Top Banner
FTCO AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO. Mechanical Department PROJECT NAME :GRAIN SOILS PROJECT NO : PREPARED BY : ENGR. SALLAM CHECKED BY : ENGR. AHSAN ALI LOONA TITLE : HOT WATER DEMAND CALCULATION From ASPE Data Book Table 4-6 page 4-15 Occupancy : Office Building All Buildings ROOM NAME: ROOM NO. All Buildings Fixture Demand UNIT NO. 2 No. OF EWH 1 TYPE L / H No.Of Fix. Total L/H Private Lavatory 7.6 15 114.00 public Lavatory 22.7 87 1974.90 shower 113.6 4 454.40 kitchen sink 75.7 21 1589.70 jointer sink 37.9 17 644.30 DISHWASHER 378.6 2 757.20 Possible Max.Demand = 5534.50 Demand factor = 0.30 Storage factor = 2.00 Pro. max. demand (LPH)=D. factor*po. max.Demand 1660.35 Possible Max.Demand (LPH)=
27

Cold and Hot Water Demand Calculation (Alfouzan)

Nov 08, 2014

Download

Documents

calculation sheets for calculation of hot and cold water demand
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Cold and Hot Water Demand Calculation (Alfouzan)

FTCOAL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.Mechanical Department

PROJECT NAME :GRAIN SOILSPROJECT NO :PREPARED BY : ENGR. SALLAMCHECKED BY : ENGR. AHSAN ALI LOONATITLE : HOT WATER DEMAND CALCULATION

From ASPE Data Book Table 4-6 page 4-15

Occupancy : Office Building

All Buildings ROOM NAME:

ROOM NO. All Buildings Fixture Demand UNIT NO. 2 No. OF EWH 1TYPE L / H No.Of Fix. Total L/H

Private Lavatory 7.6 15 114.00 public Lavatory 22.7 87 1974.90

shower 113.6 4 454.40 kitchen sink 75.7 21 1589.70 jointer sink 37.9 17 644.30

DISHWASHER 378.6 2 757.20 Possible Max.Demand = 5534.50 Demand factor = 0.30 Storage factor = 2.00 Pro. max. demand (LPH)=D. factor*po. max.Demand 1660.35 Possible Max.Demand (LPH)=

Page 2: Cold and Hot Water Demand Calculation (Alfouzan)

CTempreture Out Tout= 60

Tempreture in Tin = 20

Tempreture Diff. T rise= 40 40.00 C

m= Probable max.Demand in L/s 0.46 L/S

P= Density of water = 1 kg/L 1 1.00 Kg/L

n= Thermal efficiency = 95 0.95 Cp=specific heat of water = 4.18 4.18 kj/(kg.k)

pi(kw )= (m*cp*p*trise)/n 81.17 KW

storage tank capacity(Litters)=Prob.Max.Demand*storage factor 3320.70 Liters

Page 3: Cold and Hot Water Demand Calculation (Alfouzan)

FTCOAL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.Mechanical Department

PROJECT NAME :GRAIN SOILSPREPARED BY : ENGR. SALLAMCHECKED BY : ENGR. AHSAN ALI LOONA

TITLE : COLD WATER LOAD CALCULATIONFrom UPC Table A-2 & CHART( A-3, A-5) RISER NO. All Building

ROOM NO. All Building

FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC SYSTEM TOTALFixture CW Fixture CW

type FU QTY FUEstern WC 1 34 34

Western WC 1 69 69Bedit 1 25 25

Lavatory 1 114 114Shower 2 4 8

Kitchen sink 1.5 21 31.5Service sink 3 17 51Hose Bibb 1 20 20

Faucet 1 9 9SUB- TOTAL FU Total 361.5DEMAND GPM 115PIPE VELOCITY(FPS) 7.5PIPE FRICTION LOSS(psi/100) 4PIPE SIZE (in) 2.5

Legend :

TYPE OF FIXTURE PUBLIC & PRIVATE

Page 4: Cold and Hot Water Demand Calculation (Alfouzan)

C W = Cold water

FU =fixture unit

FTCOAL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.Mechanical Department

