Page 1: Commissioning, Global Runs & ROC All USCMS Meeting October 05, 2007 Kaori Maeshima.

Commissioning, Global Runs

& ROCAll USCMS MeetingOctober 05, 2007Kaori Maeshima

Page 2: Commissioning, Global Runs & ROC All USCMS Meeting October 05, 2007 Kaori Maeshima.

Thanks...

• Alan Stone, Bill Badgett, Andreas Meyer, Darin Acosta, Zongru Wan...... and many more for preparing this talk in hurry

Page 3: Commissioning, Global Runs & ROC All USCMS Meeting October 05, 2007 Kaori Maeshima.

Oct. 5th, 2007 All USCMS Meeting, “Commissioning, Global Runs & ROC” 3

CMS Collision Hall – Busy & Crowded

Solenoid

Electro-magnetic calorimeter

• 2/3 in collision hall• Heavy lowering of the rest begins in Oct.• Services to central piece of barrel• Preparing for silicon tracker installation in Nov.• Global Runs End of Month, since May 2007• March 2008, pixel installation.• April 2008, commissioning runs with magnet• Summer 2008 collisions

CMS Collision Hall 2007.08.30

Muon drift tubes

Silicon tracker goes here

Page 4: Commissioning, Global Runs & ROC All USCMS Meeting October 05, 2007 Kaori Maeshima.

Oct. 5th, 2007 All USCMS Meeting, “Commissioning, Global Runs & ROC” 4

Theme of this talk:• integration and commissioning Towards Remote Operation (ROC) at FNAL.

– My last report here was ~ 1 year ago, right after MTCC 2006.• put “ROC” on a CMS map CERN ROC (cms centre)

– Today's talk focus: Updates on “Global Runs” and “ROC related activities”

• Activities (TIF tests, Global runs..)• Monitoring tool development (WBM, DQM, ...)• Infrastructure (LHC @ FNAL)

Status Overall: During the year, much of detector components are lowered & placed

at UX5. They are being intIN2006_044.pdfegrated & commissioned to be read out as ONE experiment, while the detailed work to fully understand each sub-detector continues.

2007 CMS New Phase: Integration/commissioning

Note: More global view of commissioning overview talk:

Next week Friday Wine/cheese seminar @ FNAL, by Darin Acosta

Page 5: Commissioning, Global Runs & ROC All USCMS Meeting October 05, 2007 Kaori Maeshima.

Oct. 5th, 2007 All USCMS Meeting, “Commissioning, Global Runs & ROC” 5

Increasing Complexity of the 2007 Global Runs

Participating Subsystems in Global Runs

0

1

2

3

4

5

6

7

8

May June July August September

HO

HB

Tracker FEDs

CSC FEDs

RPC

EB

DT

HF

HF

DT

RPC

CSC FEDs

Tracker FEDs

HB

HO

Progress in Trigger, also• Cosmic trigger with DT• Using GT• GRES- GCT read out (configured manually)

Mone on progress in DQM & ROC participation, later• integration of DQM system• development of each DQM programs• USCMS/subdetector/trigger/DAQ ROC large contribution in this area

GREM

GREJ GREJ'

GREA

GRES

Page 6: Commissioning, Global Runs & ROC All USCMS Meeting October 05, 2007 Kaori Maeshima.

Oct. 5th, 2007 All USCMS Meeting, “Commissioning, Global Runs & ROC” 6

• GRES concluded last Friday (Sept. 26 – 28)– Ran 7HB wedges, 3 HO sectors, 4 DT sectors, 4 RPC

sectors and CSC and Tracker FEDs– Data ( ~5GB) taken and shipped to T1-FNAL and T2-

Florida, T2-MIT, as well as the CAF

• GREO is cancelled. Next global run is GREN (Nov. 26 – 30), with at most a short break before the end-of-the year Cosmic run (CCR1) ( tentatively: Dec. 10 – 22).

– Implies completing transition to CMSSW170, XDAQ3.11/SLC4, and all the necessary preparations beforehand

• Need to focus on preparation for GREN, and to work on analysis of GRES (more on this after a few pictures)

GRES Summary, GREN Preparation

Page 7: Commissioning, Global Runs & ROC All USCMS Meeting October 05, 2007 Kaori Maeshima.

