
Highways Department
Schedule of Rates for the year 2014-2015
I Rates for a!our
S.No. Description Unit"#$ R%&$S
'ituminous wor( a!our Diesel (Local Rate) Litre 54.15
1 Bitumen sprayer Man Day 300.00 urnace !il Litre 50.00
" Bitumen ra#er Man Day 31".00 $erosene Litre 50.00
3 %eat master operator Day 31".00
4 Mini %ot Mi& plant !perato Day 31".00 'I)$*
5 'unnutin plant !perator Day "1.00 Bitumen pac#e* M+ ,,,
'unnutin un !perator Day "-5.00 mulsion M+ ,,,
/ Roa* Ma*oor 'ra*e Day "5-.00
- Roa* Ma*oor 'ra*e Day "31.00
2 Roa* Ma*oor 'ra*e Day "31.00
10 %ea* Ma*oor Day ".00
11 Ma*oor (S#ille*) 0.00
1" Ma*oor (Uns#ille*) 0.00
II Hire +harges for )achineries
1oer roller - 10 ton Day -"-.00
45.00
" 6ater sprin#ler Day 1152.00 6ater tan#er #l 1 trip per 7 "50.00
3 Mini %ot Mi& lant Day 1/4.00 Mi&all 810 t capacity 15".05
4Bitumen Boiler it7 9uel Day
10.00
5 Bitumen Sprayer 10 S:.m 15.00+7ree 7eel -0100 #N static r 1/-./-
Bitumen Boiler it7out 9uel Day "0".00 Bitumen Sprayer per *ay 10/.00
/ ;entral Mi&in lant Day -43".00
-
7/26/2019 Commnity Hall Muthukrishanapuram
4/209
I, Rates of wor(s
1 Scru= unle S:m ".35
" Cunle clearance S:m ".55
3 art7 or# SS "0 ? ;um 42.00
4 art7 or# SS "0B ;um 4.00
5 art7 or# SDR not r =las ;um -.50
Me*ium roc# not re: =lasti ;um 1"0./5
/ %ar* roc# re: =lastin ;um 3".00
- ?**l one lea* o>er 10m ;um 5./5
2 ?**l one li9t o>er "m ;um 4.0
10 ReAllin e&ca>ate* eart7 ;um 1.15
11 ReAllin e&ca>ate* san* ;um 14."5
1" Sprea*in ra>el (la=our o ;um 5.1
13 Stac#in metal ;um 3.15
14 Stac#in ra>el ;um 3.05
15 Stac#in san* ;um 3.05
1 $ilometre stone eac7 30.00
1/ %ectametre stone eac7 1-5.00
7/26/2019 Commnity Hall Muthukrishanapuram
5/209
, R%&$S " )%&$RI%S
Sl.*o. Description #nit
I
i 20mm sie one cum 3"".00
ii /5mm sie one cum 30.00
iii 3mm sie one cum 45.00
i> 53mm sie one cum 55.00
> 4.5mm sie one cum /5/.00
>i 45mm sie one cum /5/.00
>ii 3/.5mm sie one cum //3.00
>iii ".5mm sie one cum /31.00
i& "5mm sie one cum /31.00
& "".4mm sie one cum 101.00
&i 13."mm sie one cum 2-3.00
&ii 11."mm sie one cum -.00
&iii ./mm sie one cum 42.00
&i> mm sie one cum 42.00
&> 5.mm sie one cum 42.00
&>i 4./5mm sie =elo one cum 440.00
&>ii 'ra>el 143.00
&>iii 6ellra>el 11-.00
&i& San* 9or Allin 1/.40
1 Bitumen pac#e* -08100 Mt 55300.00
" mulsion Mt 42300.00
,I ther )aterials
1 ;ement Mt 4200.00
" San* one cum 1/.40
3 San* 9or Allin one cum 1/.40
4 Rou7 stone one cum 35.00 31.00 or Re>etment or#s
5 Bon* stone one cum 500.50
40mm SS metal one cum -1.00/ "0mm SS metal one cum 1135.00
- ;ountry =ric#s " 384E 1000 nos 4""0.00
+oim!atore+ircle
Hard 'ro(en Stone IR+ Standard / Hand 'ro(en )achine +rushed
7/26/2019 Commnity Hall Muthukrishanapuram
6/209
,II
R%&$S "R +*,$%*+$ " )%&$RI% ' R%D I* %I*S "R &H$ $%R 2014-15.
Sl.No. Distance in $ilometre Bitumen
1 2 3 4 5 6
1 ;o eFcient 1.10 1.0 1.35 1.-0 "."5 0.00
" nci*ental c7ares
3 ?** 9or e>ery e&tra 1 #m or part t7ereo9
a 0 - 10 7ms. 5.2/ -.2 /.33 2.// 1"."" 0.00
= 10 - 20 7ms. 5.1" /.44 ."- -.3/ 10.4 0.00
c 20 - 40 7ms. 4.40 .40 5.40 /."0 2.00 0.00
* 40 - 60 7ms. 3.-0 .00 4.5 ."0 /./ 0.00
e %!o8e 60 7ms. 3.4/ 5.04 4."5 5./ /.02 0.00
4 Loa*in ;7ares 3-.40 ".30 3/./5 3/./5 3/./5 0.00
5 Unloa*in ;7ares 3-.40 ".30 3/./5 3/./5 3/./5 0.00
?n ?*7oc e&tra 9or inter st 1/.0 "5.0 "1.55 "-./5 3.00 0.00
/ L UL ;7ares 0.00 0.00 0.00 0.00 0.00 0.00
,III +on8eyance &a!le 9for HIS:
Sl.No. Distance in $ilometre Bitumen
1 2 3 4 5 6
1 ;o eFcient 1.10 1.0 1.35 1.-0 "."5 0.00
" nci*ental c7ares
3 ?** 9or e>ery e&tra 1 #m or part t7ereo9
a 0 - 10 7ms. 11.24 1/.3- 14. 12.54 "4.44 0.00
= 10 - 20 7ms. 10."4 14.-- 1".5 1./4 "0.2" 0.00
c 20 - 40 7ms. -.-0 1".-0 10.-0 14.40 1-.00 0.00
* 40 - 60 7ms. /.0 1".00 2.30 1".40 15.5" 0.00
e %!o8e 60 7ms. .24 10.0- -.50 11.34 14.1- 0.00
+on8eyance &a!le 9for%I*S:
Br. CellyG6oo*or#
(one m3)
Bro#enStoneSan*
'ra>el(one m3)
;ountryBric#s(1000NosG)
Manalore +iles(1000No
sG)
;7am=er=ric#sG
loorintiles.
(1000nos)
R%&$S "R +*,$%*+$ " )%&$RI% ' R%D I*HIS"R &H$ $%R 2014-15.
Br. CellyG6oo*or#
(one m3)
Bro#enStoneSan*
'ra>el(one m3)
;ountryBric#s(1000NosG)
Manalore +iles(1000No
sG)
;7am=er=ric#s
7/26/2019 Commnity Hall Muthukrishanapuram
7/209
7/26/2019 Commnity Hall Muthukrishanapuram
8/209
Name o9 or# Strent7enin t7e roa* 9rom
Startin n*inSc7eme H *%'%RD RID"
Iear H
$M 0.000 1.400
MetalBitumen 'ra>el San*
rom +o 3"".4 13."./
0.00 31."0 31."0 1.40 /0.40
or or or or
$M 0.00 0.00 %ills 0.00 0.00 0.00 0.00 0.00
lain 0.00 0.00 0.00 1.00 0.00
+otal 0.00 0.00 0.00 1.00 0.00
0.00 31."0 31."0 1.40 /0.40
or or or or
$M 0.00 0.00 %ills 0.00 0.00 0.00 0.00 0.00lain 0.00 0.00 0.00 1.00 0.00
+otal 0.00 0.00 0.00 1.00 0.00
0.00 31."0 31."0 1.40 /0.40
or or or or
$M 0.00 0.00 %ills 0.00 0.00 0.00 0.00 0.00
lain 0.00 0.00 0.00 1.00 0.00
+otal 0.00 0.00 0.00 1.00 0.00
0.00 31."0 31."0 1.40 /0.40
or or or or
$M 0.00 0.00 %ills 0.00 0.00 0.00 0.00 0.00
lain 0.00 0.00 0.00 1.00 0.00+otal 0.00 0.00 0.00 1.00 0.00
0."0 31.00 31.00 1."0 /0."0
or or or or
$M 1.00 1.40 %ills 0.00 0.00 0.00 0.00 0.00
lain 31.00 31.00 1.00 1.00 0.00
+otal 31.00 31.00 1.00 1.00 0.00
0.50 30.30 30.30 0.50 2.50
or or or or
$M 0.00 1.00 %ills 0.00 0.00 0.00 0.00 0.00
lain 30.00 30.00 1.00 1.00 0.00
+otal 30.00 30.00 1.00 1.00 0.00
HIS 0.00 0.00 0.00 0.00 0.00
%I*S 2;.60 2;.60 0.00 1.00 ;.00
3"".4 13."./ Bitumen 'ra>el San*
Metal Metal
6or#inmilae
7/26/2019 Commnity Hall Muthukrishanapuram
9/209
7/26/2019 Commnity Hall Muthukrishanapuram
10/209
Name o9 or# Strent7enin t7e roa* 9rom
0
Name o9 Juarry
3 "".4 Metal H 7m 222 of $rode +hennimalai road
13." ./ Metal H 7m 222 of $rode +hennimalai road
Bitumen H %t .#.Store
7/26/2019 Commnity Hall Muthukrishanapuram
11/209
RA& ME'AL RA'E
Name of work: Strengthening the road from
0
.
1 0.050 90 mm IRC Metal 322.00 16.10 0.025 63 mm IRC Metal 65.00
2 0.50 63 mm IRC Metal 65.00 209.25 0.200 53 mm IRC Metal 565.00
3 0.25 53 mm IRC Metal 565.00 20.13 0.!25 5 mm IRC Metal !5!.00
0.050 5 mm IRC Metal !5!.00 3!."5 0.025 22.0 mm IRC Metal 1061.00
5 0.025 22.0 mm IRC Metal 1061.00 26.53 0.025 11.20 mm IRC Metal 66".00
#otal 52"$ #otal
3M 0$00 $ 1$00
R%&C'
Name of ()arr* +ind of metal ,i-tane in +M
/lain- 'ill-
+m 222 of %rode Chennimalai roadM r II metal 30 0 529."6 225.30 0.00 3.15
$$do$$ M r III metal 30 0 !16.69 225.30 0.00 3.15
1$
00
$$do$$ 5mm IRC metal 30 0 !5!.00 225.30 0.00 3.15
$$do$$ 13.2mm IRC metal 30 0 9"3.00 225.30 0.00 3.15
-
$$do$$ 11.2mm IRC metal 30 0 66".00 225.30 0.00 3.15
$$do$$ 6.!mm IRC metal 30 0 96.00 225.30 0.00 3.15
0$
00
&4erage ead ra4el 1 0 13.00 ".69 0.00 3.05
+ar)r Sand for filling !0 0 1!6.0 69.30 0.00 3.05
&t /..Store7Chennimalai /aked 8it)men 1 0 55300.00 0.00 0.00 0.00
$$do$$ %m)l-ion 1 0 9300.00 0.00 0.00 0.00
&SIC CS# MM # 5 MM M%#& , M 6rade .. / &SIC CS# 63 MM # 5 MM M%#& , M 6rade ... /
M3 M3
M3 M3
M3 M3
M3 M3
M3 M3
Nat)re ofro)te for
on4e*ane
o on nhona* ngon
lamhtt;:th)ai
Con4e*ane =/lain>
Con4e*ane='ill->
StakingCharge-
7/26/2019 Commnity Hall Muthukrishanapuram
12/209
RA& ME'AL RA'E
Name of work: Strengthening the road from
0
3M 1$00 $ 1$40 Rate ;er )8i me
R
%&C'
Name of ()arr* +ind of metal ,i-tane in +M
/lain- 'ill-
+m 222 of %rode Chennimalai roadM r II metal 31 0 529."6 231.!0 0.00 3.15
$$do$$ M r III metal 31 0 !16.69 231.!0 0.00 3.15
1$
40
$$do$$ 5mm IRC metal 31 0 !5!.00 231.!0 0.00 3.15
$$do$$ 13.2mm IRC metal 31 0 9"3.00 231.!0 0.00 3.15
-
$$do$$ 11.2mm IRC metal 31 0 66".00 231.!0 0.00 3.15
$$do$$ 6.!mm IRC metal 31 0 96.00 231.!0 0.00 3.15
1$
00
&4erage ead ra4el 1 0 13.00 ".69 0.00 3.05
+ar)r Sand for filling !0 0 1!6.0 69.30 0.00 3.05
&t /..Store7Chennimalai /aked 8it)men 1 0 55300.00 0.00 0.00 0.00
$$do$$ %m)l-ion 1 0 9300.00 0.00 0.00 0.00
Nat)re ofro)te for
on4e*ane
metalled or
Co-t at@)arr*
Con4e*ane =/lain>
Con4e*ane
='ill->
StakingCharge-
2%
=a
7/26/2019 Commnity Hall Muthukrishanapuram
13/209
7/26/2019 Commnity Hall Muthukrishanapuram
14/209
RA& ME'AL RA'E
Name of work: Stren thenin the road from0
3M 0$00 $ 0$00 Rate ;er )8i metre
R%&C'
Name of ()arr* +ind of metal ,i-tane in +M
/lain- 'ill-
+m 222 of %rode Chennimalai roadM r II metal 0 0 0.00 0.00 0.00 0.00
$$do$$ M r III metal 0 0 0.00 0.00 0.00 0.00
0$
00
$$do$$ 5mm IRC metal 0 0 0.00 0.00 0.00 0.00
$$do$$ 13.2mm IRC metal 0 0 0.00 0.00 0.00 0.00
-
$$do$$ 11.2mm IRC metal 0 0 0.00 0.00 0.00 0.00
$$do$$ 6.!mm IRC metal 0 0 0.00 0.00 0.00 0.00
0$
00
&4erage ead ra4el 1 0 0.00 0.00 0.00 0.00
+ar)r Sand for filling 0 0 0.00 0.00 0.00 0.00
&t /..Store7Chennimalai /aked 8it)men 0 0 0.00 0.00 0.00 0.00
$$do$$ %m)l-ion 0 0 0.00 0.00 0.00 0.00
Nat)re ofro)te for
on4e*anemetalled or
Co-t at@)arr*
Con4e*ane =/lain>
Con4e*ane='ill->
StakingCharge-
=
7/26/2019 Commnity Hall Muthukrishanapuram
15/209
RA& ME'AL RA'E
Name of work: Stren thenin the road from0
3M 0$00 $ 0$00 Rate ;er )8i metre
R%&C'
Name of ()arr* +ind of metal ,i-tane in +M
/lain- 'ill-
+m 222 of %rode Chennimalai roadM r II metal 0 0 0.00 0.00 0.00 0.00
$$do$$ M r III metal 0 0 0.00 0.00 0.00 0.00
0$
00
$$do$$ 5mm IRC metal 0 0 0.00 0.00 0.00 0.00
$$do$$ 13.2mm IRC metal 0 0 0.00 0.00 0.00 0.00
-
$$do$$ 11.2mm IRC metal 0 0 0.00 0.00 0.00 0.00
$$do$$ 6.!mm IRC metal 0 0 0.00 0.00 0.00 0.00
0$
00
&4erage ead ra4el 1 0 0.00 0.00 0.00 0.00
+ar)r Sand for filling 0 0 0.00 0.00 0.00 0.00
&t /..Store7Chennimalai /aked 8it)men 0 0 0.00 0.00 0.00 0.00
$$do$$ %m)l-ion 0 0 0.00 0.00 0.00 0.00
Nat)re ofro)te for
on4e*anemetalled or
Co-t at@)arr*
Con4e*ane =/lain>
Con4e*ane='ill->
StakingCharge-
=
7/26/2019 Commnity Hall Muthukrishanapuram
16/209
RA& ME'AL RA'E
Name of work: Stren thenin the road from0
3M 0$00 $ 0$00 Rate ;er )8i metre
R%&C'
Name of ()arr* +ind of metal ,i-tane in +M
/lain- 'ill-
+m 222 of %rode Chennimalai roadM r II metal 0 0 0.00 0.00 0.00 0.00
$$do$$ M r III metal 0 0 0.00 0.00 0.00 0.00
0$
00
$$do$$ 5mm IRC metal 0 0 0.00 0.00 0.00 0.00
$$do$$ 13.2mm IRC metal 0 0 0.00 0.00 0.00 0.00
-
$$do$$ 11.2mm IRC metal 0 0 0.00 0.00 0.00 0.00
$$do$$ 6.!mm IRC metal 0 0 0.00 0.00 0.00 0.00
0$
00
&4erage ead ra4el 1 0 0.00 0.00 0.00 0.00
+ar)r Sand for filling 0 0 0.00 0.00 0.00 0.00
&t /..Store7Chennimalai /aked 8it)men 0 0 0.00 0.00 0.00 0.00
$$do$$ %m)l-ion 0 0 0.00 0.00 0.00 0.00
Nat)re ofro)te for
on4e*anemetalled or
Co-t at@)arr*
Con4e*ane =/lain>
Con4e*ane='ill->
StakingCharge-
=
7/26/2019 Commnity Hall Muthukrishanapuram
17/209
RA& ME'AL RA'E
Name of work: Stren thenin the road from0
3M 0$00 $ 0$00 Rate ;er )8i metre
R%&C'
Name of ()arr* +ind of metal ,i-tane in +M
/lain- 'ill-
+m 222 of %rode Chennimalai roadM r II metal 0 0 0.00 0.00 0.00 0.00
$$do$$ M r III metal 0 0 0.00 0.00 0.00 0.00
0$
00
$$do$$ 5mm IRC metal 0 0 0.00 0.00 0.00 0.00
$$do$$ 13.2mm IRC metal 0 0 0.00 0.00 0.00 0.00
-
$$do$$ 11.2mm IRC metal 0 0 0.00 0.00 0.00 0.00
$$do$$ 6.!mm IRC metal 0 0 0.00 0.00 0.00 0.00
0
$00
&4erage ead ra4el 1 0 0.00 0.00 0.00 0.00
+ar)r Sand for filling 0 0 0.00 0.00 0.00 0.00
&t /..Store7Chennimalai /aked 8it)men 0 0 0.00 0.00 0.00 0.00
Nat)re ofro)te for
on4e*anemetalled or
Co-t at@)arr*
Con4e*ane =/lain>
Con4e*ane
='ill->
StakingCharge-
=
7/26/2019 Commnity Hall Muthukrishanapuram
18/209
$$do$$ %m)l-ion 0 0 0.00 0.00 0.00 0.00 0.