PROJECT NAME :GRAIN SOILSPROJECT NO :PREPARED BY : ENGR. SALLAMCHECKED BY : ENGR. AHSAN ALI LOONA

TITLE : COLD WATER LOAD CALCULATIONFrom UPC Table A-2 & CHART( A-3, A-5) RISER NO. 1

ROOM NO. All Building

FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC SYSTEM TOTALFixture CW Fixture CW

type FU QTY FUEstern WC 1 0 0

Western WC 1 3 3Bedit 1 3 3

Lavatory 1 5 5Shower 2 0 0

Kitchen sink 1.5 0 0Service sink 3 0 0Hose Bibb 1 10 10

Faucet 2 0 0SUB- TOTAL FU Total 21

TYPE OF FIXTURE PUBLIC & PRIVATE

Page 5: Cold and Hot Water Demand Calculation (Alfouzan)

DEMAND GPM 15

PIPE VELOCITY(FPS) 5.5PIPE FRICTION LOSS(psi/100) 6.5PIPE SIZE (in) 1

Legend : C W = Cold water

FU =fixture unit

FTCOAL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.

Mechanical Department

PROJECT NAME :GRAIN SOILSPROJECT NO :PREPARED BY : ENGR. SALLAMCHECKED BY : ENGR. AHSAN ALI LOONA

TITLE : COLD WATER LOAD CALCULATIONFrom UPC Table A-2 & CHART( A-3, A-5) RISER NO. 2

ROOM NO. All Building

FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC SYSTEM TOTALFixture CW Fixture CW

type FU QTY FUEstern WC 1 11 11

Western WC 1 23 23

TYPE OF FIXTURE PUBLIC & PRIVATE

Page 6: Cold and Hot Water Demand Calculation (Alfouzan)

Bedit 1 5 5

Lavatory 1 44 44Shower 2 4 8

Kitchen sink 1.5 11 16.5Service sink 3 1 3Hose Bibb 1 0 0

Faucet 2 9 18SUB- TOTAL FU Total 128.5DEMAND GPM 50PIPE VELOCITY(FPS) 8.2PIPE FRICTION LOSS(psi/100) 8PIPE SIZE (in) 1.5

FTCOAL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.Mechanical Department

PROJECT NAME :GRAIN SOILSPROJECT NO :PREPARED BY : ENGR. SALLAMCHECKED BY : ENGR. AHSAN ALI LOONA

TITLE : COLD WATER LOAD CALCULATIONFrom UPC Table A-2 & CHART( A-3, A-5) RISER NO. 3

ROOM NO. All Building

FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC SYSTEM TOTALFixture CW Fixture CW

type FU QTY FU

TYPE OF FIXTURE PUBLIC & PRIVATE

Page 7: Cold and Hot Water Demand Calculation (Alfouzan)

Estern WC 1 5 5

Western WC 1 11 11

Bedit 1 5 5Lavatory 1 17 17Shower 2 0 0

Kitchen sink 1.5 2 3Service sink 1.5 0 0Hose Bibb 1 10 10

Faucet 2 0 0SUB- TOTAL FU Total 51DEMAND GPM 40PIPE VELOCITY(FPS) 6.5PIPE FRICTION LOSS(psi/100) 5.5PIPE SIZE (in) 1.5

Legend : C W = Cold water

FU =fixture unit

FTCOAL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.Mechanical Department

PROJECT NAME :GRAIN SOILSPROJECT NO :PREPARED BY : ENGR. SALLAMCHECKED BY : ENGR. AHSAN ALI LOONA

Page 8: Cold and Hot Water Demand Calculation (Alfouzan)

TITLE : COLD WATER LOAD CALCULATIONFrom UPC Table A-2 & CHART( A-3, A-5) RISER NO. 4

ROOM NO. All Building

FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC SYSTEM TOTALFixture CW Fixture CW

type FU QTY FUEstern WC 1 18 18

Western WC 1 21 21Bedit 1 1 1

Lavatory 1 36 36Shower 2 0 0

Kitchen sink 1.5 8 12Service sink 3 16 48Hose Bibb 1 0 0

Faucet 2 0 0SUB- TOTAL FU Total 136DEMAND GPM 60PIPE VELOCITY(FPS) 10PIPE FRICTION LOSS(psi/100) 12PIPE SIZE (in) 1.5

Legend : C W = Cold water

FU =fixture unit

TYPE OF FIXTURE PUBLIC & PRIVATE

Page 9: Cold and Hot Water Demand Calculation (Alfouzan)