Oct. 5th, 2007 All USCMS Meeting, “Commissioning, Global Runs & ROC” 7

From GREA: ECAL + DT signal

ECAL & DT chambers synchronised with the CMS clockThe DT trigger is synchronised with the DT ReadOut The DT trigger is integrated with the CMS Global TriggerThe ECAL & DT r/o is integrated with the GLOBAL DAQShifters also at FNAL, read out FEDs from each sub-detector

Page 8: Commissioning, Global Runs & ROC All USCMS Meeting October 05, 2007 Kaori Maeshima.

Oct. 5th, 2007 All USCMS Meeting, “Commissioning, Global Runs & ROC” 8

RPC-DT coincidence (GRES)

Page 9: Commissioning, Global Runs & ROC All USCMS Meeting October 05, 2007 Kaori Maeshima.

Oct. 5th, 2007 All USCMS Meeting, “Commissioning, Global Runs & ROC” 9

“conclusions” slide from HCAL Report (by Pavel, from today's run meeting)

• Very interesting/useful data• Progress with DT vs HCAL timing, DB, pedestal definition,

noisy channels• Looking forward to november run• third of HB is now commissioned !!!• Is it at all possible to try private DT/HCAL run earlier than

late november ???

Page 10: Commissioning, Global Runs & ROC All USCMS Meeting October 05, 2007 Kaori Maeshima.

Oct. 5th, 2007 All USCMS Meeting, “Commissioning, Global Runs & ROC” 10

Analyses Possible from GRES

• DataOps will make a “pass 1” reconstruction pass on GRES data based on this set of cfg’s

• Analysis of GRES data:– Inter-synchronization studies

• Are systems (or multiple sectors of same system) timed-in with respect to each other?

• Is the timing stable? (during runs, between runs)– Reconstruction performance

• Are cosmic muons identified in the right place, with right MIP signal in the calorimeters?

– Correlated noise

Page 11: Commissioning, Global Runs & ROC All USCMS Meeting October 05, 2007 Kaori Maeshima.

Oct. 5th, 2007 All USCMS Meeting, “Commissioning, Global Runs & ROC” 11

Correlated DT, CSC Noise

Run 20558DT CSC (HV off!)

Test triggers

news from this morning: Problem found!!!!!!

Elog posting by Frank GeurtsFri Oct 5 12:24:46 Entry timeSubject: CSC/DT Global Noise Run: found it

https:/cmsdaq.cern.ch/elog/CSC/2796

..... the major source..: welding equipment....

Page 12: Commissioning, Global Runs & ROC All USCMS Meeting October 05, 2007 Kaori Maeshima.

Oct. 5th, 2007 All USCMS Meeting, “Commissioning, Global Runs & ROC” 12

• hot off the press! (thanks to Ianna, Mayda, Darin.....)• 10 degree shift?

From GRES: DT and HCAL

Page 13: Commissioning, Global Runs & ROC All USCMS Meeting October 05, 2007 Kaori Maeshima.

Oct. 5th, 2007 All USCMS Meeting, “Commissioning, Global Runs & ROC” 13

GRES Run and Analysis Information

• Run description, access to data, etc. to aid those doing analyses are described here:

– https://twiki.cern.ch/twiki/bin/view/CMS/GRESAnalysis

• Global Run hypernews discussion forum also being setup.

Page 14: Commissioning, Global Runs & ROC All USCMS Meeting October 05, 2007 Kaori Maeshima.

Oct. 5th, 2007 All USCMS Meeting, “Commissioning, Global Runs & ROC” 14

Why Remote Operation? Why at FNAL?

• Thousands of collaborators located all over the world• Most of them not resident at CERN• Collider H.E.P. facilities have, however, never been more concentrated at a single site• Need to disperse and disseminate

Advantage at FNAL for USCMS:• Natural base to serve large USCMS community• LPC – LHC Physics Center• Tier-1 center, Data Operation team • Tevatron experiments' experience & resource sharing• Remote work base for LHC accel. study & operation…• Impact on future of HEP – way to operate --- ILC .......

Page 15: Commissioning, Global Runs & ROC All USCMS Meeting October 05, 2007 Kaori Maeshima.

Oct. 5th, 2007 All USCMS Meeting, “Commissioning, Global Runs & ROC” 15

Remote Operations

FNALCERN• Tools needed for remote status display

• Must be easy to use, flexible, drillable• Coöperative with firewall, security• Must survive trans-Atlantic crossing

Fermilab Remote Operations Center, LHC@FNAL CMS Underground Control Room

2007 MAY Global Integration Run.

There are many of us (USCMS people) in

action here and there!

