Top Banner
MILE END INDUSTRIAL AREA DALMARNOCK BUSINESS VILLAGE RUTHERGLEN INDUSTRIAL ESTATE FARME CROSS INDUSTRIAL ESTATE CLYDE GATEWAY INDUSTRIAL AREAS ENVIRONMENTAL IMPROVEMENTS FINAL REPORT, AUGUST 2008 Prepared for Clyde Gateway URC, the Glasgow & Clyde Valley Green Network Partnership and Scottish Enterprise by TGP Landscape Architects in Association with Binnie Murray Hutton
215

Clyde Gateway - Industrial Areas Access and Environment Study

Mar 25, 2016

Download

Documents

GCV Green Network Partnership,Clyde Gateway - Industrial Areas Access and Environmental Improvements
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • MILE END INDUSTRIAL AREA

    DALMARNOCK BUSINESS VILLAGE

    RUTHERGLEN INDUSTRIAL ESTATE

    FARME CROSS INDUSTRIAL ESTATE

    CLYDE GATEWAY INDUSTRIAL AREAS

    ENVIRONMENTAL IMPROVEMENTS

    FINAL REPORT, AUGUST 2008Prepared for Clyde Gateway URC, the Glasgow & Clyde Valley Green Network

    Partnership and Scottish Enterprise

    by TGP Landscape Architects in Association with Binnie Murray Hutton

  • CLYDE GATEWAY INDUSTRIAL AREAS

    ENVIRONMENTAL IMPROVEMENTS

  • 4

  • 5Executive Summary

    TGP Landscape Architects were commissioned by Clyde Gateway URC, the Glasgow & Clyde Valley Green Network

    Partnership and Scottish Enterprise to prepare proposals for environmental improvements within four key industrial and

    employment sites within the Clyde Gateway URC regeneration area, namely:

    Mile End Industrial Area;

    Dalmarnock Business Village;

    Farme Cross Industrial Estate;

    Rutherglen Industrial Estate.

    Clyde Gateway

    All four sites are located within the Clyde Gateway URC regeneration area. The Clyde Gateway URC is a major national

    regeneration project relating to an area of 2095 acres, approximately 850 hectares or 3.3 square miles within the East

    End of Glasgow and extending into Rutherglen in South Lanarkshire, approximately 30% of which was identifi ed as der-

    elict, vacant or underused land. The Clyde Gateway initiative aims to create a lasting transformation within the gateway

    area, increase economic activity and job opportunities and develop community well-being and culture.

    Mile End Industrial Area and Dalmarnock Business Village are located on the north side of the River Clyde within in the

    East End of Glasgow City Council, whilst Rutherglen and Farme Cross Industrial Estates are on the south side of the

    River Clyde located in South Lanarkshire Council.

    Glasgow & Clyde Valley Green Network Strategy

    The Glasgow & Clyde Valley Green Network Strategy sets out a vision for the integration of the Green Network within the

    regeneration of Clyde Gateway. It sets out the framework in which the Green Network can contribute to the Gateways

    future environmental quality, community vitality and economic success.

    Within this framework the Clyde Gateway Industrial Area Study presented here identifi es specifi c environmental im-

    provement projects that assist in implementing this vision. The study shows through detailed site survey, consultation and

    documentation the specifi c shortfalls and key issues in the public realm of the four industrial estates and conveys propos-

    als how to assist in making these sites better, greener and more pleasant and enjoyable places in which to work, live,

    pass through and in some instances relax for a short while. The environmental improvements proposed within the study

    deliver recognisable short and long term benefi ts and outcomes to the businesses and resident communities located

    within the industrial areas and residents from the surrounding communities who pass through the industrial estates on

    their way to schools, community centres and retail areas.

    We trust that our collective enthusiasm for the industrial sites and their immediate environs is conveyed within the study,

    and we would wish to extend our thanks to our client group and to everyone who has contributed in the preparation of this

    report.

    We trust that our collective enthusiasm for the industrial sites and their immediate environs is

    conveyed within the study, and we would wish to extend our thanks to our client group and to

    everyone who has contributed in the preparation of this report.

