CODE INFORMATION APPLICABLE CODES, LAWS AND REGULATIONS 2015 INTERNATIONAL RESIDENTIAL CODE (IRC) 2015 INTERNATIONAL BUILDING CODE (IBC) 2015 INTERNATIONAL FIRE CODE (IFC) 2014 NATIONAL ELECTRICAL CODE (NEC) SHEET SATELLITE IMAGE JOB NOTES COVER SHEET PVA-0 DRAWN BY DATE DRAWN DATE CHECKED SCALE CHECKED BY 06-03-2020 EVALDEZ 06-03-2020 PROJECT LOCATION NTS 1 4 1 4 H A R B O U R W A Y S O U T H R I C H M O N D , C A 9 4 8 0 4 ( 5 1 0 ) 5 4 0 - 0 5 5 0 C O R P O R A T I O N , S Y S T E M S R E V I S I O N S SOLAR INDIVIDUAL PERMIT PACKAGE GRID-TIED PHOTOVOLTAIC SYSTEM REV DESCRIPTION DATE DB CB PROJECT OPPORTUNITY JEFF OLANDER / THERESA OLANDER 4160 STAGE STOP WAY LOT 620 WICKENBURG, ARIZONA 85390 RP-113183 8.63 kW SPRI - PHOENIX 7.88 kW MAX. OUTPUT POWER RATING TYLER BOSHARD C A L I C E N S E # 8 9 0 8 9 5 GRID-TIED PHOTOVOLTAIC SYSTEM SOLAR INDIVIDUAL PERMIT PACKAGE JEFF OLANDER / THERESA OLANDER 4160 STAGE STOP WAY LOT 620 4022187889 WICKENBURG, ARIZONA 85390 8.63 kW AHJ: TOWN OF WICKENBURG UTILITY: ARIZONA PUBLIC SERVICE CO AC MAX. CONTINUOUS POWER RATING OF (25) SPR-X21-345-E-AC = 25 x 315W = 7.88 kW PV SOLAR ARCHITECTURAL DRAWINGS SHEET INDEX PV SOLAR ELECTRICAL DRAWINGS PVE-1 ELECTRICAL THREE-LINE DIAGRAM & PVE-2 ELECTRICAL CALCULATION PVE-3 ELECTRICAL DATA & SPECIFICATIONS SPECIFICATIONS PVE-4 PVE-5 BRANCH DIAGRAM PV SOLAR STRUCTURAL DRAWINGS PVS-1 MOUNTING DETAILS PVA-0 COVER SHEET PVA-1 ARRAY LAYOUT PLACARD / EQUINOX GROUNDING DETAILS
22

CODE INFORMATION SOLAR INDIVIDUAL PERMIT …...2020/05/10  · UTILITY: ARIZONA PUBLIC SERVICE CO AC MAX. CONTINUOUS POWER RATING OF (25) SPR-X21-345-E-AC = 25 x 315W = 7.88 kW PV

Aug 11, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CODE INFORMATION SOLAR INDIVIDUAL PERMIT …...2020/05/10  · UTILITY: ARIZONA PUBLIC SERVICE CO AC MAX. CONTINUOUS POWER RATING OF (25) SPR-X21-345-E-AC = 25 x 315W = 7.88 kW PV

CODE INFORMATION

APPLICABLE CODES, LAWS AND REGULATIONS

2015 INTERNATIONAL RESIDENTIAL CODE (IRC)2015 INTERNATIONAL BUILDING CODE (IBC)2015 INTERNATIONAL FIRE CODE (IFC)2014 NATIONAL ELECTRICAL CODE (NEC)

SHEET

SATELLITE IMAGE

JOB NOTES

CO

VER

SH

EET

PVA-0

DRAWN BY

DATE DRAWN

DATE CHECKED

SCALE

CHECKED BY

06-03-2020

EVALDEZ

06-03-2020

PROJECT LOCATION

NTS

1 4

1 4

H

A R

B O

U R

W

A Y

S O

U T

H

R I

C H

M O

N D

,

C A

9 4

8 0

4

( 5

1 0

) 5

4 0

- 0

5 5

0

C O

R P

O R

A T

I O

N ,

S Y

S T

E M

S

R E V I S I O N S

SO

LAR I

ND

IVID

UAL

PERM

IT P

ACKAG

E

GRID

-TIE

D P

HO

TOVO

LTAIC

SYS

TEM

REV DESCRIPTION DATE DB CB

PROJECT

OPPORTUNITY

JEFF

OLA

ND

ER /

TH

ERES

A O

LAN

DER

4160

STA

GE

STO

P W

AY

LOT

620

WIC

KEN

BU

RG

, ARIZ

ON

A 8

5390

RP-113183

8.63

kW

SPRI - PHOENIX

7.88

kW

MAX.

OU

TPU

T PO

WER

RATI

NG

TYLER BOSHARD

C A

L

I C

E N

S E

#

8 9

0 8

9 5

GRID-TIED PHOTOVOLTAIC SYSTEM

SOLAR INDIVIDUAL PERMIT PACKAGE

JEFF OLANDER / THERESA OLANDER

4160 STAGE STOP WAY LOT 6204022187889

WICKENBURG, ARIZONA 85390

8.63 kW

AHJ: TOWN OF WICKENBURGUTILITY: ARIZONA PUBLIC SERVICE CO

AC MAX. CONTINUOUS POWER RATING OF (25) SPR-X21-345-E-AC = 25 x 315W = 7.88 kW

PV SOLAR ARCHITECTURAL DRAWINGS

SHEET INDEX

PV SOLAR ELECTRICAL DRAWINGS

PVE-1 ELECTRICAL THREE-LINE DIAGRAM &

PVE-2 ELECTRICAL CALCULATIONPVE-3 ELECTRICAL DATA & SPECIFICATIONS

SPECIFICATIONS

PVE-4PVE-5 BRANCH DIAGRAM

PV SOLAR STRUCTURAL DRAWINGS

PVS-1 MOUNTING DETAILS

PVA-0 COVER SHEET

PVA-1 ARRAY LAYOUT

PLACARD / EQUINOX GROUNDING DETAILS

Page 2: CODE INFORMATION SOLAR INDIVIDUAL PERMIT …...2020/05/10  · UTILITY: ARIZONA PUBLIC SERVICE CO AC MAX. CONTINUOUS POWER RATING OF (25) SPR-X21-345-E-AC = 25 x 315W = 7.88 kW PV

87'-7

"

67'-7"

ROOF ONE: 21 MODULES

5.5:12ROOF TWO: 4 MODULES

3:12

TO E

LECT

RIC

UTIL

ITY

GRID

ACD

PVM

N-LC

(E) GARAGE

ROOF ACCESSPOINT

(E) FENCE/GATE

(E) FENCE/GATE

SHEET

ARRAY

LAYO

UT

PVA-1

DRAWN BY

DATE DRAWN

DATE CHECKED

SCALE

CHECKED BY

06-03-2020

EVALDEZ

06-03-2020

ROOF TYPE

CONTRACT MODULE

MICROINVERTER

STORY

SYSTEM

ROOF PITCH

& QUANTITY

TYPE & QUANTITY

HOME TYPE

ORIENTATION

TOTALARRAY AREA

ROOF ATTACHMENTQUANTITY

SQ.FT.

