Page 1: Collaboration and Planning for Successful Stream Management

Collaboration and Planning for Successful Stream ManagementDenise Cameron, Woodard & CurranJohn Livsey, Town of Lexington, MA

Page 2: Collaboration and Planning for Successful Stream Management

The Original Green Infrastructure:The Stream Channel

Page 3: Collaboration and Planning for Successful Stream Management

A Typical New England Stream History

Page 4: Collaboration and Planning for Successful Stream Management

Circa 1930

Page 5: Collaboration and Planning for Successful Stream Management

1930 - Today

Route 2

1930

TODAY

Page 6: Collaboration and Planning for Successful Stream Management

The Need

▀ Persistent flooding and complaints from public▀ Sediment buildup in streams and wetlands▀ Old and deteriorated drainage infrastructure▀ Desire to improve water quality and protect

wildlife habitats ▀ Consistently increasing stormwater

regulatory requirements

Page 7: Collaboration and Planning for Successful Stream Management

Driving Action through Planning: Development of Stream Management Plans

Page 8: Collaboration and Planning for Successful Stream Management

Conservation

Public Works

A Collaborative Approach

Page 9: Collaboration and Planning for Successful Stream Management

A Plan for Action

Town of Lexington worked with Woodard & Curran to develop a plan for both watershed restoration anddrainage enhancement.

Page 10: Collaboration and Planning for Successful Stream Management

A Phased Implementation

The plan was implementedin three phases,per major watershed:

▀ Charles River▀ Mystic River▀ Shawsheen River

Page 11: Collaboration and Planning for Successful Stream Management

It starts with data…

A multi-year,comprehensivedrainage study,including both:

▀ Desktop Assessment▀ Field Surveys

Page 12: Collaboration and Planning for Successful Stream Management

...it grows through public involvement…

▀ Began collaboration early▀ Formal and informal meetings:

Director of Conservation Watershed Stewards Capital Expenditure Committee TMMA (Town Meeting Members Association) Board of Selectmen

▀ Build support for program to getfunding at Town Meeting

Page 13: Collaboration and Planning for Successful Stream Management

…it is refined through prioritization…

Conducted a pair-wise comparisonwith the following scoring criteria

Health & Safety Flood Mitigation Coordination with other

Town Projects Environmental Benefits Social Impact Improved O&M Regulatory Compliance

Page 14: Collaboration and Planning for Successful Stream Management

…and it leads to a consensus for CIP

▀ From the three watershedstream management plans,a single, Capital ImprovementsPlan was developed

Page 15: Collaboration and Planning for Successful Stream Management

A Balanced Funding Approach

Infrastructure Project Funding

Ecological Drainage Restoration Funding

Page 16: Collaboration and Planning for Successful Stream Management

The Plan’s Foundation:Field Surveys

Page 17: Collaboration and Planning for Successful Stream Management

Structures and Crossings

Stream Reaches

Stormwater Outfalls

What We Looked For In The Field…

Page 18: Collaboration and Planning for Successful Stream Management

What we found in the field…

Page 19: Collaboration and Planning for Successful Stream Management

What we found in the field…Culverts in

good shape…

…and culverts with structural and safety

issues

Page 20: Collaboration and Planning for Successful Stream Management

What we found in the field…Trash and debris…

…hydraulic restrictions

Page 21: Collaboration and Planning for Successful Stream Management

What we found in the field…Sediment buildup…

…and straightened channels

Page 22: Collaboration and Planning for Successful Stream Management

What we found in the field…Stormwater Inputs…

…and drainagetrouble spots.

Page 23: Collaboration and Planning for Successful Stream Management

The Plan’s Recommendations: Project Identification

Page 24: Collaboration and Planning for Successful Stream Management

Categories of Recommendations

▀ Infrastructure & drainage restoration▀ Wetlands protection▀ Drainage investigation▀ Roadway and drainage system O&M▀ Long-term O&M for streams

