Top Banner

of 25

Coal and Gas TARGET 2050

Mar 10, 2016

Download

Documents

SAMRIN

POWER SECTOR SENARIO VISION 2050
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript

Slide 1

Generation(Coal & Gas)

1Manish S // Rabbani // Goutham Y // Ratnesh K // Aslam SK1INDEXSr NoDescription1INDIAN POWER SECTOR AT A GLANCE2INDIA LOOKING AHEAD 3MISSION 20504EXPEDITIOUS CAPACITY ADDITION - DRIVERS5SCENARIO - POST PARIS MEET6COAL BASED GENERATION7GAS BASED GENERATION 8ROAD MAP / GOAL ~ 2025 & 205092050 ~ WHERE WE STAND ?

22Total Installed Capacity ~ 281 GW (As on 31.11.2015)Source : www.powermin.nic.inIndian Power Sector- At a Glance

33ECONOMY & ENERGY SECTORIndian EconomyExpected ~ Worlds Largest Economy by 2050

Energy FutureMultifold Increase in Electricity Generation Expected

Expected Demand *Energy Demand ~ 1500 GW by 2050

India ~ Looking Ahead ~ 2050

* World Energy Council44

WHAT WHEREVisionIncrease in Manufacturing Growth @ 12-14% AnnuallyAimIncrease in Manufacturing Share in GDP (16% in FY 2014-15 to 25% in FY 2021-2022)How Top Priority Sectors Develop Manufacturing CapabilityDefense SectorReduced Reliance on Imports by 30% (In 05 Years)Energy Future Multifold Increase in Electricity Generation *: Urban Area to Go Up ( 31 % to 41 % by 2031): Metros / Bullet Trains / Smart Cities: Digital India : Agricultural DevelopmentCapacity Addition1350 to 1500 GW by 2050 **

Make in IndiaMission Mode5* SOURCE : CEA** SOURCE : WORLD ENERGY COUNCIL

5

Economic GrowthEnergy Demand *Per Capita20122047Transport Demand(Km) 5970 18700Residential Space(Sqm) 1.8 35Commercial Space (Sqm) 0.7 5.9Modern Energy Use (Kgoe)(Cooking-Rural) 61 183Drivers ~ Towards Capacity Addition

Govt Cant Afford Societal Divide Any Longer *SOURCE : NITI AAYOG ENERGY MIX REPORT

6Growth in Economic Activity ~ Lead to Demand for Energy6Commitment of Republic of IndiaPriority & Ist Commitment ~ Solar & WindHydro, Nuclear & Other Non- Carbon Resources ( Shall be developed to the Largest Possible Extent)What cannot be met by Non - Carbon Resources Shall be met by CoalScenario ~ Post Paris Climate Meet

Source : Economic Times / 15.12.2015 Indian Interlocutor

77

COAL BASED GENERATION88Total Installed CapacityPlant Load FactorSource : www.powermin.nic.inScenario Coal Based Generation

DescriptionCapacityCentral Sector 49380 MWState Sector59450 MWPrivate Sector61307 MWTotal (30.11.2015)170137 MWTarget Actual 99LANDLANDIssues Land acquisition - R&R Typical Power Plant (1000 MW) ~ 15000 Tons Coal / DayAsh Handling Area ~ 66 % of Total Plant RequirementWay AheadOptimum Utilization of Land for Power Plant & AncillaryLand ~ Feasible for Long Term Economic JustificationDesirable ~ Proximity & Availability of Coal & Water

0.40.350.252014201720252050Land Requirement (Acre / MW)

Source : www.cseindia.org0.6

1010Integrated-Gasification Combined Cycle (IGCC)Enhanced Efficiency (Approx 46%)Clean Coal GasReduces Water RequirementTechnology

Carbon Capture & StorageMitigate the Contribution of EmissionsPost Capture, CO2 is injected through Pipeline Geo-sequestration

11CCSIGCC11

Auxiliary PowerSuper Ultra Mega Power Plant TechnologyEnhancement in Efficiency5.75 %5.00 %4.75 %4.00 %2015201720252050Adopting Energy Efficient EquipmentsConservation of EnergyEfficiency12Air Cooled CondensersActs as Condensing System ~ If Water is LimitedAlso Known as Dry Cooling Tower

