Comm
issioning for Sustained Building Perform
ance
Heifer Village Little Rock, AR
09/17/10
Retrocommissioning | RCx(Existing Building Commissioning | EBCx)
• “I have never seen such a difficult time for colleges and universities in my 40 years as an educator.” - SIU Pres. Mr. Glenn Poshard http://www.universitybusiness.com/newssummary.aspx?news_date=2009-09-25&news_id=20490
– (3) Distinct Calendar Periods• Spring / Fall Semesters: 8am to 11pm• Summer Semester: 8am to 9pm• Summer, Winter, Spring, Thanks Breaks: 8am to 5pm
– What Happens?• Exhaust Fans Stop• OA Dampers Close• Static Pressure Reduced 100%
100%100%
Commissioning for Sustained Building Performance
31
ACES Library & Alumni CenterStrategy: Control System Analysis
– Pneumatic Review– Confidence in thermostats– Faulty Humidity Sensor– Reheat System Schedule– Reduced the minimum VAV CFM
Commissioning for Sustained Building Performance
32
ACES Library & Alumni Center
42% $110,000
hans
enho
mes
aven
tura
.com
$70,000
Commissioning for Sustained Building Performance
33
Animal Science Laboratory
Commissioning for Sustained Building Performance
34
Animal Science Laboratory
Commissioning for Sustained Building Performance
35
Animal Sciences Laboratory
24/7$571,000
Commissioning for Sustained Building Performance
36
Animal Sciences LaboratoryStrategy: Occupancy Schedules Where PossibleStrategy: Review Lab Exhaust System
Commissioning for Sustained Building Performance
37
Animal Sciences Laboratory
25% $60,000
hans
enho
mes
aven
tura
.com
$102,000
Commissioning for Sustained Building Performance
38
Siebel Center for Computer Science
Commissioning for Sustained Building Performance
39
• Reheat Coil Issues• Control Sequences
– Occupancy Sensor– “Night Setback” / Unoccupied– Lack of dead band
Siebel Center for Computer Science
Commissioning for Sustained Building Performance
40
Siebel Center for Computer Science
24/7$1,300,000
Commissioning for Sustained Building Performance
41
• Connected occupancy sensors to HVAC• Modified DDC programming
• Night Setback Sequence• Increased dead band ranges on thermostats
• Recommended system cleanup• Recommended 100+ HW reheat valves
Siebel Center for Computer Science
Commissioning for Sustained Building Performance
42
Re-balanced entire building• Minimum VAV CFMs• Maximum VAV CFMs
Siebel Center for Computer Science
Lecture Hall Zone• VFDs• CO2 Monitoring• Scheduling
Commissioning for Sustained Building Performance
43
Siebel Center for Computer Science
42% $290,000
hans
enho
mes
aven
tura
.com
$277,000
Commissioning for Sustained Building Performance
44
• Install required DDC Controls• Implement Occupancy Schedules• Reduce / Eliminate EA & OA• CO2 and RH feedback• Improve Sequences of Operation• Continuous commissioning by
temperature control graphics• Support & Encourage Occupant &