Infrastructure

trust – one experiment

technical ground

Page 16: Commissioning, Global Runs & ROC All USCMS Meeting October 05, 2007 Kaori Maeshima.

Oct. 5th, 2007 All USCMS Meeting, “Commissioning, Global Runs & ROC” 16

3-fold approach to ROC

• Infrastructure– LHC@FNAL – being used since Feb. 2007

• CMS, LHC, & Outreach– WH11 ROC room – completed in the end of 2005. being used

MTCC-I, II 2006, HCAL test beam and other tool development activities, and now as multi-purpose room (meetings, discussions, software/hardware development, etc.).

• Actions– MTCC I, II (Aug-Oct. 2006)– HCAL test beam (summer 2006, 2007)– SiTracker test (Feb. - Jun. 2007)– T0 shifts, Data Operation (Feb. 2007 - )– Global Runs End of Month (GREM, GREJ, GREJ', GREA, GRES.....

2007)• Monitoring Tool Development (software & hardware)

– DQM (data quality monitoring) development (Trigger, HCal)– Web Based Monitoring Tool (WBM)

Page 17: Commissioning, Global Runs & ROC All USCMS Meeting October 05, 2007 Kaori Maeshima.

Oct. 5th, 2007 All USCMS Meeting, “Commissioning, Global Runs & ROC” 17

The first group to use the ROC for shifts was the CMS Tier-1 computing administration operations team which was during weekday business hours.

• Responsible for FNAL Tier-1 resources (~ 50% of CMS computing in U.S.)• Provides central support for the several university-based Tier-2 centers

The first detector group to use the ROC for shifts was the silicon tracker.•Coordinated effort with the silicon tracker group & CMS ROC people working together.•The remote shift operation at the ROC involved about 15 people from several different institutions from Feb – Jun 2007•Remote Monitoring included

• Data Quality• Data transfer & bookkeeping• Event display• Detector Control System

2007 CMS ROC Shift Activities

Current: Global runs & Data Operation

Page 18: Commissioning, Global Runs & ROC All USCMS Meeting October 05, 2007 Kaori Maeshima.

Oct. 5th, 2007 All USCMS Meeting, “Commissioning, Global Runs & ROC” 18

http://uscms.org/roc

ROC Web Page

Base page formany useful links

Information keptup-to-date

by Alan Stone

global run info.

Commissioning,Run Coordination

Page 19: Commissioning, Global Runs & ROC All USCMS Meeting October 05, 2007 Kaori Maeshima.

Oct. 5th, 2007 All USCMS Meeting, “Commissioning, Global Runs & ROC” 19

Background: WBM (Web-based Monitoring)

These are tools developed mainly by Bill Badgett, et. al., over the years of CDF running/monitoring. These tools have been found extremely useful (Trigger/DAQ/subdetector experts at local and remote locations ).

In February 2006, we proposed to install the WBM tools to CMS. Shortly after we began the development and implementation.

WBM is a general tool, and CMS specific applications are rapidly developing.

In addition to WBM software tool development, we also installed powerful server machines (cmsmon and cmsmon_dev) in order to distribute information outside of the experimental hall (P5) reliably for all the CMS colleagues.

Page 20: Commissioning, Global Runs & ROC All USCMS Meeting October 05, 2007 Kaori Maeshima.

Oct. 5th, 2007 All USCMS Meeting, “Commissioning, Global Runs & ROC” 20

Web-based Monitoring

• Wealth of information in database Trigger rates, event rates, cross sections, beam conditions, temperatures,

voltages, environmental conditions, etc. … Database is preferred locale for configuration and monitoring data

persistency Oracle 10 located at CMS site; replicated to offline world Has current and historical status data

Latency ~ < 1 second to ~1 minute Behind firewall for security reasons

• Need a portal to gain access Provide display of contents And provide access control

• Typical data present, “Value vs. Time” Needs tools to access, plot, download, correlate

• Complex, heterogeneous database Many schemas, many designers Already have 140 schemas just in the online database & not nearly done

• Central description needed Correlate across subsystems Typical monitoring is “Value vs. Time”

Global meta-data descriptive tables

Page 21: Commissioning, Global Runs & ROC All USCMS Meeting October 05, 2007 Kaori Maeshima.