  • Contents

    Executive Summary 5

    List of Illustrations 9

    1 APPROACH 11

    1.1 Introduction 14

    1.1.1 Study Context 14

    1.1.2 Study Aims 14

    1.1.3 Study Methodology 15

    1.1.4 Study Outputs 15

    1.2 Key Issues and Objectives 16

    1.2.1 Key Issues 16

    1.2.2 Objectives 16

    2 MILE END INDUSTRIAL AREA 19

    2.1 Existing Situation/ Survey 22

    2.1.1 Location 22

    2.1.2 Character 22

    2.1.3 Existing Land Use 22

    2.1.4 Public Transport Infrastructure 22

    2.1.5 Road Hierarchy 22

    2.1.6 Public Realm/ Pedestrian Activity 22

    2.1.7 Surface Materials 23

    2.1.8 Street Furniture 23

    2.1.9 Boundary Treatment 23

    2.1.10 Public Green Space 23

    2.1.11 Private Green Space 23

    2.1.12 Architecture 23

    2.2 Review of Previous Studies 36

    2.2.1 Clyde Gateway Green Network Strategy 36

    2.2.2 A Vision for the East End - Clyde Gateway Development Framework 36

    2.2.3 Glasgow Core Path Plan 36

    2.2.4 Glasgow East End Local Path Network and Greenspace Strategy 36

    2.2.5 The East End Local Development Strategy Changing Places: Changing Lives 37

    2.2.6 Mile End Industrial Area Action Plan 37

    2.2.7 Previous studies - Recommendations 38

    2.3 Key Issues 39

    2.3.1 Key Issues - General 39

    2.3.2 Key Issues - Specifi c to Mile End Industrial Area 39

    2.4 Environmental Improvements 40

    2.4.1 Green Spaces 40

    2.4.2 Green Links 40

    2.4.3 Priority Projects 40

    2.5 Recommendations 44

    3 DALMARNOCK BUSINESS VILLAGE 69

    3.1 Existing Situation/ Survey 72

    3.1.1 Location 72

    3.1.2 Character 72

    3.1.3 Existing Land Use 72

    3.1.4 Public Transport Infrastructure 72

    3.1.5 Road Hierarchy 72

    3.1.6 Public Realm/ Pedestrian Activity 72

    3.1.7 Surface Materials 73

    3.1.8 Street Furniture 73

    3.1.9 Boundary Treatment 73

    3.1.10 Public Green Space 73

    3.1.11 Private Green Space 73

  • 73.1.11 Private Green Space 73

    3.1.12 Architecture 73

    3.2 Review of Previous Studies 91

    3.2.1 Clyde Gateway Green Network Strategy 91

    3.2.2 A Vision for the East End - Clyde Gateway Development Framework 91

    3.2.3 Glasgow Core Path Plan 91

    3.2.4 Glasgow East End Local Path Network and Greenspace Strategy 91

    3.2.5 The East End Local Development Strategy Changing Places: Changing Lives 91

    3.2.6 Review of Infrastructure Improvements 91

    3.2.7 Previous studies - Recommendations 92

    3.3 Key Issues 92

    3.3.1 Key Issues - General 92

    3.3.2 Key Issues - Specifi c to Dalmarnock 92

    3.4 Environmental Improvements 93

    3.4.1 Green Spaces 93

    3.4.2 Green Links 93

    3.4.3 Priority Projects 93

    3.5 Recommendations 96

    4 RUTHERGLEN INDUSTRIAL ESTATE 121

    4.1 Existing Situation/ Survey 124

    4.1.1 Location 124

    4.1.2 Character 124

    4.1.3 Existing Land Use 124

    4.1.4 Public Transport Infrastructure 124

    4.1.5 Road Hierarchy 124

    4.1.6 Public Realm/ Pedestrian Activity 125

    4.1.7 Surface Materials 125

    4.1.8 Street Furniture 125

    4.1.9 Boundary Treatment 125

    4.1.10 Public Green Space 125

    4.1.11 Private Green Space 125

    4.1.12 Architecture 125

    4.2 Review of Previous Studies 138

    4.2.1 Clyde Gateway Green Network Strategy 138

    4.2.2 A Vision for the East End - Clyde Gateway Development Strategy 138

    4.2.3 South Dalmarnock & Shawfi eld Strategic Study and Implementation Plan 138

    4.2.4 Review of Infrastructure Improvements 138

    4.2.5 Previous Studies - Recommendations 139

    4.3 Key Issues 140

    4.3.1 Key Issues - General 140

    4.3.2 Key Issues specifi c to Rutherglen Industrial Estate 140

    4.4 Environmental Improvements 140

    4.4.1 Green Spaces 140

    4.4.2 Green Links 140

    4.4.3 Priority Projects 141

    4.5 Recommendations 144

    5 FARME CROSS INDUSTRIAL ESTATE 169

    5.1 Existing Situation/ Survey 172

    5.1.1 Location 172

    5.1.2 Character 172

    5.1.3 Existing Land Use 172

    5.1.4 Public Transport Infrastructure 172

    5.1.5 Road Hierarchy 172

    5.1.6 Public Realm/ Pedestrian Activity 173

    5.1.7 Surface Materials 173

    5.1.8 Street Furniture 173

    5.1.9 Boundary Treatment 173

    5.1.10 Public Green Space 173

    5.1.11 Private Green Space 173

  • 8

    5.1.11 Private Green Space 173

    5.1.12 Architecture 173

    5.2 Review of Previous Studies 186

    5.2.1 Clyde Gateway Green Network Strategy 186

    5.2.2 A Vision for the East End - Clyde Gateway Development Framework 186

    5.2.3 Glasgow Core Paths Plan 186

    5.2.4 Review of Infrastructure Improvements 186

    5.2.5 Previous Studies - Recommendations 187

    5.3 Key Issues 187

    5.3.1 Key Issues - General 187

    5.3.2 Key Issues specifi c to Farme Cross Industrial Estate 187

    5.4 Environmental Improvements 188

    5.4.1 Green Spaces 188

    5.4.2 Green Links 188

    5.4.3 Priority Projects 189

    5.5 Recommendations 192

    APPENDIX 213

    Study and strategy context - Associated reports, policies and studies 215

    Related studies associated with the sites 215

    Infrastructure Improvements related to the sites 215

  • 9List of Illustrations

    Title Drawing Number Scale

    Overview Plan 01 None

    Mile End Industrial Area

    Land Use 02 1:2000

    Road Hierarchy 03 1:2000

    Public Utilities 04 1:2000

    Aerial 05 Not to scale

    Recommendations 06 1:2000

    Olympia Street - Plan 07 1:250

    Olympia Street - Section 08 1:100

    Olympia Street - Detail 09 1:100

    Orr Street - Plan 10 1:250

    Orr Street - Section 11 1:100

    Orr Street - Detail 12 1:100

    Camlachie Burn - Plan 13 1:500

    Camlachie Burn - Section 14 1:100

    Camlachie Burn - Detail 15 1:100

    Dalmarnock Business Village

    Land Use 16 1:2000

    Road Hierarchy 17 1:2000

    Public Utilities 18 1:2000

    Aerial 19 Not to scale

    Recommendations 20 1:2000

    Baltic Street - Plan 21 1:500

    Baltic Street - Section 22 1:100

    Baltic Street - Detail 23 1:100

    Dunn Street - Plan 24 1:200

    Dunn Street - Detail 25 1:100

    Dunn Street - Section 26 1:100

    Bernard Street - Plan 27 1:500

    Bernard Street - Section and Detail 28 1:100

    Rutherglen Industrial Estate

    Land Use 29 1:2000

    Road Hierarchy 30 1:2000

    Public Utilities 31 1:2000

    Aerial 32 Not to scale

    Recommendations 33 1:2000

    Glasgow Road - Plan 34 1:500

    Glasgow Road - Section 35 1:100

    Glasgow Road - Detail 36 1:100

    Main Entrance - Plan 37 1:200

    Vacant Plot Pocket Park - Plan 38 1:200

    Re-aligned Quay Road - Plan 39 1:500

    Re-aligned Quay Road - Section 40 1:100

    Riverside Park - Plan 41 1:200

    Riverside Park - Section 42 Not to scale

    Farme Cross Industrial Estate

    Land Use 43 1:2000

    Road Hierarchy 44 1:2000

    Public Utilities 45 1:2000

    Aerial 46 Not to scale

    Recommendations 47 1:2000

    Baronald Street - Plan 48 1:500

    Baronald Street - Detail and Section 49 1:100

    Barnfl at Street/ Pocket Park - Plan 50 1:500

    Barnfl at Street - Detail and Section 51 1:100

    Riverside Park - Plan 52 1:200

    Appendix

    Survey Physical Features Mile End 53 1:1000

    Survey Physical Features Dalmarnock 54 1:1000

    Survey Physical Features Rutherglen 55 1:1000

    Survey Physical Features Farme Cross 56 1:1250

  • 10

  • 1 APPROACH

  • 1 INTRODUCTION

  • 14

    1.1 Introduction

    TGP Landscape Architects are a dynamic and enthusias-

    tic landscape design practice who were commissioned by

    Clyde Gateway URC, the Glasgow & Clyde Valley Green

    Network Partnership and Scottish Enterprise to prepare

    proposals for the environmental improvements within four

    key industrial and employment sites within the Clyde

    Gateway URC regeneration area, namely:

    Mile End Industrial Area;

    Dalmarnock Business Village;

    Farme Cross Industrial Estate;

    Rutherglen Industrial Estate.

    1.1.1 Study Context

    All four sites are located within the Clyde Gateway URC

    regeneration area. The Clyde Gateway URC is a major

    national regeneration project relating to an area of 2095

    acres, approximately 850 hectares or 3.3 square miles

    within the East End of Glasgow and extending into Ruther-

    glen in South Lanarkshire approximately 30% of which was

    identifi ed as derelict, vacant or underused land. The Clyde

    Gateway project area is defi ned by eight districts com-

    prising Shawfi eld; Dalmarnock; Bridgeton; London Road;

    Farme Cross; Toryglen; National Indoor Sports Arena and

    Cuningar Loop.

    The Clyde Gateway initiative aims to create a lasting

    transformation within the gateway area; increase economic

    activity and job opportunities; develop community well-be-

    ing and culture.

    Mile End Industrial Area and Dalmarnock Business Village

    are located on the north side of the River Clyde within in

    the East End of Glasgow City Council, whilst Rutherglen

    and Farme Cross Industrial Estates are on the south side

    of the River Clyde located in South Lanarkshire Council.

    The Development Framework for the Clyde Gateway, the

    Gensler Report published in March 2004 identifi ed the

    need to transform the east end from a place of dereliction

    and decline into one of growth and opportunity. The Clyde

    Gateway Green Network Strategy published in July 2007

    prepared by Land Use Consultants on behalf of the Glas-

    gow & Clyde Valley Green Network Partnership defi ned

    a need turn the whole area into a high quality, dynamic

    urban environment and to improve access into the indus-

    trial estates, whether pedestrian, cycle or vehicular into the

    industrial areas. The East End Local Development Strat-

    egy Changing Places: Changing Lives identifi es signifi cant

    development proposals for the Bridgeton/ Mile End and

    Dalmarnock Hub areas.

    These studies together with related strategic context stud-

    ies and infrastructure improvements (refer to Appendix 1)

    have informed us of the development issues relating to

    each of the sites and within the context of the Clyde Gate-

    way URC regeneration area.

    Within the Clyde Gateway work has already commenced

    on three major projects including the National Indoor Sports

    Arena; the M74 motorway completion and the East End

    Regeneration Route.

    Further, the report recognises the signifi cant contribu-

    tion which the industrial estate could potentially make to

    Bridgeton Cross and the proposed Bridgeton Cross Con-

    servation Area which recognises the architectural quality of

    buildings surrounding the Cross.

    These studies together with related strategic context stud-

    ies and infrastructure improvements (refer to Appendix 1)

    have informed us of the development issues relating to

    each of the sites and within the surrounding area.

    In 2014 the Commonwealth Games are to be held in the

    East End of Glasgow and hosting this event will have a

    major impetus on upgrading the infrastructure and facilities

    within the area. Work has already commenced on three

    major projects including the National Indoor Sports Arena

    (NISA); the M74 motorway completion and the East End

    Regeneration Route EERR.

    In South Lanarkshire the proposed M74 link from the east

    to the city centre will have a major infl uence on the sites of

    Farme Cross and Rutherglen Industrial Estates. Both of

    these sites are presently going through a major change due

    to the land take and infl uence of the proposed line (horizon-

    tal and vertical) of the motorway, associated junctions and

    land take. Our recommendations for improvements refl ect

    this and prescribe strategic approaches to improvements.

    In the East End of Glasgow, the main strategic infl uence is

    the East End Regeneration Route which has been aligned

    along the east boundary of Dalmarnock Business Village.

    1.1.2 Study Aims

    One of the aims of the study is to identify proposals that de-

    liver identifi able benefi ts and outcomes in terms of the key

    themes of the GCV Green Network Partnership. The Clyde

    Gateway Network Strategy study sets out a vision for the

    integration of the Green Network within the regeneration of

    the Clyde Gateway.

    The ultimate benefi ciaries are the business and resident

    communities located within the industrial areas and resi-

    dents from the surrounding communities who pass through

    the industrial estates on their way to schools, community

    centres and retail areas.

  • 15

    1.1.3 Study Methodology

    Initially A joint site walk was undertaken with the client

    group: Scottish Enterprise; Glasgow City Council; South

    Lanarkshire Council and Glasgow & Clyde Valley Green

    Network Partnership of the four industrial areas.

    TGP then undertook detailed site surveys and appraisals

    of each site to record physical features, discussed where

    possible the existing issues and related problems with local

    stakeholders and community, and prepared costed recom-

    mendations for physical improvements within each of the

    Industrial Areas.

    The detailed site surveys recorded the following:

    Surface Materials:

    Poor quality bitmac pavements;

    Insitu concrete pavements and plot entrances;

    Pre-cast concrete paving slabs;

    Natural stone upstand and fl ush kerbs;

    Drop kerb locations.

    Soft Landscaping:

    Amenity grass (private and public);

    Amenity shrubs (private and public);

    Amenity trees (private and public);

    Scrub woodland (private and public).

    Boundary Treatments:

    Freestanding masonry walls;

    Buildings and storey height;

    Fence type and height in metres.

