Commissioning of the CMCF 08ID-1 Beamline
18

Commissioning of the CMCF 08ID-1 Beamline. Light in the Optical Hutch September 2005 Light at the entrance to the white beam slits (42 m). The rectangular.

Jan 17, 2016

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Commissioning of the CMCF 08ID-1 Beamline. Light in the Optical Hutch September 2005 Light at the entrance to the white beam slits (42 m). The rectangular.

Commissioning of the CMCF 08ID-1 Beamline

Page 2: Commissioning of the CMCF 08ID-1 Beamline. Light in the Optical Hutch September 2005 Light at the entrance to the white beam slits (42 m). The rectangular.

Light in the Optical HutchSeptember 2005

Light at the entrance to the white beam slits (42 m).The rectangular “glow” comes from the light produced by the in-vacuum small-gap undulator. The gap was at 8.0 mm and the ring current 10 mA. The screen is a CVD-deposited diamond foil doped with nitrogen atoms. Small round spot from a visible BM light.After the FE valve was opened!

November 2005

Monochromatic light, just downstream of the DCM (45 m).

18 mm

Gap = 12 mm (10 keV, 3rd harmonic)Current = 90mA

Page 3: Commissioning of the CMCF 08ID-1 Beamline. Light in the Optical Hutch September 2005 Light at the entrance to the white beam slits (42 m). The rectangular.

First diffraction patter.March 18, 2006.E=9.31 keV, d=260 mm,exposure 3s.

Page 4: Commissioning of the CMCF 08ID-1 Beamline. Light in the Optical Hutch September 2005 Light at the entrance to the white beam slits (42 m). The rectangular.

Wet lab

08ID-1

50 m 40 m 20 m

08B1-1

1.5 mrad sep.

DCM - 1st crystalcryocooled offsettingthe beam 0.5 m up

08ID-2Mini hutch

CMCF

Page 5: Commissioning of the CMCF 08ID-1 Beamline. Light in the Optical Hutch September 2005 Light at the entrance to the white beam slits (42 m). The rectangular.

  08ID-1 08B1-1

(Toroid)

08ID-2

(Toroid)

Spectral range (keV) 6.5 - 18.0 5.0 - 18.0 10 – 13?

Energy bandwidth (ΔE/E) Si(111) @12 keV

1.466 x 10-4 1.397 x 10-4 1.466 x 10-4

Flux on the sample @ 12keV photons/s

(from 7th harmonic for ID)

(from 5th harmonic for ID)~ 6.5 x 1012

~ 4.1 x 1012

~3.0 x 1011*

~ 6.0 x 1012

~ 3.7 x 1012

Focal Size @ 12 keV

(FWHM)

167μm (H) x

50 μm (V)

210 μm (H) x 200 μm (V)

~160μm (H) x

50 μm (V)

Flux density [ph/s/mm2] @ 12 keV

(from 7th harmonic for ID)

(from 5th harmonic for ID)

~4.5 x 1014

~2.8x 1014

~3.5 x 1012

~4.0 x 1014

~2.0x 1014

Beam crossfire at the sample (H x

V) @ 12 keV (FWHM)

0.9 mrad x 0.2 mrad

1.8 mrad x 0.2 mrad

< 1.0 mrad

When CLS at 200 mA

Page 6: Commissioning of the CMCF 08ID-1 Beamline. Light in the Optical Hutch September 2005 Light at the entrance to the white beam slits (42 m). The rectangular.

Layout of the CMCF 08ID-1 Layout of the CMCF 08ID-1 BeamlineBeamline

Component Distance from Source

WBPM (White Beam Position Monitor) 40.6 m

WBS (White Beam Slits) 41.5 m

DCM (Double Crystal Monochromator) 43.5 m

VFM (Vertically Focusing Mirror) 46.0 m

Sample 49.9 m

 

1/Mx = 6.81/My = 11.8

Page 7: Commissioning of the CMCF 08ID-1 Beamline. Light in the Optical Hutch September 2005 Light at the entrance to the white beam slits (42 m). The rectangular.

End-station

Page 8: Commissioning of the CMCF 08ID-1 Beamline. Light in the Optical Hutch September 2005 Light at the entrance to the white beam slits (42 m). The rectangular.
Page 9: Commissioning of the CMCF 08ID-1 Beamline. Light in the Optical Hutch September 2005 Light at the entrance to the white beam slits (42 m). The rectangular.
Page 10: Commissioning of the CMCF 08ID-1 Beamline. Light in the Optical Hutch September 2005 Light at the entrance to the white beam slits (42 m). The rectangular.
Page 11: Commissioning of the CMCF 08ID-1 Beamline. Light in the Optical Hutch September 2005 Light at the entrance to the white beam slits (42 m). The rectangular.
Page 12: Commissioning of the CMCF 08ID-1 Beamline. Light in the Optical Hutch September 2005 Light at the entrance to the white beam slits (42 m). The rectangular.
Page 13: Commissioning of the CMCF 08ID-1 Beamline. Light in the Optical Hutch September 2005 Light at the entrance to the white beam slits (42 m). The rectangular.
Page 14: Commissioning of the CMCF 08ID-1 Beamline. Light in the Optical Hutch September 2005 Light at the entrance to the white beam slits (42 m). The rectangular.
Page 15: Commissioning of the CMCF 08ID-1 Beamline. Light in the Optical Hutch September 2005 Light at the entrance to the white beam slits (42 m). The rectangular.
Page 16: Commissioning of the CMCF 08ID-1 Beamline. Light in the Optical Hutch September 2005 Light at the entrance to the white beam slits (42 m). The rectangular.
Page 17: Commissioning of the CMCF 08ID-1 Beamline. Light in the Optical Hutch September 2005 Light at the entrance to the white beam slits (42 m). The rectangular.

Issues

• Not sufficient, not complete or wrong info from vendors (motors, gearboxes)

• Poor design of some components, no reference switch (crystal bender, yaw)

• Malfunction equipment equipment that cannot be tested without the light (SESO XBPM, BPM)

• Installation of optics without functional control system• Implementing physical units• Problems with saving the “final” motors’ parameters• Not implemented feedbacks from encoders• Noise from “high current” motors• Lack of man power to finish “control” of the end-station

before the first light (high current motor drivers)

Page 18: Commissioning of the CMCF 08ID-1 Beamline. Light in the Optical Hutch September 2005 Light at the entrance to the white beam slits (42 m). The rectangular.

To Do• CCD holder (2)• Testing of shutter/omega synchronization• Data acquisition (collect tab)• MOSTAB (pitch of the second crystal)• SGU – DCM “calibration”• Stability of the beam (electron & X-ray BPM)• Fluorescence scan, Roentec MCA, Chooch, MAD• Save-restore• Automatic beamline alignment • Final GUI• Automounter• Remote access