FLAT TILE

5.5:12 & 3:12

1 - STORY

222°

SPR-X21-345-E-AC (240) (25)

IQ7XS-96-ACM-US (240)(25)

52

447

1/16" = 1'-0"

L E G E N D

JUNCTION BOX

EXISTING SERVICE POINTAND UTILITY METERING

PROPERTY LINE

3' WIDE ACCESS PATH

CONDUIT

ACD PV UTILITY DISCONNECT

N-LC NEW LOAD CENTER

PV METERPVM

1 4

1 4

H

A R

B O

U R

W

A Y

S O

U T

H

R I

C H

M O

N D

,

C A

9 4

8 0

4

( 5

1 0

) 5

4 0

- 0

5 5

0

C O

R P

O R

A T

I O

N ,

S Y

S T

E M

S

R E V I S I O N S

SO

LAR I

ND

IVID

UAL

PERM

IT P

ACKAG

E

GRID

-TIE

D P

HO

TOVO

LTAIC

SYS

TEM

REV DESCRIPTION DATE DB CB

PROJECT

OPPORTUNITY

JEFF

OLA

ND

ER /

TH

ERES

A O

LAN

DER

4160

STA

GE

STO

P W

AY

LOT

620

WIC

KEN

BU

RG

, ARIZ

ON

A 8

5390

RP-113183

8.63

kW

SPRI - PHOENIX

7.88

kW

MAX.

OU

TPU

T PO

WER

RATI

NG

TYLER BOSHARD

C A

L

I C

E N

S E

#

8 9

0 8

9 5

ROOF VENT

1.5' WIDE ACCESS PATH

NOTE: UTILITY HAS 24-HR UNRESTRICTEDACCESS TO ALL PHOTOVOLTAIC SYSTEMCOMPONENTS LOCATED AT SERVICEENTRANCE.

NOTE: REFERENCE SECTION 301.15 OF THEAPS ESRM FOR ELECTRIC METERSEPARATION BETWEEN WATER AND GAS.

NOTE: WORKSPACE IN FRONT OF ACELECTICAL SYSTEM COMPONENTS SHALLBE IN ACCORDANCE WITH APS AND NECREQUIREMENS. FOR APSREQUIREMENTS, REFERENCE SECTION300 OF THE APS ESRM AND SECTION 8.2OF THE APS INTERCONNECTIONREQUIREMENTS.

NOTE: NO FENCES OR GATES RESTRICTING ACCESS TO UTILITY METER AND APS EQUIPMENT.

NOTE:1. FIELD ADJUSTMENTS OF FEWER

THAN 6” MAY BE ALLOWED BASED ON SITECONDITIONS AND MEASUREMENTS.

N

Page 3: CODE INFORMATION SOLAR INDIVIDUAL PERMIT …...2020/05/10  · UTILITY: ARIZONA PUBLIC SERVICE CO AC MAX. CONTINUOUS POWER RATING OF (25) SPR-X21-345-E-AC = 25 x 315W = 7.88 kW PV

FIGURE 3: MOUNTING CLAMPPOSITIONING DETAILSTABLE 2: PENETRATION GUIDE FOR INSTALL

STACKED STAGGERED FULLY STAGGERED

STACKED/STAGGEREDFULLY STAGGERED

*CHECK TABLE 1 FOR MAX.. PENETRATION SPACING AND PENETRATION PATTERN FOR EACH ARRAY.

TWO OR MORE ROWS OF MODULES

ONE ROW OF MODULES

96 CELL MODULE

·RAILS SHALL BE POSITIONED IN THE NON-CROSSHATCHED REGIONS

FIGURE 2: INVISIMOUNT WITH PEGASUS SOLAR ROOF ATTACHMENT DETAILS @ TRUSS / RAFTERS

PV MODULE PV MODULE

FIG 1.1: ROOF 1 STRUCTURAL FRAMING DETAIL

FIG 1.2: ROOF 2 STRUCTURAL FRAMING DETAIL

TABLE 1 – ARRAYS INFORMATION

ROOF

PITCH

ROOFING

TYPE

ATTACHMENT

TYPE

NO. OF

STORIES

FRAMING

TYPE (in.)

MAX.

RAFTER

SPAN (ft.)

PENETRATION

PATTERN (in.)

MAX. ATTACHMENT

SPACING (in.)

MAX. RAIL

OVERHANG (in.)

ROOF 1 24° Flat Tile Pegasus Tile 1 2x4 Truss @ 24" OC 8' Staggered 48" 16"

ROOF 2 14° Flat Tile Pegasus Tile 1 2x4 Truss @ 24" OC 6' Staggered 48" 16"

ROOF 3 -- -- -- -- -- -- -- -- --

ROOF 4 -- -- -- -- -- -- -- -- --

ROOF 5 -- -- -- -- -- -- -- -- --

ROOF 6 -- -- -- -- -- -- -- -- --

CHECK TABLE 2 FOR PENETRATION PATTERN GUIDE

SHEET

STR

UCTU

RAL

INFO

RM

ATI

ON

AN

D M

OU

NTI

NG

DET

AIL

S

PVS-1

DRAWN BY

DATE DRAWN

DATE CHECKED

SCALE

CHECKED BY

06-03-2020

EVALDEZ

06-03-2020

NTS

1 4

1 4

H

A R

B O

U R

W

A Y

S O

U T

H

R I

C H

M O

N D

,

C A

9 4

8 0

4

( 5

1 0

) 5

4 0

- 0

5 5

0

C O

R P

O R

A T

I O

N ,

S Y

S T

E M

S

R E V I S I O N S

SO

LAR I

ND

IVID

UAL

PERM

IT P

ACKAG

E

GRID

-TIE

D P

HO

TOVO

LTAIC

SYS

TEM

REV DESCRIPTION DATE DB CB

PROJECT

OPPORTUNITY

JEFF

OLA

ND

ER /

TH

ERES

A O

LAN

DER

4160

STA

GE

STO

P W

AY

LOT

620

WIC

KEN

BU

RG

, ARIZ

ON

A 8

5390

RP-113183

8.63

kW

SPRI - PHOENIX

7.88

kW

MAX.

OU

TPU

T PO

WER

RATI

NG

TYLER BOSHARD

C A

L

I C

E N

S E

#

8 9

0 8

9 5

Page 4: CODE INFORMATION SOLAR INDIVIDUAL PERMIT …...2020/05/10  · UTILITY: ARIZONA PUBLIC SERVICE CO AC MAX. CONTINUOUS POWER RATING OF (25) SPR-X21-345-E-AC = 25 x 315W = 7.88 kW PV

9

C

YES

THWN-2

EGC: THWN-2

3

1

C

WITH VISIBLE KNIFE BLADES

SQUARE D LOCATED OUTSIDE

GND

C#8

#10EMT 3/4"

DU222RB OR EQUIVALENTUTILITY-LOCKABLE SAFETY SWITCH 60A, 240VAC

EGC: BARE Cu #6

BRANCH CIRCUITFROM PV ARRAY TO

JUNCTION BOX

SUNPOWER PROVIDED AC MODULES EXTENSIONCABLE, LISTED AS AN ASSEMBLY #12 2

A --

1EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THENEC AND ALL APPLICABLE REQUIREMENTS OF THE SERVINGELECTRIC UTILITY COMPANY AND OF THE LOCAL AUTHORITYHAVING JURISDICTION.

2BI-DIRECTIONAL UTILITY METER TO BE INSTALLED BY UTILITYCOMPANY.

3LABEL "PHOTOVOLTAIC SYSTEM UTILITY DISCONNECT SWITCH".SWITCH COVER TO BE LOCKED AT ALL TIMES. SWITCH TO BEVISUAL OPEN AND ACCESSIBLE PER UTILITY REQUIREMENTS ANDCONFORM TO NEC 705.22

4LABEL "PHOTOVOLTAIC ARRAY DC DISCONNECT SWITCH: PERNEC 690.14(C)(2). LABEL WITH OPERATING CURRENT,OPERATING VOLTAGE MAXIMUM SYSTEM VOLTAGE, AND SHORTCIRCUIT CURRENT PER NEC 690.53 SWITCH TO BE LOCKED PERNEC 690.70(D)

5LABEL" PHOTOVOLTAIC POWER SYSTEM DEDICATED KWHMETER".METER ENCLOSURE AND SOCKET PROVIDED ANDINSTALLED BY CUSTOMER PER APS ESRM.METER PROVIDED BYCUSTOMER.