    Physical Features:

    Lampposts;

    Wall mounted luminaries;

    Barriers;

    Bollards;

    Bespoke artwork;

    Signage;

    Bus stops;

    Service and lighting boxes;

    Controlled crossing points;

    CCTV and telephone poles.

    In addition TGP compiled a comprehensive set of record

    photographs for each site which have been grouped ac-

    cording to:

    Public Realm/ Pedestrian Activity;

    Surface Materials;

    Street Furniture;

    Boundary Treatment;

    Public and Private Greenspace;

    Architecture.

    Public utilities information has been obtained and is pre-

    sented as a composite plan.

    The site surveys, review of previous reports, related studies

    and infrastructure improvements has enabled us to defi ne

    a set of key issues within the sites and develop a series of

    generic objectives for all four sites. These serve to inform

    a series of recommendations and environmental improve-

    ment projects within the industrial estates.

    1.1.4 Study Outputs

    A series of recommendations have been drawn up for each

    industrial site, and a number of individual environmental

    improvement projects titled Green Spaces or Green Links

    have been prescribed within each industrial estate. These

    proposals have been worked up to the equivalent of LI

    Work Stage D Sketch Design Proposals and are expressed

    through a combination of plans; sections; detail layout

    plans and supporting sketch proposals in suffi cient detail

    to convey the scale, size and character of the projects to

    agree spatial arrangements, materials and appearance.

    In consultation with the client group a short list of top fi ve

    priority projects and recommendations have been identifi ed

    within each industrial site.

    Cost estimates have been prepared by Binnie Murray Hut-

    ton for each recommendation which are expressed as a

    table for each industrial site.

  • 16

    1.2 Key Issues and Objectives

    1.2.1 Key Issues

    Key issues have been identifi ed through the site surveys,

    consultations and the fi ndings of reports previously under-

    taken in the study areas. Despite the four industrial areas

    differing in character, location, size and identity, there are a

    number of key issues which reoccur within each industrial

    site, these are as follows:

    Poor condition of footpath surfacing;

    Disparate, often unattractive boundary treatments;

    General neglect and maintenance issues;

    Personal safety issues;

    Feelings of hostility and anonymity;

    Pedestrian routes (to schools) perceived as unsafe

    and unattractive;

    Vacant plots emptiness, dereliction;

    Litter and fl y tipping;

    High usage of vehicles, low usage of public trans

    port despite close proximity to public transport

    services within all four sites;

    Lack of green space and very colourless places.

    Further problems and issues relating to each of the in-

    dividual sites can be found in the following site specifi c

    chapters.

    1.2.2 Objectives

    Objectives have been identifi ed through the survey and

    appraisal process. They have been discussed and devel-

    oped throughout the preparation of this study report with

    the client group.

    This study seeks to identify proposals for the physical

    improvement of the external environment within the four

    industrial estates that:

    This study seeks to identify proposals for the physical

    improvement of the external environment within the four

    industrial estates that:

    1. Promote pedestrian activity and create more

    pleasant and walkable environments/ neigh-

    bourhoods

    Promote ease of navigation and legibility of walking

    routes (particularly in Mile End and along River

    Clyde) through creating an identifi able character

    for streets and a comprehensive directional

    signage strategy; creating new

    links between neighbourhoods, places of work and

    recreational paths (particularly in Farme Cross and

    Rutherglen);

    Introduce improvements within the public realm;

    Improve pedestrian comfort by: addressing

    uneven surfaces; introducing street furniture; exist

    ing lighting upgraded to a white light source;

    removing of obstacles and attending to litter and

    fl y-tipping; removing barriers to access;

    Promote ease of access for less able and disa

    bled people through the introduction of dropped

    kerbs, reasonable gradients, smooth surfaces,

    highlighting edges, obstacles and alleviating exist

    ing road fl ooding and surface water ponding.

    2. Counteract perceived safety concerns and

    foster feelings of security

    Introduce white lighting on all principle, secondary

    or core path routes

    Reveal boarded windows and doors at street level

    to encourage passive surveillance;

    Cutting back overgrown vegetation

    Introduce surveillance cameras at strategic loca

    tions.

    3. Celebrate local identity and foster a Sense of

    Place

    Introduce environmental improvements to raise

    the image of the area; create identity and

    character through public art, promote landmarks,

    and lighting projects;

    Illuminate landmark features and buildings

    i.e. facade of the former Olympia Cinema

    building at Bridgeton Cross or the Scottish Power

    Substation within Farme Cross Industrial Estate;

    Promote working with the local community and

    stakeholders.

    4. Arrest decline and foster rejuvenation of the

    surrounding areas within the Clyde Gateway as

    well as the Industrial Areas

    Provide an attractive environment for the East End

    as a whole, thus attracting investment and stimulat

    ing the upgrade and renewal of buildings and vacant

    plots by the private sector.

    5. Promote a landscape led unifying framework

    and structure for an attractive public realm

    and improve the general appearance of the

    industrial estates in order to promote regenera

    tion.

    Create a site specifi c set of design guidelines for

    the new private sector developments to follow;

    Remove visual clutter i.e. differing boundary

    treatments, unnecessary or unused lamp posts,

    traffi c and advertising signs, and ensure a consist

    ent and cohesive approach to the look of each

    estate;

    Reduce clutter through a coordinated approach

    to the public realm by following a simple, uncompli

    cated set of rules, such as directional signage on

    lighting poles, wall mounted luminaries, coordinat

    ed street surfacing (e.g. all asphalt with cobbled

    entrances to buildings and a consistent kerb

    material, hierarchy of materials depending on use

    of the area, co-ordinated and consistent design

    and boundary materials);

    Introduce unifying and more aesthetically

    pleasing surface treatments, adding colour and tex

    tural materials into the external environment;

    Introduce robust plant material and tree species

    tailored to each estate.

  • 17

    6. Increase public amenity/ green space provi

    sions

    Provide small usable green spaces for users

    of the industrial estates as well as residents and

    passers-through;

    Safeguarding existing green spaces from pres-

    sures of development;

    Consider the location of green space in relation to

    vandalism and the wrong sort of use, consider

    areas that are overlooked at all times;

    Introduce seating to make spaces more usable but

    allow for robust furniture in the design;

    Safeguard existing green spaces from pres

    sures of development;

    Consider the location of green space in relation to

    vandalism and attracting the wrong sort of user,

    consider areas that are overlooked at all times;

    Introduce seating to make spaces more usable and

    attractive allow for robust furniture in the design;

    Increase/ introduce regular management and

    maintenance regimes i.e. litter collection and the

    removal of fl y-tipping.

    7. Promote sustainable modes of transport:

    Improve pedestrian links and signage to public

    transport hubs and corridors;

    Confi rm and promote Glasgows Core Path Plan;

    Rationalise the space allocated for vehicular traffi c

    with a focus on improving conditions for

    pedestri ans and cyclists

    Promote cycling by reducing traffi c speeds (i.e.

    Nuneaton Street and Boden Street within

    Dalmarnock Business Village) and incorporating

    cycle lanes within new road proposals i.e. Downie

    brae Road at Farme Cross, East End Regenera-

    tion Route, London Road corridor, and to road

    corridors with reduced traffi c fl ows following the

    completion of the M74 and EERR.

    8. Use sustainable materials

    Use materials that are sustainable and have long

    life spans such as natural stone for kerbing and

    paving;

    Consider robust street furniture and planting

    tailored to each estate;

    Chose materials that have relatively low mainte-

    nance requirements.

    9. Increase wildlife/ environmental value

    Introduce street trees, which provides both

    environ mental and aesthetic improvements by

    creating habitats, cleaning air, intercepting cold

    wind, reducing CO2 emissions, creating feelings of

    well being, shading properties and adding land

    value);

    Introduce native planting in appropriate locations;

    Manage the existing areas of vegetation e.g. River

    Clyde corridor.

    10. Increase views and public access to/ along

    and across the River Clyde

    Make better use of existing path networks and

    createadditional path links;

    Open up views and vistas through the manage-

    ment of existing river corridor vegetation.

    In addition to these generic objectives within all of the four

    sites, specifi c issues and objectives have been drawn up

    for each indivual industrial area. These can be found in the

    respective chapter of the report. Based on these objec-

    tives a set of environmental improvements and recommen-

    dations have been developed, which are described and

    illustrated in detail in the following chapters.

  • 18

  • 2 MILE END INDUSTRIAL AREA

  • 20

  • 1 INTRODUCTION

  • 22

    2.1 Existing Situation/ Survey

    2.1.1 Location

    Mile End Industrial Area is located within the northwest

    corner of the Clyde Gateway. The industrial area benefi ts

    from being close to Bridgeton Cross with its retail centre.

    The site is well served by the existing road network and

    nearby main line Bridgeton Railway Station.

    2.1.2 Character

    Mile End Industrial Area presents itself as a citadel of

    industrial buildings within the surrounding urban fabric. Its

    simple strong grid street pattern adds to its unique metro-

    politan characteristics. Internally it is typifi ed by building fa-

    cades and plot boundaries hard up against the pavements

    to the road network. Internal roads appear on occasion like

    gorges, in particular when they are bounded by four to fi ve

    storey high buildings.

    The physical quality of the industrial estate is in a rea-

    sonably good condition in the western part, however the

    physical character deteriorates towards the east boundary.