FTCOAL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.Mechanical Department

PROJECT NAME :GRAIN SOILSPROJECT NO :PREPARED BY : ENGR. SALLAMCHECKED BY : ENGR. AHSAN ALI LOONA

TITLE : GRAY WATER LOAD CALCULATION

From UPC Table A-2 & CHART( A-3, A-5) RISER NO. All Building ROOM NO. All Building

FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC SYSTEM TOTALFixture CW Fixture CW

type FU QTY FUEstern WC 5 34 170

Western WC 2.5 69 172.5SUB- TOTAL FU Total 342.5DEMAND GPM 115PIPE VELOCITY(FPS) 7.5PIPE FRICTION LOSS(psi/100) 4PIPE SIZE (in) 2.5 (63mm)

Legend :G W =gray water

FU =fixture unit

(63mm)

TYPE OF FIXTURE PUBLIC & PRIVATE

Page 10: Cold and Hot Water Demand Calculation (Alfouzan)

FTCOAL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.

Mechanical Department

PROJECT NAME :GRAIN SOILSPROJECT NO :

PREPARED BY : ENGR. SALLAMCHECKED BY : ENGR. AHSAN ALI LOONA

TITLE : GRAY WATER LOAD CALCULATIONFrom UPC Table A-2 & CHART( A-3, A-5) RISER NO. 1

ROOM NO. All Building

FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC SYSTEM TOTALFixture CW Fixture CW

type FU QTY FUEstern WC 5 0 0

Western WC 2.5 3 7.5SUB- TOTAL FU Total 7.5DEMAND GPM 15PIPE VELOCITY(FPS) 5.7PIPE FRICTION LOSS(psi/100) 6.5PIPE SIZE (in) 1 (25mm)

Legend :G W =gray water

FU =fixture unit

TYPE OF FIXTURE PUBLIC & PRIVATE

Page 11: Cold and Hot Water Demand Calculation (Alfouzan)

FTCOAL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.Mechanical Department

(25mm)PROJECT NAME :GRAIN SOILSPROJECT NO :PREPARED BY : ENGR. SALLAMCHECKED BY : ENGR. AHSAN ALI LOONA

TITLE : GRAY WATER LOAD CALCULATION

From UPC Table A-2 & CHART( A-3, A-5) RISER NO. 2

ROOM NO. All Building

FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC SYSTEM TOTALFixture CW Fixture CW

type FU QTY FUEstern WC 5 11 55

Western WC 2.5 23 57.5SUB- TOTAL FU Total 112.5DEMAND GPM 55PIPE VELOCITY(FPS) 9.5PIPE FRICTION LOSS(psi/100) 10PIPE SIZE (in) 1.5 (40mm)

Legend :G W =gray water

FU =fixture unit

TYPE OF FIXTURE PUBLIC & PRIVATE

Page 12: Cold and Hot Water Demand Calculation (Alfouzan)

FTCOAL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.Mechanical Department

PROJECT NAME :GRAIN SOILSPROJECT NO :PREPARED BY : ENGR. SALLAMCHECKED BY : ENGR. AHSAN ALI LOONA

TITLE : GRAY WATER LOAD CALCULATIONFrom UPC Table A-2 & CHART( A-3, A-5) RISER NO. 3

(40mm) ROOM NO. All Building

FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC SYSTEM TOTALFixture CW Fixture CW

type FU QTY FUEstern WC 5 5 25

Western WC 2.5 11 27.5SUB- TOTAL FU Total 52.5DEMAND GPM 40PIPE VELOCITY(FPS) 7PIPE FRICTION LOSS(psi/100) 6PIPE SIZE (in) 1.5 (40mm)

Legend :G W =gray water

FU =fixture unit

TYPE OF FIXTURE PUBLIC & PRIVATE

Page 13: Cold and Hot Water Demand Calculation (Alfouzan)