Page 25: Collaboration and Planning for Successful Stream Management

Fact Sheets

▀ One per recommendation▀ Summarizes existing

conditions andproposed project

▀ Detailed maps

Page 26: Collaboration and Planning for Successful Stream Management

Putting the Plan into Action:Project Case Studies

Page 27: Collaboration and Planning for Successful Stream Management

Willard’s Woods Stream Restoration

Page 28: Collaboration and Planning for Successful Stream Management

Willard’s Woods Stream Restoration

Page 29: Collaboration and Planning for Successful Stream Management

Willard’s Woods Stream Restoration

▀ Rather than replacing thefailed culvert, the Townopted to daylight the stream

Page 30: Collaboration and Planning for Successful Stream Management

Willard’s Woods Stream Restoration

▀ A rock vane wasconstructed forenergy dissipationand grade control

Page 31: Collaboration and Planning for Successful Stream Management

Willard’s Woods Stream Restoration

Page 32: Collaboration and Planning for Successful Stream Management

Willard’s Woods Stream Restoration

▀ A headwall was constructed for the stream crossing under North Street

Page 33: Collaboration and Planning for Successful Stream Management

Willard’s Woods Stream Restoration

▀ Pedestrian bridge was constructed at trail crossing

Page 34: Collaboration and Planning for Successful Stream Management

Willard’s Woods Stream Restoration

▀ To save an existing tree, a stone wall was created using stones from the failed culvert

Page 35: Collaboration and Planning for Successful Stream Management

Willard’s Woods Stream Restoration

▀ The stone was alsoused to reconstructthe stone wall alongNorth Street

Page 36: Collaboration and Planning for Successful Stream Management

Willard’s Woods Stream Restoration:A Multi-disciplinary Approach

▀ Successful streamrestoration ismultidisciplinary Scientists Engineers Landscape Architects, Contractors experienced in

ecological restoration

Page 37: Collaboration and Planning for Successful Stream Management

Willard’s Woods Stream Restoration:Creating a Natural Stream…not a Ditch

▀ Construction documents were developed to allow for flexibility during construction to better mimic the irregular conditions of a natural stream.

Page 38: Collaboration and Planning for Successful Stream Management

Willard’s Woods Stream Restoration: Reference Reach Model

Page 39: Collaboration and Planning for Successful Stream Management

Willard’s Woods Stream Restoration:Which one is the New Stream?

Page 40: Collaboration and Planning for Successful Stream Management

Willard’s Crossing:

Page 41: Collaboration and Planning for Successful Stream Management

▀ Sediment buildup at the trail culvert restricts culvert flow, contributing to upstream flooding

Willard’s Crossing: Culvert Removal

Page 42: Collaboration and Planning for Successful Stream Management

Willard’s Crossing: Bridge Construction

▀ Vehicular Bridge to improve emergency access▀ Stone channel to manage flooding both upstream

and down

Page 43: Collaboration and Planning for Successful Stream Management

Willard’s Crossing: Bridge Construction

Page 44: Collaboration and Planning for Successful Stream Management

Vine Brook – Streambank Stabilization

Page 45: Collaboration and Planning for Successful Stream Management

Vine Brook – Streambank Stabilization

▀ Bank failure led to sediment buildup in Vine Brook

Page 46: Collaboration and Planning for Successful Stream Management

Vine Brook – Streambank Stabilization

Page 47: Collaboration and Planning for Successful Stream Management

Vine Brook – Streambank Stabilization

Page 48: Collaboration and Planning for Successful Stream Management

Vine Brook – Streambank Stabilization

Page 49: Collaboration and Planning for Successful Stream Management

Whipple Hill Culvert

Replacement

Pleasant Street Drainage

Improvements

Valleyfield Drainage

Assessment

Upcoming Projects

Page 50: Collaboration and Planning for Successful Stream Management

Conclusions: Keys to Success

Page 51: Collaboration and Planning for Successful Stream Management

Keys to Success

▀ Engage community, municipal departments, and environmental groups to make it one all-encompassing project

▀ Don’t separate water quantity and quality▀ Make it an active plan – not just a study sitting

on shelf▀ Don’t lose momentum!

Page 52: Collaboration and Planning for Successful Stream Management

Contacts

▀ Woodard & Curran Denise Cameron ([email protected]) Zach Henderson ([email protected])

▀ Town of Lexington John Livsey ([email protected]) David Pavlik ([email protected]) Karen Mullins ([email protected])

▀ Town of Lexington web site http://www.lexingtonma.gov/stormwater

Page 53: Collaboration and Planning for Successful Stream Management

Questions &Discussion