    Here it is in places heavily littered and when matched with

    the numerous derelict buildings and dead end streets (in

    particular Brookside Street) the area feels unsafe despite

    the presence of the nearby police station. The police sta-

    tion with its high fortifi ed masonry boundary adds further to

    a feeling of personal vulnerability.

    2.1.3 Existing Land Use

    Mile End Industrial Area measures 25 ha. of which

    18,500m2 the equivalent to 7.5% is vacant land.

    Figure 02 records land use within Mile End Industrial Area.

    The range of occupants and businesses within Mile End

    Industrial Area are varied and diverse. There exist large

    expanses of hardstanding areas which serve as vehicle

    parking or storage areas which by their unkempt nature de-

    tract from the overall dense urban impression of the estate.

    2.1.4 Public Transport Infrastructure

    Mile End Industrial Area is well served by Bridgeton Rail-

    way Station which is on the Milngavie/ Dalmuir/ Glasgow/

    Motherwell/ Lanark route. Bridgeton has a frequent and

    regular train service and is only seven minutes travel time

    from Glasgow Central and 30 minutes from Motherwell.

    Further the estate is well served by bus services; London

    Road is on the No.16 and 18 bus routes which connect

    Mile End Industrial Area with Glasgow city centre.

    Businesses located within the western half of Mile End

    Industrial Area are within a 500m radius; the equivalent to

    7 minutes walking distance of Bridgeton Railway Station.

    The entire industrial estate is within a 1km/ 0.6mile walk

    distance.

    2.1.5 Road Hierarchy

    Figure 03 records the existing road infrastructure surround-

    ing Mile End Industrial Area. Mile End is bounded by three

    major arterial roads, namely: Crownpoint Road to the north,

    London Road to the south, and Fielden Street to the east.

    These are major road corridors with both London Road

    and Fielden Street consisting of four lanes. Fielden Street

    changes into Dunn Street as it crosses London Road and

    therefore provides a physical link with adjacent Dalmarnock

    Business Village.

    Mile End has fi ve principal entrances, three from Crown-

    point Road along the north boundary and two from London

    Road along the south boundary.

    Mile End has a further seven secondary entrances, three

    from Crownpoint Street along the north boundary and four

    from London Road along the south boundary. There are

    no offi cial entrances into the industrial estate from Fielden

    Street along the sites east boundary, although vehicles

    utilise the blocked off Barrowfi eld Street to enter and exit

    the industrial area.

    Internally Broad Street, Brook Street and Fordneuk Street

    are primary roads. Of these Broad Street with an east west

    orientation functions as the primary road link to all other

    primary and secondary roads.

    In general the internal roads are of a suffi cient width to ac-

    commodate parallel parking on both sides. However, many

    internal roads appear poorly signed whilst visibility at road

    junctions is often compromised by vehicles and service

    vans parked along the roadside.

    2.1.6 Public Realm/ Pedestrian Activity

    There is a generous footfall along Orr Street (west) bound-

    ary which noticeably drops off towards the Fielden Street

    (east) boundary. This is due to the close proximity of Orr

    Street to nearby Bridgeton Cross, to the physical condition

    of the surroundings as well as the location of community

    facilities in the Orr Street vicinity.

    St. Mungos Academy School is situated to the north of

    Crownpoint Road, as are the Crownpoint Sports Centre

    and East End Healthy Living Centre. Both the school and

    the sports centre generate a high footfall within the estate.

    Typically north-south along Fordneuk Street, and east

    along Crownpoint Road and then south along Orr Street.

    Orr Street has been designated as an existing path that

    could become a core path in the Glasgow City Council

    Core Paths Plan (Final Consultation Draft, Feb 2008) as it

    functions as an important pedestrian route linking St. Mun-

    gos Academy and the East End Healthy Living Centre on

    Crownpoint Road with Bridgeton Cross.

    In particular along Fordneuk Street and Crownpoint Road

    many of the buildings present blank brick facades to the

    adjacent pavements. Therefore there are long sections of

    streets where pavements are not overlooked by the adja-

  • 23

    cent premises, notably Fordneuk Street, Crownpoint Street

    and St. Marnock Street and ones perception of personal

    safety is compromised. There are also instances where

    windows to premises have been boarded up, further com-

    pounding ones feeling of isolation and vulnerability. Some

    buildings also include recessed doorways at ground level

    which due to the potential of people concealing themselves

    cause further safety concerns.

    The physical quality of the industrial estate deteriorates to-

    wards the east boundary. In particularly Brookside Street,

    Avenue Street and Barrowfi eld Street all display an oppres-

    sive walking experience.

    2.1.7 Surface Materials

    There is a consistent treatment of new granite setts to

    road entrances from the surrounding arterial roads. This

    is both visually pleasing and serves as a threshold to an-

    nounce ones entry into the Mile End Industrial Area as well

    as automatically reducing traffi c speed. Fordneuk Street

    retains its original granite sett carriageway between Rogart

    Street and Broad Street. The granite setts combined with

    the whinstone kerb upstands provide a distinct character

    along this short section of road. The site survey revealed

    granite setts beneath the blacktop wearing course along

    the remainder of Fordneuk Street south of Broad Street.

    Within the estate the majority of pavements are edged with

    Whinstone or granite kerbs and surfaced in asphalt. How-

    ever, there are examples of concrete road kerbs and insitu

    concrete surface to pavements. The use of indigenous

    natural stone kerb edging gives a far superior appearance

    to the concrete kerbs.

    2.1.8 Street Furniture

    There is no seating provision within Mile End Industrial

    Area and the introduction of bench seating within exist-

    ing green spaces along London Road would be benefi cial

    to the usability of these spaces as well as the usability of

    London Road as a walking route.

    Due to the boundaries being hard up against the back of

    pavements, street lighting columns are often located within

    pavements. The staggering of lighting columns along

    some internal streets, noticeably Brook Street and Rims-

    dale Street clutter the pavements. This is in some instanc-

    es further exacerbated by the fi xing of telephone wires to

    lighting columns.

    2.1.9 Boundary Treatment

    There is a disparity between boundary treatments through-

    out the industrial area, which vary between masonry walls,

    wire-mesh fencing and palisade security fencing. Notably

    some property boundaries benefi t from the introduction of a

    bespoke black metal 3 metre high security fence introduced

    under previous environmental improvements.

    However both the north and south boundaries benefi t from

    2.1.10 Public Green Space

    Figure 02 Land Use reveals the extent of Public and

    Private green space provision within Mile End Industrial

    Area. In general there is little private or public green space

    within the site with units typically bounding the internal road

    network/ pavements.

    However both the north and south boundaries benefi t from

    the provision of public and private green space. The south

    boundary in particularly is demarcated by linear parks

    along the London Road corridor. The consistent use of tree

    species together with the introduction of bespoke signage

    serves to provide a cohesive appearance along this major

    arterial road. In addition to providing a consistent bound-

    ary treatment to London Road these green spaces provide

    a visually pleasing setting to the industrial area, provide

    breathing space to pedestrians and noise attenuation

    from London Road traffi c and the nearby railway line. Here

    - under previous environmental improvements a robust

    tree guard which compliments the bespoke 3 metre high

    security fence has been introduced. The tree guards have

    served there original purpose but are now having a detri-

    mental effect on tree health and establishment. Therefore

    they should now be removed and salvaged for use else-

    where within Mile End Industrial Area to protect new tree

    planting.

    Along the north boundary of the estate Crownpoint Road

    provides a valuable green space provision due to the green

    spaces associated with the nursery, sports complex, acad-

    emy, healthy living centre and primary school. Here there

    is a small area of well maintained private green space

    along the northern edge, which is unfortunately fenced off

    and is therefore even visually separated from the usable

    road corridor. Along the south side of Crownpoint Road the

    only green space is a small vacant gap site at the junction

    with Brook Street which has been taken over by unman-

    aged vegetation, albeit with boundary tree planting.

    2.1.11 Private Green Space

    There are limited examples of green space within privately

    owned plots. Individual trees notably along Redan Street

    within the grounds to Bridgeton Day Nursery enhance the

    immediate setting. Elsewhere unmanaged hedge bounda-

    ries detract. Noticeably the high cypress trees bounding

    Crownpoint Road and Fordneuk Street within G.M.Radiator

    Co. Ltd. cast dense shade onto adjacent pavements and

    impede on the usable width of the pavement.

    2.1.12 Architecture

    Mile End Industrial Area includes a number of buildings

    of architectural merit which are listed. These include

    the former Olympia cinema building and Orange Hall on

    Bridgeton Cross. Overall the site contains a variety of

    architectural styles, building heights and building footprints.

    These range from 1930s buildings with pleasingly de-

    tailed facades, to single storey metal clad units and newly

    conceived brick built four storey offi ces. The area includes

    a single row of red sandstone tenements with retail units at

    ground level on Broad Street.