7/26/2019 Commnity Hall Muthukrishanapuram
19/209
ic(ing 5 cm to 10 cm old metalled surface and sectioning - 1 s=.m
Ma*oor class K184 & 1.0- Nos "5-.00 2.
Rate 8 S:.m .;
9i: Hire charges for )achineries
6ater sprin#ler inclu*in 9uel c7ares 1152.00
uel c7ares 8 *ay 3."5 litres R54.15 8 litre - lit 140/.20
"5.20
Daily out turn 1000 cum
%ire c7ares 9or per cum 2.5
9ii: ower roller 6-10 ton capacity
%ire c7ares 9or per *ay -"-.00
uel c7ares 8 *ay "0 litres R54.15 per litre 10-3.001211.00
Daily out turn 4"5 cum
%ire c7ares 9or per cum 4.50
Ma*oor class " Nos. "5-.00 51.00
La=our c7ares per ;um 5.1
+otal 7ire c7ares an* La=our c7ares per ;um 9i:>9ii:>9iii: 12.23
aying well gra8el
La=our ;7ares 9or t7e area o9 100 cum.
Ma*oor class " Nos. "5-.00 51.00
Rate per ;u.m 5.1aying #.S. ?ra8el
La=our ;7ares 9or t7e area o9 100 cum.
Ma*oor class " Nos. "5-.00 51.00
Rate per ;u.m 5.1
%ire c7ares 9or Mac7inery
6ater srin#ler
%ire c7ares e&clu*in 9uel c7ares8*ay 1152.00
uel c7ares 8 *ay 3.50 litres 54.15 - 151."0
+otal 7ire c7ares 8 *ay "/5."0
Daily out turn 450 S:.m o9 /5mm t7ic#
%ire c7ares per 10S:.m "/5."0 8450&10 52.45
oer roller
%ire c7ares e&clu*in 9uel c7ares8*ay -"-.00
uel c7ares 8 *ay ".5 litres 54.15 8 litre - 10-3.00
Spreading ?ra8eland consolidation with power roller rolling e@cluding costof ?ra8el
9iii:a!our charges9or sprea*in 100cum o9 ra>el
ro8iding A') ?rade II B ?rade III 5mm thic( Hire charges and la!ourcharges for A') ?r.II B III
7/26/2019 Commnity Hall Muthukrishanapuram
20/209
+otal 7ire c7ares 8 *ay 1211.00
Daily out turn 450 S:.m o9 /5mm t7ic#
%ire c7ares per 10S:.m 1211.00 8450&10 4".4/
52.45 4".4/ 101.;2
La=our c7ares (9or sprea*in 10s:.m /5mm t7ic#)
1.0-&381 Nos Ma*oor class "5-.00 5"."5
1.0-&184 Nos Ma*oor class "31.00 ".3/
1.0-&183 Nos Ma*oor class "31.00 -3.1
a) ormin e*e =un*s L.S. 1.4
=) Maintainin =erms 9or traFc =arrica*inG pro>i*in *aner li L.S. 1.4
c) 6aterin an* #eepin t7e sur9ace moist 9or 15*ays L.S. 1.4
*) Rent 9or tools inclu*in =as#etsG s7erpininG pic# a&es L.S. 1.4
e) Sun*ries suc7 as ropeG aterpots L.S. 1.5"
La=our c7ares per 10 S:.m 205.14
%ire c7ares 9or Mac7inery an* La=our c7ares
10 S=.m of 5mm t( 9i:>9ii: 101.2" "05.14 30.0
%pplying &ac( coat o8er A') surface at 47g 10 s=.m
La=our c7ares 9or 500 S:.m
or preparin t7e sur9ace
10 Nos Ma*oor class "5-.00 "5-0.00
1 Nos Ma*oor class "31.00 32.00
or preparin +ac# coat
4 Nos Ma*oor class "31.00 2"4.00
/"00.00
(i) La=our c7ares per 10 S:.m /"00.00 8500&10 144.00
(ii) %ire c7ares 9or Bitumen Sprayer per 10 s:m L.S. 15.00
Rate for a!our and )achinery per 1 S=.m 9i:>9ii:10C 15.;0
%pplying rime coat o8er #n primed A') surface at 7g 10 s=.m
La=our c7ares 9or 500 S:.m
or preparin t7e sur9ace
10 Nos Ma*oor class "5-.00 "5-0.00
1 Nos Ma*oor class "31.00 32.00
or ?pplyin rime coat
/ Nos Ma*oor class "31.00 11/.00
/-23.00
(i) La=our c7ares per 10 S:.m /-23.00 8500&10 15/.-
(ii) %ire c7ares 9or Bitumen Sprayer L.S. 15.00
&otal hire charges 9or Mac7inery 8 10M"
7/26/2019 Commnity Hall Muthukrishanapuram
21/209
Rate for a!our and )achinery per 1 S=.m 9i:>9ii:10C 1.2;
%pplying &ac( coat o8er rimed A') surface at 2.50 7g 10 s=.m
or ?pplyin +ac# coat 500 s:m
".5 Nos Ma*oor class "5-.00 45.00
(i) La=our c7ares per 10 S:.m 45.00 8500&10 1".20
(ii) %ire c7ares 9or Bitumen Sprayer L.S. 15.00
Rate for a!our and )achinery per 1 S=.m 9i:>9ii:10C 2.;
%pplying &ac( coat o8er A')'& surface at 37g 10 s=.m
La=our c7ares 9or 500 S:.m
or preparin t7e sur9ace
5 Nos Ma*oor class "5-.00 1"20.00
or preparin +ac# coat
5 Nos Ma*oor class "31.00 1155.00
"445.00
(i) La=our c7ares per 10 S:.m "445.00 8500&10 4-.20
(ii) %ire c7ares 9or Bitumen Sprayer L.S. 15.00
Rate for a!our and )achinery per 1 S=.m 9i:>9ii:10C .3;
7/26/2019 Commnity Hall Muthukrishanapuram
22/209
remi@ carpet with seal coat
Premix Carpet
(i) Mini %ot mi& plant
%ire c7ares e&clu*in 9uel c7ares8%our ,,, 8 - "02."5
uel c7ares 9or runnin plant 15 lit 8 %ou 1.00 54.15 -1"."5
or 7eatin t7e areate (oil) 45 lit 8 %ou 1.00 50.00 ""50.00
!utturn87our 1-0s:m 3"/1.50
%ire c7ares 9or 10 S:.m 3"/1.50 8 1-0&10 161.5
9ii: ower roller
%ire c7ares e&clu*in 9uel c7ares8*ay o9 -%our -"-.00
uel c7ares Diesel oil ".5 lit 8 %ou -.00 54.15 10-3.00
Daily out turn 9or ; K 500 S:.m 1211.00
%ire c7ares 9or 10 S:.m 1211.00 &108500 36.22
9iii: 'itumen 'oiler
"0".00 50.00 145"
%ire c7ares 8 7our ,,, 8 - 1-1.50
!ut turn per %our K 1"5$
%ire c7ares per # o9 =itumen 1-1.50 8 1"5# 1.45"
Bitumen 9or ; per 10 s:m 14.0 $ & 1.45" 21.20
(i) Mini %ot mi& plant 1-1./5 810 s:m
(ii) Roller 3-."" 810 s:m
(iii) Bitumen Boiler "1."0 810 s:m
"41.1/ 810 s:m 241.1
La=our c7ares per 10 s:m
0./5 No. Ma*oor class "5-.00 1;3.50
Hire and a!our charges Rate 10 S=.m "41.1/ 123.50 434.
Seal coat - &ype %
Mac7inery(i) oer roller %ire c7ares e&clu*in 9uel c7ares8*ay o9 -%our -"-.00
uel c7ares Diesel oil ".5 lit 8 %ou -.00 54.15 10-3.00
oer roller inclu*in 9uel c7ares per *ay 1211.00
Daily out turn 9or seal coat K 1000 S:.m
%ire c7ares 9or 10 S:.m 1211.00 &1081000 1;.11
(ii) Bitumen Boiler
"0".00 50.00 145"
%ire c7ares 8 7our ,,, 8 - 1-1.50
!ut turn per %our K 1"5$
%ire c7ares per # o9 =itumen 1-1.50 8 1"5# 1.45"
Bitumen 9or Seal coat +ype ? 2.-0 $ 8 10 S:.m 14.23
%ire c7ares 9or =itumen =oiler inclu*in 9uel ($erosen "5 lit &
+otal %ire 9uel c7ares 9or ; "0mm t7ic# 10 s:m 9i:>9ii:>9iii:
%ire c7ares 9or =itumen =oiler inclu*in 9uel ($erosen "5 lit &
7/26/2019 Commnity Hall Muthukrishanapuram
23/209
(i) Roller 12.11 810 s:m
(ii) Bitumen Boiler 14."3 810 s:m
33.34 810 s:m 33.34
La=our c7ares
0."5 No Ma*oor class "5-.00 4.50
Seal coat &ype%
Hire and a!our charges Rate 10 S=.m 33.34 4.50 ;.64
a!our charges for A') patch wor( - 1 cum
ic#in t7e metal sur9ace "E to 3E *eep
n patc7es an* cuttin Ma 1.0-&18 "5-.00 4.44
Remo>al o9 pic#e* up stu an*
collection o9 metal ra>el an* Ma 1.0-&18- "5-.00 34.-3
con>eyin t7e same to site
Brus7in an* cleanin t7e sur9ace L.S "."0
Le>ellin t7e materials in t7e patc7es an* pot 7oles L.S 5.50
an* tampin a9ter =lin*in it7 ater
Special tools suc7 as ire =rus7 L.S "."0
Reulation o9 traFc L.S "."0
Sun*ries suc7 as =arrica*in arranementsG L.S 0.55
con>eyin ater etcG.
Rate per ;u.m ;3.;2
ic#in t7e roa* sur9ace "E to 3E *eep
n patc7es an* cuttin Ma* 1.0- & 18 "5-.00 4.44
Remo>al o9 pic#e* up s Ma* 1.0- & 18- "5-.00 34.-3
Brus7in an* cleanin t7e sur9ace L.S 4.55
Sprea*in t7e Bitumen 9or +ac# coat L.S 3.54
rmi&in c7ips it7 Bitumen in t7e Drum mi&er an* layin o9
L.S 1/.-
Le>ellin an* tampin t7e remi& in t7e patc7es an* pot 7oles rollin etc.G .0
Special tools suc7 as ire =rus7 L.S ".53
Reulation o9 traFc L.S ".53
Sun*ries suc7 as =arrica*in arranementsG L.S 0./1
116.6
11-.-/ 8 0."5 1;0.1;
+otal %ire 9uel c7ares 9or Sealcoat type E?E 10 s:m 9i:>9ii:
a!our charges for atch wor( with 'ituminous remi@ materials for 0.25cum of 'ituminous material.