6PROVIDE WARNING SIGN PER NED 690.17 READING"WARNING-ELECTRIC SHOCK HAZARD-DO NOT TOUCHTERMINALS-TERMINALS ON BOTH LINE AND LOAD SIDES MAY BEENERGIZED IN THE OFF POSITION.

7METALLIC CONDUIT SHALL BE USED WITHIN BUILDING PER NEC690.31(E)

8LABEL "DEDICATED PHOTOVOLTAIC SYSTEM COMBINER PANEL"AND " LOADS NOT TO BE ADDED TO THIS PANEL.

9GEC TO BE INSTALLED AS REQUIRED BY MANUFACTURERINSTRUCTIONS AND NED 690.47.

10GROUNDING BUSHINGS AT EVERY ENTRY AND EXIT POINT TOENCLOSURES WITH RMC

11A PLACARD OR DIRECTORY IS INSTALLED AT THE SERVICEENTRANCE WITH EXPLICIT DIRECTIONS TO THE LOCATION OFTHE PHOTOVOLTAIC SYSTEM UTILITY DISCONNECT SWITCH ASREQUIRED BY APS.

12A PERMANENT PLACARD OR DIRECTORY IS INSTALLED PER NEC705.10

13SUPPLY SIDE CONNECTION IS INSTALLED PER NEC 230 APS,ESRM AND APS INTERCONNECTION REQUIREMENTS, LABELPHOTOVOLTAIC SYSTEM SERVICE DISCONNECT SWITCH, SWITCHCOVER TO BE LOCKED AT ALL TIMES.

14SUPPLY SIDE CONNECTIONS IS INSTALLED IN ACCORDANCEWITH MANUFACTURERS INSTRUCTIONS. DOCUMENTATION ISINCLUDED WITH THE APS INTERCONNECTION APPLICATION.ENSURE UL LISTED CONNECTORS.

15LABEL WARNING - A GENERATION SOURCE IS CONNECTED TOTHE SUPPLY (UTILITY) SIDE OF THE SERVICE OF THE SERVICEDISCONNECTING MEANS. FOLLOW PROPER LOCKOUT/ TAGOUTPROCEDURES TO ENSURE THE PHOTOVOLTAIC SYSTEM UTILITYDISCONNECT SWITCH IS OPENED PRIOR TO PERFORMING WORKON THIS DEVICE.

16EQUIPMENT SHALL BE LISTED, TESTEDAND MARKED TOWITHSTAND THE AVAILABLE SHORT CIRCUITCURRENT

AC MODULES NOTES:1. DC CIRCUIT IS ISOLATED AND INSULATED FROM GROUND AND MEETS THE REQUIREMENT OF NEC 690.35.2. SUNPOWER PROVIDED CABLES COMES WITH TWO (2) #12 AWG WIRE AND THIS IS BY DESIGN. NEUTRAL AND

ADDITIONAL GROUND WIRE IS NOT REQUIRED FOR PROVIDED TRUNK AND EXTENSION CABLES.3. SUNPOWER AC MODULES HAVE BEEN TESTED AND CERTIFIED TO UL 2703 FOR INTEGRATED GROUNDING AND

HENCE A SEPARATE GROUND WIRE IS NOT REQUIRED WITHIN THE ARRAY.4. USE ROW-TO-ROW GROUNDING CLIP PROVIDED TO GROUND ROWS OF MODULE. BOND SUB-ARRAYS BY

RUNNING #6 AWG BARE CU WIRE AND GROUND LUGS AT A SINGLE POINT ON EACH SUB-ARRAY AND THEN TOTHE JUNCTION BOX. REFER TO PVE-4 FOR ADDITIONAL DETAILS.

NOTE:BELOW ARE OPTIONAL OFFERINGS AND SHALLONLY BE INSTALLED IF THE HOMEOWNER SIGNSA SPECIFIC CONTRACT WITH SUNPOWER:· SUNPOWER MONITORING SYSTEM

ELECTRICAL NOTES:1. PROPER LISTING EXPECTED FOR CONDITIONS OF USE ON ALL LUGS, FITTINGS, CRIMPS, ETC.2. ALL CONDUIT BEND RADII TO CONFORM TO THE NEC MINIMUM BEND RADII REQUIREMENTS.3. MINIMUM CLEARANCE SHALL BE MAINTAINED PER NEC FOR ALL NEW EQUIPMENT TO BE INSTALLED.4. EXISTING GROUNDING ELECTRODE SYSTEM MUST MEET NEC AND LOCAL UTILITY REQUIREMENTS.5. COPPER CONDUCTORS SHALL BE USED UNLESS SPECIFIED.6. TYPE NM (ROMEX) CONDUCTORS ARE ALLOWED FOR INTERNAL AND ATTIC RUNS AND SHALL BE INSTALLED MEETING NEC

REQUIREMENTS.7. IF MAIN SERVICE PANEL IS TO BE UPGRADED, IT WILL BE PERMITTED AND INSTALLED BY 3RD PARTY.8. AC WIRING SHALL UPSIZE IF VOLTAGE DROP EXCEEDS 2%.9. RUN CONDUCTORS IN EXISTING CONDUIT WHEN AVAILABLE PROVIDED IT HAS NO OTHER CONDUCTORS RUNNING THROUGH IT.10. EQUIVALENT SPECIFICATION ON CABLES AND ELECTRICAL EQUIPMENT SPECIFIED ARE ACCEPTABLE.11. AS DC POWER IS INTERNAL TO THE MODULE, GROUNDING ELECTRODE CONDUCTOR (GEC) FOR THE MODULE OR ARRAY IS NOT

REQUIRED.

CHECK BOX FOR WHETHER SYSTEM IS GROUNDED ORUNGROUNDED:

GROUNDED (INCLUDE GEC)UNGROUNDED

FOR UNGROUNDED SYSTEMS:· DC OCPD DISCONNECT BOTH CONDUCTORS OF EACH

SOURCE CIRCUIT.· UNGROUNDED CONDUCTORS MUST BE IDENTIFIED PER

210.5(C). WHITE FINISHED CONDUCTORS ARE NOTPERMITTED.

TAG

1

2

3

4

5

6

7

8

9

DC / DC CONVERTERS

SOURCE CIRCUIT JUNCTION BOX

SEPARATE DC DISCONNECT

INTERNAL INVERTER DC DISCONNECT

STRING INVERTER

SOLAR LOAD CENTER

PV PRODUCTION METER

SEPARATE AC DISCONNECT

DESCRIPTION

NO

NO

YES

1

SOLAR AC MODULE / BRANCH ACM

NO

NO 1

A

DC

AC

DC

AC

DC

AC

1SUNPOWER MODULES

AC MODULEEXTENSION CABLE

AC MODULEEXTENSION CABLE

AC MODULEEXTENSION CABLE

8 AC MODULESBRANCH CIRCUIT #3

8 AC MODULESBRANCH CIRCUIT #2

9 AC MODULESBRANCH CIRCUIT #1

SPR-X21-345-E-AC (240)

GROUNDING ELECTRODEGROUND ROD

H

INCOMING SOURCE FEED

, 120/240V, 1PH, 3W

TOP FED

MCB

*MSP MAX PV BREAKER (A) = x 120% -

=

LOCATION:

MANUF: (E) UTILITYBIDIRECTIONAL

METER #:

(E) MAIN SERVICE PANEL

TO HOUSELOADS

L1L2N

GN

D

PV BREAKER: TO BEINSTALLED ON THE OPPOSITE SIDE

OF THE MAIN OCPD OF THE BUSS

225A 200A70A

225A

200A, 2P

LEFT SIDE OF HOME

SQUARE D

GA5774

50A, 2P

B

THWN-2

EGC: THWN-2

6

1

JUNCTION BOX,NEMA-3R,

3

B 3/4"EMT#10

#10

CONDUCTOR / CONDUIT SCHEDULE

DESCRIPTION &CONDUCTOR TYPE

CONDUCTOR SIZE(AWG) CONDUIT/CABLE TYPETAG CONDUIT SIZENUMBER OF

CONDUCTORS

L1L2N

GN

D

7

YES

MIN., 120/240 V,LOCATION:

MLO

20A, 2P

20A, 2P

20A, 2P

NEAR MSP100 A(N) SOLAR LOAD CENTER

MICROINVERTER MODEL:IQ7XS-96-ACM-US (240)

YES

M

8*MILBANK 100A, 1Ø, 3W,

U5929-XL-INS, 4-JAW, FORM 2S

SUNPOWERMONITORING

PVS6

ETHERNETCONNECTION TO

DSL/CABLE MODEM

CAT5e

(3) #14 THWN(1) #14 THWN EGC

15A, 2P

PV UTILITY DISCONNECT SWITCH

DRAWN BY

DATE DRAWN

DATE CHECKED

SCALE

CHECKED BY

FIGURE A: THREE LINE DIAGRAM -

ELEC

TRIC

AL

THREE

-LIN

E D

IAG

RAM

& S

PECIF

ICATI

ON

S

06-03-2020

EVALDEZ

06-03-2020

8.63 kW

SHEET

PVE-1

NTS

1 4

1 4

H

A R

B O

U R

W

A Y

S O

U T

H

R I

C H

M O

N D

,

C A

9 4

8 0

4

( 5

1 0

) 5

4 0

- 0

5 5

0

C O

R P

O R

A T

I O

N ,

S Y

S T

E M

S

R E V I S I O N S

SO

LAR I

ND

IVID

UAL

PERM

IT P

ACKAG

E

GRID

-TIE

D P

HO

TOVO

LTAIC

SYS

TEM

REV DESCRIPTION DATE DB CB

PROJECT

OPPORTUNITY

JEFF

OLA

ND

ER /

TH

ERES

A O

LAN

DER

4160

STA

GE

STO

P W

AY

LOT

620

WIC

KEN

BU

RG

, ARIZ

ON

A 8

5390

RP-113183

8.63

kW

SPRI - PHOENIX

7.88

kW

MAX.

OU

TPU

T PO

WER

RATI

NG

TYLER BOSHARD

C A

L

I C

E N

S E

#

8 9

0 8

9 5

Page 5: CODE INFORMATION SOLAR INDIVIDUAL PERMIT …...2020/05/10  · UTILITY: ARIZONA PUBLIC SERVICE CO AC MAX. CONTINUOUS POWER RATING OF (25) SPR-X21-345-E-AC = 25 x 315W = 7.88 kW PV

ELECTRICAL CALCULATIONS

BRANCH 2 BRANCH 3BRANCH 1

NUMBER OF MODULES

VOLTAGE

RATED AC OUTPUT CURRENT: IOUT =

MINIMUM WIRE AMPACITY: IMAX = IOUT x 1.25

CONDUCTOR DE-RATING

MAXIMUM AMBIENT TEMPERATURE

TEMPERATURE ADDER

TEMPERATURE USED FOR AMPACITY DE-RATING

TEMPERATURE DE-RATING COEFFICIENT

FILL DE-RATING COEFFICIENT

IWIREMIN = IMAX / TEMP_COEFF / FILL_COEFFWIRE SIZE AMPACITY

CONDUCTOR SIZE

CONDUCTOR SIZE ADJUSTED FOR VOLTAGE DROP

OVERCURRENT PROTECTION

MINIMUM OCPD = IOUT x 1.25

CALCULATED VOLTAGE DROP

ONE WAY CIRCUIT LENGTH

SUBPANEL TO GRID-TIE WIRING

VOLTAGE

SUM OF BRANCHES: IOUT_TOTAL =

MINIMUM WIRE AMPACITY: IMAX = IOUT x 1.25

CONDUCTOR DE-RATING

MAXIMUM AMBIENT TEMPERATURE

TEMPERATURE USED FOR AMPACITY DE-RATING

TEMPERATURE DE-RATING COEFFICIENT

FILL DE-RATING COEFFICIENT

IWIREMIN = IMAX / TEMP_COEFF / FILL_COEFF

WIRE SIZE AMPACITY

CONDUCTOR SIZE

CONDUCTOR SIZE ADJUSTED FOR VOLTAGE DROP

OVERCURRENT PROTECTION

MINIMUM OCPD = IOUT x 1.25

VOLTAGE DROP

ONE WAY CIRCUIT LENGTH

ROOF JCT BOX TO SUBPANEL WIRING #10

8

240 V

10.48 A

13.10 A

46°C

22°C

68°C

0.58

0.8028.23 A

40 A

#10

#10

1.68%

20A, 2P

13.10 A

#10

9

240 V

11.79 A

14.74 A

46°C

22°C

68°C

0.58

0.80

31.76 A40 A

#10

#10

1.93%

20A, 2P

14.74 A

#10

8

240 V

10.48 A

13.10 A

46°C

22°C

68°C

0.58

0.8028.23 A

40 A

#10

#10

1.79%

20A, 2P

13.10 A

85 FT.85 FT. 85 FT.

40.94 A

50A, 2P

1.04%

#8

#8

55A

49.92 A

1

0.82

46°C

46°C

#8

10 FT.

40.94 A

32.75 A

240 V

SHEET

ELEC

TRIC

AL

CALC

ULA

TIO

N

PVE-2

DRAWN BY

DATE DRAWN

DATE CHECKED

SCALE

CHECKED BY

06-03-2020

EVALDEZ

06-03-2020

NTS

1 4

1 4

H

A R

B O

U R

W

A Y

S O

U T

H

R I

C H

M O

N D

,

C A

9 4

8 0

4

( 5

1 0

) 5

4 0

- 0

5 5

0

C O

R P

O R

A T

I O

N ,

S Y

S T

E M

S

R E V I S I O N S

SO

LAR I

ND

IVID

UAL

PERM

IT P

ACKAG

E

GRID

-TIE

D P

HO

TOVO

LTAIC

SYS

TEM

REV DESCRIPTION DATE DB CB

PROJECT

OPPORTUNITY

JEFF

OLA

ND

ER /

TH

ERES

A O

LAN

DER

4160

STA

GE

STO

P W

AY

LOT

620

WIC

KEN

BU

RG

, ARIZ

ON

A 8

5390

RP-113183

8.63

kW

SPRI - PHOENIX

7.88

kW

MAX.

OU

TPU

T PO

WER

RATI

NG

TYLER BOSHARD

C A

L

I C

E N

S E

#

8 9

0 8

9 5

Page 6: CODE INFORMATION SOLAR INDIVIDUAL PERMIT …...2020/05/10  · UTILITY: ARIZONA PUBLIC SERVICE CO AC MAX. CONTINUOUS POWER RATING OF (25) SPR-X21-345-E-AC = 25 x 315W = 7.88 kW PV

PHOTOVOLTAIC SYSTEMAC DISCONNECT

RATED AC OUTPUT CURRENT:

NOMINAL OPERATING AC VOLTAGE:

SIGNAGE LOCATIONS:

· INDOOR / OUTDOOR AC DISCONNECT

AMPS

VOLTS

·

RAPID SHUTDOWN SWITCH FORSOLAR PV SYSTEM

SOLAR PV SYSTEM EQUIPPEDWITH RAPID SHUTDOWN

TURN RAPID SHUTDOWNSWITCH TO THE "OFF"

POSITION TO SHUT DOWNAND REDUCE SHOCK

HAZARD IN THE ARRAY

SOLAR ELECTRICPV PANELS

SIGNAGE LOCATIONS:

· SHALL BE LOCATED ON OR NO MORE THAN 1 M (3 FT)FROM THE SERVICE DISCONNECTING MEANS TO WHICHTHE PV SYSTEMS ARE CONNECTED.