  • 24 (Lodged applications)

  • 25

  • 26

  • 27

  • 28

  • 29

  • 30

    Boundary Treatment

    Various types of fencing

    Crownpoint Road Orr Street

    GCC Vehicle Pound - Avenue Street Crownpoint Road Cnr. Broad Street/ David Street

  • 31

    Public and Private Green Space

    Trees with Tree guards along London Road

    Bespoke artwork

    Litter

    London Road green spaces

    Fly tipping Tree guards

  • 32

    Surface Materials

    Examples of retained and recently installed reclaimed granite setts

    Crownpoint Road/ Brook Street

    Brook Street

    Fordneuk Street

    Crownpoint Road/ St Marnock Street

  • 33

    Surface materials

    Existing streetscape

    Fordneuk Street - North Fordneuk Street - South

    Fielden StreetCrownpoint Road

    London Road Orr Street

  • 34

    Public Realm/ Pedestrian Activity

    Particularly neglected areas: Barrowfi eld Street, Avenue Street, Brookside Street, eastern part of

    Crownpoint Road

    Barrowfi eld Street Crownpoint Road

    Avenue Street Brookside Street

    Avenue StreetBrookside Street

    Barrowfi eld Street

  • 35

  • 36

    2.2 Review of Previous Studies

    2.2.1 Clyde Gateway Green Network Strategy

    The Clyde Gateway Green Network Strategy identifi es as

    a strategic objective to create an attractive environment

    within which new development will be located, encouraging

    investment as houses become more marketable and com-

    mercial investors are attracted by a distinctive new urban

    character and the ability to recruit locally.

    The Clyde Gateway Green Network Strategy has recog-

    nized a number of opportunities to introduce greenspace

    within existing commercial developments and identifi es a

    number of initiatives within Mile End Industrial Area specifi -

    cally developing a landscape strategy for London Road as

    a priority project with the potential to develop London Road

    as a green corridor linking Bridgeton Cross with Celtic Park

    and the National Indoor Sports Arena. Further recom-

    mendations contained within The Clyde Gateway Green

    Network Strategy include planting street trees along inter-

    nal roads in order to develop secondary green spines along

    Broad Street, Fordneuk Street and Brook Street.

    2.2.2 A Vision for the East End - Clyde Gateway Development Framework

    A Vision for the East End Clyde Gateway Development

    Framework (referred to as the Gensler report proposals)

    include recommendations to improve connectivity within

    the Clyde Gateway through environmental improvements

    which include: Street Lighting; Signage and branding; Tree

    Planting and improved footpaths and cycle ways.

    Within Mile End Industrial Area specifi c recommendations

    include exposing the culverted Camlachie Burn water-

    course as part of wider fl ood attenuation proposals for the

    River Clyde and its tributaries. To strengthen the identity

    of the light industrial zone, strategic infi ll projects, upgraded

    streets and branding signage interventions are proposed.

    Further the Gensler report prescribes to strengthen the

    Bridgeton Cross Districts identity whilst promoting better

    connectivity, environmental improvements are proposed

    to Fielden Street and London Road in order to emphasise

    their urban importance, historic signifi cance and to exploit

    their visual signifi cance. These corridors should also be

    subject to building refurbishments, lighting programmes

    and where appropriate, traffi c calming measures.

    2.2.3 Glasgow Core Path Plan

    The Glasgow Core Paths Plan: Final Consultative Draft

    identifi es Orr Street, Brook Street and London Road as

    existing paths that could become core paths.

    2.2.4 Glasgow East End Local Path Network

    and Greenspace Strategy

    The study examines existing access routes and open

    space provisions as well as showing potential new paths/

    open spaces and aspirations in regards to development of

    paths and open space structure.

    This study concentrated on the audit of existing open space

    and access development of health walks including audit of

    existing green spaces and public consultation.

    Relevant Comments/ Consultation for Mile End (Crown-

    point Hub and Bridgeton Hub)

    People feel safe to walk because there is enough traffi c

    (42)

    Loss of greenspace to building developments (42)

    Better signage needed (37)

    Paths need improvement (36)

    Parks maintenance required (32)

    Provide more benches/ street furniture/ picnic tables (32)

    More bike routes needed (25) but also Cycling routes are

    good (29)

    Area is safe (20)

    Anti-social behaviour (20 in Crownpoint, 1 in Bridgeton)

    More/ better/ safer road crossings (20 Crownpoint only)

    Views/ landscape/ dereliction (18)

    Community art or more colourful places desired (16

    Crownpoint only)

    Problems with dogs/ dog mess (14 Bridgeton only)

    More facilities needed (e.g. toilets) (14)

    More/ better parking needed (14 Bridgeton only)

    Improve pavement surface (13)

    Improve access for people with disability/ prams (9 Bridg-

    eton only)

    Improve local parks (9 Bridgeton only)

    Area needs cleaned (8)

    More parks needed (6 - Crownpoint only)

    Make area safer (6)

    Traffi c is bad (5 Bridgeton only)

    More play parks or facilities for young people and children

    (4)

    Crownpoint Road is identifi ed as an important local route,

    however it is considered unsafe by many. Recommended

    improvements include lighting, signing and security up-

    grade/ assessment.

    Orr Street and Crownpoint Road require lighting upgrade

    and general improvements to the area.

  • 37

    2.2.6 Mile End Industrial Area Action Plan

    The Mile End Industrial Area Action Plan (referred to as the

    DTZ report) is intended to guide the future development of

    the area, and is intended as both a policy and delivery tool.

    The proposals prescribe a vision and development propos-

    als for Mile End. Nine key development opportunities are

    prescribed for underused or derelict land parcels within

    Mile End.

    2.2.5 The East End Local Development Stra-

    mmm tegy Changing Places: Changing Lives

    Changing Places: Changing Lives East End Local De-

    velopment Strategy places Mile End Industrial Area within

    the Repair and Reconnection zone.

    The study identifi es signifi cant development proposals for

    the Bridgeton/ Mile End area. The focus of the Bridgeton

    & Mile End Hub is the area around Bridgeton Cross which

    functions as a neighbourhood centre for the Bridgeton com-

    munity and also serves as a hub for the industrial district of

    Mile End to the north of Bridgeton Cross.

    The report identifi es the signifi cant contribution which the

    industrial estate could potentially make to Bridgeton Cross

    and the proposed Bridgeton Cross Conservation Area

    which recognises the architectural quality of buildings sur-

    rounding the Cross.

    The Olympia Building on the corner of Bridgeton Cross has

    been identifi ed as a Key Development Site. This listed

    building would be included within the proposed designa-

    tion of the Bridgeton Cross Conservation Area. Further the

    Olympic Street/ Summer Street/ Broad Street/ Orr Street

    block has been identifi ed as a key development site within

    the Local Development Strategy.

  • 38

    2.2.7 Previous studies - Recommendations

    The Clyde Gateway Green Network Strategy includes for

    public realm improvements along the north side of London

    Road. Our proposals refl ect these through the introduction

    of widenend pavements and avenue trees at regular spac-

    ing.

    Recommendations within The Clyde Gateway Green

    Network Strategy also prescribe the introduction of street

    trees to internal roads in order to develop secondary green

    spines along Broad Street, Fordneuk Street and Brook

    Street. However, we consider tree planting should be con-

    fi ned to development plot boundaries when the opportunity

    is presented, and we do not consider the introduction of

    street trees to internal roads to be appropriate.

    Within our recommendations we have developed and

    costed the introduction of a pocket park at the junction of

    Crownpoint Road and Brook Street and tree planting to

    Fielden Road which are consistent with the recommenda-

    tions contained within the Green Network Strategy.

    The DTZ study prescribes a vision as well as concrete de-

    velopment proposals within Mile End Industrial Area. Nine

    key development opportunities are prescribed for under-

    used or derelict land parcels.

    Recommendations contained within the Changing Plac-

    es: Changing Lives East End Local Development Strate-

    gy prepared by Glasgow City Council focus on the creation

    of a Bridgeton and Mile End Hub area around Bridgeton

    Cross which functions as a neighbourhood centre for the

    Bridgeton community and also serves as a gateway to

    the industrial district of Mile End to the north of the cross.

    The report recognises that Mile End Industrial Area offers

    signifi cant opportunities to accommodate new business

    development with the potential to offer sites for businesses

    required to relocate as a result of the M74/ EERR. Further,

    the report recognises the signifi cant contribution which the

    industrial estate could potentially make to Bridgeton Cross.

    Key projects and opportunities include:

    Designation of Bridgeton Cross as a Conservation

    Area;

    Upgrade of Bridgeton station;

    Mile End Industrial Area Action Plan;

    Green link to Glasgow Green along James Street;

    Community Link on Orr Street;

    Alterations to the road network;

    Redevelopment of key sites to restore the urban

    fabric of the Cross.

    Specifi c proposals include:

    Mile End Industrial Area improved new business

    development and environmental improvements;

    Key development Sites, Iceland and the former

    Olympia Cinema building;

    London Road key connection;

    Public Realm Improvements at Bridgeton Cross;

    Bridgeton railway Station upgrading and transport

    Future road realignment opportunities at Bridgeton

    Cross;

    Connection route to Glasgow Green and the River

    Clyde;

    Dalmarnock road quality bus corridor.

    The study recognises that the Mile End Industrial Area will

    continue to function as a locally important industrial area.

    Proposals to enhance the area and maximise the develop-

    ment opportunities within Mile End have been identifi ed

    through the preparation of the DTZ Action Plan. The Action

    Plan identifi es the key development opportunities in Mile

    End and where public realm and environmental improve-

    ments should be targeted for maximum benefi t.