0."5 m3o9 metal it7 5 $ o9 Bitumen
La=our c7ares 9or layin 0."5 m3o9 Bituminous Material
La=our c7ares 9or layin 1.00 m3o9 Bituminous material
7/26/2019 Commnity Hall Muthukrishanapuram
24/209
Soling with 150mm cu!e stones - 10S=.m
9i:a!our charges
Ma*oor 9or preparin 18 No "31.00 3-.50
Ma*oor 9or aterin 1 No "31.00 "31.00
Ma*oor 9or pac#in 3 No "5-.00 //4.00
Ma*oor 9or =lin*in ra>el 18 No "31.00 3-.50
10-".00
Rate per 10S:.m 106.20
9ii:Hire +harges
+a#in out put K 00 S:.m
%ire c7ares 9or poer roller per *ay -"-.00
uel c7ares8*ay ".5 litres & - %ours 54.15 10-3.00
1211.00
+otal 7ire c7ares inclu*in 9uel ,,, 800&10 K 31.-5
+otal 7ire c7ares an* La=our c7ares 9i:>9ii: Rate per S:.m 140.05
"orming em!an(ment with earth wor( e@ca8ation from !orrow pits and
compaction !y power roller 100 E +ompaction
9i: Hire charges and la!our charges for earthwor( compaction
%ire c7ares 9or Mac7inery
(i) 6ater sprin#ler
%ire c7ares e&clu*in 9uel c7ares8*ay 1152.00
uel c7ares 8 *ay 3."5 litres 54.15 8 litre - 140/.20
+otal 7ire c7ares 8 *ay "5.20
Daily out turn 1000 cum
%ire c7ares per cum ".5/
(ii) oer roller
%ire c7ares e&clu*in 9uel c7ares8*ay -"-.00
uel c7ares 8 *ay ".5 litres 54.15 8 litre - 10-3.00
+otal 7ire c7ares 8 *ay 1211.00
Daily out turn 4"5 cum
%ire c7ares per cum 1211.00 84"5 4.50
Total hire charges for Machinery(i)(ii) ".5/ 4.50 7.07
(iii) La=our c7ares 9or 100 cum
Ma*oor class " Nos "5-.00 51.00
La=our c7ares per cum 5.16
/.0/ 5.1 12.23Hire and a!our charges per )3 9i:>9ii:>9iii:
7/26/2019 Commnity Hall Muthukrishanapuram
25/209
"orming em!an(ment with earth wor( e@ca8ation from !orrow pits and
compaction !y power roller ;E +ompaction
Hire charges and la!our charges for earthwor( compaction
%ire c7ares 9or Mac7inery
(i) 6ater srin#ler
%ire c7ares e&clu*in 9uel c7ares8*ay 1152.00
uel c7ares 8 *ay 3."5 litres 54.15 8 litre - 140/.20
+otal 7ire c7ares 8 *ay "5.20
Daily out turn 1000 cum
%ire c7ares per cum ".5/
(ii) oer roller
%ire c7ares e&clu*in 9uel c7ares8*ay -"-.00
uel c7ares 8 *ay ".5 litres 54.15 8 litre - 10-3.00
+otal 7ire c7ares 8 *ay 1211.00
Daily out turn 500 cum
%ire c7ares per cum 3.-"
+otal 7ire c7ares 9or Mac7inery (i)(ii) ".5/ 3.-" 6.39
(iii) La=our c7ares 9or 100 cum
Ma*oor class " Nos "5-.00 51.00
La=our c7ares per cum 5.1
.32 5.1 11.55
ro8iding and laying ?ranular su!-!ase compaction 100mm thic(
!y power roller - Hire charges and la!our charges for ?S' -10 S=.m
(i) %ire c7ares 9or Mac7inery
6ater srin#ler
%ire c7ares e&clu*in 9uel c7ares8*ay 1152.00
uel c7ares 8 *ay 3."5 litres 54.15 8 litre - 140/.20
+otal 7ire c7ares 8 *ay "5.20
Daily out turn 1000 cum
%ire c7ares per 10S:.m "5.20 81000 2.57
oer roller
%ire c7ares e&clu*in 9uel c7ares8*ay -"-.00
uel c7ares 8 *ay ".5 litres 54.15 8 litre - 10-3.00
+otal 7ire c7ares 8 *ay 1211.00
Daily out turn 250 S:.m o9 100mm t7ic#
%ire c7ares per 10 S:.m 1211.00 8250&10 20.12
Hire and a!our charges )3 9i:>9ii:>9iii:
7/26/2019 Commnity Hall Muthukrishanapuram
26/209
Total hire charges for Machinery/10 sqm ".5/ "0.1" 22.;
(ii) La=our c7ares (9or mi&in 250 S:.m)
Ma*oor class Nos "5-.00 154-.00
Ma*oor class "4 Nos "31.00 5544.00
/02".00
La=our c7ares per 10 S:.m /02".00 8250&10 4.5
or sprea*in 100cum
Ma*oor class 4 Nos "5-.00 103".00
La=our c7ares 9or sprea*in er 1 ;um or 10 S:.m 10.32
Total Labour charges for 10 Sq.m /4.5 10.3" 64.;
%ire c7ares 9or Mac7inery an* La=our c7ares
10 S=.m of 100mm t( 9i:>9ii: "".2 -4.2/ 10.
Hire and a!our +harges Rate #nit
1 ic#in 5 cm to 10 cm ol* metalle* sur9ace an* sectionin 1 s:.m .2/ 8 S:.m
" Solin it7 150mm cu=e stones 10S:.m 140.05 8 S:.m
3 1"."3 8cum
4 Layin ell ra>el 5.1 8 cum
5 Layin U.S. 'ra>el 5.1 8 cum
La=our c7ares 9or 6BM patc7 or# 23.2" 8 cum
/a. ormin em=an#ment it7 eart7 or# 1"."3 8cum
/=. ormin em=an#ment it7 eart7 or# 11.55 8cum
- 10/. 8 10 S:.m
2 ro>i*in 6BM 'ra*e 'ra*e /5mm t7ic# 30/.0
10 ?pplyin +ac# coat o>er 6BM sur9ace at 4$ 8 10 s:.m 15.20 8 S:.m.
11 ?pplyin +ac# coat o>er B+ sur9ace at 3$ 8 10 s:.m .32 8 S:.m.1" remi& carpet it7 seal coat type ? 53".51 8 10 S:.m
1"= remi& carpet it7 seal coat type B ,,, 8 10 S:.m
13 remi& ;arpet 434./ 8 10 S:.m
14 Seal coat +ype ? 2/.-4 8 10 S:.m
15 ?pplyin rime coat o>er Un prime* 6BM sur9ace at /$ 8 10 s:.m 1/."2 8 10 S:.m
1 ?pplyin +ac# coat o>er rime* 6BM sur9ace at ".50 $ 8 10 s:.m "./2 8 10 S:.m
14= Seal coat +ype B ,RO 8 10 S:.m
15 La=our c7ares 9or Bituminous remi& atc7 or# 120.12 8 cum
Sprea*in 'ra>el an* consoli*ation it7 poer roller rolline&clu*in cost o9 'ra>el
100 P ;ompaction
2/ P ;ompaction
ro>i*in an* layin 'ranular su==ase compaction =y poerroller 100 mm t7ic#
8 10 S:.m
7/26/2019 Commnity Hall Muthukrishanapuram
27/209
Name o9 or Strent7enin t7e roa* 9rom
0
D%&% SH$$&
1
Rs 2.35 8S:.m
?** "0P &tra 9or La=our in 7illy areas 0.00
2.35 8S:.m
"
Rs 4;.00 8;u.m
?** "0P &tra 9or La=our in 7illy areas 0.00
4;.00 8;u.m
"a
Rs 4.00 8;u.m
?** "0P &tra 9or La=our in 7illy areas 0.00
4.00 8;u.m
3
1.16 Co-t of ra4el Rs 15.! C)m 1!9.50
1.00 La=our ;7ares Rs 12.23 C)m 12.23
?** "0P &tra 9or La=our in 7illy areas 0.00 C)m 0.00
121./3
Rate per ;UMH 1"1$7
4
-for 7m 0.00 1.00 for 7m 1.00 1.40
D%&%
1.00 cum 345mm R; metal /5-.31 8cum /5-.31 /4./1 /4./1
0."4 cum ra>el 154./4 8cum 3/.14 154./4 3/.14
10.00 s:m %ire an* 9uel c7ares 101.2" 810s:m 101.2" 101.2" 101.2"
10.00 s:m La=our c7ares "05.14 810s:m "05.14 "05.14 "05.14
?** "0P &tra 9or La=our in 7illy areas 0.00 0.00110".51 110-.21
1102.51 80./5 FFF 80./5
+learing the Scru! Gungleinclu*in all la=our c7ares 9or =urryinn an* =urnin et
$arth wor(e&ca>ation an* *epositin on =an# it7in initial lea* an* li9t in7ar* ra>elly soil 9or ;uttin si*e*rain etcG complete. as per SS"0 ?
$arth wor(e&ca>ation an* *epositin on =an# it7in initial lea* an* li9t in7ar* ra>elly soil 9or ;uttin si*e*rain etcG complete. as per SS"0 B
+ollection and supply of gritty gra8el9rom app* :uarry inclu*in costan* con>eyance o9 all materials to site inclu*in all la=our c7ares 9orspreadingan* compaction it7 poer roller etc.completeG 9or
A') ?rade II'ottom layer using 3 - 45mm IR+ graded metal
7/26/2019 Commnity Hall Muthukrishanapuram
28/209
Rate per ;UMH Rs 140.01 Rs 146.55
-for 7m 0.00 0.00 for 7m 0.00 0.00
D%&%
1.00 cum 345mm R; metal 0.00 8cum 0.00 0.00 0.00
0."4 cum ra>el 0.00 8cum 0.00 0.00 0.00
10.00 s:m %ire an* 9uel c7ares 0.00 810s:m 0.00 0.00 0.00
10.00 s:m La=our c7ares 0.00 810s:m 0.00 0.00 0.00
?** "0P &tra 9or La=our in 7illy areas 0.00 0.00
0.00 0.00
0.00 80./5 0.00 80./5
Rate per ;UMH Rs 0.00 Rs 0.00
-for 7m 0.00 0.00 for 7m 0.00 0.00
D%&%
1.00 cum 345mm R; metal 0.00 8cum 0.00 0.00 0.00
0."4 cum ra>el 0.00 8cum 0.00 0.00 0.00
10.00 s:m %ire an* 9uel c7ares 0.00 810s:m 0.00 0.00 0.00
10.00 s:m La=our c7ares 0.00 810s:m 0.00 0.00 0.00
?** "0P &tra 9or La=our in 7illy areas 0.00 0.000.00 0.00
0.00 80./5 0.00 80./5
Rate per ;UMH Rs 0.00 Rs 0.00
5
-for 7m 0.00 1.00 for 7m 1.00 1.40
D?+?
1.00 cum 53"".40mm R; metal 245.14 8cum 245.14 251.54 251.54
0."4 cum ra>el 154./4 8cum 3/.14 154./4 3/.14
10.00 s:m %ire an* 9uel c7ares 101.2" 810s:m 101.2" 101.2" 101.2"
10.00 s:m La=our c7ares "05.14 810s:m "05.14 "05.14 "05.14
?** "0P &tra 9or La=our in 7illy areas 0.00 0.00
1"-2.34 1"25./4
126;.34 80./5 FFF 80./5
Rate per ;UMH Rs 11;.12 Rs 12.5
A') ?rade II'ottom layer using 3 - 45mm IR+ graded metal
A') ?rade II'ottom layer using 3 - 45mm IR+ graded metal
A') ?rade III &op layer using 53-22.40mm IR+ graded metal
7/26/2019 Commnity Hall Muthukrishanapuram
29/209
-for 7m 0.00 0.00 for 7m 0.00 0.00
D?+?
1.00 cum 53"".40mm R; metal 0.00 8cum 0.00 0.00 0.00
0."4 cum ra>el 0.00 8cum 0.00 0.00 0.00
10.00 s:m %ire an* 9uel c7ares 0.00 810s:m 0.00 0.00 0.00
10.00 s:m La=our c7ares 0.00 810s:m 0.00 0.00 0.00
?** "0P &tra 9or La=our in 7illy areas 0.00 0.00
0.00 0.00
0.00 80./5 0.00 80./5
Rate per ;UMH Rs 0.00 Rs 0.00
-for 7m 0.00 0.00 for 7m 0.00 0.00D?+?