32.75 A

240 V

1. MATERIAL USED FOR THE SIGNAGE SHALL BE REFLECTIVE,WEATHER RESISTANT AND SUITABLE FOR THEENVIRONMENT.

2. ALL SIGNAGE SHALL HAVE ALL CAPITAL LETTERS WITHMINIMUM 38" LETTER HEIGHT.

3. MAIN SERVICE DISCONNECT MARKING SHALL BE PLACEDADJACENT TO MAIN SERVICE DISCONNECT IN A LOCATIONCLEARLY VISIBLE FROM THE LOCATION WHERE THE LEVER ISOPERATED.

4. MARKING IS REQUIRED ON ALL INTERIOR AND EXTERIOR DCCONDUIT, RACEWAYS, ENCLOSURES, CABLE ASSEMBLIES,AND JUNCTION BOXES TO ALERT THE FIRE SERVICE TOAVOID CUTTING THEM. MARKINGS SHALL BE PLACED EVERY10', AT TURNS AND ABOVE AND/OR BELOW PENETRATIONS,AND AT ALL DC COMBINER AND JUNCTION BOXES.

5. DO NOT USE SCREWS FOR SIGNAGE ATTACHMENT. USEONLY APPROVED ADHESIVE.

SIGNAGE NOTES

ELECTRICAL DATA & SPECIFICATIONS

PHOTOVOLTAIC SYSTEM EQUIPPEDWITH RAPID SHUTDOWN

AMPS

VOLTS

PHOTOVOLTAIC POINT OFINTERCONNECTION

WARNING: DUAL POWER SOURCE.SECOND SOURCE IS PHOTOVOLTAIC

SYSTEM

SIGNAGE LOCATIONS:

· MAIN SERVICE PANEL· INDOOR / OUTDOOR SUBPANEL

MAXIMUM RATED AC OUTPUT CURRENT:

MAXIMUM OPERATING AC VOLTAGE:

SIGNAGE LOCATIONS:

· MAIN SERVICE PANEL

PV SOLAR BREAKERDO NOT RELOCATE THISOVERCURRENT DEVICE

SIGNAGE LOCATIONS:

· MAIN SERVICE PANEL· NEW INDOOR / OUTDOOR LOAD CENTER· INDOOR / OUTDOOR SUBPANEL

32.75 A

240 V

SHEET

ELEC

TRIC

AL

DATA

& S

PECIF

ICATI

ON

S

PVE-3

DRAWN BY

DATE DRAWN

DATE CHECKED

SCALE

CHECKED BY

06-03-2020

EVALDEZ

06-03-2020

NTS

1 4

1 4

H

A R

B O

U R

W

A Y

S O

U T

H

R I

C H

M O

N D

,

C A

9 4

8 0

4

( 5

1 0

) 5

4 0

- 0

5 5

0

C O

R P

O R

A T

I O

N ,

S Y

S T

E M

S

R E V I S I O N S

SO

LAR I

ND

IVID

UAL

PERM

IT P

ACKAG

E

GRID

-TIE

D P

HO

TOVO

LTAIC

SYS

TEM

REV DESCRIPTION DATE DB CB

PROJECT

OPPORTUNITY

JEFF

OLA

ND

ER /

TH

ERES

A O

LAN

DER

4160

STA

GE

STO

P W

AY

LOT

620

WIC

KEN

BU

RG

, ARIZ

ON

A 8

5390

RP-113183

8.63

kW

SPRI - PHOENIX

7.88

kW

MAX.

OU

TPU

T PO

WER

RATI

NG

TYLER BOSHARD

C A

L

I C

E N

S E

#

8 9

0 8

9 5

Page 7: CODE INFORMATION SOLAR INDIVIDUAL PERMIT …...2020/05/10  · UTILITY: ARIZONA PUBLIC SERVICE CO AC MAX. CONTINUOUS POWER RATING OF (25) SPR-X21-345-E-AC = 25 x 315W = 7.88 kW PV

ACD

PVM

N-LC

FIGURE 1: SUNPOWER EQUINOX GROUNDING DETAILS

FILE: RP-113183-IP-PLSOLAR-PVE-4.dwg, USER: erwvaldez, DATE/TIME: Jun 05, 2020 - 9:48am

SHEET

PVE-4

DRAWN BY

DATE DRAWN

DATE CHECKED

SCALE

CHECKED BY

06-03-2020

EVALDEZ

06-03-2020

NTS

POWER TO THIS BUILDING IS ALSOSUPPLIED FROM THE FOLLOWINGSOURCES WITH DISCONNECT(S)

LOCATED AS SHOWN:

CAUTION:

ACDISCONNECT

PHOTOVOLTAICARRAY ON ROOF

SERVICE POINT &UTILITY METERING

SOLAR LOADCENTER

PV METER

FIGURE 2: PLACARD IDENTIFYING LOCATION OF DISCONNECTS AND POWER SOURCES

PLACARD SIGNAGE / SUNPOWER EQUINOX GROUNDING DETAILS

PLACARD

/ S

UN

POW

ER E

QU

INO

XG

RO

UN

DIN

G D

ETAIL

S

4160 STAGE STOP WAY

1 4

1 4

H

A R

B O

U R

W

A Y

S O

U T

H

R I

C H

M O

N D

,

C A

9 4

8 0

4

( 5

1 0

) 5

4 0

- 0

5 5

0

C O

R P

O R

A T

I O

N ,

S Y

S T

E M

S

R E V I S I O N S

SO

LAR I

ND

IVID

UAL

PERM

IT P

ACKAG

E

GRID

-TIE

D P

HO

TOVO

LTAIC

SYS

TEM

REV DESCRIPTION DATE DB CB

PROJECT

OPPORTUNITY

JEFF

OLA

ND

ER /

TH

ERES

A O

LAN

DER

4160

STA

GE

STO

P W

AY

LOT

620

WIC

KEN

BU

RG

, ARIZ

ON

A 8

5390

RP-113183

8.63

kW

SPRI - PHOENIX

7.88

kW

MAX.

OU

TPU

T PO

WER

RATI

NG

TYLER BOSHARD

C A

L

I C

E N

S E

#

8 9

0 8

9 5

Page 8: CODE INFORMATION SOLAR INDIVIDUAL PERMIT …...2020/05/10  · UTILITY: ARIZONA PUBLIC SERVICE CO AC MAX. CONTINUOUS POWER RATING OF (25) SPR-X21-345-E-AC = 25 x 315W = 7.88 kW PV

ROOF ONE: 21 MODULES

5.5:12ROOF TWO: 4 MODULES

3:12

ACD

PVM

N-LC

SHEET

BRAN

CH

DIA

GRAM

PVE-5

DRAWN BY

DATE DRAWN

DATE CHECKED

SCALE

CHECKED BY

06-03-2020

EVALDEZ

06-03-2020

3/32" = 1'-0"

INSTALLER NAME:

_____________________BRANCH VOLTAGES:

1.2.3.4.5.6.