  • 39

    2.3 Key Issues

    2.3.1 Key Issues - General

    Key issues have been identifi ed through the site survey,

    consultations and the fi ndings of reports previously under-

    taken in the study areas. Despite the four industrial areas

    differing in character, location, size and identity, there are a

    number of key issues which reoccur within each industrial

    site, these are as follows:

    Poor condition of footpath surfacing;

    Disparate, often unattractive boundary treatments;

    General neglect and maintenance issues;

    Personal safety issues;

    Feelings of hostility and anonymity;

    Pedestrian routes (to schools) perceived as unsafe

    and unattractive;

    Vacant plots emptiness, dereliction;

    Litter and fl y tipping;

    High usage of vehicles, low usage of public trans

    port despite close proximity to public transport

    services in all four sites;

    Lack of Green (street trees, green spaces) and

    very colourless places.

    2.3.2 Key Issues - Specifi c to Mile End

    Industrial Area

    In contrast to the other three industrial estates Mile End

    Industrial Area draws great benefi ts from its location (close

    proximity to Bridgeton Cross - proposed conservation

    area), relatively high urban density, some good building

    examples, a mix of uses and users (industrial, residential,

    educational and community facilities) as well as recent en-

    vironmental improvements. These are all existing qualities

    on which to build upon.

    Other specifi c issues to the above include:

    gang territory, perceived safety issues amongst the

    public, especially along school routes (Crownpoint

    Street. Fordneuk Street, Brook Street);

    derelict area around Barrowfi eld Street, Avenue

    Street and Brookfi eld Street;

    Location along London Road major arterial road

    between City Centre, future Commonwealth

    Games Village and National Indoor Arena.

  • 40

    Green Space #4

    Introduce a small pocket park within small gap site at cor-

    ner of Crownpoint Road/ Brook Street into usable formal-

    ised (temporary) public green space through the following

    environmental improvements:

    Tree planting;

    Bespoke street furniture (tree grilles, bench

    seating, bollards and bins).

    2.4.2 Green Links

    Green Link #1

    Promote Orr Street as a principal pedestrian thoroughfare

    between Bridgeton Cross and Crownpoint Street. Create

    home zone qualities giving preference to pedestrian activ-

    ity through a combination of the following environmental

    improvements:

    Pavement widening and resurfacing in concrete

    paving units;

    Resurface a section of Orr Street carriageway in

    granite setts;

    Trees planted within pavement projections along

    the street and to adjacent private green space

    within the Nursing Home.

    Green Link #2

    Introduce strategic public realm improvements along the

    north side of London Road, Recommendation 29 through a

    combination of the following environmental improvements:

    Increase pavement width to 5m and resurface in

    natural stone paving slabs;

    Introduce street trees at regular spacing along

    London Road.

    2.4.3 Priority Projects

    Priority projects identifi ed and agreed with the client group

    within the Mile End Industrial Area are as follows:

    1. Resurface existing pavements in poor condition

    and replace insitu concrete surfaces with asphalt/

    concrete paving slabs. Recommendations 1 and 2;

    2. Introduce white light source and wall mounted

    luminaries to reduce clutter at ground level and

    increase safety. Recommendations 13 and 14;

    3. Olympia Cinema streetscape improvements de

    scribed in Green Space #1 above;

    4. Orr Street streetscape improvements described in

    Green Link #1 and Green Space #2 above;

    5. Introduce tree planting within privately owned

    green space. Recommendation 20.

    2.4 Environmental Improvements

    The following objectives and recommendations have been

    prepared for Mile End Industrial Area and are accompanied

    by supporting illustrative material. Figure 05 is an aerial

    sketch of the industrial area which locates the Green Link,

    Green Spaces and Priority Projects. Figure 06 locates the

    recommendations on a site plan.

    2.4.1 Green Spaces

    Green Space #1

    Provide a new public realm/ streetscape proposal fronting

    the former Olympic Cinema building on Bridgeton Cross in-

    corporating the existing public green space. Figures 07-09

    illustrate the proposals in greater detail. These proposals

    include a new bespoke Info Box building which we intend

    to announce the initiatives and activities within the Clyde

    Gateway Regeneration Area at this highly prominent loca-

    tion through a combination of the following environmental

    improvements:

    Realise a new building through an open

    architec tural competition for a temporary public

    building to act as an Info Box;

    Illumination of former Olympia Cinema faade/

    temporary installation to project movie classics

    onto faade;

    Resurface pavements in natural stone paving;

    Resurface small section of Olympia Street car

    riageway in granite setts;

    Introduce 5m wide pavement along north side of

    London Road including street trees;

    New street furniture including lighting columns

    (white light source) tree grilles, bench seats and

    bollards;

    New natural stone pavement threshold including

    interpretation panels to Olympia Street;

    New footpath and seating within existing public

    green space and removal of existing tree guards.

    Green Space #2

    Introduce a small neighbourhood square on Orr Street to

    front former Church building through a combination of the

    following environmental improvements. Figures 10-12 il-

    lustrate the proposals in greater detail:

    Tree planting;

    Resurface pavements in concrete paving units;

    Resurface a section of Orr Street carriageway in

    granite setts;

    Bespoke street furniture (tree grilles, bench seat

    ing, bollards and bins).

    Green Space #3

    Expose canalised and culverted Camlachie Burn water-

    course and introduce riverside linear park as part of future

    development proposals for adjacent land parcels through

    the following environmental improvements. Figures 13-15

    illustrate the proposals in greater detail:

  • 41

  • 42 42

  • 4343

  • 44

    2.5 Recommendations

    The following environmental improvements within Mile End Industrial Area have been assigned short, medium and long

    term priorities. Typically recommendations have been assigned a time-related priority rating:

    - Short term priority: represent a quick fi x, low in cost items which should be considered as ongoing

    maintenance items and should be regarded as ongoing maintenance items in the future;

    - Medium term priorities: require the minor infrastructure improvement incl. design detailing

    and planning;

    - Long term priorities: these form strategic, holistic and aspirational recommendations and represent

    major infrastructure improvements which by their complex nature may be the subject of a separate study.

    Note: The below budget costs exclude professional fees and VAT. They include a 10% contingency allowance.

    The costs are based on current tender rates (June 2008) and assume that for each area:

    - all short term priorities are let as a single contract

    - all medium term priorities are let as a single contract

    Ref. Recommendation Objective Priority Cost

    Public Realm/ Pedestrian Activity

    1 Attend to uneven/ neglected pavement surfaces User comfort and promote

    pedestrian activity

    short 102,800.00

    2 Replace existing in situ concrete pavements with

    asphalt or PCC paving

    User comfort and promote

    pedestrian activity

    medium 238,600.00

    3 Widen and resurface the pavements along Orr

    Street. Resurface pavements in PCC paving.

    Introduce street trees where possible.

    User comfort and promote

    pedestrian activity

    medium 429,900.00

    28 Introduce path within greenspace at Bridgeton X. Promote pedestrian activity medium 50,000.00

    29 Introduce public realm improvements along the

    north side of London Road. Widen pavement to

    5m and surface in natural stone. Introduce street

    trees at regular spacings.

    Aspirational objective to rec-

    ognise arterial road corridor

    and promote links between

    Bridgeton X and Celtic Park/

    National Indoor Sports Arena.

    long 838,600.00

    Surface Materials

    4 Remove Bitmac surface from Fordneuk Street to

    reveal original granite setts to carriageway. Rein-

    state areas of missing setts.

    Aesthetic and robust medium 53,800.00

    5 Resurface pedestrian area around Olympia Build-

    ing at Bridgeton Cross with natural stone paving

    integrate design of pedestrian area with recom-

    mendations from Bridgeton Cross Study

    Aesthetic and robust long 81,300.00

    6 Introduce a central green space on Orr Street

    within the triangular T-junction between Rogart

    Street and Orr Street consisting of trees, granite

    setts, lighting and seating. Resurface carriageway

    in this section in granite setts.

    Aesthetic and robust, promote

    pedestrian activity, create

    community atmosphere

    around group of Nursery/

    NHS buildings

    long 62,300.00

    Street Furniture

    7 Introduce seats and litter bins within existing green

    spaces along London Road

    Aesthetic short 13,600.00

  • 45

    Ref. Recommendation Objective Priority Cost

    Street Furniture (cont.)

    8 Demolish brick planters and walls in front of police

    building on London Road. Integrate area into new

    streetscape proposals for London Road

    Aesthetic long 4,100.00

    9 Introduce 5 No. estate plan/ orientation boards at

    strategic locations/ gateways into estate

    Promote pedestrian

    activity,

    Clarity of navigation

    short 14,800.00

    10 Introduce signage locating community facilities,

    public transport incl. distance and walking times

    Promote pedestrian

    activity,

    Clarity of navigation

    short 3,000.00

    11 Introduce bespoke street furniture (sculptural bol-

    lards etc.) within pedestrian area around Olympia

    Building

    Promote pedestrian activity medium 7,700.00

    12 Introduce 3 No. bronze inscribed panels set within

    pavement to reveal locally important historical fact

    (philanthropist David Dale etc.)

    Promote pedestrian activ-

    ity and raise local historical

    awareness

    medium 3,100.00

    13 Introduce white light source to replace

    65 No. existing sodium light source to existing

    lighting columns to primary and secondary roads

    and principle pedestrian routes

    User comfort and promote pe-

    destrian activity, public safety

    long 76,800.00

    14 Introduce 15 No. white light source wall mounted

    luminaries where possible (Broad Street, St. Mar-

    nock Street, Fordneuk Street)

    User comfort and promote pe-

    destrian activity, public safety,

    remove clutter

    long 29,500.00

    Boundary Treatment

    15 Enter into discussions with land owners to extend

    the use of bespoke fence to properties currently

    using palisade fencing

    Aesthetic medium 271,900.00

    Public Green Space

    16 Enter into negotiations with Land Services to

    address current levels of maintenance for green

    spaces along London Road. Ensure tree guards

    are removed and retained for use elsewhere and

    litter removed from shrub planting areas.