1.00 cum 53"".40mm R; metal 0.00 8cum 0.00 0.00 0
0."4 cum ra>el 0.00 8cum 0.00 0.00 0
10.00 s:m %ire an* 9uel c7ares 0.00 810s:m 0.00 0.00 0
10.00 s:m La=our c7ares 0.00 810s:m 0.00 0.00 0
?** "0P &tra 9or La=our in 7illy areas 0.00 0.00
0.00 0.00
0.00 80./5 0.00 80./5
Rate per ;UMH Rs 0.00 Rs 0.00
1/
or $m 0.00 1.00 or $m 1.00 1.40
1.00 ;u.m 45 mm R; Metal 2-5.45 8cu.m 2-5.45 221.-5 221.-5
44.00 $ Bitumen ,,, 8mt "433."0 55300.00 "433."0
1.00 ;u.m La=our ;7ares 120.12 8cu.m 120.12 120.12 120.12
?** "0P &tra 9or La=our in 7illy areas 0.00 0.00
306.64 315.24
Rate per cu.m Rs 306.64 Rs 315.24
or $m 0.00 0.00 or $m 0.00 0.00
1.00 ;u.m 45 mm R; Metal 0.00 8cu.m 0.00 0.00 0.00
44.00 $ Bitumen 0.00 8mt 0.00 0.00 0.001.00 ;u.m La=our ;7ares 0.00 8cu.m 0.00 0.00 0.00
?** "0P &tra 9or La=our in 7illy areas 0.00 0.00
A') ?rade III &op layer using 53-22.40mm IR+ graded metal
A') ?rade III &op layer using 53-22.40mm IR+ graded metal
%d8ance patch wor(9or ma#in up t7e un*ulation in t7e e&istin B.+sur9ace to an a>erae t7ic#ness o9 o9 50mmusin 45mm R; sie %B'metal
%d8ance patch wor(9or ma#in up t7e un*ulation in t7e e&istin B.+sur9ace to an a>erae t7ic#ness o9 o9 50mmusin 45mm R; sie %B'metal
7/26/2019 Commnity Hall Muthukrishanapuram
30/209
0.00 0.00
Rate per cu.m Rs 0.00 Rs 0.00
or $m 0.00 0.00 or $m 0.00 0.00
1.00 ;u.m 45 mm R; Metal 0.00 8cu.m 0.00 0.00 0.00
44.00 $ Bitumen 0.00 8mt 0.00 0.00 0.00
1.00 ;u.m La=our ;7ares 0.00 8cu.m 0.00 0.00 0.00
?** "0P &tra 9or La=our in 7illy areas 0.00 0.00
0.00 0.00
Rate per cu.m Rs 0.00 Rs 0.00
1-
or $m 0.00 1.00 or $m 1.00 1.40
1.00 ;u.m 13." mm R; Metal 1"11.45 8cu.m 1"11.45 1"1/.-5 1"1/.-5
44.00 $ Bitumen ,,, 8mt "433."0 55300.00 "433."0
1.00 ;u.m La=our ;7ares 120.12 8cu.m 120.12 120.12 120.12
?** "0P &tra 9or La=our in 7illy areas 0.00 0.00
3634.64 3641.24
Rate per cu.m Rs 3634.64 Rs 3641.24
or $m 0.00 0.00 or $m 0.00 0.00
1.00 ;u.m 13." mm R; Metal 0.00 8cu.m 0.00 0.00 0.00
44.00 $ Bitumen 0.00 8mt 0.00 0.00 0.00
1.00 ;u.m La=our ;7ares 0.00 8cu.m 0.00 0.00 0.00
?** "0P &tra 9or La=our in 7illy areas 0.00 0.00
0.00 0.00
Rate per cu.m Rs 0.00 Rs 0.00
or $m 0.00 0.00 or $m 0.00 0.00
1.00 ;u.m 13." mm R; Metal 0.00 8cu.m 0.00 0.00 0.0044.00 $ Bitumen 0.00 8mt 0.00 0.00 0.00
1.00 ;u.m La=our ;7ares 0.00 8cu.m 0.00 0.00 0.00
%d8ance patch wor(9or ma#in up t7e un*ulation in t7e e&istin B.+sur9ace to an a>erae t7ic#ness o9 o9 50mmusin 45mm R; sie %B'metal
%d8ance patch wor(9or ma#in up t7e un*ulation in t7e e&istin B.+
sur9ace to an a>erae t7ic#ness o9 o9 "5mmusin 13."0mm R; sie %B'metal
%d8ance patch wor(9or ma#in up t7e un*ulation in t7e e&istin B.+sur9ace to an a>erae t7ic#ness o9 o9 "5mmusin 13."0mm R; sie %B'metal
%d8ance patch wor(9or ma#in up t7e un*ulation in t7e e&istin B.+sur9ace to an a>erae t7ic#ness o9 o9 "5mmusin 13."0mm R; sie %B'metal
7/26/2019 Commnity Hall Muthukrishanapuram
31/209
?** "0P &tra 9or La=our in 7illy areas 0.00 0.00
0.00 0.00
Rate per cu.m Rs 0.00 Rs 0.00
-for 7m 0.00 1.00 for 7m 1.00 1.40
0.004 Mt mulsion =itumen ,,, 8mt 12/."0 42300.00 12/."0
10.00 s:m La=our c7ares 144.00 810 s:m 144.00 144.00 144.00
?** "0P &tra 9or La=our in 7illy areas 0.00 0.00
L.S %ire c7ares 9or =itumen sprayer 15.00 15.00
35.20 35.20
Rate per s:m Rs 35.2 Rs 35.2
-for 7m 0.00 0.00 for 7m 0.00 0.00
0.004 Mt mulsion =itumen 0.00 8mt 0.00 0.00 0.00
10.00 s:m La=our c7ares 0.00 810 s:m 0.00 0.00 0.00
?** "0P &tra 9or La=our in 7illy areas 0.00 0.00
L.S %ire c7ares 9or =itumen sprayer 0.00 0.00
0.00 0.00
Rate per s:m Rs 0.00 Rs 0.00
-for 7m 0.00 0.00 for 7m 0.00 0.00
0.004 Mt mulsion =itumen 0.00 8mt 0.00 0.00 0.00
10.00 s:m La=our c7ares 0.00 810 s:m 0.00 0.00 0.00
?** "0P &tra 9or La=our in 7illy areas 0.00 0.00L.S %ire c7ares 9or =itumen sprayer 0.00 0.00
0.00 0.00
Rate per s:m Rs 0.00 Rs 0.00
/
-for 7m 0.00 1.00 for 7m 1.00 1.40
0.003 Mt mulsion =itumen ,,, 8mt 14/.20 42300.00 14/.20
10.00 s:m La=our c7ares 4-.20 810 s:m 4-.20 4-.20 4-.20
%pplying &%+7 +%& o8er A') surface at 47g 10 s=.m
%pplying &%+7 +%& o8er A') surface at 47g 10 s=.m
%pplying &%+7 +%& o8er A') surface at 47g 10 s=.m
%pplying &%+7 +%& o8er '& surface at 3 7g 10 s=.m
7/26/2019 Commnity Hall Muthukrishanapuram
32/209
?** "0P &tra 9or La=our in 7illy areas 0.00 0.00
L.S %ire c7ares 9or =itumen sprayer 15.00 15.00
211.60 211.60
Rate per s:m Rs 21.16 Rs 21.16
-for 7m 0.00 0.00 for 7m 0.00 0.00
0.003 Mt mulsion =itumen 0.00 8mt 0.00 0.00 0.00
10.00 s:m La=our c7ares 0.00 810 s:m 0.00 0.00 0.00
?** "0P &tra 9or La=our in 7illy areas 0.00 0.00
L.S %ire c7ares 9or =itumen sprayer 0.00 0.00
0.00 0.00
Rate per s:m Rs 0.00 Rs 0.00
-for 7m 0.00 0.00 for 7m 0.00 0.00
0.003 Mt mulsion =itumen 0.00 8mt 0.00 0.00 0.00
10.00 s:m La=our c7ares 0.00 810 s:m 0.00 0.00 0.00
?** "0P &tra 9or La=our in 7illy areas 0.00 0.00
L.S %ire c7ares 9or =itumen sprayer 0.00 0.00
0.00 0.00
Rate per s:m Rs 0.00 Rs 0.00
10
-for 7m 0.00 1.00 for 7m 1.00 1.40
0.1- ;um 13."mm R; metal 1"11.45 8cum "1-.0 1"1/.-5 "12."1
0.02 ;um 11." mm R; metal -2.45 8cum -0.- 20".-5 -1."
0.02 ;um ./ mm R; metal /"4.45 8cum 5." /30.-5 5./-
"4.40 $s Bitumen -08100 ,,, 8Mt 1342.3" 55300.00 1342.3"
10.00 S:m %ire 9uel c7ares 9or . "41.1/ 810s:m
53".51
"41.1/
53".51
10.00 S:m %ire 9uel c7ares 9or S 33.34 810s:m 33.34
10.00 S:m La=our c7ares 9or .; 123.50 810s:m 123.50
10.00 S:m La=our c7ares 9or S.; 4.50 810s:m 4.50
?** "0P &tra 9or La=our in 7illy areas 0.00 0.00
2245. 2246.06
Rate per s:m Rs 224.56 Rs 224.61
-for 7m 0.00 0.00 for 7m 0.00 0.00
0.1- ;um 13."mm R; metal 0.00 8cum 0 0.00 0
0.02 ;um 11." mm R; metal 0.00 8cum 0 0.00 0
0.02 ;um ./ mm R; metal 0.00 8cum 0 0.00 0
%pplying &%+7 +%& o8er '& surface at 3 7g 10 s=.m
%pplying &%+7 +%& o8er '& surface at 3 7g 10 s=.m
R$)I +%R$& 6+% S?L ;!?+ +I ?
R$)I +%R$& 6+% S?L ;!?+ +I ?
7/26/2019 Commnity Hall Muthukrishanapuram
33/209
"4.40 $s Bitumen -08100 0.00 8Mt 0.00 0.00 0
10.00 S:m %ire 9uel c7ares 9or . 0.00 810s:m
0.00
0.00
0.0010.00 S:m %ire 9uel c7ares 9or S 0.00 810s:m 0.00
10.00 S:m La=our c7ares 9or .; 0.00 810s:m 0.00
10.00 S:m La=our c7ares 9or S.; 0.00 810s:m 0.00
?** "0P &tra 9or La=our in 7illy areas 0.00 0.00
0.00 0.00
Rate per s:m Rs 0.00 Rs 0.00
-for 7m 0.00 0.00 for 7m 0.00 0.00
0.1- ;um 13."mm R; metal 0.00 8cum 0 0.00 0
0.02 ;um 11." mm R; metal 0.00 8cum 0 0.00 0
0.02 ;um ./ mm R; metal 0.00 8cum 0 0.00 0
"4.40 $s Bitumen -08100 0.00 8Mt 0.00 0.00 0
10.00 S:m %ire 9uel c7ares 9or . 0.00 810s:m
0.00
0.00
0.0010.00 S:m %ire 9uel c7ares 9or S 0.00 810s:m 0.00
10.00 S:m La=our c7ares 9or .; 0.00 810s:m 0.00
10.00 S:m La=our c7ares 9or S.; 0.00 810s:m 0.00
?** "0P &tra 9or La=our in 7illy areas 0.00 0.00
0.00 0.00
Rate per s:m Rs 0.00 Rs 0.00
10
-for 7m 0.00 1.00 for 7m 1.00 1.40
0.1- ;um 13."mm R; metal 1"11.45 8cum "1-.0 1"1/.-5 "12."1
0.02 ;um 11." mm R; metal -2.45 8cum -0.- 20".-5 -1."
0.02 ;um ./ mm R; metal /"4.45 8cum 5." /30.-5 5./-
"".45 $s Bitumen -08100 ,,, 8Mt 1"41.42 55300.00 1"41.42
1.25 $s lastic aste ,,, 8Mt 5-.50 30000.00 5-.50
10.00 S:m %ire 9uel c7ares 9or . "41.1/ 810s:m
53".51
"41.1/
53".5110.00 S:m %ire 9uel c7ares 9or S 33.34 810s:m 33.34
10.00 S:m La=our c7ares 9or .; 123.50 810s:m 123.50
10.00 S:m La=our c7ares 9or S.; 4.50 810s:m 4.50
?** "0P &tra 9or La=our in 7illy areas 0.00 0.00
21;.44 21;6.5
Rate per s:m Rs 21;.4 Rs 21;.66
-for 7m 0.00 0.00 for 7m 0.00 0.00
0.1- ;um 13."mm R; metal 0.00 8cum 0 0.00 0.00
0.02 ;um 11." mm R; metal 0.00 8cum 0 0.00 0.00
0.02 ;um ./ mm R; metal 0.00 8cum 0 0.00 0
R$)I +%R$& 6+% S?L ;!?+ +I ?
R$)I +%R$& 6+% S?L ;!?+ +I ? #sing %S&I+ A%S&$
R$)I +%R$& 6+% S?L ;!?+ +I ? #sing %S&I+ A%S&$
7/26/2019 Commnity Hall Muthukrishanapuram
34/209
"1.2 $s Bitumen -08100 0.00 8Mt 0.00 0.00 0
".44 $s lastic aste ,,, 8Mt /3."0 30000.00 /3."0
10.00 S:m %ire 9uel c7ares 9or . 0.00 810s:m
0.00
0.00
0.0010.00 S:m %ire 9uel c7ares 9or S 0.00 810s:m 0.00
10.00 S:m La=our c7ares 9or .; 0.00 810s:m 0.00
10.00 S:m La=our c7ares 9or S.; 0.00 810s:m 0.00
?** "0P &tra 9or La=our in 7illy areas 0.00 0.00
3.20 3.20
Rate per s:m Rs .32 Rs .32
-for 7m 0.00 0.00 for 7m 0.00 0.00
0.1- ;um 13."mm R; metal 0.00 8cum 0 0.00 0
0.02 ;um 11." mm R; metal 0.00 8cum 0 0.00 0
0.02 ;um ./ mm R; metal 0.00 8cum 0 0.00 0
"1.2 $s Bitumen -08100 0.00 8Mt 0.00 0.00 0
".44 $s lastic aste ,,, 8Mt /3."0 30000.00 /3."0
10.00 S:m %ire 9uel c7ares 9or . 0.00 810s:m
0.00
0.00
0.0010.00 S:m %ire 9uel c7ares 9or S 0.00 810s:m 0.00
10.00 S:m La=our c7ares 9or .; 0.00 810s:m 0.00
10.00 S:m La=our c7ares 9or S.; 0.00 810s:m 0.00
?** "0P &tra 9or La=our in 7illy areas 0.00 0.00
3.20 3.20
Rate per s:m Rs .32 Rs .32
12
-for 7m 0.00 1.00 for 7m 1.00 1.40
1.00 ;u.m 45 mm R; Metal 2-5.45 8cu.m 2-5.45 221.-5 221.-5
0.33 ;u.m 'ra>el 154./4 8mt 51.0 154./4 51.0
1.00 ;u.m La=our ;7ares 23.2" 8cu.m 23.2" 23.2" 23.2"
?** "0P &tra 9or La=our in 7illy areas 0.00 0.00
1130.43 113.63
Rate per cu.m Rs 1130.43 Rs 113.63
R$)I +%R$& 6+% S?L ;!?+ +I ? #sing %S&I+ A%S&$
ro>i*in an* layin A') atch wor( usin 1 cum o9 45mm R; %B'metal an* 0.33 cum o9 'ra>el 9or =lin*ae 9or inclu*in cost an*con>eyance o9 all materials 9rom appro>e* :uarry to or#site an* stac#into *epartmental aue 9or premeasurement as *irecte* =y t7e*epartmental oFcers inclu*in la=our 9or sprea*in metal an* ra>el 7an*pac#in to cam=er an* ra*e lines =lin*in it7 re:uire* :uantity o9 ra>el
ro>i*in an* layin A') atchwor(usin 1 cum o9 45mm R; %B'
7/26/2019 Commnity Hall Muthukrishanapuram
35/209
or $m 0.00 0.00 or $m 0.00 0.00
1.00 ;u.m 45 mm R; Metal 0.00 8cu.m 0.00 0.00 0.00
0.33 ;u.m 'ra>el 0.00 8mt 0.00 0.00 0.00
1.00 ;u.m La=our ;7ares 23.2" 8cu.m 23.2" 23.2" 23.2"
?** "0P &tra 9or La=our in 7illy areas 0.00 0.00
;3.;2 ;3.;2