Oct. 5th, 2007 All USCMS Meeting, “Commissioning, Global Runs & ROC” 21

RunSummary Pages

• Clickable measurements Drill-down capability

• Plot creation Provides Root TTree and

histogram object in file Resizeable on resubmit

Page 22: Commissioning, Global Runs & ROC All USCMS Meeting October 05, 2007 Kaori Maeshima.

Oct. 5th, 2007 All USCMS Meeting, “Commissioning, Global Runs & ROC” 22

Environmental - Slow Control

• Access to current “right-now” conditions• …and historical settings and trends…

(Zongru Wan)

Page 23: Commissioning, Global Runs & ROC All USCMS Meeting October 05, 2007 Kaori Maeshima.

Oct. 5th, 2007 All USCMS Meeting, “Commissioning, Global Runs & ROC” 23

Trends over Time Plots Search for performance anomalies Interactive, historical, downloadable Selection of type of data Zoom in on problems

EM Calorimeter (ECAL) Test Beam

Page 24: Commissioning, Global Runs & ROC All USCMS Meeting October 05, 2007 Kaori Maeshima.

Oct. 5th, 2007 All USCMS Meeting, “Commissioning, Global Runs & ROC” 24

DQM / RootBrowser

Silicon Tracker Integration FacilityCosmic Ray Run

Hadron Calorimeter (HCAL) Global Integration / Cosmic Ray Run

New DQM GUI with user markup

(Lassi Tuura)

Dynamic JavaScript displays with Tomcat/Java

backend

Page 25: Commissioning, Global Runs & ROC All USCMS Meeting October 05, 2007 Kaori Maeshima.

Oct. 5th, 2007 All USCMS Meeting, “Commissioning, Global Runs & ROC” 25

CMS “Page 1” top level status display, simplicity for even the

most naïve user(Oracle Portal)

CMS Fermilab Data File Process Summary Page

Files copied to FNAL Tier 1 site and status of processing

(jsp)

(S.Murray)

More Run Monitor Tools

(Francisco Yumiceva)

Page 26: Commissioning, Global Runs & ROC All USCMS Meeting October 05, 2007 Kaori Maeshima.

Oct. 5th, 2007 All USCMS Meeting, “Commissioning, Global Runs & ROC” 26

Screen Snapshot Service, S3

• Remote Operations need Remote Knowledge Operations screens, e.g. RunControl, HV Control,

EventDisplay valuable for remote users to know what is going on

But normally have tight restrictions on access to nodes

• What is the Screen Snapshot Service? A way to provide periodic, read-only copies of display

images (snapshots) for remote viewing Similar to products like VNC, pcAnywhere, and VGA2WEB

but without the cost or danger of accidental remote control

Can be used to make private-network displays viewable on the public internet (useful for remote monitoring)

Uses commonly available technologies for portability and ease of use: Java, JSP, Tomcat

Page 27: Commissioning, Global Runs & ROC All USCMS Meeting October 05, 2007 Kaori Maeshima.

Oct. 5th, 2007 All USCMS Meeting, “Commissioning, Global Runs & ROC” 27

Screen Snapshot Service Example

IGUANA EventDisplay

CMS RunControl(see Alex Oh, CHEP’07 279)

Actual snapshots from 2007.08.30 CMS global

integration run

S3

Page 28: Commissioning, Global Runs & ROC All USCMS Meeting October 05, 2007 Kaori Maeshima.

Oct. 5th, 2007 All USCMS Meeting, “Commissioning, Global Runs & ROC” 28

More things.......Odds and Ends....

• Playback storage manager service enabling online environment DQM test even when the DAQ is not running (Kurt Biery)

• Work on DQM GUI with Lassi, Nov. 7 - (visiting FNAL)

• DQM core programming, base monitor work starting– Summary of “Online DQM Baseline Architecture” linked from

http://indico.cern.ch/conferenceDisplay.py?confid=19909– For all the DQM related issues, we are working very closely with Andreas Meyer, et. al.

• IN 2007/025 “putting trigger scalar and luminosity information into the event stream”. Hardware and Software are being prepared and planning to do a preliminary test in GREN. (G3, TTC, test/programming – Frank Chelebana, TrigXMonitor (Richard Ruiz, Lorenzo Agostino)

• We are also started considering the mechanism for the interrupt driven fast alarms at ROC (for exmaple, beam dump), from what available at P5, without distracting the P5/Accel. operation.