1 4

1 4

H

A R

B O

U R

W

A Y

S O

U T

H

R I

C H

M O

N D

,

C A

9 4

8 0

4

( 5

1 0

) 5

4 0

- 0

5 5

0

C O

R P

O R

A T

I O

N ,

S Y

S T

E M

S

R E V I S I O N S

SO

LAR I

ND

IVID

UAL

PERM

IT P

ACKAG

E

GRID

-TIE

D P

HO

TOVO

LTAIC

SYS

TEM

REV DESCRIPTION DATE DB CB

PROJECT

OPPORTUNITY

JEFF

OLA

ND

ER /

TH

ERES

A O

LAN

DER

4160

STA

GE

STO

P W

AY

LOT

620

WIC

KEN

BU

RG

, ARIZ

ON

A 8

5390

RP-113183

8.63

kW

SPRI - PHOENIX

7.88

kW

MAX.

OU

TPU

T PO

WER

RATI

NG

TYLER BOSHARD

C A

L

I C

E N

S E

#

8 9

0 8

9 5

LEGEND & SYMBOLS:

TERMINATOR

GROUND LUG ASSEMBLY

FEMALE CONNECTOR

R2R GROUNDING CLIP

SEALING CAP

MALE CONNECTOR

JUNCTION BOX

RAW TRUNK CABLE

2.0 m. TRUNK CABLE

1.3 m. TRUNK CABLE

2.3 m. TRUNK CABLE

ONE CONNECTORPER MODULE

EXISTING RAFTER

ROOF ATTACHMENT

RAIL

1 2ROOF

SYSTEMORIENTATION

ROOF PITCH

MODULE QTY.

3:12

222

4

5.5:12

222

21

N

Page 9: CODE INFORMATION SOLAR INDIVIDUAL PERMIT …...2020/05/10  · UTILITY: ARIZONA PUBLIC SERVICE CO AC MAX. CONTINUOUS POWER RATING OF (25) SPR-X21-345-E-AC = 25 x 315W = 7.88 kW PV

PV MODULE SPECIFICATION SHEET AC MODULE COMPLIANCE LETTER SHEET

DRAWN BY

DATE DRAWN

DATE CHECKED

SCALE

CHECKED BY

1 4

1 4

H

A R

B O

U R

W

A Y

S O

U T

H

R I

C H

M O

N D

,

C A

9 4

8 0

4

( 5

1 0

) 5

4 0

- 0

5 5

0

C O

R P

O R

A T

I O

N ,

S Y

S T

E M

S

THIS

DO

CU

MEN

T CO

NTA

INS P

RO

PRIE

TARY

INFO

RM

ATI

ON

. REP

RO

DU

CTI

ON

,D

ISCLO

SU

RE,

OR U

SE

WIT

HO

UT

SPE

CIF

IC W

RIT

TEN

AU

THO

RIZ

ATI

ON

OF

SU

NPO

WER

CO

RPO

RATI

ON

IS S

TRIC

TLY

FORBID

DEN

.

R E V I S I O N SREV DESCRIPTION DATE DB CB

C A

L

I C

E N

S E

#

8 9

0 8

9 5

PROJECT

OPPORTUNITY

Page 10: CODE INFORMATION SOLAR INDIVIDUAL PERMIT …...2020/05/10  · UTILITY: ARIZONA PUBLIC SERVICE CO AC MAX. CONTINUOUS POWER RATING OF (25) SPR-X21-345-E-AC = 25 x 315W = 7.88 kW PV

FIGURE 1: MODULE INSTALLATION MANUAL PAGE 1 FIGURE 2: MODULE INSTALLATION MANUAL PAGE 2SHEET

DRAWN BY

DATE DRAWN

DATE CHECKED

SCALE

CHECKED BY

1 4

1 4

H

A R

B O

U R

W

A Y

S O

U T

H

R I

C H

M O

N D

,

C A

9 4

8 0

4

( 5

1 0

) 5

4 0

- 0

5 5

0

C O

R P

O R

A T

I O

N ,

S Y

S T

E M

S

THIS

DO

CU

MEN

T CO

NTA

INS P

RO

PRIE

TARY

INFO

RM

ATI

ON

. REP

RO

DU

CTI

ON

,D

ISCLO

SU

RE,

OR U

SE

WIT

HO

UT

SPE

CIF

IC W

RIT

TEN

AU

THO

RIZ

ATI

ON

OF

SU

NPO

WER

CO

RPO

RATI

ON

IS S

TRIC

TLY

FORBID

DEN

.

R E V I S I O N SREV DESCRIPTION DATE DB CB

C A

L

I C

E N

S E

#

8 9

0 8

9 5

PROJECT

OPPORTUNITY

Page 11: CODE INFORMATION SOLAR INDIVIDUAL PERMIT …...2020/05/10  · UTILITY: ARIZONA PUBLIC SERVICE CO AC MAX. CONTINUOUS POWER RATING OF (25) SPR-X21-345-E-AC = 25 x 315W = 7.88 kW PV

FIGURE 1: MODULE INSTALLATION MANUAL PAGE 3 FIGURE 2: MODULE INSTALLATION MANUAL PAGE 4SHEET

DRAWN BY

DATE DRAWN

DATE CHECKED

SCALE

CHECKED BY

1 4

1 4

H

A R

B O

U R

W

A Y

S O

U T

H

R I

C H

M O

N D

,

C A

9 4

8 0

4

( 5

1 0

) 5

4 0

- 0

5 5

0

C O

R P

O R

A T

I O

N ,

S Y

S T

E M

S

THIS

DO

CU

MEN

T CO

NTA

INS P

RO

PRIE

TARY

INFO

RM

ATI

ON

. REP

RO

DU

CTI

ON

,D

ISCLO

SU

RE,

OR U

SE

WIT

HO

UT

SPE

CIF

IC W

RIT

TEN

AU

THO

RIZ

ATI

ON

OF

SU

NPO

WER

CO

RPO

RATI

ON

IS S

TRIC

TLY

FORBID

DEN

.

R E V I S I O N SREV DESCRIPTION DATE DB CB

C A

L

I C

E N

S E

#

8 9

0 8

9 5

PROJECT

OPPORTUNITY

Page 12: CODE INFORMATION SOLAR INDIVIDUAL PERMIT …...2020/05/10  · UTILITY: ARIZONA PUBLIC SERVICE CO AC MAX. CONTINUOUS POWER RATING OF (25) SPR-X21-345-E-AC = 25 x 315W = 7.88 kW PV

FIGURE 1: MODULE INSTALLATION MANUAL PAGE 5 FIGURE 2: MODULE INSTALLATION MANUAL PAGE 6SHEET

DRAWN BY

DATE DRAWN

DATE CHECKED

SCALE

CHECKED BY

1 4

1 4

H

A R

B O

U R

W

A Y

S O

U T

H

R I

C H

M O

N D

,

C A

9 4

8 0

4

( 5

1 0

) 5

4 0

- 0

5 5

0

C O

R P

O R

A T

I O

N ,

S Y

S T

E M

S

THIS

DO

CU

MEN

T CO

NTA

INS P

RO

PRIE

TARY

INFO

RM

ATI

ON

. REP

RO

DU

CTI

ON

,D

ISCLO

SU

RE,

OR U

SE

WIT

HO

UT

SPE

CIF

IC W

RIT

TEN

AU

THO

RIZ

ATI

ON

OF

SU

NPO

WER

CO

RPO

RATI

ON

IS S

TRIC

TLY

FORBID

DEN

.