Rate per cu.m Rs ;3.;2 Rs ;3.;2
or $m 0.00 0.00 or $m 0.00 0.00
1.00 ;u.m 45 mm R; Metal 0.00 8cu.m 0.00 0.00 0.00
0.33 ;u.m 'ra>el 0.00 8mt 0.00 0.00 0.00
1.00 ;u.m La=our ;7ares 23.2" 8cu.m 23.2" 23.2" 23.2"
?** "0P &tra 9or La=our in 7illy areas 0.00 0.00
;3.;2 ;3.;2
Rate per cu.m Rs ;3.;2 Rs ;3.;2
metal an* 0.33 cum o9 'ra>el 9or =lin*ae 9or inclu*in cost an*con>eyance o9 all materials 9rom appro>e* :uarry to or#site an* stac#into *epartmental aue 9or premeasurement as *irecte* =y t7e*epartmental oFcers inclu*in la=our 9or sprea*in metal an* ra>el 7an*pac#in to cam=er an* ra*e lines =lin*in it7 re:uire* :uantity o9 ra>el
ro>i*in an* layin A') atchwor(usin 1 cum o9 45mm R; %B'
metal an* 0.33 cum o9 'ra>el 9or =lin*ae 9or inclu*in cost an*con>eyance o9 all materials 9rom appro>e* :uarry to or#site an* stac#into *epartmental aue 9or premeasurement as *irecte* =y t7e*epartmental oFcers inclu*in la=our 9or sprea*in metal an* ra>el 7an*pac#in to cam=er an* ra*e lines =lin*in it7 re:uire* :uantity o9 ra>el
7/26/2019 Commnity Hall Muthukrishanapuram
36/209
$%D S&%&$)$*& 9 7ms:
San* Bric#elly Lime stone S7ell lime 'ra>el
lain 3.00 1.00 3.00 3 3 3 3 3 3 3
HIS 0 0 0 0 0 0 0 0 0 0
& & & 6D Rates Schedule of Rates for the year 2014-2015 & & & %i7ays s7. rates
& & & ;ollectors app* rates & & & Local Rates
I Rates of a!our II Rates of )aterial 9 contd..: III Rates of wor(s 9 +ontd..:
1 ;arpenter class 401.00 c ime and cement c uarrying and !lasting
" ;arpenter class 3-.00 1 3".00
3 itter class 35/ 35/.00 1 ;ement 4200.00 " 6e*in 7ar* roc# 53.00
4 itter clas 331 331.00 " S7ell lime 1"00.00 3 Me*ium roc# =lastin 1/.00
5 loor polis7er 31/.00 3 Lime stone --5.00 4 Drillin 7oles 50mm 14/.35
;ement 8Steel
Rou7stoneG
Metal
;ountryBric#s
M.+iles resse*+iles
6oo*
%ar* roc# =lastin Stac#
7/26/2019 Commnity Hall Muthukrishanapuram
37/209
Mason class 9or B6 410.00 4 'rin*in mortor 11.45 5 Drillin 7oles 40 mm 105.20 1"3./0 4
/ Mason class 9or B 3-.00 5 Mi&in mortor =y M 4/.5 3.35
- Ma*oor class "5/.00 +oncrete ,i!rators ift ?harges
2 Ma*oor class "3".00 1 ;; "-.-0 1 ;oncrete 42.10 2/.20
10 ainter ;lass 331.00 " R;; 3-./5 " Br#8stone masny 3".50 5.30
11 ainter ;lass 30.00 d &im!er and RooJng materials Belo 'L
1" lum=er class 35/.00 1 310.00 1 ;oncrete 4-.45 2/.15
13 lum=er class 331.00 " 33"/5.00 " Br#8stone masny 3".50 5.30
14 Stone ;utter class 31.00 3 ;6 plan#s 3330.00 d $arth wor( "/.30 1
15 Stone ;utter class "21.00 4 31.20 1 !r*inary soil "0= 30.-0 1/-.10 1
1 6o**er ".00 5 "3.00 " 'ra>elly soil SS "0 ? 42.00 /.30 1
1/ Ma*oor cl. or roa "5-.00 almyra7 ra9ter 45.50 3 'ra>elly soil SS "0 = 4.00 25.10 1
1- Mason class(stone 410.00 / 30.50 4 SDR -.50 -2.00 1
12 Mason class(stone 3-.00 - "3."0 5 MR DMR 1"0./5 /.30 1
II Rates of )aterial 2 1/.-0 6 a**l. Lea* 10mts 5./5 2.00
a 'ric(s and &ile product 10 15."0 / 6 a**l. Li9t 1mts 4.0 12.25 1
1 4""0.00 Sil>er oa# Scan*lin 1435 - ReAllin ( San* ) 14."5
" Bric# Celly 40 mm 5"4.00 2 ReAllin ( art7 ) 1.15
3 *o "0mm 5-3.00 10 Sprea*in ra>el 8s:m 5.1
4 2"30.00 e )etal and Iron w rom 14.."013 11 Stac#in metal 3.15
5 130-0.00 1 Steel ro*s 45300.00 1" Stac#in ra>el 3.05
'r.loor
?**l.loor
1.5m4.5m
4.5m2.00m
;6 scantlin Q 4m
;6 scantlin (ra9t)
;6 reepers50&"5
;6 reepers50&1"
;asu. poles 1315
;asu. poles 1013
;asu. poles -10
;asu. poles 5-
;ountry =ric#s ( "38
resse* +iles.("0&"0) 8m3
*o ("3&"3) 8m3
7/26/2019 Commnity Hall Muthukrishanapuram
38/209
-/20.00 " MS plate # 4-.00 13 Stac#in san* 3.05
/ 1100.00 3 MS ?nle # 4-.00 aying of R++ pipes
- /400.00 4 Bin*in ir Mt 4-000.00 1 00 to 200mm *ia 45.35
2 ;eilin tiles "0&"0& 5000.00 5 335.00 " 300 to 00mm *ia "-./5
10 33"5.00 ron or#s ( la=) "1.15 8# 3 up to 300 mm *ia 1/./5
f R++ Hume ipes*2 B coller n a!our wrought put up DoorA
N3 200mm *ia pipe 44-0 1 200 mm *i ".5m 3"20 ""0 1 rames8cum ,,,
" /50 mm *i ".5m "20 "10 " S7utters8s:m 35.00
! Stone and Road materials 3 00 mm *i ".5m "320 120 , )iscellaneous 9ocal Rates: 3300
4 450 mm *i ".5m ""20 1-0 1 Rural sanitay pan 153.00 "2"0
1 35.00 III Rates of wor(s 100 100 " n*ian ater closet 67ite ,,, 1452
" Rou7stone ( re>et ) 31.00 a +learing the site 3 6as7 =asin 550&400 mm ,,, "1"5
3 Bon* stones 500.50 1 Li7unle ".55 4 namel aint lit ron "4".55 "54.1
4 4"00.00 " Scru= unle ".35 5 6oo* primer paint 15./5
5 $m stone1.5 & 0.4 30.00 3 %ea>y unle 3.40 Re* o&i*e primer 9or ron 145.50 145
%m stone 0./5 &0." 1-5.00 ! Dismanling / ;ement paint 53.10 145
/ 130.00 - lastic emulsion 315.15 15./5
- ;ut stone rou7ly *r 3520.00 1 "-."0 2 Distem=er !BD # /-.50 20.0
ISS )etal " -.50 10 67ite 8 ;lr cement (#) "3.00 ".5
- 40mm metal -1.00 3 10.00 11 ?; S7eet s:m ain m 15/.0 1/5.50
2 "0mm metal 1135.00 4 Lime concrete 134.30 1" ;ru*e oil # 15.00 2."0
10 1"mm metal 1053.00 5 ;ement concrete 1-".10 13 'lass tiles 0.15&0.15 2.5 11.40
Man. +iles class ?? 8m3
Mosaic ('rey)"5&"5
Mosaic ('rey)"0&"0
' s7eet300&1.mm8 8m"
;ountry =ric#s ( "18
Rou7stone (masonry)
Stonesla= (3 9ace 1 ln)
'uar* stone0."3&0."
Bric#8stone in clay
Bric#8stone in lime
Bric#8stone in cemen
7/26/2019 Commnity Hall Muthukrishanapuram
39/209
11 10mm metal //5.00 R;; "/.00 14 *o 0.30&0."0& 31.10 10."5 0
1" mm metal 5"5.00 / ;7ippin concrete 15."5 15 ;eramic tiles 0."0&0."0 "".35 1."5
13 'ra>el 143.00 - res.tiles 6; 1/.0 1 *o 0.305&0.30 Desin 50.-0 3.30
14 6ell ra>el 11-.00 2 ;lean remo>al;em 3.35 1/ *o 0.400&0.400 4.00 220
15 San* 9or mortor 1/.40 I, $lectriJcation 1- %ollo =loc# 1E&4E&-E 10.00 531 p
1 San* 9or Allin 1/.40 12 %ollo =loc# 1E&E&-E 14.00 3.30 e -0 $ 3.15 3.15 3.4/ 5.04 4."5 5./ /.02
4 Loa*in c7a -0.40 -0.40 3-.40 ".30 3/./5 3/./5 3/./5
5 Unloa*in c -0.40 -0.40 3-.40 ".30 3/./5 3/./5 3/./5
?n a*7oc e& 1.00 1.00 1/.0 "5.0 "1.55 "-./5 3.00
inter state or#s
;ement1 M.+
Steel1.00M+
LimestoneG
=ric# ellyGoo*or#
(1;um)
Rou7 stoneGMetalG san*Gra>elGsur#iGeart7 (1;um)
;ountry=ric#s
M.+iles(1000)Gpresse*
tiles("000)
Bric# classG
;7am=er=ric#s
7/26/2019 Commnity Hall Muthukrishanapuram
41/209
+ransport an* Deli>ery o9 -08100 ra*e Bitumen an* mulsion 9rom !;G B;G %;L to ro*e Dt. "0 Bloc# %ea* Juarters
1 ;7ennai !; B; to "0 Bloc# %ea* Rs ".-0 8 $m 8 Mt " %;L to ro*e *t "0 =loc#s 1500 8 8 Mt
3 ;oim=atore !; to "0 Bloc# %ea* :rs. Rs 550 8 8 Mt 4 ;B 8 B; to "0 =loc#s 550 8 8 Mt
+*,$%*+$ &%'$
$M 010 $M 10"0 $M "040 $M 40-0 $M a=o>e -0
$M .; $M rate amt $M rate amt $M rate amt $M rate amt $M rate am
I 'uildings
1 ;ement 3 0.00 3 5.43 ,,, 0 4.5 0.00 0 4.00 0.00 0 3.45 0.00 0 3.15 0.0
" Rou7 stone 3 0.00 3 -.2 ,,, 0 /.44 0.00 0 .40 0.00 0 .00 0.00 0 5.04 0.0
3 Bon* stone 3 0.00 3 -.2 ,,, 0 /.44 0.00 0 .40 0.00 0 .00 0.00 0 5.04 0.0
4 40mm iss m 3 0.00 3 -.2 ,,, 0 /.44 0.00 0 .40 0.00 0 .00 0.00 0 5.04 0.0
5 "0mm iss m 3 0.00 3 -.2 ,,, 0 /.44 0.00 0 .40 0.00 0 .00 0.00 0 5.04 0.0
101"mm m 3 0.00 3 -.2 ,,, 0 /.44 0.00 0 .40 0.00 0 .00 0.00 0 5.04 0.0
/ 10mm m 3 0.00 3 -.2 ,,, 0 /.44 0.00 0 .40 0.00 0 .00 0.00 0 5.04 0.0
- san* 9or mo 1 0.00 10 -.2 ,,, /.44 44.4 0 .40 0.00 0 .00 0.00 0 5.04 0.0
2 san* 9or Alli 1 0.00 10 -.2 ,,, /.44 44.4 0 .40 0.00 0 .00 0.00 0 5.04 0.0
10 steel 3 0.00 3 5.43 ,,, 0 4.5 0.00 0 4.00 0.00 0 3.45 0.00 0 3.15 0.0
11 country =ric 3 0.00 3 /.33 ,,, 0 ."- 0.00 0 5.40 0.00 0 4.5 0.00 0 4."5 0.0
1" =ric# elly 3 0.00 3 5.2/ ,,, 0 5.1" 0.00 0 4.40 0.00 0 3.-0 0.00 0 3.4/ 0.0
13 s7ell lime 3 0.00 3 5.2/ ,,, 0 5.1" 0.00 0 4.40 0.00 0 3.-0 0.00 0 3.4/ 0.0
14 Lime stone 3 0.00 3 5.2/ ,,, 0 5.1" 0.00 0 4.40 0.00 0 3.-0 0.00 0 3.4/ 0.0
7/26/2019 Commnity Hall Muthukrishanapuram
42/209
15 presse* tile 3 0.00 3 2.// ,,, 0 -.3/ 0.00 0 /."0 0.00 0 ."0 0.00 0 5./ 0.
1 ;6 plan#s 3 0.00 3 5.2/ ,,, 0 5.1" 0.00 0 4.40 0.00 0 3.-0 0.00 0 3.4/ 0.
1/ ;6 scantlin 3 0.00 3 5.2/ ,,, 0 5.1" 0.00 0 4.40 0.00 0 3.-0 0.00 0 3.4/ 0.
1- 'ra>el 3 0.00 3 -.2 ,,, 0 /.44 0.00 0 .40 0.00 0 .00 0.00 0 5.04 0.
12 cutstone rou 3 0.00 3 -.2 ,,, 0 /.44 0.00 0 .40 0.00 0 .00 0.00 0 5.04 0.
"0 "5mm R; 3 0.00 3 -.2 ,,, 0 /.44 0.00 0 .40 0.00 0 .00 0.00 0 5.04 0.
"1 11."mm R 3 0.00 3 -.2 ,,, 0 /.44 0.00 0 .40 0.00 0 .00 0.00 0 5.04 0.
"" mm R; m 3 0.00 3 -.2 ,,, 0 /.44 0.00 0 .40 0.00 0 .00 0.00 0 5.04 0.
"3 45mm R; 3 0.00 3 -.2 ,,, 0 /.44 0.00 0 .40 0.00 0 .00 0.00 0 5.04 0.
+on8eyance of )aterial !y road in HI areas for the year 2014 - 15
Sl.No. Distance in
1 " 3 4 5 / - 2
1 ;oeFcient 1.00 1.00 1.10 1.0 1.35 1.-0 "."5
" nci*ental c 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3 ?** 9or e>ery e&tra 1 #m part t7ere
a 0 10 $ms 10.- 10.- 11.24 1/.3- 14. 12.54 "4.44
= 10 "0 $ms 2.30 2.30 10."4 14.-- 1".5 1./4 "0.2"
c "0 40 $ms -.00 -.00 -.-0 1".-0 10.-0 14.40 1-.00
;ement1 M.+
Steel1.00M+
LimestoneG
=ric# ellyGoo*or#
(1;um)
Rou7 stoneGMetalG san*Gra>elGsur#iGeart7 (1;um)
;ountry=ric#s
M.+iles(1000)Gpresse*
tiles("000)
Bric# classG
;7am=er=ric#s
7/26/2019 Commnity Hall Muthukrishanapuram
43/209
* 40 -0 $ms .20 .20 /.0 1".00 2.30 1".40 15.5"
e a=o>e -0 $ .30 .30 .24 10.0- -.50 11.34 14.1-
7/26/2019 Commnity Hall Muthukrishanapuram
44/209
/&%
N?M ! 6!R$H ;onstruction o9
stimate ?mount H RsH
+S& " )%&$RI%S %& SI&$
Sl.No name o9 materials lea* in $M cost on>eyanc total
1 ;ement 3 4200.00 1."2 0.00 421."2
" san* 9or mortar 1 1/.40 131.54 0.00 30/.243 san* 9or Allin 1 1/.40 131.54 0.00 30/.24
4 Rou7 stone 3 35.00 ".0/ 0.00 321.0/
5 Bon* stone 3 500.50 ".0/ 0.00 5".5/
40mm iss metal 3 -1.00 ".0/ 0.00 -4".0/
/ "0mm iss metal 3 1135.00 ".0/ 0.00 111.0/
- 101"mm metal 3 214.00 ".0/ 0.00 240.0/
2 steel 3 45300.00 1."2 0.00 4531."2
10 3 4""0.00 "1.22 0.00 4"41.22
11 3 33"5.00 "1.22 0.00 334.22
1" =ric# elly "0 mm 3 5-3.00 1/.21 0.00 00.2113 s7ell lime 3 1"00.00 1/.21 0.00 1"1/.21
14 Lime stone 3 --5.00 1/.21 0.00 20".21
15 presse* tiles 3 130-0.00 14. 0.00 13024.