• (from computing side): an MTCC reprocessing to make files readable with CMSSW > 1_5_0 and with new reconstruction is in the works.

Page 29: Commissioning, Global Runs & ROC All USCMS Meeting October 05, 2007 Kaori Maeshima.

ROC mini History and Plan

Alan Stone arrives – full time ROC person

Construction of WH11NW ROC room

2004 2005 2006 2007 2008 --

HCAL Test Beam

WBM effort continues.....

MTCC I and II

DQM work continues ...

Location: Move to WH1 (LHC@FNAL)

Tracker integ. test

Commissioning & DQM for physics runs ....

we are here

Page 30: Commissioning, Global Runs & ROC All USCMS Meeting October 05, 2007 Kaori Maeshima.

Oct. 5th, 2007 All USCMS Meeting, “Commissioning, Global Runs & ROC” 30

Plans and Man Goals for Future Runs

Page 31: Commissioning, Global Runs & ROC All USCMS Meeting October 05, 2007 Kaori Maeshima.

Oct. 5th, 2007 All USCMS Meeting, “Commissioning, Global Runs & ROC” 31

summary

CMS is now in new phase:

• 2/3 of detectors are in the collision hall. The rest of the heavy parts are planed to be lowered within 2007. (pixel in March 2008).

• Commissioning “global runs”, while each sub-detector work continues.

• Many more sub-detectors are included in global runs, and can learn a lot from the data. Please start looking at REAL DATA!

• Availability of Coherent way of looking at the huge amount of information (data, monitoring information...) is crucial for the CMS operation as well as the CMS remote operation.

• CMS is being commissioned and so as the Remote Operation at the same time.

• ROC at FNAL (a beautiful facility – lhc @ fnal) is here for you for all the USCMS colleagues. Please use it to commission your detector and also involve in shift taking – added bonus: shift service credit

Page 32: Commissioning, Global Runs & ROC All USCMS Meeting October 05, 2007 Kaori Maeshima.

Oct. 5th, 2007 All USCMS Meeting, “Commissioning, Global Runs & ROC” 32

---- Backup Slides ----

Page 33: Commissioning, Global Runs & ROC All USCMS Meeting October 05, 2007 Kaori Maeshima.

Oct. 5th, 2007 All USCMS Meeting, “Commissioning, Global Runs & ROC” 33

LHC@FNAL ROC Features

• 4 CERN-style consoles (8 workstations) shared by CMS & LHC scientists

• 4 Projectors to share content within the ROC or to remote participants

• Videoconferencing installed for two consoles

• Webcams for remote viewing of ROC• Secure keycard access to the ROC

from Atrium and 1East Mtg Room• Secure network for console PCs

– Dedicated subnet, dedicated router w/Access Control Lists to restrict access.

• 12-minute video essay displayed on the large “Public Display” used by docents from the Education Department to explain CMS and LHC to tour groups

• High Definition videoconferencing system for conference room

• HD viewing of the ROC, and HD display capabilities in the ROC

• Secure group login capability for consoles, with persistent console sessions

– Allows multiple users to share common console settings.

• Telephone lines share common number. International services enabled.

• Access to LHC Physics Center computing resources.

Page 34: Commissioning, Global Runs & ROC All USCMS Meeting October 05, 2007 Kaori Maeshima.

Oct. 5th, 2007 All USCMS Meeting, “Commissioning, Global Runs & ROC” 34

Screen Snapshot Service Mechanism

Snapshot Producer 1Java web start app

Snapshot Producer n

...

Web ServiceDisk Cache

Web Client m

Periodic HTTP Web POSTwith image payload

Private netFirewall Public net

Web Client 1Remote Ops

Web Client 2...

Normal HTTP RequestWeb page, no special config

(Kurt Biery)control widget

Provides real time images of monitor displays to remote sites

Page 35: Commissioning, Global Runs & ROC All USCMS Meeting October 05, 2007 Kaori Maeshima.

UXC: general logistic arrangement today

Completing phase 1of +end programmeon YB-1 and -2Phase 2 starts later this week

ECAL barrel installed

TK PP1, pipework and LV cabling off critical path.HB/EB cabling starting

Plug installedHF raising testCASTOR/TOTEM tests

Fwd pipe and VAX(pump)installed