12

Fuel ~ Coal

1313DescriptionFigureAnnual Requirement ~ 01 GW ( Million Tonne)5Estimated Addition of Coal Power Plants (GW)650Estimated Life Span of Coal Power Plants (Years)35Total Coal Requirement ( BillionTonne )115.00Estimated Coal Reserves ~ India (Billion Ton)301.56Proportionate Share for Power Sector @ 70 %211.09Coal to Last For Indias Coal Reserves ~ to last Up to 100 Years Coal Production (CIL) is poised to grow @ 15% by 2022 (Against Present Rate of 7% )CIL ~ Additional Budget Provision of 15% on Mining Tech(FY 2015-2016)CIL ~ Next 7 Year Budget for Mining Tech : $ 25 BillionCommercial Mining License to State ~ Production to Increase *

Coal ~ Requirement & Reserves

Source : GSI / * Economic Times 15.12.2015 14

Coal Based Plants ~ ChallengesLikely Road-Blocks Sustainability ~ Carbon Capping ( Low Emission Pathway ) ~ 2 deg C sustainability IssueAvailability of Water & Land for Thermal Power StationsPoor Efficiency of Existing & Old Thermal Power StationsAvailability of Equipment Suppliers ~ Matching the Target / Delivering on TimeNeed of Consistent GCV coal for UMPPs / Fast Paced Technology AdvancementSustainability of Business ~ Bleeding DISCOMs / Low scheduling / Low PLFPolitical ~ Continuity of Policy & Stability of EstablishmentRegulatory Challenges

1515Planning & ManagingDecommissioning Retirement of Old & Inefficient Generation Units In Phases

Ultra Mega Power Projects (UMPPs) Super Critical Technology Implementation ( In Reduced Area)Hybrid Power plants Coal and SolarAutomatic Transfer of Coal LinkageIn case of Scrapping of Old Units & Replacement Ultra Super Critical Boiler TechnologyTowards Enhanced Efficiency ( 50 %) Swapping of Coal Reserves (On Merit)Based on the Proximity of Power PlantsPower Purchase AgreementPrior Purchase Agreement with BeneficiariesCOAL ~ TO REMAIN THE BACKBONE OF INDIAN POWER SECTOR

Strategy

1616

17

GAS BASED GENERATION17FY 2014-201518Scenario Gas Based Generation Constraints > 50 % of Installed Capacity ~ Inability to Acquire Fuel at a Commercially Viable Rate FY 2104-2015 ~ PLF : 22 % // Power Plants Financially Stranded

* mmscmd ~ million metric standard cubic meter per day1819

Fuel ~ Gas2014- 2015Gas Reserves

Clean Energy Green EnergyAllocation 30% for Electricity19

Gas Based Plants ~ ChallengesRoad-Blocks Only 30% of Gas Produced is Allocated for ~ Power Generation in IndiaLack of Permanent Linkage of Gas for Power Plants Identified Sedimentary Basins in India ~ 26 // Only 20 % ExploredIndia produces Less Gas (98.15 mmscmd) ~ Compared to Pakistan(109 mmscmd )Bangladesh Produces ~ 65 mmscmd Gas ( Much Smaller Industrial Base) : 2014 EstimatesExpected Gas Availability through TAPI (2020) is only 38 mmscmdD 6 Basin ~ Production Output is Minimal against Expectation 20

2021

21

AgencyCapacity Addition Fossil FuelNTPC30 GWUMPP (5 Nos)20 GWState & Others( Incl Stranded Projects)80 GWTotal130 GWDescriptionCapacityInstalled (2015)280 GWAddition Plan ~ Renewables175 GWAddition Plan ~ Fossil Fuel130 GWAddition Plan ~ Others 25 GWTotal (2025)610 GWRoad Map 20252215 GW ( NTPC)+ 30 GW ( Others)15 GW ( NTPC)+ 20 GW ( UMPP) + 50 MW (Others)22

DescriptionCapacityInstalled (2025)610 GWAddition Plan ~ Renewables175 GWAddition Plan ~ Hydro 35 GWAddition Plan ~ Nuclear 40 GWAddition Plan ~ Fossil Fuel(125 + 125 + 100 +75 + 75) GW 500 GWTotal (2050)1360 GWRoad Map 205023

2324TYPEExisting (DEC -2015)GWShare(2015)%Addition(2015-2025)GW Addition(2025-2050)GWTotal(2050)GWShare(2050)%Renewables3612.8517517538628.38Hydro 4315.3525351037.58Nuclear62.14040463.38Gas258.9200251.84Fossil Fuel17060.7113050080058.82Total28010033075013601002050 ~ Where We Stand ?

2425

25