1 ;ountry oo* plan#s 3 3330.00 1/.21 0.00 334/.21
1/ Sil>er !a# scantlins 3 1435.00 1/.21 0.00 143-".21
1- 10mm metal 3 50.00 ".0/ 0.00 /.0/
12 "5 mm metal 3 /31.00 ".0/ 0.00 /5/.0/
"0 1" mm metal 3 -.00 ".0/ 0.00 24.0/
"1 mm metal 3 42.00 ".0/ 0.00 5"".0/
"" Rou7 stone 9or re>etm 3 31.00 ".0/ 0.00 34".0/"3 ;utstone rou7ly *resse 3 3520.00 ".0/ 0.00 31.0/
"4 'ra>el (6ell) 3 11-.00 ".0/ 0.00 144.0/
'ra>el ('ritty) 1 143.00 ".0/ 0.00 12.0/
S#' D%&%
;MN+ M!R+?R 1H1.5
0.20 M+ ;ost o9 cement 421."2 8M+ 4/12.4
1.00 cum ;ost o9 san* 30/.24 8cum 30/.24
502.56
;MN+ M!R+?R 1H"
0./"0 M+ ;ost o9 cement 421."2 8M+ 3532./3
1.00 cum ;ost o9 san* 30/.24 8cum 30/.24
364.
;MN+ M!R+?R 1H3
0.4-0 M+ ;ost o9 cement 421."2 8M+ "352.-"
1.00 cum ;ost o9 san* 30/.24 8cum 30/.24
2.
1.00 cum Mi&in c7ares 4/.5 8cum 4/.5
215.41
;MN+ M!R+?R 1H4
0.30 M+ ;ost o9 cement 421."2 8M+ 1/2.-
1.00 cum ;ost o9 san* 30/.24 8cum 30/.24
unloa*in
country =ric#s ( "384E)
country =ric#s ( "184E)
7/26/2019 Commnity Hall Muthukrishanapuram
45/209
/&%5
20.60
1.00 cum Mi&in c7ares 4/.5 8cum 4/.5
2125.45
;MN+ M!R+?R 1H5
0."-- M+ ;ost o9 cement 421."2 8M+ 1415.-2
1.00 cum ;ost o9 san* 30/.24 8cum 30/.24
123.63
1.00 cum Mi&in c7ares 4/.5 8cum 4/.511.46
;MN+ M!R+?R 1H
0."40 M+ ;ost o9 cement 421."2 8M+ 11/2.21
1.00 cum ;ost o9 san* 30/.24 8cum 30/.24
146.65
1.00 cum Mi&in c7ares 4/.5 8cum 4/.5
1535.50
LM M!R+?R 1H"0.5 cum Lime 20".21 8cum 451.4
1.00 cum ;ost o9 san* 30/.24 8cum 30/.24
1.00 cum 'rin*in mortor 11.45 8cum 11.45
65.65
D%&%
art7 or# e&ca>ation an* *epositin on =an# it7 in initial lea* o9 10 m
an* initial li9t o9 "m in 7ar* sti clayG sti =lac# cotton soilG 7ar* re* eart7G
eart7 mi&e* it7 small sie* =oul*ers an* 7ar* ra>elly soil as per SS "0B
Rate 8 cum 4.00?** 100P e&tra 9or narro 9oun*ati 4.00
;2.00 8cum
Jty tems Rate er ?mount
con>eyance o9 all materials to site an* all la=our c7ares 9or mi&inG
layin an* curin etc complete 9or 10 cum.
2.00 cum ;ost o9 40mm SS metal -4".0/ 8cum /5/-.3
4.50 cum cement mortar 1H 14-/.-5 8cum 25.331.-0 nos Mason class 3-.00 8eac7 ".40
1/./0 nos Ma*oor class "5/.00 8eac7 454-.20
14.10 nos Ma*oor class "3".00 8eac7 3"/1."0
0.54
225.00
R?+ @ RS 225.0 8cum
con>eyance o9 all materials to site an* all la=our c7ares 9or mi&inG
layin an* curin etc complete 9or 10 cum.
2.00 cum ;ost o9 40mm SS metal -4".0/ 8cum /5/-.3
4.50 cum cement mortar 1H5 1/"3.-3 8cum //5/."4
1.-0 nos Mason class 3-.00 8eac7 ".40
1/./0 nos Ma*oor class "5/.00 8eac7 454-.20
+ement concrete 1//12mi& usin 40mm SS metal inclu*in cost an*
+ement concrete 1/5/10mi& usin 40mm SS metal inclu*in cost an*
7/26/2019 Commnity Hall Muthukrishanapuram
46/209
/&%6
14.10 nos Ma*oor class "3".00 8eac7 3"/1."0
0.3
2361;.00
R?+ @ RS 2361.;0 8cum
con>eyance o9 all materials to site an* all la=our c7ares 9or mi&inG
layin an* curin etc complete 9or 10 cum.
2.00 cum ;ost o9 40mm SS metal -4".0/ 8cum /5/-.3
4.50 cum ;ost o9 cement mortar 1H4 "0//.-0 8cum 2350.10
1.-0 nos Mason class 3-.00 8eac7 ".40
1/./0 nos Ma*oor class "5/.00 8eac7 454-.20
14.10 nos Ma*oor class "3".00 8eac7 3"/1."0
0.//
25412.00
R?+ @ RS 2541.20 8cum
con>eyance o9 all materials to site an* all la=our c7ares 9or mi&inG
layin an* curin etc complete 9or =e* =loc#s 9or 10 cum
2.00 cum "0mm SS metal 111.0/ 8cum 10442.3
4.50 cum ;ement mortar 1H" 3-4/./ 8cum 1/314.5"
1.-0 nos Mason class 3-.00 8eac7 ".40
1/./0 nos Ma*oor class "5/.00 8eac7 454-.20
14.10 nos Ma*oor class "3".00 8eac7 3"/1."0
0.35324.00
R?+ @RS 324.0 8cum
pointin inclu*in cost an* con>eyance p9 all materials to site an* all
la=our c7ares etc complete 9or 10 cum
10.00 cum Rou7 stone 321.0/ 8cum 3210./0
1.00 cum Bon* stone 5".5/ 8cum 5".5/3.40 cum ;ement mortar 1H5 1//1.4- 8cum 0"3.03
/.10 nos Mason class 410.00 8eac7 "211.00
10.0 nos Mason class 3-.00 8eac7 3200.-0
14.10 nos Ma*oor class "5/.00 8eac7 3"3./0
14.10 nos Ma*oor class "3".00 8eac7 3"/1."0
0.00
241.00
R?+ @RS 241.0 8cum
an* con>eyance o9 all materials to site an* all la=our c7ares etc complete 10 cu
4520 nos ;ountry =ric#s 4"41.22 81000nos 124/0./3
".50 cum ;ement mortar 1H5 1//1.4- 8cum 44"-./0
+ement concrete 1/4/6mi& usin 40mm SS metal inclu*in cost an*
+ement concrete 1/2/4mi& usin "0mm SS metal inclu*in cost an*
Random ru!!le masonryin cement mortar 1H5 mi& it7 simultaneous
'ric( wor(in cement mortar 1H5 mi& usin country =ric#s -384E&438-E&"384E
- 384E & 4 38-E & " 384E
7/26/2019 Commnity Hall Muthukrishanapuram
47/209
/&%!
3.50 nos Mason class 410.00 8eac7 1435.00
10.0 nos Mason class 3-.00 8eac7 3200.-0
/.10 nos Ma*oor class "5/.00 8eac7 1-"4./0
"1."0 nos Ma*oor class "3".00 8eac7 421-.40
0./
35;;.00
?."loor R?+ @RS 35;.;0 8cum
"."loor R?+ @RS 330.40 8cum 3"5
3304.00
an* con>eyance o9 all materials to site an* all la=our c7ares etc complete
010 nos ;ountry =ric#s 334.22 81000nos "0115.41
".-0 cum ;ement mortar 1H5 1//1.4- 8cum 420.14
3.50 nos Mason class 410.00 8eac7 1435.00
/.10 nos Mason class 3-.00 8eac7 "1".-0/.10 nos Ma*oor class "5/.00 8eac7 1-"4./0
14.10 nos Ma*oor class "3".00 8eac7 3"/1."0
0./5
34220.00
R?+ @RS 3422.00 8cum
con>eyance to t7e sitean* all la=our c7ares 9or Allin
as per stan*ar* speeciAcations
1.00 cum san* 9or Allin 30/.24 8cum 30/.24
1.00 cum La=our c7ares 9or Allin 14."5 8cum 14."5
322.1;
R?+ @RS 322.1; 8cum
1.00 cum 'ra>el 9or Allin 12.0/ 8cum 12.0/0.00 cum Stac#in c7ares 3.05 8cum 0.00
1.00 cum La=our c7ares 9or Allin 1.15 8cum 1.15
165.22
R?+ @RS 165.22 8cum
1.00 cum 6ellra>el 144.0/ 8cum 144.0/0.00 cum Stac#in c7ares 3.05 8cum 0.00
1.00 cum La=our c7ares 9or Allin 1.15 8cum 1.15
10.22
R?+ @RS 10.22 8cum
Li9tin;7ares
'ric( wor(in cement mortar 1H5 mi& usin country =ric#s -384E&4184E&"184E
- 384E & 4 184E & " 184E
;ollection an* supply o9 sand and Jllingin to t7e =asement inclu*in cost an*
(o++ection and su+) of 8ritt) 8ra9e+from a;;d ()arr* inl)dingo-t and on4e*ane of all material- to -ite inl)ding all la8o)r harge-for fi++in8 et.om;lete7
(o++ection and su+) of e++ 8ra9e+from a;;d ()arr* inl)ding o-tand on4e*ane of all material- to -ite inl)ding all la8o)r harge- forfi++in8 et.om;lete7
7/26/2019 Commnity Hall Muthukrishanapuram
48/209
/&%"
Stan*ar* speciAcation
R?+ @RS 1.15 8cum
sur9ace in 9oun*ation an* =asement an* in all Toors 9or R ; ; column 9ootin
column plint7 =eamG =eamsG roo9 sla=sG staircase stepsG =e* =loc#sG critical pier etc
usin mil* steel s7eets o9 sie 20 & 0 cm an* 10 uae stiene*G el*e* it7 mil*
steel anles o9 sie "5mm&"5mm&3mm 9or =oar*in lai* o>er sil>er oa# (country
oo*) scantlins o9 sie 10cm & .5cm space* o9 a=out 20cm centre to centre an*
supporte* =y casurina props o9 10cm to 13cm *ia space* at /5cm centre to centre
complete complyin it7 stan*ar* speciAcations an* as *irecte* =y *epartmental
oFcers inclu*in con>eyance o9 all materials to site an* proper centerin etc complete.
%u &ata .
Co-t of MS -heet- A angle- for eah -et
eight of MS -heet . 10 a)ge -iBe 90er oa# 143-".21 8cum 1/"5.25
2-.5 Rm ;asurina props 10 to 13cm *ia "3."0 8Rm ""-5."0
4011.15
Rate per one operation 9or MS s7eet anle 1340.00 840 40-.50
Rate per one operation 9or struttin 4011.15 85 -0"."3
)ain data for one use for 10 S=m
MS s7eet rate per one operation 40-.50 8eac7 40-.50
props rate per one operation -0"."3 8eac7 -0"."3
3.-0 nos ;arpenter class 401.00 8eac7 15"3.-0
5.40 nos Ma*oor class "5/.00 8eac7 13-/.-0
1 nos itter class 331.00 8eac7 331.00
L.S e*es 11.00
L.S perio*ical cleanin an* paintin etc 3.23
446.2
iK Rate for roof sla!< lintel< !eam 44.63 8S:miiiK Rate for column post
2-.5 Nos ;asurina props 10 13 "3."0 ""-5."0 85 45/.04
0.3 Nos ;arpenter class 401.00 8eac7 1"0.30
0.3 Nos Ma*oor class "5/.00 8eac7 //.10
ReJllingt7e =asement it7 e@ca8ated earth ot7er t7an san* complyin t7e
Supplying and erectingcentering s7utterin inclu*in necessary supports 9or
3.1!5 < !"501000 2.92 kgm2
24$"24 38#m2 ; 0$54 m2 < 17$4 38$
7/26/2019 Commnity Hall Muthukrishanapuram
49/209
/&%9
54.44
44-." () 54.44 K 3613.62
R?+ @RS 361.36 8S:m
i8K +entering !elow ?round le8el
50P o9 t7e a=o>e rate 44.-3 8" 223.41
R?+ @RS 223.41 8S:m
steel to site an* all la=our c7ares 9or strai7teninG cuttin to lent7G
=en*in to s7ape an* tyin in position an* 9ormin rills 9or all R.;.; or#s
1.00 M+ ;ost o9 steel 4531."2 8mt 4531."2
0.01 mt ;ost o9 =in*in ire 4-000.00 8mt 4-0.00
35.00 nos itter class 35/.00 8eac7 1"425.00
0./1
562;2.00
R?+ @RS 562;2.00 8M+
1445.-5
inclu*in cost an* con>eyance o9 all materials to site an* all
la=our c7ares 9or mi&inG layinG an* curin etc complete 9or 10 cum
2.00 cum "0mm SSmetal 111.0/ 8cum 10442.3
4.50 cum ;ement mortar 1H" 3-4/./ 8cum 1/314.5"
3.50 nos Mason class 3-.00 8eac7 1"--.00
"1."0 nos Ma*oor class "5/.00 8eac7 544-.4035.30 nos Ma*oor class "3".00 8eac7 -1-2.0
0.-5
42;1.00
R?+ @RS 42;.10 8cum
1445.-5
inclu*in cost an* con>eyance o9 all materials to site an* all
la=our c7ares 9or mi&inG layinG an* curin etc complete 9or 10 cum
2.00 cum "0mm SSmetal 111.0/ 8cum 10442.3
4.50 cum san* 30/.24 8cum 13-5./3,,, $ cement 4.21"2 8# 15--4.53
3.50 nos Mason class 3-.00 8eac7 1"--.00
"1."0 nos Ma*oor class "5/.00 8eac7 544-.40
35.30 nos Ma*oor class "3".00 8eac7 -1-2.0
0.11
424.00
R?+ @RS 424.0 8cum
inclu*in cost an* con>eyance o9 all materials to site an* allla=our c7ares 9or mi&inG layinG an* curin etc complete 9or 10 cum
2.00 cum "0mm SSmetal 111.0/ 8cum 10442.3
4.50 cum ;ement mortar 1H1.5 50"/.5- 8cum """4.11
3.50 nos Mason class 3-.00 8eac7 1"--.00
"1."0 nos Ma*oor class "5/.00 8eac7 544-.40
Supplying and fa!rication of steelinclu*in cost an* con>eyance o9
Reinforced cement concrete 1/2/4mi& usin "0mm SS metal
Reinforced cement concrete 1/2/4mi& usin "0mm SS metal
Reinforced cement concrete 1/1.5/3mi& usin "0mm SS metal
7/26/2019 Commnity Hall Muthukrishanapuram
50/209
/&%50
35.30 nos Ma*oor class "3".00 8eac7 -1-2.0
0."