FTCOAL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.Mechanical Department

PROJECT NAME :GRAIN SOILSPROJECT NO :PREPARED BY : ENGR. SALLAMCHECKED BY : ENGR. AHSAN ALI LOONA

TITLE : GRAY WATER LOAD CALCULATIONFrom UPC Table A-2 & CHART( A-3, A-5) RISER NO. 4

ROOM NO. All Building(40mm)

FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC SYSTEM TOTALFixture CW Fixture CW

type FU QTY FUEstern WC 5 18 90

Western WC 2.5 21 52.5

SUB- TOTAL FU Total 142.5

DEMAND GPM 60PIPE VELOCITY(FPS) 10PIPE FRICTION LOSS(psi/100) 12PIPE SIZE (in) 1.5 (40mm)

Legend :G W =gray water

FU =fixture unit

TYPE OF FIXTURE PUBLIC & PRIVATE

Page 14: Cold and Hot Water Demand Calculation (Alfouzan)

(40mm)

Page 15: Cold and Hot Water Demand Calculation (Alfouzan)

FTCOAL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.Mechanical Department

PROJECT NAME :GRAIN SOILSPROJECT NO :PREPARED BY : ENGR. SALLAMCHECKED BY : ENGR. AHSAN ALI LOONA

TITLE : PLUMBING FIXTURE LOAD CALCULATION

From UPC Table A-2&7-3 & CHART A-5 RISER NO All Building ROOM All Building

NAME All BuildingFLUSH TANK FOR WWC & FLUSH VALVE FOR EWC ROOM NO TOTAL

Fixture CW D Fixturetype FU FU QTY

Estern WC 1 8 2Western WC 1 5.5 1

Bedit 1 1 0Lavatory 1 1 4Shower 2 2 3

Kitchen sink 1.5 2 1Service sink 1.5 2 1

washing machine 4 4 1D.F. 0.75 1 1

SUB- TOTAL FU TotalDEMAND GPM

PIPE VELOCITY(FPS)

TYPE OF FIXTURE PUBLIC & PRIVATE

Page 16: Cold and Hot Water Demand Calculation (Alfouzan)

PIPE FRICTION LOSS(psi/100)

PIPE SIZE (mm)

Legend :

WS = water sup D = Drain

CW = Cold Water

Page 17: Cold and Hot Water Demand Calculation (Alfouzan)

FTCOAL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO. AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.

Mechanical Department

PROJECT NAME :GRAIN SOILSPROJECT NO :PREPARED BY : ENGR. SALLAMCHECKED BY : ENGR. AHSAN ALI LOONATITLE : HOT WATER DEMAND CALCULATION

From ASPE Data Book Table 4-6 page 4-15

All Building Occupancy : Office Building

All Building First Basemant Floor All Building ROOM NAME: ClinicToilet Guard Toilet

TOTAL ROOM NO. B 03 B 56CW D Fixture Demand UNIT NO. EWH 1 EWH 2FU FU L / H No.Of Fix. Total L/H No.Of Fix.2 16 Private Lavatory 7.6 0 0 11 5.5 public Lavatory 22.7 1 22.7 00 0 shower 113.6 0 0 04 4 kitchen sink 75.7 0 0 06 6 jointer sink 37.9 1 37.9 0

1.5 21.5 2 Possible Max.Demand (LPH)= 60.6 L/H4 4 Demand facto= 0.3

0.75 1 Storage facto= 220.75 40.5 Pro. max. demand (LPH)=D. factor*po. max.Demand 18.18 L

35 472.5

Page 18: Cold and Hot Water Demand Calculation (Alfouzan)

0.6 C50 100 Tempretur Tout= 55

Tempreture Tin = 10

Tempreture T rise= 45 45

D = Drain m= Probable max.Demand in L/s 0.00505 L/S

P= Density of water =1 k 1 1 Kg/L

CW = Cold Water n= Thermal efficiency= 95 0.95Cp=specific heat of water 4.18 4.18pi(kw)=(m*cp*p*trise)/n 0.9999storage tank capacity(Gallons)=Prob.Max.Demand*storage factor

storage tank capacity(Litters)=Prob.Max.Demand*storage factor 36.36

Heaters selection based on A.O.Smith catalogue

Model No.

