Colstrip Public Schools: Phase II – Facility Planning Daniel A. McGee | Tyler Bush | October 30, 2014
8

Colstrip Public Schools: Phase II – Facility Planning Daniel A. McGee | Tyler Bush | October 30, 2014.

Jan 02, 2016

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Colstrip Public Schools: Phase II – Facility Planning Daniel A. McGee | Tyler Bush | October 30, 2014.

Colstrip Public Schools: Phase II – Facility Planning

Daniel A. McGee | Tyler Bush | October 30, 2014

Page 2: Colstrip Public Schools: Phase II – Facility Planning Daniel A. McGee | Tyler Bush | October 30, 2014.

Challenges Facing Every School District

Your Budget

Your Facilities

Your People

Big Issues

Page 3: Colstrip Public Schools: Phase II – Facility Planning Daniel A. McGee | Tyler Bush | October 30, 2014.

BUILDING OPERATION LIFECYCLE

OPTIMIZATION IS AN ONGOING CYCLE

Demographics / Planning

Financing Options

Design

ConstructCommission

Operate

Sustain

Pages from COLSTRIP Final report 12 16 2013.pdf

..\Colstrip report 2013.pdf

Page 4: Colstrip Public Schools: Phase II – Facility Planning Daniel A. McGee | Tyler Bush | October 30, 2014.

Implementation of Phase II

•Define Facility Improvement Measures• High School Lower Level Renovation• High School Auxiliary Expansion

November 2014 – Concept

•Directed Engineer Study Proposal – December 8th – Action Item

December 2014 – Proposal – Schematic Design Phase

January 2015 – Development – Design Development Phase

•Guaranteed Maximum Pricing proposal – February 9th – Action Item

February 2015 – Design Build

February 2015 –Construction Documents

February 2015 thru September 2016 –Construction

Page 5: Colstrip Public Schools: Phase II – Facility Planning Daniel A. McGee | Tyler Bush | October 30, 2014.

2014 IBES / FBMS Budget BreakdownFrank Brattin Middle School – Utility Only Budgets

• Heating (Propane) $70,000

• Electrical $91,000

• Water / Sewer $56,000

• Telephone / Minor equip / Supplies $3,700

• Total Middle School Utility Costs $220,700

Isabel Bills Elementary School – Utility Only Budgets

• Heating (Propane) $0

• Electrical $11,925

• Water / Sewer $2,000

• Telephone / Minor equip / Supplies $1,500

• Total Middle School Utility Costs $15,425

Total budget available with closure of IBES and FBMS = $236,125

..\12-9-13 Presentation\Colstrip Expenditure Report 2014.pdf ..\COLSTRIP Final report 12 16 2013.pdf

Page 6: Colstrip Public Schools: Phase II – Facility Planning Daniel A. McGee | Tyler Bush | October 30, 2014.

2014 IBES / FBMS – Defferred Maintenance

Total budget available with closure of IBES and FBMS = $236,125

Multiply over 15 years with escalation at 3% = $4,391,669

Additional maintenance budget and property insurance | Determine what percentage to be divided by percent of square footage of elementary district. Total budget $213,087

Total budget with percentage of other maintenance dollars = $378,894

Multiply over 15 years with escalation at 3% = $7,047,017*Mothballing a facility will require a portion of these budgets to remain in place. Estimate 25% of heating costs - $20,481 annually. Cost avoidance of other maintenance budget $147,995 or $2,527,140 over 15 years.

Forecasted Future Differed maintenance expenditures Frank Brattin Middle School – Library and east side 88 edition window Privacy partitions for bathrooms Science lab faucets Concrete SettlingIsabell Bills Elementary School - Hot water heater Cooling TowerBoilerBoth Schools – Doors -Closers both buildings  Door nobs both building Panic bars both buildings

Pics

Page 7: Colstrip Public Schools: Phase II – Facility Planning Daniel A. McGee | Tyler Bush | October 30, 2014.

Estimated Demolition Cost – Cost avoidance

Frank Brattin Middle School –

• Demolition Cost – Building $492,680

• Demolition Cost - Footings $21,490

• Dump Fees - $420,000

• Other related cost – GRT, Contingency, Bond, ETC. $337,790

Total Estimated Demolition Cost $1,271,960

Isabel Bills Elementary School –

• Demolition Cost – Building $177,600

• Demolition Cost - Footings $13,673

• Dump Fees - $217,000

• Other related cost – GRT, Contingency, Bond, ETC. $147,628

Total Estimated Demolition Cost $555,901

*The budget numbers listed are budget numbers based on 2014 RS Means, district could capture this as cost avoidance for future project financing.

CPS Bldg demo.xlsx

Page 8: Colstrip Public Schools: Phase II – Facility Planning Daniel A. McGee | Tyler Bush | October 30, 2014.

QUESTIONS?