R E V I S I O N SREV DESCRIPTION DATE DB CB

C A

L

I C

E N

S E

#

8 9

0 8

9 5

PROJECT

OPPORTUNITY

Page 13: CODE INFORMATION SOLAR INDIVIDUAL PERMIT …...2020/05/10  · UTILITY: ARIZONA PUBLIC SERVICE CO AC MAX. CONTINUOUS POWER RATING OF (25) SPR-X21-345-E-AC = 25 x 315W = 7.88 kW PV

FIGURE 1: MODULE INSTALLATION MANUAL PAGE 7SHEET

DRAWN BY

DATE DRAWN

DATE CHECKED

SCALE

CHECKED BY

1 4

1 4

H

A R

B O

U R

W

A Y

S O

U T

H

R I

C H

M O

N D

,

C A

9 4

8 0

4

( 5

1 0

) 5

4 0

- 0

5 5

0

C O

R P

O R

A T

I O

N ,

S Y

S T

E M

S

THIS

DO

CU

MEN

T CO

NTA

INS P

RO

PRIE

TARY

INFO

RM

ATI

ON

. REP

RO

DU

CTI

ON

,D

ISCLO

SU

RE,

OR U

SE

WIT

HO

UT

SPE

CIF

IC W

RIT

TEN

AU

THO

RIZ

ATI

ON

OF

SU

NPO

WER

CO

RPO

RATI

ON

IS S

TRIC

TLY

FORBID

DEN

.

R E V I S I O N SREV DESCRIPTION DATE DB CB

C A

L

I C

E N

S E

#

8 9

0 8

9 5

PROJECT

OPPORTUNITY

Page 14: CODE INFORMATION SOLAR INDIVIDUAL PERMIT …...2020/05/10  · UTILITY: ARIZONA PUBLIC SERVICE CO AC MAX. CONTINUOUS POWER RATING OF (25) SPR-X21-345-E-AC = 25 x 315W = 7.88 kW PV

FIGURE 1: INVISIMOUNT DATA SHEET FIGURE 2: CERTIFICATE OF COMPLIANCESHEET

DRAWN BY

DATE DRAWN

DATE CHECKED

SCALE

CHECKED BY

1 4

1 4

H

A R

B O

U R

W

A Y

S O

U T

H

R I

C H

M O

N D

,

C A

9 4

8 0

4

( 5

1 0

) 5

4 0

- 0

5 5

0

C O

R P

O R

A T

I O

N ,

S Y

S T

E M

S

THIS

DO

CU

MEN

T CO

NTA

INS P

RO

PRIE

TARY

INFO

RM

ATI

ON

. REP

RO

DU

CTI

ON

,D

ISCLO

SU

RE,

OR U

SE

WIT

HO

UT

SPE

CIF

IC W

RIT

TEN

AU

THO

RIZ

ATI

ON

OF

SU

NPO

WER

CO

RPO

RATI

ON

IS S

TRIC

TLY

FORBID

DEN

.

R E V I S I O N SREV DESCRIPTION DATE DB CB

C A

L

I C

E N

S E

#

8 9

0 8

9 5

PROJECT

OPPORTUNITY

Page 15: CODE INFORMATION SOLAR INDIVIDUAL PERMIT …...2020/05/10  · UTILITY: ARIZONA PUBLIC SERVICE CO AC MAX. CONTINUOUS POWER RATING OF (25) SPR-X21-345-E-AC = 25 x 315W = 7.88 kW PV

UL CERTIFICATION - MOUNTING SYSTEMS,DEVICES, CLAMPING DEVICES & GROUND LUGS FOR PV UL CERTIFICATION - MOUNTING SYSTEMS,DEVICES, CLAMPING DEVICES & GROUND LUGS FOR PVSHEET

DRAWN BY

DATE DRAWN

DATE CHECKED

SCALE

CHECKED BY

1 4

1 4

H

A R

B O

U R

W

A Y

S O

U T

H

R I

C H

M O

N D

,

C A

9 4

8 0

4

( 5

1 0

) 5

4 0

- 0

5 5

0

C O

R P

O R

A T

I O

N ,

S Y

S T

E M

S

THIS

DO

CU

MEN

T CO

NTA

INS P

RO

PRIE

TARY

INFO

RM

ATI

ON

. REP

RO

DU

CTI

ON

,D

ISCLO

SU

RE,

OR U

SE

WIT

HO

UT

SPE

CIF

IC W

RIT

TEN

AU

THO

RIZ

ATI

ON

OF

SU

NPO

WER

CO

RPO

RATI

ON

IS S

TRIC

TLY

FORBID

DEN

.

R E V I S I O N SREV DESCRIPTION DATE DB CB

C A

L

I C

E N

S E

#

8 9

0 8

9 5

PROJECT

OPPORTUNITY

Page 16: CODE INFORMATION SOLAR INDIVIDUAL PERMIT …...2020/05/10  · UTILITY: ARIZONA PUBLIC SERVICE CO AC MAX. CONTINUOUS POWER RATING OF (25) SPR-X21-345-E-AC = 25 x 315W = 7.88 kW PV

UL CERTIFICATION - MOUNTING SYSTEMS,DEVICES, CLAMPING DEVICES & GROUND LUGS FOR PVSHEET

DRAWN BY

DATE DRAWN

DATE CHECKED

SCALE

CHECKED BY

1 4

1 4

H

A R

B O

U R

W

A Y

S O

U T

H

R I

C H

M O

N D

,

C A

9 4

8 0

4

( 5

1 0

) 5

4 0

- 0

5 5

0

C O

R P

O R

A T

I O

N ,

S Y

S T

E M

S

THIS

DO

CU

MEN

T CO

NTA

INS P

RO

PRIE

TARY

INFO

RM

ATI

ON

. REP

RO

DU

CTI

ON

,D

ISCLO

SU

RE,

OR U

SE

WIT

HO

UT

SPE

CIF

IC W

RIT

TEN

AU

THO

RIZ

ATI

ON

OF

SU

NPO

WER

CO

RPO

RATI

ON

IS S

TRIC

TLY

FORBID

DEN

.

R E V I S I O N SREV DESCRIPTION DATE DB CB

C A

L

I C

E N

S E

#

8 9

0 8

9 5

PROJECT

OPPORTUNITY

Page 17: CODE INFORMATION SOLAR INDIVIDUAL PERMIT …...2020/05/10  · UTILITY: ARIZONA PUBLIC SERVICE CO AC MAX. CONTINUOUS POWER RATING OF (25) SPR-X21-345-E-AC = 25 x 315W = 7.88 kW PV

FIGURE 1: PEGASUS SOLAR MOUNTING DATA SHEET FIGURE 2: PEGASUS SOLAR MOUNTING DATA SHEET

FILE: Pegasus Solar_SPEC SHEETS.dwg, USER: reude, DATE/TIME: Mar 20, 2017 - 7:43pm

SHEET

REV DESCRIPTION DATE DB CB

R E V I S I O N S

1 4

1 4

H

A R

B O

U R

W

A Y

S O

U T

H

R I

C H

M O

N D

,

C A

9 4

8 0

4

( 5

1 0

) 5

4 0

- 0

5 5

0

C O

R P

O R

A T

I O

N ,

S Y

S T

E M

S

THIS

DO

CU

MEN

T CO

NTA

INS P

RO

PRIE

TARY

INFO

RM

ATI

ON

. REP

RO

DU

CTI

ON

,D

ISCLO

SU

RE,

OR U

SE

WIT

HO

UT

SPE

CIF

IC W

RIT

TEN

AU

THO

RIZ

ATI

ON

OF

SU

NPO

WER

CO

RPO

RATI

ON

IS S

TRIC

TLY

FORBID

DEN

.