Available storage tank capacity (Gallons)

Recovery rate (GPH)

Elemant Power

Dimensions (Diameter.Height) mm

Page 19: Cold and Hot Water Demand Calculation (Alfouzan)

FTCOAL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.Mechanical Department

PROJECT NAME :GRAIN SOILSPROJECT NO :PREPARED BY : ENGR. SALLAMCHECKED BY : ENGR. AHSAN ALI LOONATITLE : HOT WATER DEMAND CALCULATION

From ASPE Data Book Table 4-6 page 4-15

Occupancy : Office Building

First Floor All Buildings Guard Toilet Tr.Manager Toilet ROOM NAME:

B 56 106 ROOM NO.

EWH 2 EWH3 Fixture Demand UNIT NO. 2 No. OF EWH 1Total L/H No.Of Fix. Total L/H L / H No.Of Fix. Total L/H

7.6 1 7.6 Private Lavatory 7.6 13 98.80 0 0 0 public Lavatory 22.7 75 1702.50 0 0 0 shower 113.6 2 227.20 0 0 0 kitchen sink 75.7 21 1589.70 0 0 0 jointer sink 37.9 17 644.30

7.6 L/H 7.6 L/H Possible Max.Demand (LPH)= 4262.50 0.3 0.3 Demand factor = 0.30 2 2 Storage factor = 2.00

2.28 L 2.28 L Pro. max. demand (LPH)=D. factor*po. max.Demand 639.38

Page 20: Cold and Hot Water Demand Calculation (Alfouzan)

CTempreture Ou Tout= 65

Tempreture Tin = 20

C 45 C 45 C Tempreture T rise= 45 45.00

0.000633 L/S 0.000633 L/S m= Probable max.Demand in L/s 0.09 L/S

1 Kg/L 1 Kg/L P= Density of water =1 kg/L 1 1.00 Kg/L

0.95 0.95 n= Thermal efficiency= 95 0.95 kj/(kg.k) 4.18 kj/(kg.k) 4.18 kj/(kg.k) Cp=specific heat of water 4.18 4.18

KW 0.1254 KW 0.1254 KW pi(kw)=(m*cp*p*trise)/n 17.58 storage tank capacity(Gallons)=Prob.Max.Demand*storage factor

Liters 4.56 Liters 4.56 Liters storage tank capacity(Litters)=Prob.Max.Demand*storage factor 1278.75

Heaters selection based on A.O.Smith catalogue

Model No.

Available storage tank capacity (Gallons)

Recovery rate (GPH)

Elemant Power

Dimensions (Diameter.Height) mm

Page 21: Cold and Hot Water Demand Calculation (Alfouzan)

FTCOAL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.Mechanical Department

PROJECT NAME :GRAIN SOILSPROJECT NO :PREPARED BY : ENGR. SALLAMCHECKED BY : ENGR. AHSAN ALI LOONA

TITLE : PLUMBING FIXTURE LOAD CALCULATION (W.SUPPLY&DRIANGE)

From UPC Table A-2&7-3 & CHART A-5 BUILDING NO. 62 ROOM All Building

NAME All BuildingFLUSH TANK FOR WWC & FLUSH VALVE FOR EWC S ROOM NO. TOTAL

Fixture CW D Fixture CW Dtype FU FU QTY FU FU

Estern WC 1 8 4 4 32Western WC 1 5.5 8 8 44

WASHING MACH. 4 4 8 32 32Lavatory 1 1 16 16 16Shower 2 2 12 24 24

Kitchen sink 1.5 2 4 6 8D.F. 0.75 0.75 4 3 3

SUB- TOTAL FU Total 90 156DEMAND GPM 65 80PIPE VELOCITY(FPS) 7PIPE FRICTION LOSS(psi/100) 3.5PIPE SIZE (mm) 50 100

TYPE OF FIXTURE PUBLIC & PRIVATE

Page 22: Cold and Hot Water Demand Calculation (Alfouzan)

Legend :

C WS = water supply D = Drain

CW = Cold Water

kj/(kg.k)

KW

Liters