46000.00
?round "loo R?+ @RS 4600.00 8cum 421.00
Ist "loor R?+ @RS 464;.10 8cum 464;1.00
inclu*in cost an* con>eyance o9 all materials to site an* all
la=our c7ares 9or mi&inG layinG an* curin etc complete 9or 10 cum
2.00 cum "0mm SSmetal 111.0/ 8cum 10442.3
4.50 cum san* 30/.24 8cum 13-5./3
,,, $' ;ement 421."2 8M+ "11/2.3-
3.50 nos Mason class 3-.00 8eac7 1"--.00
"1."0 nos Ma*oor class "5/.00 8eac7 544-.40
35.30 nos Ma*oor class "3".00 8eac7 -1-2.0
0."
4;41.00
R?+ @RS 4;4.10 8cum
cost an* con>eyance o9 all materials to site an* all la=our
c7ares etc complete 9or 10 S:m
0.10 cum ;ement mortar 1H3 "/15.41 8cum "/1.54
1.10 nos Mason class 410.00 8eac7 451.00
1.10 nos Ma*oor class "5/.00 8eac7 "-"./0
1.10 nos Ma*oor class "3".00 8eac7 "55."0
0.5
121.00
R?+ @RS 12.10 8S:m
cost an* con>eyance o9 all materials to site an* all la=our
c7ares etc complete 9or 10 S:m
0."" cum ;ement mortar 1H3 "/15.41 8cum 52/.32
"."0 nos Mason class 410.00 8eac7 20".00
0.50 nos Ma*oor class "5/.00 8eac7 1"-.503."0 nos Ma*oor class "3".00 8eac7 /4".40
0./1
231.00
R?+ @RS 23.10 8S:m
cost an* con>eyance o9 all materials to site an* all la=our
c7ares etc complete 9or 10 S:m
0."" cum ;ement mortar 1H4 "1"5.45 8cum 4/.0
"."0 nos Mason class 410.00 8eac7 20".00
0.50 nos Ma*oor class "5/.00 8eac7 1"-.50
3."0 nos Ma*oor class "3".00 8eac7 /4".40
0.50
2241.00
R?+ @RS 224.10 8S:m
Li9tin;7ares
Reinforced cement concrete 1/1.5/3mi& usin "0mm SS metal
lasteringit7 cement mortar 1/3mi& to 10 mmt7ic# inclu*in
lastering it7 cement mortar 1/3mi& to 20 mm t7ic# inclu*in
lasteringit7 cement mortar 1/4mi& to 20 mmt7ic# inclu*in
7/26/2019 Commnity Hall Muthukrishanapuram
51/209
/&%51
cost an* con>eyance o9 all materials to site an* all la=our
c7ares etc complete 9or 10 S:m
0."" cum ;ement mortar 1H5 1//1.4- 8cum 3-2./3
"."0 nos Mason class 410.00 8eac7 20".00
0.50 nos Ma*oor class "5/.00 8eac7 1"-.50
3."0 nos Ma*oor class "3".00 8eac7 /4".40
0.3/
213.00
R?+ @RS 21.30 8S:m
cost an* con>eyance o9 all materials to site an* all la=our c7ares etc
0.14 cum ;ement mortar 1H3 "/15.41 8cum 3-0.1
1.10 nos Mason class 410.00 8eac7 451.00
0.50 nos Ma*oor class "5/.00 8eac7 1"-.50
1.10 nos Ma*oor class "3".00 8eac7 "55."0
0.14
1215.00
R?+ @RS 121.50 8S:m
cost an* con>eyance o9 all materials to site an* all la=our c7ares etc
0.14 cum ;ement mortar 1H4 "1"5.45 8cum "2/.5
1.10 nos Mason class 410.00 8eac7 451.00
0.50 nos Ma*oor class "5/.00 8eac7 1"-.50
1.10 nos Ma*oor class "3".00 8eac7 "55."0
0./4
1133.00
R?+ @RS 113.30 8S:m
cost an* con>eyance o9 all materials to site an* all la=our c7ares etc
0.14 cum ;ement mortar 1H5 1//1.4- 8cum "4-.01
1.10 nos Mason class 410.00 8eac7 451.00
0.50 nos Ma*oor class "5/.00 8eac7 1"-.50
1.10 nos Ma*oor class "3".00 8eac7 "55."0
0."2
1063.00
R?+ @RS 106.30 8S:m
SS metal to "5mm t7ic# inclu*in cost an* con>eyance o9 all materials to site
an* all la=our c7ares 9or mi&inG layinG curin etc complete 9or 10 cum
2.00 cum 101"mm SS metal 240.0/ 8cum -40.3
4.50 cum ;ement mortar 1H" 3-4/./ 8cum 1/314.5"
1.-0 nos Mason class 3-.00 8eac7 ".40
1/./0 nos Ma*oor class "5/.00 8eac7 454-.20
14.10 nos Ma*oor class "3".00 8eac7 3"/1."0
lasteringit7 cement mortar 1/5mi& to 20 mm t7ic# inclu*in
lasteringit7 cement mortar1/3 mi& to 12mm t7ic# inclu*in
lasteringit7 cement mortar 1/4mi& to 12mm t7ic# inclu*in
lasteringit7 cement mortar 1/5mi& to 12mm t7ic# inclu*in
ro>i*ingranolethic LoorAnis7 in cement concrete 1/2/4mi& usin 101"m
7/26/2019 Commnity Hall Muthukrishanapuram
52/209
/&%52
0.35
34256.00
R?+ @RS 34"5.-0 8cum
"5mm +# 34"5.-0 & 0.0"5 K 65.5 8S:m
1./0 cum 'ra>el 144.0/ cum "44.2"
1.10 No Ma*oor ;lass "5/.00 "-"./0
0.50 No Ma*oor class "3".00 11.00
sun*ries 0.3-
44.00
R?+ @RS 4.40 8S:m
10S:m
450 Nos 'lae* tiles (;olour) 2.5 8eac7 434".50
0.10 cum cement mortar 1H" mi& 3-4/./ 8cum 3-4.//
4.00 # 67ite cement "3.00 8# 2".00
1.10 nos Mason class 410.00 8eac7 451.00
4.10 nos Mason class 3-.00 8eac7 150-.-0
"./0 nos Ma*oor class "5/.00 8eac7 23.20
3.30 nos Ma*oor class "3".00 8eac7 /5.0
0.43
623;.00
R?+ @RS 623.;0 8S:m
inclu*in cost an* con>eyance o9 all materials to site an* all la=our c7ares etc
complete.
1/ Nos 'lae* tiles (;olour Desine*) 31.10 8eac7 5123./0
0.10 cum cement mortar 1H" mi& 3-4/./ 8cum 3-4.//
4.00 # ;olour cement ".5 8# 10.0
1.10 nos Mason class 410.00 8eac7 451.00
4.10 nos Mason class 3-.00 8eac7 150-.-0
"./0 nos Ma*oor class "5/.00 8eac7 23.20
3.30 nos Ma*oor class "3".00 8eac7 /5.0
0.3
;105.00
R?+ @RS ;10.50 8S:m
an* con>eyance o9 all materials to site an* all la=our c7ares etc complete
"50 Nos ;eromic tiles (;olour Desine*) "".35 8eac7 55-/.50
0."1 cum cement mortar 1H3 mi& "/15.41 8cum 5/0."4
1.10 nos Mason class 410.00 8eac7 451.00
1.10 nos Mason class 3-.00 8eac7 404.-0
"."0 nos Ma*oor class "5/.00 8eac7 55.40
"."0 nos Ma*oor class "3".00 8eac7 510.40
0.
60;0.00
R?+ @RS 60;.00 8S:m
loorin it7 gra8el100mm t7ic# 10S:m
Dadooing o9 alls it7 lae* tileso9 sie 15 cm &15cm&mm lai* in
;M 1H"G 10mm t7ic# pointin it7 7ite cement usin 0.4#8cm"
Dadooingo9 alls it7 colour lae* tiles o9 sie 300&"00&mm o9 =est :uality
"loor Jnishingit7 ceromic tileso9 sie "0cm&"0cminclu*in cost
7/26/2019 Commnity Hall Muthukrishanapuram
53/209
/&%53
cost an* con>eyance o9 all materials to site an* all la=our c7ares etc complete
11" Nos Desin ;eromic tiles all co305&305& 50.-0 8eac7 5-2.0
0."1 cum ;ement mortar 1H3 mi& "/15.41 8cum 5/0."4
1."0 nos Mason class 410.00 8eac7 42".00
1.00 no Mason class 3-.00 8eac7 3-.00
1.00 no Ma*oor class "5/.00 8eac7 "5/.00
1.00 no Ma*oor class "3".00 8eac7 "3".00
0.50 no Stone cutter class 31.00 8eac7 15-.00
0.50 $ ;otton aste 2."0 8$ 4.0
3.0 $ ;olour cement ".5 8$ /2.25
Sun*ries LS 0.1
652.00R?+ @RS 65.20 8S:m
cost an* con>eyance o9 all materials to site an* all la=our c7ares etc complete
3 Nos Desin colour ;eromic tile400&400&/ 4.00 8eac7 403".000."1 cum ;ement mortar 1H3 mi& "/15.41 8cum 5/0."4
1."0 nos Mason class 410.00 8eac7 42".00
1.00 no Mason class 3-.00 8eac7 3-.00
1.00 no Ma*oor class "5/.00 8eac7 "5/.00
1.00 no Ma*oor class "3".00 8eac7 "3".00
0.50 no Stone cutter class 31.00 8eac7 15-.00
0.50 $ ;otton aste 2."0 8$ 4.0
3.0 $ ;olour cement ".5 8$ /2.25
Sun*ries LS 0."1
1;4.00R?+ @RS 1;.40 8S:m
cost an* con>eyance o9 all materials to site an* all la=our c7ares etc complete
10 s:m Desin colour ;eromic tile00&00&/ 220.00 8eac7 2200.00
0."1 cum ;ement mortar 1H3 mi& "/15.41 8cum 5/0."4
1."0 nos Mason class 410.00 8eac7 42".00
1.00 no Mason class 3-.00 8eac7 3-.00
1.00 no Ma*oor class "5/.00 8eac7 "5/.00
1.00 no Ma*oor class "3".00 8eac7 "3".00
0.50 no Stone cutter class 31.00 8eac7 15-.00
0.50 $ ;otton aste 2."0 8$ 4.0
3.0 $ ;olour cement ".5 8$ /2.25
Sun*ries LS 0."1
1202.00
R?+ @RS 120.20 8S:m
0.01 cum ;ement mortar 1H3 "/15.41 8cum "/.15
1.0 nos Mason class 3-.00 8eac7 5--.-0
0.50 nos Ma*oor class "5/.00 8eac7 1"-.50
a>in t7e loor it7 scratch proof ceromic tileso9 sie 305&305&mminclu*in
a>in t7e loor it7 scratch proof ceromic tileso9 sie 400&400&/mm inclu*in
a>in t7e loor it7 scratch proof 8ertiJed tileso9 sie 00&00&/mm inclu*i
ointing it7 cement mortor 1H3cuddapah sla! B pa8ing stone to 9ull *ept7-
7/26/2019 Commnity Hall Muthukrishanapuram
54/209
/&%5
1.10 nos Ma*oor class "3".00 8eac7 "55."0
0.35
1000.00
R?+ @RS 100.00 8S:m
t7ic# an* pointe* it7 cement mortar 1H3 10 S:m
10.50 S:m ;u**apa7 sla=s (50mm t7ic#) 3/.00 S:m 324-.000.1" cum cement mortar1H3 "/15.41 cum 3"5.-5
1.00 cum ;ement ;oncrete 1HH1" ""/5./0 cum ""/5./0
10.00 S:m ointin it7 ;M 1H3 100.00 cum 1000.00
1.10 No Mason class 410.00 cum 451.00
".10 No Mason class 3-.00 8eac7 //".-0
"."0 No Ma*oor ;lass "5/.00 8eac7 55.40
1.10 No Ma*oor class "3".00 8eac7 "55."0
sun*ries 0.05
;5;4.00
R?+ @RS ;5;.40 8S:m
all materials to site an* all la=our c7ares etc comoplete 9or 100 S:m
0.0/ cum cost o9 s7ell lime 1"1/.21 8cum -5."5
1.0 nos Mason class 3-.00 8eac7 5--.-0
0.50 nos Ma*oor class "5/.00 8eac7 1"-.50
"./0 nos Ma*oor class "3".00 8eac7 ".40
1.05
1430.00R?+ @RS 14.30 8S:m
an* con>eyance o9 all materials to site an* all la=our c7ares etc complete
1 S:m rate 9or 7ite as7in 14.30
?DD 50P e&tra 9or colour piments /.15
21.45
R?+ @Rs 21.45 8S:m
0.55 # Blac# Lea* /0.00 3-.50
0.55 # 67ite Lea* /0.00 3-.50
0.0 Lit Linsee* oil 50.00 30.00
0./0 No ainter ;lass "5/.00 1/2.20
Sun*riries 9or =rus7es /.20
2;4.60
R?+ @RS 2;.46 8S:m
an* con>eyance o9 all materials to site an* all la=our c7ares etc complete
10 s:.m rimin coat 34. 8$ 34.0
1.34 $ Distem=er /-.50 8$ 105.12
0.50 No ainter ;lass 331.00 8eac7 15.50
0.50 No Ma*oor ;lass "5/.00 8eac7 1"-.50
loorin it7 cuddapah sla!s 50mm thic(o>er a =e* o9 concrete 100mm
Ahite washingto coats usin s7ell lime inclu*in cost an* con>eyance o9
+olour washing to coats usin appro>e* colour piments inclu*in cost
aintingriming +oato8er *ew lastered Surface - 10 S=.m
Distem!eringto coats it7 =est appro>e* *istem=er inclu*in cost
7/26/2019 Commnity Hall Muthukrishanapuram
55/209
/&%55
0.-0 No Ma*oor ;lass "3".00 8eac7 1-5.0
Ls Sun*riries 9or =rus7es LS -.00
;40.00
R?+ @RS ;4.00 8S:m
an* con>eyance o9 all materials to site an* all la=our c7ares etc complete
3."3 $ Distem=er 53.10 8$ 1/1.5110 S:.m rimin coat 34. 8$ 34.0