SCALE

DRAWN BY

PROJECT

DATE DRAWN

OPPORTUNITY

CHECKED BY

DATE CHECKED

NTS

C A

L

I C

E N

S E

#

8 9

0 8

9 5

Page 18: CODE INFORMATION SOLAR INDIVIDUAL PERMIT …...2020/05/10  · UTILITY: ARIZONA PUBLIC SERVICE CO AC MAX. CONTINUOUS POWER RATING OF (25) SPR-X21-345-E-AC = 25 x 315W = 7.88 kW PV

FIGURE 1: PEGASUS SOLAR CERTIFICATION LETTER FIGURE 2: PEGASUS SOLAR CERTIFICATION LETTER

FILE: SPD_PS_SPEC SHEETS.dwg, USER: reude, DATE/TIME: Mar 20, 2017 - 7:30pm

SHEET

REV DESCRIPTION DATE DB CB

R E V I S I O N S

1 4

1 4

H

A R

B O

U R

W

A Y

S O

U T

H

R I

C H

M O

N D

,

C A

9 4

8 0

4

( 5

1 0

) 5

4 0

- 0

5 5

0

C O

R P

O R

A T

I O

N ,

S Y

S T

E M

S

THIS

DO

CU

MEN

T CO

NTA

INS P

RO

PRIE

TARY

INFO

RM

ATI

ON

. REP

RO

DU

CTI

ON

,D

ISCLO

SU

RE,

OR U

SE

WIT

HO

UT

SPE

CIF

IC W

RIT

TEN

AU

THO

RIZ

ATI

ON

OF

SU

NPO

WER

CO

RPO

RATI

ON

IS S

TRIC

TLY

FORBID

DEN

.

SCALE

DRAWN BY

PROJECT

DATE DRAWN

OPPORTUNITY

CHECKED BY

DATE CHECKED

C A

L

I C

E N

S E

#

8 9

0 8

9 5

NTS

Page 19: CODE INFORMATION SOLAR INDIVIDUAL PERMIT …...2020/05/10  · UTILITY: ARIZONA PUBLIC SERVICE CO AC MAX. CONTINUOUS POWER RATING OF (25) SPR-X21-345-E-AC = 25 x 315W = 7.88 kW PV

FIGURE 1: PEGASUS SOLAR CERTIFICATION LETTER FIGURE 2: PEGASUS SOLAR TEST VERIFICATION OF CONFORMITY

FILE: Pegasus Solar_SPEC SHEETS.dwg, USER: reude, DATE/TIME: Mar 20, 2017 - 7:44pm

SHEET

REV DESCRIPTION DATE DB CB

R E V I S I O N S

1 4

1 4

H

A R

B O

U R

W

A Y

S O

U T

H

R I

C H

M O

N D

,

C A

9 4

8 0

4

( 5

1 0

) 5

4 0

- 0

5 5

0

C O

R P

O R

A T

I O

N ,

S Y

S T

E M

S

THIS

DO

CU

MEN

T CO

NTA

INS P

RO

PRIE

TARY

INFO

RM

ATI

ON

. REP

RO

DU

CTI

ON

,D

ISCLO

SU

RE,

OR U

SE

WIT

HO

UT

SPE

CIF

IC W

RIT

TEN

AU

THO

RIZ

ATI

ON

OF

SU

NPO

WER

CO

RPO

RATI

ON

IS S

TRIC

TLY

FORBID

DEN

.

SCALE

DRAWN BY

PROJECT

DATE DRAWN

OPPORTUNITY

CHECKED BY

DATE CHECKED

C A

L

I C

E N

S E

#

8 9

0 8

9 5

NTS

Page 20: CODE INFORMATION SOLAR INDIVIDUAL PERMIT …...2020/05/10  · UTILITY: ARIZONA PUBLIC SERVICE CO AC MAX. CONTINUOUS POWER RATING OF (25) SPR-X21-345-E-AC = 25 x 315W = 7.88 kW PV

FIGURE 1: PVS6 SPECIFICATION SHEET FIGURE 1: PVS6 SPECIFICATION SHEETSHEET

DRAWN BY

DATE DRAWN

DATE CHECKED

SCALE

CHECKED BY

1 4

1 4

H

A R

B O

U R

W

A Y

S O

U T

H

R I

C H

M O

N D

,

C A

9 4

8 0

4

( 5

1 0

) 5

4 0

- 0

5 5

0

C O

R P

O R

A T

I O

N ,

S Y

S T

E M

S

THIS

DO

CU

MEN

T CO

NTA

INS P

RO

PRIE

TARY

INFO

RM

ATI

ON

. REP

RO

DU

CTI

ON

,D

ISCLO

SU

RE,

OR U

SE

WIT

HO

UT

SPE

CIF

IC W

RIT

TEN

AU

THO

RIZ

ATI

ON

OF

SU

NPO

WER

CO

RPO

RATI

ON

IS S

TRIC

TLY

FORBID

DEN

.

R E V I S I O N SREV DESCRIPTION DATE DB CB

C A

L

I C

E N

S E

#

8 9

0 8

9 5

PROJECT

OPPORTUNITY

Page 21: CODE INFORMATION SOLAR INDIVIDUAL PERMIT …...2020/05/10  · UTILITY: ARIZONA PUBLIC SERVICE CO AC MAX. CONTINUOUS POWER RATING OF (25) SPR-X21-345-E-AC = 25 x 315W = 7.88 kW PV

FIGURE 1: SUNPOWER EQUINOX GROUND PATH & COMPLIANCE FIGURE 2: CURRENT TRANSFORMER SPECIFICATION SHEETSHEET

DRAWN BY

DATE DRAWN

DATE CHECKED

SCALE

CHECKED BY

1 4

1 4

H

A R

B O

U R

W

A Y

S O

U T

H

R I

C H

M O

N D

,

C A

9 4

8 0

4

( 5

1 0

) 5

4 0

- 0

5 5

0

C O

R P

O R

A T

I O

N ,

S Y

S T

E M

S

THIS

DO

CU

MEN

T CO

NTA

INS P

RO

PRIE

TARY

INFO

RM

ATI

ON

. REP

RO

DU

CTI

ON

,D

ISCLO

SU

RE,

OR U

SE

WIT

HO

UT

SPE

CIF

IC W

RIT

TEN

AU

THO

RIZ

ATI

ON

OF

SU

NPO

WER

CO

RPO

RATI

ON

IS S

TRIC

TLY

FORBID

DEN

.

R E V I S I O N SREV DESCRIPTION DATE DB CB

C A

L

I C

E N

S E

#

8 9

0 8

9 5

PROJECT

OPPORTUNITY

Page 22: CODE INFORMATION SOLAR INDIVIDUAL PERMIT …...2020/05/10  · UTILITY: ARIZONA PUBLIC SERVICE CO AC MAX. CONTINUOUS POWER RATING OF (25) SPR-X21-345-E-AC = 25 x 315W = 7.88 kW PV

FILE: SQUARE D SPEC SHEETS.dwg, USER: jbernales, DATE/TIME: Jul 05, 2018 - 11:32am

SHEET

REV DESCRIPTION DATE DB CB

R E V I S I O N S

1 4

1 4

H

A R

B O

U R

W

A Y

S O

U T

H

R I

C H

M O

N D

,

C A

9 4

8 0

4

( 5

1 0

) 5

4 0

- 0

5 5

0

C O

R P

O R

A T

I O

N ,

S Y

S T

E M

S

THIS

DO

CU

MEN

T CO

NTA

INS P

RO

PRIE

TARY

INFO

RM

ATI

ON

. REP

RO

DU

CTI

ON

,D

ISCLO

SU

RE,

OR U

SE

WIT

HO

UT

SPE

CIF

IC W

RIT

TEN

AU

THO

RIZ

ATI

ON

OF

SU

NPO

WER

CO

RPO

RATI

ON

IS S

TRIC

TLY

FORBID

DEN

.

SCALE

DRAWN BY

PROJECT

DATE DRAWN

OPPORTUNITY

CHECKED BY

DATE CHECKED

C A

L

I C

E N

S E

#

8 9

0 8

9 5

NTS