    Increase public amenity short No cost

    allowance

    17 Remove fence along green space on north side of

    Crownpoint road adjacent to sports pitch

    Aesthetic short 1,800.00

    18 Introduce tree planting within existing shrub plant-

    ing areas along Rockbank Place, Rockbank Street

    and Broad Street. Restock tired planting beds,

    replacing shrub species that have become over

    mature and leggy

    Aesthetic and biodiversity medium 25,200.00

    19 Develop small gap site at corner Crownpoint Road/

    Brook Street into usable formalised (temporary)

    public green space.

    Increase public amenity medium 33,000.00

    20A Introduce linear greenspace along Camlachie Burn

    when redeveloping adjacent land parcel. De-ca-

    nalise burn introduce areas of hardstanding, 1 No.

    bridge crossing and bench seating.

    Increase public amenity. Al-

    low local fl ood attenuation

    long 181,400.00

  • 46

    Ref. Recommendation Objective Priority Cost

    Private Green Space

    20 Examine opportunities to introduce tree planting

    within areas of hardstanding to private plots, i.e.

    - nursing home on Orr Street

    - GCC vehicle pound at Avenue Street

    - Platform Builders Merchant car parking

    area along Crownpoint Road

    - GM Radiator MFG (to replace Leylands

    cypress hedge)

    - Private car park on Broad Street cnr.

    Summer Street (to replace Leylands

    cypress hedge)

    Aesthetic, environmental medium 13.900,00

    Architecture

    21 Enter into negotiations with owner of Orr Street 82,

    90 (James Watt Motors) regarding advertisement

    display on north facade

    Aesthetics, community in-

    volvement

    medium No cost

    allowance

    22 Enter into negotiations with owners of 76-176

    Fordneuk Street to introduce artwork along faade.

    Explore opportunity to develop artwork in conjunc-

    tion with St. Mungos Academy

    Aesthetics medium 7,400.00

    23 Amendments to recessed doorways:

    set-back 5 No. doors to front of faade in agree-

    ment with property owners along (e.g. on Broad

    Street, Brook Street)

    Public safety medium 22,100.00

    24 Explore opportunities to reinstate blocked up

    windows within long brick facades to the proper-

    ties along Crownpoint Road, Rimsdale Road and

    Fordneuk Street

    Public safety, increase pedes-

    trian activity, aesthetics

    medium No cost

    allowance

    25 Illuminate faade of Olympia Cinema Aesthetics, pride, Assist in

    attracting new user

    medium 14,800.00

    26 Free up land parcels for re-development as indi-

    cated in plan

    Economic growth long No cost

    allowance

    27 Design and build temporary structure to house

    public consultation events, exhibitions to promote

    the Clyde Gateway and East End regeneration lo-

    cated within green space opposite Bridgeton Cross

    Economic growth, public-

    ity, raise local awareness of

    change

    long 548,800.00

    The above costs amount to 3,130,200.00. Three million one hundred and thirty thousand and two hundred pounds.

    xx The highlighted box denotes recommendations that for

    part of the list of Priority Project as described in chapter 3.4.3.

  • 47

    Legend - Recommendations Plan

  • 48

  • 49

  • 50 50

  • 5151

  • 52 52

  • 5353

  • 54 54

  • 5555

  • 56 56

  • 5757

  • 58 58

  • 5959

  • 60 60

  • 61

  • 63

    MILE END INDUSTRIAL AREA - CONCEPT IMAGES - BRIDGETON CROSS

    Recommendation 5:

    Natural stone surfacing around Bridgeton Cross

    Recommendation 27:

    Temporary Exhibition/ Info Building for Clyde Gateway Area

    62

  • 63 63

    MILE END INDUSTRIAL AREA - CONCEPT IMAGES - ORR STREET

    Recommendation 6:

    Central Space on Orr Street

    Recommendation 21:

    Resolve advertisement signage

    on building facade

    Recommendation 3:

    Widen and resurface footpaths,

    introduce street trees where possible

  • MILE END INDUSTRIAL AREA - CONCEPT IMAGES - SIGNAGE

    Recommendations 9, 10:

    Directional signage, orientation maps bespoke entrance

    signage

    64

  • 65

    MILE END INDUSTRIAL AREA - CONCEPT IMAGES - STREET FURNITURE

    Recommendation 23:

    Existing recessed doorways to be amended

    Recommendation 15:

    Extend use of existing bespoke fencing

    Recommendation 7:

    Introduction of seating and litter bins

  • 66

    MILE END INDUSTRIAL AREA - CONCEPT IMAGES - CAMLACHIE BURN

    Recommendation 20A:

    Regenerate Calmachie Burn

    and create linear green space

    66

  • 67

  • 68

  • 3 DALMARNOCK BUSINESS VILLAGE

  • 70

  • 71

  • 72

    3.1 Existing Situation/ Survey

    3.1.1 Location

    A readily accessible site centrally located within the Clyde

    Gateway with immediate access to major arterial roads,

    namely London Road, Dunn Street and Dalmarnock Road.

    In the future Dalmarnock Business Village will be bounded

    along its entire west boundary by the East End Regenera-

    tion Route. The site is near to the proposed Common-

    wealth Games Village, directly adjacent to The National In-

    door Sports Arena and will benefi t from direct road access

    to the East End Regeneration Route.

    3.1.2 Character

    There is a distinction within Dalmarnock Business Village

    between those businesses located to the south of Baltic

    Street and north of Dalmarnock Road which are regarded

    as Nuneaton Street Industrial Estate and those to the north

    of Baltic Street and south of London Road which are con-

    sidered as Boden Industrial Estate. The southern portion

    of the business village includes pockets of mature green

    space which respond well to the cohesively designed single

    storey business units.

    There is a disparate size and style of architecture within the

    estate, ranging from substantial brick and masonry struc-

    tures, to smaller clusters of brick buildings and modern

    buildings typically with glazed and metal curtain walling.

    The nature of the business activities within the estate re-

    quires substantial areas of hardstanding yards to the back

    of the units, which are inevitably cluttered and unsightly.

    Dalmarnock Business Village is characterised by the use

    of an aesthetically pleasing fence type at various locations

    throughout the Industrial Estate, comprising of rounded

    black posts and railings and ensuring a sense of cohesive-

    ness in the estate. Elsewhere palisade security fencing

    has also been fi nished in black which helps to promote a

    uniformity of boundary treatments within the estate. Out

    of the four industrial sites it has benefi ted from an infl ux of

    new businesses.

    3.1.3 Existing Land Use

    Dalmarnock Business Village measures 20ha. of which

    10,000m2 the equivalent to 5% is vacant land. The estates

    occupants are predominantly light industrial, some busi-

    ness, no residential. Figure 16 records Land Use within

    Dalmarnock Business Village.

    3.1.4 Public Transport Infrastructure

    Dalmarnock Business Village is well served by Dalmarnock

    Railway Station which is on the Glasgow/ Larkhall/ Moth-

    erwell/ Lanark route. Despite being the least used railway

    station on the SPT network Dalmarnock has a frequent

    and regular service. It is only 12 minutes travel time from

    the Exhibition Centre; 7 minutes from Glasgow Central low

    level and 29 minutes from Motherwell.

    A small number of businesses are within a 4 minute walk-

    ing distance from Dalmarnock Railway Station (250m).

    The southern half of the business village is within a 500m

    radius the equivalent to 7 minutes walking distance, whilst

    the entire industrial village is within a 1km walking distance.

    Route No. 16/16A and No. 18 buses operate along Dal-

    marnock Road. London Road is serviced by the No. 61/ 62

    and No. 240 buses.

    3.1.5 Road Hierarchy

    Figure 17 shows the existing road infrastructure within Dal-

    marnock Business Village. Dalmarnock Business Village

    is bounded on three sides by major arterial roads, namely:

    London Road to the north; Dunn Street to the west and

    Dalmarnock Road to the south. These major arterial roads

    consist of four lanes.

    Dalmarnock Business Village has three principal entrances,

    two off London Road (Boden Street and Nuneaton Street)

    from the north boundary and one from Dalmarnock Road

    (Nuneaton Street) along the south boundary. Additionaly

    Dalmarnock Business Village has two secondary en-

    trances, an additional entrance along the south boundary

    on Mordaunt Street off Dalmarnock Road and a further

    secondary entrance from Baltic Street to the east.

    It is noteworthy that there are no vehicle entrances into

    the industrial estate off Dunn Street along the entire west

    boundary, where both Baltic Street and Bernard Street

    have been closed at Dunn Street.

    In the future on completion of the East End Regeneration

    Route (EERR), a 4th principal entrance will be provided

    along the east boundary. Further the secondary Mordaunt

    Street entrance will be closed.

    Internally Nuneaton Street and Boden Street are primary

    roads. Of these Nuneaton Street functions as the primary

    road link to all secondary roads. Both primary roads suffer

    from speeding vehicles.