0.50 No ainter ;lass 331.00 8eac7 15.50
0.50 No Ma*oor ;lass "5/.00 8eac7 1"-.50
0.-0 No Ma*oor ;lass "3".00 8eac7 1-5.0
Ls Sun*riries 9or =rus7es LS "."2
1000.00
R?+ @RS 100.00 8S:m
Ne
inclu*in costan* con>eyance o9 all materials to site an* all la=our c7ares etc co
1.40 $ mulsion 315.15 8$ 441."1
0.2- # rimer 145.00 8$ 14".10
"."0 No ainter ;lass 331.00 8eac7 /"-."0
Ls Sun*ries 9or =rus7es LS -.42
1320.00
R?+ @RS 132.00 8S:m
'lac( !oard painting two coats with good =uality of paint
inclu*in cost an* con>eyance o9 paint an* all la=our c7ares etc complete
"."" Lit ;ost o9 paint ""0.50 8lit 4-2.51
1."0 nos ainter class 331.00 8eac7 32/."0
sun*ries inclu*in =rus7esG soaps.putty etc 13."2
;00.00
R?+ @Rs ;0.00 8S:m
riming coat for new iron with ready mi@ed primer of appro8ed =uality 10S=m
1.33 # Re* !&i*e 145.50 # 123.5"
0./0 No ainter class 331.00 8eac7 "31./0
sun*ries inclu*in =rus7esG soaps.putty etc 0./-
42.00
R?+ @RS 42.0 8S:m
riming coat on new wood wor( with ready mi@ed primer of appr8d =uality-10 S=
1.44 # Rea*y mi&e* primer 15./5 # ""5./"
0./0 No ainter class 331.00 8eac7 "31./0
sun*ries inclu*in =rus7esG soaps.putty etc 0.5-
456.00
R?+ @Rs 45.60 8S:m
inclu*in cost an* con>eyance o9 paint an* all la=our c7ares etc complete
+ement 'ased Distem!eringto coats it7 =est appro>e* +ement aint incl
$@terier $mulsion to coats inclu*in primin coat it7 =est appr
aintingto coats o>er ne iron or#susin rea*y mi&e* enamel paint
7/26/2019 Commnity Hall Muthukrishanapuram
56/209
/&%56
"."" Lit ;ost o9 paint "4".55 8lit 53-.4
1.10 nos ainter class 331.00 8eac7 34.10
sun*ries inclu*in =rus7esG soaps.putty etc 0.44
;03.00
R?+ @Rs ;0.30 8S:m
inclu*in cost an* con>eyance o9 paint an* all la=our c7ares etc complete
".55 Lit ;ost o9 paint "54.10 8lit 4/.2
1."0 nos ainter class 331.00 8eac7 32/."0
sun*ries inclu*in =rus7esG soaps.putty etc 0.-4
104.00
R?+ @Rs 104.0 8S:m
inclu*in cost an* con>eyance o9 paint an* all la=our c7ares etc complete
"."" Lit ;ost o9 paint "54.10 8lit 54.10
1."0 nos ainter class 331.00 8eac7 32/."0
sun*ries inclu*in =rus7esG soaps.putty etc -./0
;0.00
R?+ @Rs ;.00 8S:m
inclu*in cost an* con>eyance o9 all materials to site an* all la=our
c7ares etc complete 9or 10 S:m
0.02 cum ;ement mortar 1H3 "/15.41 8cum "44.32
1.0 nos Mason class 3-.00 8eac7 5--.-0
0.50 nos Ma*oor class "5/.00 8eac7 1"-.50
1.10 nos Ma*oor class "3".00 8eac7 "55."0
0.11
121.00
R?+ @RS 121.0 8S:m
an* con>eyance o9 all materialsan* all la=our c7ares etc complete 9or 10 S:m
0.0 cum ;ement mortar 1H3 "/15.41 8cum 1".2"
1.0 nos Mason class 3-.00 8eac7 5--.-0
0.50 nos Ma*oor class "5/.00 8eac7 1"-.50
1.10 nos Ma*oor class "3".00 8eac7 "55."0
0.5-
113.00
R?+ @RS 113.0 8S:m
ei7t o9 cement inclu*in cost an* con>eyance o9 all materials to site
an* all la=our c7ares etc complete 9or 10 S:m
aintingto coats o>er ne oo* or#susin rea*y mi&e* enamel paint
aintingto coats o>er ol* oo* or#susin rea*y mi&e* enamel paint
ointingt7e RR Masonryit7 cement mortar 1H3 mi&
ointing it7 cement mortar 1H3Tus7 pointin 9or =ric#or# inclu*in cost
ointing it7 cement mortar 1H3to 9ull *ept7 o9 tiles usin cru*eoil 10P =y
7/26/2019 Commnity Hall Muthukrishanapuram
57/209
/&%5!
0.04 cum ;ement mortar 1H3 "/15.41 8cum 10-."
"."0 nos Mason class 3-.00 8eac7 -02.0
0.50 nos Ma*oor class "5/.00 8eac7 1"-.50
1.10 nos Ma*oor class "3".00 8eac7 "55."0
0.0-
1302.00
R?+ @RS 130.20 8cum
o9 3"H1".5 inclu*in cost an* con>eyance o9 all materials to site an* all la=our
c7ares 9or mi&in G layin Gan* Anis7in etc complete 9or 10 cum
1".-0 cum Bric# elly "0mm 00.21 8cum /21.5
5.00 cum slac#e* lime 20".21 8cum 4514.55
1.-0 nos Mason class 3-.00 8eac7 ".40
1/./0 nos Ma*oor class "5/.00 8eac7 454-.20
14.10 nos Ma*oor class "3".00 8eac7 3"/1."0
0.30
206;.00
R?+ @RS 206.;0 8cum
pure slac#e* lime o>er R.;.;. roo9 sla= in t7e proportion o9 3"H1".5 an*
mortar 1H3 mi& an* pointe* it7 t7e same oile* mortar inclu*in cost an*
con>eyance o9 all materials to site an* all la=our c7ares etc complete 9or 10 S:m
0.-0 cum Bric# elly lime concrete "0-.20 8cum 155.1"
1-2 nos presse* tiles 13024. 81000 no "4/4.-20.1" cum cement mortar 1H3 mi& "/15.41 8cum 3"5.-5
5.-0 # cru*e oil 15.00 8# -/.00
10.00 S:m pointin it7 cement mortar 1H3 130."0 8S:m 130".00
1.10 nos Mason class 410.00 8eac7 451.00
".10 nos Mason class 3-.00 8eac7 //".-0
"."0 nos Ma*oor class "5/.00 8eac7 55.40
1.10 nos Ma*oor class "3".00 8eac7 "55."00./4
6;0.00
R?+ @RS 6;.00 8S:m
pure slac#e* lime o>er R.;.;. roo9 sla= in t7e proportion o9 3"H1".5 an*
mortar 1H3 mi& an* pointe* it7 t7e same oile* mortar inclu*in cost an*
con>eyance o9 all materials to site an* all la=our c7ares etc complete 9or 10 S:m
0.00 cum Bric# elly lime concrete 0.00 8cum 0.00
1-2 nos presse* tiles 13024. 81000 no "4/4.-2
0.1" cum cement mortar 1H3 mi& "/15.41 8cum 3"5.-5
5.-0 # cru*e oil 15.00 8# -/.00
10.00 S:m pointin it7 cement mortar 1H3 130."0 8S:m 130".00
1.10 nos Mason class 410.00 8eac7 451.00
".10 nos Mason class 3-.00 8eac7 //".-0
"."0 nos Ma*oor class "5/.00 8eac7 55.40
'ric( Gelly lime concreteusin "0mm =ric# elly it7 slac#e* lime in t7e ratio
Aeathering courseit7 =ric# elly lime concrete usin "0mm =ric# elly it7
Ans7e* it7 one course o9 presse* tiles o9 sie "3&"3&"cmit7 cement
Aeathering courseit7 =ric# elly lime concrete usin "0mm =ric# elly it7
Ans7e* it7 one course o9 presse* tiles o9 sie "3&"3&"cmit7 cement
7/26/2019 Commnity Hall Muthukrishanapuram
58/209
/&%5"
1.10 nos Ma*oor class "3".00 8eac7 "55."00.-
235.00
R?+ @RS 23.50 8S:m
o9 all materials to site an* all la=our c7ares etc complete
0.4 ;ountry =ric#s 4"41.22 81000No "/14.-/
0./0 cum cement mortar 1H3 mi& "/15.41 8cum 1200./2
3."0 nos Mason class 410.00 8eac7 131".00
.50 nos Mason class 3-.00 8eac7 "32".00
"."0 nos Ma*oor class "5/.00 8eac7 55.40
5.40 nos Ma*oor class "3".00 8eac7 1"5".-0.
10136.00
R?+ @RS 1013.60 8S:m
appro>e* :uality
1.00 no n*ian type ater closet (67ite) 1143.00 81 no 1143.00
0.0 m 100mm *ia
7/26/2019 Commnity Hall Muthukrishanapuram
59/209
/&%59
1.00 No 110 mm *ia
7/26/2019 Commnity Hall Muthukrishanapuram
60/209
/&%60
;onstruction o9
stimate ?mount H RsH
+S& " )%&$RI%S %& SI&$
Sl.No Name o9 materialslea* in $M
;ost +otallains %ills
1 ;ement 3 0 4200.00 1."2 0.00 421."2
" san* 9or mortar 1 0 1/.40 131.54 0.00 30/.24
3 san* 9or Allin 1 0 1/.40 131.54 0.00 30/.244 Rou7 stone 3 0 35.00 ".0/ 0.00 321.0/
5 Bon* stone 3 0 500.50 ".0/ 0.00 5".5/
40mm iss metal 3 0 -1.00 ".0/ 0.00 -4".0/
/ "0mm iss metal 3 0 1135.00 ".0/ 0.00 111.0/
- 101"mm metal 3 0 214.00 ".0/ 0.00 240.0/
2 10mm metal 3 0 50.00 ".0/ 0.00 /.0/
10 Rou7 stone 9or re>et 3 0 31.00 ".0/ 0.00 34".0/
11 ;utstone rou7ly *res 3 0 3520.00 ".0/ 0.00 31.0/
1" steel 3 0 45300.00 1."2 0.00 4531."2
13 3 0 4""0.00 "1.22 0.00 4"41.22
14 3 0 33"5.00 "1.22 0.00 334.22
15 =ric# elly "0 mm 3 0 5-3.00 1/.21 0.00 00.21
1 =ric# elly 40 mm 3 0 5"4.00 1/.21 0.00 541.21
1/ s7ell lime 3 0 1"00.00 1/.21 0.00 1"1/.21
1- Lime stone 3 0 --5.00 1/.21 0.00 20".21
12 presse* tiles 3 0 130-0.00 14. 0.00 13024.
"0 ;ountry oo* plan#s 3 0 3330.00 1/.21 0.00 334/.21
"1 Sil>er oa# scantlins 3 0 1435.00 1/.21 0.00 143-".21
"" 'ra>el ritty 3 0 143.00 ".0/ 0.00 12.0/
"3 'ra>el 6ell 3 0 11-.00 ".0/ 0.00 144.0/
"4 "5mm R; metal 3 0 /31.00 ".0/ 0.00 /5/.0/
"5 1"mm R; c7ips 3 0 -.00 ".0/ 0.00 24.0/
" mm R; c7ips 3 0 42.00 ".0/ 0.00 5"".0/
S#' D%&%
;MN+ M!R+?R 1H1.5
0.20 M+ ;ost o9 cement 421."2 8M+ 4/12.4
1.00 cum ;ost o9 san* 30/.24 8cum 30/.24
502.56
;MN+ M!R+?R 1H"
0./"0 M+ ;ost o9 cement 421."2 8M+ 3532./3
1.00 cum ;ost o9 san* 30/.24 8cum 30/.24
364.
;MN+ M!R+?R 1H3
0.4-0 M+ ;ost o9 cement 421."2 8M+ "352.-"
1.00 cum ;ost o9 san* 30/.24 8cum 30/.24
2.
1.00 cum Mi&in c7ares 4/.5 8cum 4/.5
?** 9or "0P on la=our 0.00 8cum 0.00
215.41
;MN+ M!R+?R 1H4
0.30 M+ ;ost o9 cement 421."2 8M+ 1/2.-
1.00 cum ;ost o9 san* 30/.24 8cum 30/.24
;on>eyanc ( lains )
;on>eyanc ( %ills )
country =ric#s ( "384E)
country =ric#s ( "184E)
7/26/2019 Commnity Hall Muthukrishanapuram
61/209
/&%61
20.60
1.00 cum Mi&in c7ares 4/.5 8cum 4/.5
?** 9or "0P on la=our 0.00 8cum 0.00
2125.45
;MN+ M!R+?R 1H5
0."-- M+ ;ost o9 cement 421."2 8M+ 1415.-2
1.00 cum ;ost o9 san* 30/.24 8cum 30/.24
123.631.00 cum Mi&in c7ares 4/.5 8cum 4/.5
?** 9or "0P on la=our 0.00 8cum 0.00
11.46
;MN+ M!R+?R 1H
0."40 M+ ;ost o9 cement 421."2 8M+ 11/2.21
1.00 cum ;ost o9 san* 30/.24 8cum 30/.24
146.65
1.00 cum Mi&in c7ares 4/.5 8cum 4/.5
?** 9or "0P on la=our 0.00 8cum 0.00
1535.50
LM M!R+?R 1H"
0.5 cum Lime 20".21 8cum 451.4
1.00 cum ;ost o9 san* 30/.24 8cum 30/.24
1.00 cum 'rin*in mortor 11.45 8cum 11.45
?** 9or "0P on la=our 0.00 8cum 0.00
65.65
D%&%
art7 or# e&ca>ation an* *epositin on =an# it7 in initial lea* o9 10 m
an* initial li9t o9 "m in 7ar* sti clayG sti =lac# cotton soilG 7ar* re* eart7G
eart7 mi&e* it7 small sie* =oul*ers an* 7ar* ra>elly soil as per SS "0B
Rate 8 cum 4.00
?** 100P e&tra 9or narro 9oun*ation 4.00
;2.00
?** 9or "0P on la=our 0.00
;2.00 8cum
con>eyance o9 all materials to site an* all la=our c7ares 9or mi&inGlayin an* curin etc complete 9or 10 cum.
2.00 cum ;ost o9 40mm SS metal -4".0/ 8cum /5/-.3
4.50 cum cement