Prepared By: Reviewed By: Page 1 of 19 Cluster Acceptance Report Cluster Name: 115 Cluster Stage 100% (With Respect to Launch Sites)
19
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Cluster 115 Post Drive Report Template

Prepared By:

Reviewed By:

Page 1 of 14

Cluster Acceptance Report 

Cluster Name: 115

Cluster Stage 100%(With Respect to Launch Sites)

Page 2: Cluster 115 Post Drive Report Template

Table of Contents

1 INTRODUCTION................................................................................................3

1.1 DT Route/Area...........................................................................................3

1.2 On-Air Status of Cluster...........................................................................4

2 PROCEDURE.....................................................................................................5

3 CALL SUMMARY...............................................................................................5

4 RF INDICATORS DISTRIBUTION PLOTS........................................................6

4.1 RxLev(Sub)................................................................................................7

4.2 RxQuality(Sub)..........................................................................................8

4.3 C/I...................................................................Error! Bookmark not defined.

4.4 Handover Failure....................................................................................11

4.5 Call Drop..................................................................................................11

4.6 Data Throughput(Downlink)..................................................................11

5 UPDATED ENGINEERING PLANNING DATA:.....ERROR! BOOKMARK NOT

DEFINED.

6 RECOMMENDATION & TECHNICAL OVERVIEW.........................................13

7 Punch List.......................................................................................................13

Page 2 of 14

Page 3: Cluster 115 Post Drive Report Template

1 Introduction1.1 DT Route/Area

Page 3 of 14

Page 4: Cluster 115 Post Drive Report Template

1.2 On-Air Status of Cluster

Cluster Completion : 100% with Respect to Launch Sites)

Page 4 of 14

Page 5: Cluster 115 Post Drive Report Template

2 ProcedureThe procedure for the drive tests is described below:

Cluster drive tests shall perform 3 call scenarios: short call, long call, and PS call. GPRS functionality drive tests were performed by downloading a huge file from an FTP server throughout the cluster drive test route. Configuration of MS is as follows in the DT Kit:

MS1= Long call (MS to MSC Test Number ,continous call )

MS2 = Short call (MS to MSC Test Number, 30sec., 3 sec. delay)

MS3 = EGPRS downloading

MS4 = Idle

3 Call Summary

Content Couter & KPI Value Remark

Call Drop(Long Call) Number of Call Drops 0

Total Call duration Contionous call

Call Drop Rate(<=1.2%) 0%

Call Setup(Short Call) Number of call setup failed 0

Number of Call Attempt 91

Call Setup Succ. Rate(>=97%) 100%

Handover(Long Call) Handover Success 38

Handover Attempt 38

HO Succ. Rate( >=97%) 100%

Downlink Throughput Average Downlink Throughput 57.35

Page 5 of 14

Page 6: Cluster 115 Post Drive Report Template

4 RF Indicators Distribution Plots4.1 Serving Cell ID

4.2 RxLev(Sub)

Page 6 of 14

Page 7: Cluster 115 Post Drive Report Template

In this cluster most of the places having terrian issue(Hilly terrian)Area 1& 2: Rx level was poor due to terrian issue in those places. (attached radiation pattern below)

Legend Bin count Percentage-68 to 0 3598 50.22

Page 7 of 14

Page 8: Cluster 115 Post Drive Report Template

-76 to -68 1429 19.95-84 to -76 1467 20.48-92 to -84 622 8.68-110 to -92 48 0.67

Total 7164 100

4.3 RxQuality(Sub)

Page 8 of 14

Page 9: Cluster 115 Post Drive Report Template

Legend Bin count Percentage

0-4 6992 97.605 93 1.306 64 0.897 15 0.21

Total 7164 100

4.3 C/I

Page 9 of 14

Page 10: Cluster 115 Post Drive Report Template

Legend Bin count Percentage20 to 35 6257 91.08

Page 10 of 14

Page 11: Cluster 115 Post Drive Report Template

12 to 20 611 8.899 to 12 1 0.015 to 9 1 0.010 to 5 0 0

-10 to 0 0 0TOTAL 6870 100

4.4 Handover Failure

No Handover failure

4.5 Call Drop

No call drop

4.6 Data Throughput(Downlink)

Page 11 of 14

Page 12: Cluster 115 Post Drive Report Template

GPRS was not connected in Gandhinagar site & Muvattupuzha site’s 2nd sector, informed to OMCR.

Page 12 of 14

Page 13: Cluster 115 Post Drive Report Template

5 Recommendation & Technical Overview

In this cluster most of the places having terrian issue(Hilly terrian) We couldn’t able to change the azimuth of Muvattupuzha site’s 3rd sector, due to another

antenna obstraction. There is an over shoot from Muvattupuzha site , On 3rd sector mainlobe of Gandhi

nagar,Because Gandhi Nagar Site’s antenna height is 40m and Muvattupuzha site’s antenna ht is 49 m and sharp variation in AMSL also.

We have attached the radiation patterns for the issue sites. Muvattupuzha 3rd sector antenna photo:

Vellorekunnam 2nd sector : Vellorekunnam 3rd sector :

Page 13 of 14

Page 14: Cluster 115 Post Drive Report Template

Gandhi Nagar 1st sector : Market Area 1st sector :

6 Punch List

Sr. No. Item Date ClosedName / Signature of closing

authority       

       

       

     

       

ALL TEST COMPLETED WITHOUT ANY ITEMS ON PUNCH LIST

Yes No

Page 14 of 14