    3.1.6 Public Realm/ Pedestrian Activity

    Mordaunt Street has been designated as an Existing path

    that could become a core path in the Glasgow Core Paths

    Plan (Final Consultative Draft, Feb 2008). There is a con-

    trolled pedestrian crossing on Dunn Street aligned on Baltic

    Street. Baltic Street serves as an important pedestrian

    route catering for parents and pupils to and from the nearby

    Dalmarnock Primary School.

    Baltic Street is visually interrupted by high palisade fenc-

    ing which has recently been erected along Dunn Street

    and does not give the impression of a through route to the

    nearby Primary school. The pavements along Baltic Street

    are in an extremely poor state of repair, further they are

    currently very narrow for being an effective core path.

    There is a large undefi ned expanse of hardstanding on

    Dunn Street which visually and physically detracts when

    travelling south along this road corridor.

  • 73

    3.1.7 Surface Materials

    Generally the majority of pavements are surfaced in

    asphalt which is in a reasonable condition. However, the

    pavements along Baltic Street and part of Bernard Street

    are in an exceptionally bad condition.

    Approximately half of the pavements are edged with Whin-

    stone stone kerbs. The use of indigenous natural stone

    kerb edging gives a far superior appearance to the con-

    crete kerb upstand. Some of the bell mouths to individual

    unit entrances are surfaced with granite setts, once again

    this is visually far superior in appearance to insitu concrete

    or blacktop.

    There are localised areas of concrete slab paving within ar-

    eas of public open space below acer trees to Boden Street

    and along Bernard Street which have proved unsuccessful.

    Within the industrial estate red engineering bricks have

    been used to edge areas of amenity shrub planting and

    grass. In places individual bricks have become dislodged

    which detracts from the overall appearance of these fea-

    tures.

    3.1.8 Street Furniture

    Trip rails have been deployed to protect areas of amenity

    shrub planting and grass areas from unwanted foot traffi c.

    There are a few litter bins along Nuneaton Street, however

    these are inadequate when coping with the sheer volume

    of match day litter during home fi xtures at Celtic Park.

    At present there is no seating provision within the industrial

    estate to cater for lunch breaks etc. Further there are over-

    sized metal barriers along Bernard Street which appear

    visually intrusive.

    3.1.9 Boundary Treatment

    At present the boundary treatments vary according to the

    requirements, taste and budgets of land owners. However,

    some consideration has been given to unifying boundary

    treatments and there are some examples of merit. This

    can be seen in both fence treatment and planting selec-

    tion. The good work undertaken to date can be built upon

    in the future to further unify boundary treatments within the

    estate.

    3.1.10 Public Green Space

    Figure 16 Land Use reveals that those businesses located

    to the south of Baltic Street and north of Dalmarnock Road

    within Nuneaton Street Industrial Estate benefi t from a

    generous provision of mature trees set within amenity open

    green space. There is a noticeable lack of open green

    space elsewhere within the larger northern portion of the

    industrial estate. Some exceptions to this general appear-

    ance are:

    tree and shrub planting to the verge of the Stairlift

    Scotland property along Arrol Road and short

    lengths of Boden and Nuneaton Street and

    Lime trees and shrub planting (albeit in mediocre

    shrub beds along a short length of Nuneaton Street

    at the frontage of the Calder Millerfi eld buildingg

    Lime trees and shrub planting (albeit in mediocre

    condition) to the south verge of London Road.

    green space consisting of a grassed area, shrub

    planting, trees and large evergreen hedges on

    the premises of the former youth club (bounded

    by Dnn Street, London Road, Boden Street and

    Bernard Street)

    The landscape strip along the London Road boundary

    comprises of raised red engineering brick planters contain-

    ing Lime trees and evergreen shrubs. In places the cope

    course of engineering brick has become dislodged. In ad-

    dition to requiring repair, its dated and dilapidated appear-

    ance is not befi tting of this major road corridor.

    3.1.11 Private Green Space

    Overall there is little notable private green space within Dal-

    marnock Business Village. However, there is a generous

    provision of public green space within Nuneaton Industrial

    Estate which compensates for the lack of private green

    space here. Private green space in Dalmarnock Business

    Village consists mainly of the introduction of hedge plant-

    ing along the face of units and property boundaries. The

    evergreen Photinia fraserii Red Robin, which as the name

    suggests is a red foliaged shrub, has been used as hedge

    planting on several properties. It compliments the black fi n-

    ish to the bespoke boundary fence very well.

    3.1.12 Architecture

    Generally Dalmarnock Business Village includes a variety

    of buildings which differ in scale, age and in fi nish. Gener-

    ally the buildings within the estates interior are of a smaller

    scale, with larger units occupying plots around the estate

    perimeter.

    Dalmarnock Business Village has some buildings of archi-

    tectural merit and longevity including the church building

    on Boden Street. However the sandstone to the principal

    faade has received an application of masonry paint which

    is now peeling. The paint does not allow the sandstone to

    breath and often causes the exfoliation of the stonework.

    Recent additions include buildings with glass/ metal curtain

    walling which promote a welcome contemporary architec-

    tural quality, these include Glasgow Taxis, PR Print Design,

    and SRS developments.

    The clusters of single storey brick-built units with a curved

    metal roof within Nuneaton Street Industrial Estate promote

    a unifi ed and domestic scale when entering from Dalmar-

    nock Road. However these units have been designed with-

    out a rain water gutter and water draining off the roofs is

    discharged onto a red engineering brick perimeter around

    the units at ground level. This detail has failed and bricks

    have become dislodged in many places. The aggressive

    surface root action of some inappropriate tree species,

    namely Cherry and Sycamore trees has further compro-

    mised this brick band.

  • 74 (Lodged applications)

  • 75

  • 76

  • 77

  • 78

  • 79

  • 80

    Character - The good things fi rst:

    mature amenity planting, modern architecture, historic St. Francis in the East church building

    with vegetation

  • 81

    Public Realm/ Pedestrian Activity

    London Road Nuneaton Street

    Dunn StreeetBaltic Street/ Dunn Street

    Baltic Street

  • 82

    BoundaryTreatment

    Use of unifi ed black fencing at properties throughout the estate and amenity planting

  • 83

    Nuneaton Industrial Estate

    Baltic Street/ Dunn Street

    Boden Street Nuneaton Street

    Boundary Treatment

    Fencing - uninspiring: galvanised palisade fences, barb-wire and brick walls - along London Road,

    Nuneaton Street, Bernard Street and Mordaunt Street and at the juntion of Baltic/Dunn Street

  • 84

    Public Green Space

    General lack of maintenance, neglect and litter

    London Road

    Bernard Street

    Mordaunt Street

    Boden Street

  • 85

    Public Green Space

  • 86

    Poor quality surfacing examples

    Bernard Street

    Baltic Street

    Boden Street

  • 87

    S

    urf

    ace M

    ate

    rials

    -

    G

    ood a

    nd b

    ad e

    xam

    ple

    s

    Go

    od

    Good

    Bad

    Ba

    d

    Ba

    dB

    ad

    Ba

    d

  • 88

    Public Realm

    Unregulated Parking

    Boden Street Boden Street Nuneaton Street

    Dunn StreetDunn StreetDunn Street

    Boden Street Dunn Street

  • 89

  • 90

  • 91

    3.2 Review of Previous Studies

    3.2.1 Clyde Gateway Green Network Strategy

    The Clyde Gateway Green Network Strategy identifi es

    as a strategic objective to create an attractive environment

    within which new development will be located, encouraging

    investment as houses become more marketable and com-

    mercial investors are attracted by a distinctive new urban

    character and the ability to recruit locally.

    The Clyde Gateway Green Network Strategy has also iden-

    tifi ed a number of opportunities to introduce green space

    within existing commercial developments and identifi es a

    number of initiatives within Dalmarnock Business Village

    specifi cally in relation to the landscape proposals associat-

    ed with the EERR in the provision of avenue tree and shrub

    planting and providing/ improving pedestrian and cyclists

    space and access. Within the industrial estate the recom-

    mendations include increasing the area of woodland cover-

    age on vacant land to provide greater woodland framework

    for adjacent development and increase biodiversity.

    3.2.2 A Vision for the East End - Clyde

    Gateway Development Framework

    A Vision for the East End Clyde Gateway Development

    Framework referred to as the Gensler report proposals

    include recommendations to improve connectivity within

    the Clyde Gateway through environmental improvements

    which include: Street Lighting; Signage and branding; Tree

    Planting and Improved footpaths and cycleways.

    Further the Gensler report prescribes to strengthen the

    Bridgeton Cross Districts identity whilst promoting better

    connectivity, environmental improvements are proposed

    to . . Dalmarnock Road, Dunn Street . . to emphasise their

    urban importance, historic signifi cance and to exploit their

    visual signifi cance. These corridors should also be subject

    to building refurbishments, lighting programmes and where

    appropriate, traffi c calming measures.

    3.2.3 Glasgow Core Path Plan

    The Glasgow Core Path Plan: Final Consultative Draft

    identifi es Mordaunt Street, Baltic Street and London Road

    as existing paths that could be core paths.

    3.2.4 Glasgow East End Local Path Network

    and Greenspace Strategy

    The study examines existing access routes and open

    space provisions as well as showing potential new paths/

    open spaces and aspirations in regards to development of

    paths and open space structure.

    The study included public consultation. The relev