Columbia Regional Airport New Terminal Design City of Columbia, Missouri Columbia City Council Regular Meeting May 20, 2013
Columbia Regional Airport New Terminal Design
City of Columbia, Missouri Columbia City Council Regular Meeting
May 20, 2013
New Terminal Design Concept Presentation Agenda: • Recap of
o Current Facility o Current/Future Needs
• Alternatives & Associated Costs • New Terminal Concept
Current Facility: • FAA Master Plan acknowledges challenges:
• Check-point, counter space and interior size • Accessibility issues
o Restaurant o Airport Manager’s Office o Conference/Meeting room
ADA/Independent Living Services report to Chamber
Current Facility: • FAA Master Plan acknowledges challenges:
• Security Assurance (General Aviation / Commercial traffic)
Current / Future Needs of the Facility: • FAA Master Plan projects increase in traffic:
Current Hold Room 1 Gate
9,000 (2007) 40,000 (2011)
3
2
1
Current / Future Needs of the Facility: • FAA Master Plan projects increase in traffic:
Current Hold Room 1 Gate
In 20 yrs. will need Hold Room & 3 Gates (min)
Mayor McDavid’s 2020 Goal 40% market share capture
2011 at 12%
9,000 (2007) 40,000 (2011)
3
2
1
Alternatives to Meeting the Facility Needs: • Do nothing
o Opportunity costs o Growing Operations & Maintenance costs o Not meeting the needs of changing demographic o Security (General Aviation and Commercial)
Alternatives to Meeting the Facility Needs: • RS&H Report considered (in 2018 dollars)
• North Renovation ($34.0M) • South Expansion ($24.6M)
Alternatives to Meeting the Facility Needs: • PB’s New Terminal / Greenfield
• Initial Construction (3 Gates, 80,000 enplanement capacity) • $33.7M in 2018 project costs
• Comparison of Alternatives:
Do Nothing North Renovation
South Expansion
New Greenfield
Project Costs (2018) $34.0M $24.6M $33.7M
Passenger Space Met no yes yes yes
Construction Phasing no yes yes no
Operational/Energy Efficient no yes yes yes
Security Assurances no no no yes
LEGEND A Airport Terminal B Aircraft Apron C Aircraft Rescue and Fire Fighting Building (ARFF) D Stormwater Detention Basin E Surface Parking (450 spaces) F On-Site Energy Production (Solar Farm) G Water Quality Feature H Prairie Habitat Restoration I Underground Rainwater Harvesting Cistern J Shuttle / Taxi K Drop-off / Pick-up L Relocate Runway 13/31 & Taxiway End M Landscaped Terminal Frontage with Art Elements. N New Access Road O Access Road Removal P Relocated State Rt. H Q State Rt. H Removal R Extension of Runway 2/20 S Landscaped Blvd. with Art Elements T Employee Parking (60 spaces) U Fuel Farm / Apron Access V Gas Station
P
Entrance Monument Sign
A C
B
D
F
G G
G
I
J
K
L
M
N O
Q
R
S
T U
V
H
T
TSA Setback (300’)
E
Columbia Regional Airport: New Terminal Design
Site Plan: Initial Build-Out
Solar/Geothermal Farm
Water Quality/Detention
Building Orientation
(LEED)
Landscape Art Incorporation
3 Gates 1 Narrow Body
2 RJs
A
D
C
Z
E E
F
G G
G
G
H
H
H
I
J
K
L
L
M M
P
N O
Q
R
S
T
U
V
BB
X
X
X
Y B
TSA Setback (300’)
Entrance Monument Sign Entrance
Monument Sign
AA
W
CC
T
Columbia Regional Airport: New Terminal Design
Site Plan: Full Build-Out
6 Gates 2 Narrow Body
4 RJs
Parking Garage
Commercial Lots New Entrance
Columbia Regional Airport: New Terminal Design
Site Aerial Perspective
Columbia Regional Airport: New Terminal Design
COMPARABLE FACILITIES
Manhattan, Kansas
Springfield, Missouri
Columbia Regional Airport: New Terminal Design
Level 1 Floor Plan
LEGEND A Vestibule B Elevators C Seating D Baggage Claim Court E Ticketing Court F Car Rental G Office H Toilet J Training K EOC L Business Center M Director N Janitorial O Ops P Mechanical Q Ticketing R ATO S Storage T TSA Offices U Break Room W Art Feature XD Future Expansion, Baggage Claim Court XF Future Expansion, Car Rental XQ Future Expansion, Ticketing Y Bag Loading Z Bag Unloading
A A
B B
C C D E
F F
G G H H
H N
J K
L
M
O
P S
U T
Q
R R R
W W
XD, XF XQ
up dn
up up up up
Z Y
Columbia Regional Airport: New Terminal Design
Level 2 Floor Plan
LEGEND A Kitchen B Elevators C Restaurant / Bar D Colonnade E Security F Screening G Security H Toilet J TSA Support Area K Administration L Hold Room M Gate N Return Flight Corridor O Open to Below R Retail S Storage W Art Feature XL Future Expansion, Hold Room XM Future Expansion, Gate
A
B B
C
D
E
F
G H H R
R J K H
H S N
L L
O O W W
XL XL
M
M M
XM XM
XM
up dn dn
dn
dn dn
Columbia Regional Airport: New Terminal Design
Terminal Section
Hold Room
Business Center
Emergency Operations
Center
Land Side Air Side
Pick-up / Drop-off
Ticketing Court
Columbia Regional Airport: New Terminal Design
Terminal Perspective
Columbia Regional Airport: New Terminal Design
Interior Perspective
211 North Broadway • Saint Louis, Missouri 63102
PH: 314.206.4444
For a listing of our offices, please visit our website at
www.pbworld.com
211 North Broadway • Saint Louis, Missouri 63102
PH: 314.206.4444
For a listing of our offices, please visit our website at
www.pbworld.com
Next Steps – Planning (FAA) & Final Design
2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Realistic
Conservative
Complete Terminal
Planning and ALP Update
Complete Environmental
(Cat Ex)
Complete Design
Start Construction
End Construction
Terminal Planning and ALP Update*
Environmental Review
(Cat Ex)*
Final Design and Bidding
12-18 mos
6-12 mos
9-12 mos