Page 1: Columbia Regional Airport New Terminal Design

Columbia Regional Airport New Terminal Design

City of Columbia, Missouri Columbia City Council Regular Meeting

May 20, 2013

Page 2: Columbia Regional Airport New Terminal Design

New Terminal Design Concept Presentation Agenda: • Recap of

o Current Facility o Current/Future Needs

• Alternatives & Associated Costs • New Terminal Concept

Page 3: Columbia Regional Airport New Terminal Design

Current Facility: • FAA Master Plan acknowledges challenges:

• Check-point, counter space and interior size • Accessibility issues

o Restaurant o Airport Manager’s Office o Conference/Meeting room

ADA/Independent Living Services report to Chamber

Page 4: Columbia Regional Airport New Terminal Design

Current Facility: • FAA Master Plan acknowledges challenges:

• Security Assurance (General Aviation / Commercial traffic)

Page 5: Columbia Regional Airport New Terminal Design

Current / Future Needs of the Facility: • FAA Master Plan projects increase in traffic:

Current Hold Room 1 Gate

9,000 (2007) 40,000 (2011)

3

2

1

Page 6: Columbia Regional Airport New Terminal Design

Current / Future Needs of the Facility: • FAA Master Plan projects increase in traffic:

Current Hold Room 1 Gate

In 20 yrs. will need Hold Room & 3 Gates (min)

Mayor McDavid’s 2020 Goal 40% market share capture

2011 at 12%

9,000 (2007) 40,000 (2011)

3

2

1

Page 7: Columbia Regional Airport New Terminal Design

Alternatives to Meeting the Facility Needs: • Do nothing

o Opportunity costs o Growing Operations & Maintenance costs o Not meeting the needs of changing demographic o Security (General Aviation and Commercial)

Page 8: Columbia Regional Airport New Terminal Design

Alternatives to Meeting the Facility Needs: • RS&H Report considered (in 2018 dollars)

• North Renovation ($34.0M) • South Expansion ($24.6M)

Page 9: Columbia Regional Airport New Terminal Design

Alternatives to Meeting the Facility Needs: • PB’s New Terminal / Greenfield

• Initial Construction (3 Gates, 80,000 enplanement capacity) • $33.7M in 2018 project costs

• Comparison of Alternatives:

Do Nothing North Renovation

South Expansion

New Greenfield

Project Costs (2018) $34.0M $24.6M $33.7M

Passenger Space Met no yes yes yes

Construction Phasing no yes yes no

Operational/Energy Efficient no yes yes yes

Security Assurances no no no yes

Page 10: Columbia Regional Airport New Terminal Design

LEGEND A Airport Terminal B Aircraft Apron C Aircraft Rescue and Fire Fighting Building (ARFF) D Stormwater Detention Basin E Surface Parking (450 spaces) F On-Site Energy Production (Solar Farm) G Water Quality Feature H Prairie Habitat Restoration I Underground Rainwater Harvesting Cistern J Shuttle / Taxi K Drop-off / Pick-up L Relocate Runway 13/31 & Taxiway End M Landscaped Terminal Frontage with Art Elements. N New Access Road O Access Road Removal P Relocated State Rt. H Q State Rt. H Removal R Extension of Runway 2/20 S Landscaped Blvd. with Art Elements T Employee Parking (60 spaces) U Fuel Farm / Apron Access V Gas Station

P

Entrance Monument Sign

A C

B

D

F

G G

G

I

J

K

L

M

N O

Q

R

S

T U

V

H

T

TSA Setback (300’)

E

Columbia Regional Airport: New Terminal Design

Site Plan: Initial Build-Out

Solar/Geothermal Farm

Water Quality/Detention

Building Orientation

(LEED)

Landscape Art Incorporation

3 Gates 1 Narrow Body

2 RJs

Page 11: Columbia Regional Airport New Terminal Design

A

D

C

Z

E E

F

G G

G

G

H

H

H

I

J

K

L

L

M M

P

N O

Q

R

S

T

U

V

BB

X

X

X

Y B

TSA Setback (300’)

Entrance Monument Sign Entrance

Monument Sign

AA

W

CC

T

Columbia Regional Airport: New Terminal Design

Site Plan: Full Build-Out

6 Gates 2 Narrow Body

4 RJs

Parking Garage

Commercial Lots New Entrance

Page 12: Columbia Regional Airport New Terminal Design

Columbia Regional Airport: New Terminal Design

Site Aerial Perspective

Page 13: Columbia Regional Airport New Terminal Design

Columbia Regional Airport: New Terminal Design

COMPARABLE FACILITIES

Manhattan, Kansas

Springfield, Missouri

Page 14: Columbia Regional Airport New Terminal Design

Columbia Regional Airport: New Terminal Design

Level 1 Floor Plan

LEGEND A Vestibule B Elevators C Seating D Baggage Claim Court E Ticketing Court F Car Rental G Office H Toilet J Training K EOC L Business Center M Director N Janitorial O Ops P Mechanical Q Ticketing R ATO S Storage T TSA Offices U Break Room W Art Feature XD Future Expansion, Baggage Claim Court XF Future Expansion, Car Rental XQ Future Expansion, Ticketing Y Bag Loading Z Bag Unloading

A A

B B

C C D E

F F

G G H H

H N

J K

L

M

O

P S

U T

Q

R R R

W W

XD, XF XQ

up dn

up up up up

Z Y

Page 15: Columbia Regional Airport New Terminal Design

Columbia Regional Airport: New Terminal Design

Level 2 Floor Plan

LEGEND A Kitchen B Elevators C Restaurant / Bar D Colonnade E Security F Screening G Security H Toilet J TSA Support Area K Administration L Hold Room M Gate N Return Flight Corridor O Open to Below R Retail S Storage W Art Feature XL Future Expansion, Hold Room XM Future Expansion, Gate

A

B B

C

D

E

F

G H H R

R J K H

H S N

L L

O O W W

XL XL

M

M M

XM XM

XM

up dn dn

dn

dn dn

Page 16: Columbia Regional Airport New Terminal Design

Columbia Regional Airport: New Terminal Design

Terminal Section

Hold Room

Business Center

Emergency Operations

Center

Land Side Air Side

Pick-up / Drop-off

Ticketing Court

Page 17: Columbia Regional Airport New Terminal Design

Columbia Regional Airport: New Terminal Design

Terminal Perspective

Page 18: Columbia Regional Airport New Terminal Design

Columbia Regional Airport: New Terminal Design

Interior Perspective

Page 19: Columbia Regional Airport New Terminal Design

211 North Broadway • Saint Louis, Missouri 63102

PH: 314.206.4444

For a listing of our offices, please visit our website at

www.pbworld.com

Page 20: Columbia Regional Airport New Terminal Design

211 North Broadway • Saint Louis, Missouri 63102

PH: 314.206.4444

For a listing of our offices, please visit our website at

www.pbworld.com

Next Steps – Planning (FAA) & Final Design

2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024

Realistic

Conservative

Complete Terminal

Planning and ALP Update

Complete Environmental

(Cat Ex)

Complete Design

Start Construction

End Construction

Terminal Planning and ALP Update*

Environmental Review

(Cat Ex)*

Final Design and Bidding

12-18 mos

6-12 mos

9-12 mos