Limitations for Number of Test Tenants
Beginning with r1308, the number of “work” test tenants allowed per customer is limited to one per productive tenant.* This is in effect for SAP Business ByDesign, Cloud for Customer, Cloud for Financials and Cloud for Travel and Expense customers.
* The number of production tenants purchased via Enterprise Standard Edition (multiple productive tenants purchasable) and Enterprise Private Edition (package with maximum of ten productive tenants) subscriptions are taken into account.
For the purpose of this presentation, there are two types of test tenants: Work test tenants: Temporary test tenants that are available free of charge and
meant for managing the lifecycle of the SAP Cloud solution (i.e. implementations, training, change projects, etc.)
Permanent test tenants: Test tenants that are purchased separately by the customer, have no expiration date and are used to manage integration and/or customizations using SAP Cloud Applications Studio
© 2013 SAP AG. All rights reserved. 4
Selling Permanent Test Tenants
Permanent Test tenants need to be purchased as usual as an additional material number in the quote.
Customers can order more than one permanent test tenant SAP Cloud for Customer: A permanent test tenant is purchased with material number
8000567 (Cloud for Customer, Test Tenant) or with 8000660 (360 Customer, on-demand version bundle, which includes one 8000567). The permanent test tenant (8000567) is required when integration is in scope and/or the project requires customization via the SDK (8000570, now called SAP Cloud Applications Studio).
SAP Cloud for Travel and Expense: A permanent test tenant is purchased with material number 8000094. It is recommended when integration is in scope and/or the project requires customization via the SDK.
SAP Business ByDesign and SAP Cloud for Financials: No product code exists for permanent test tenant
It is NOT possible for a customer to purchase an additional test tenant on a temporary basis (i.e. “work” test tenant).
Please direct all questions related to selling permanent test tenants to SAP Cloud Sales Operations.
© 2013 SAP AG. All rights reserved. 5
New Functions in Service Control Center Work Center
Three new functions have been introduced in the Systems view in order to enable the new tenant processes for customer tenants only*: “Request Creation” of a new tenant “Request Termination” of an existing tenant “Copy Solution Profile” from one tenant to another
* Other types of tenants, such as internal tenants, cannot use the SCC work center to request/terminate tenants.
© 2013 SAP AG. All rights reserved. 6
Controls
If a user submits a tenant request via the Service Control Center (SCC) work center which results in the customer exceeding his allotted number of tenants, then an error message will be returned that an existing tenant must be decommissioned first.
An exception can be requested via an incident from your SAP Cloud solution. Please note:
Incident must include source tenant URL, decommissioning date for new tenant and why the exception is being requested (turnaround time depends on incident priority and if all details are included in the request)
SAP Cloud Hosting will request approval from Platinum Engineering prior to fulfilling the request (will take one business day in CET)
Examples of exceptions:
1. Prior to cutting over in the production tenant, the financial data migration must be fully tested in a tenant that has no transactions
2. Customer’s go-live is dependent on new functionality in the latest release, requiring you to install a new release now instead of waiting until scheduled upgrade
3. A new installation is required to mitigate risk of customer’s go-live and upgrade occurring around the same time
Refer to Appendix A for examples of when tenants are requested and limits are applied.
© 2013 SAP AG. All rights reserved. 7
R1308 Tenant Provisioning Changes
# In r1305 and prior Effective starting with r1308
1 First customer tenant that was handed over after subscription was booked was the production tenant
First customer tenant that is handed over after subscription is booked in CRM@SAP is test tenant which cannot be set live
2 Some implementations request a new production tenant during the implementation to replace the initial production tenant
All implementation projects must request a production tenant since the initial tenant is now a test tenant
3 Additional tenants are requested via the Request System button under Business Configuration
Request System button is automatically redirected to new UI in the SCC work center
4 A customer’s test and production tenants reside on the same system
Process is the same for SAP Business ByDesign and Cloud for Financials. SAP Cloud for Customer and Cloud for Travel and Expense customer’s test and production tenants are on separate systems.
© 2013 SAP AG. All rights reserved. 8
R1308 Tenant Decommissioning Changes
In r1305 and prior Effective starting with r1308
Test tenants are automatically triggered for decommissioning (in 14 days) once the “Close Project” activity is completed
Tenants are no longer automatically triggered for decommissioning; a user must request termination via SCC work center
Initial production tenant is automatically triggered for decommissioning (in 14 days) after a new system request is submitted for a replacement production tenant
Tenants are no longer automatically triggered for decommissioning (but a replacement production tenant is no longer relevant for implementations)
Implementation Tenant Landscape
Starting with r1308
© 2013 SAP AG. All rights reserved. 10
VERIFYPREPARE REALIZE LAUNCH
1 Configure solution 4 Request production tenant 7 Cutover to production (inc. DM)2 Configure test integration 5 Reload level 0 data & finish FT
3 Test data migration & scenarios 6 Configure production integration
Implementation Cloud System Landscape 2 Tenants Implementation
CLOUD TEST TENANT
CLOUD PRODUCTION TENANT
C
1 3 4
5
C
C C
ON PREMISE QA SYSTEM ON PREMISE PRODUCTION SYSTEM
C
67
C
2
C
ScopeVerification
SolutionAcceptance
ReadinessAcceptance
Go-Live
Sub-scription booked
© 2013 SAP AG. All rights reserved. 11
For Step 4 in Previous SlideRequest Production Tenant
First, click Request
Creation button
Then select:• Solution Profile Source System
ID = test tenant• Source Solution Profile ID =
always Initial Implement
Refer to Appendix B for more details related to this type of system request.
© 2013 SAP AG. All rights reserved. 12
VERIFYPREPARE REALIZE LAUNCH
1 Configure solution, inc. integration 4 Request new tenant as full copy 7 Configure production integration2 Request production tenant 5 Configure test integration 8 Update required config changes
3 Reload level 0 data & finish FT 6 Test data migration & scenarios 9 Cutover to production (inc. DM)
Implementation Cloud System Landscape3 Tenants Implementation Recommended Approach
CLOUD TEST TENANT #1
CLOUD PRODUCTION TENANT
3 4
756
CLOUD TEST TENANT #2
2
ON PREMISE QA SYSTEM ON PREMISE PRODUCTION SYSTEM
C C
C
C
C
ScopeVerification Solution
Acceptance
ReadinessAcceptance
Go-Live
C
C C
Sub-scription booked
8
1
9
C
© 2013 SAP AG. All rights reserved. 13
For Step 2 in Previous SlideRequest Production Tenant
First, click Request
Creation button
Then select:• Solution Profile Source System
ID = test tenant #1• Source Solution Profile ID =
always Initial Implement
Refer to Appendix B for more details related to this type of system request.
© 2013 SAP AG. All rights reserved. 14
For Step 4 in Previous SlideRequest New Test Tenant as Copy of Production
Then select:• Data Source = production tenant
First, click Request
Creation button
Refer to Appendix B for more details related to this type of system request.
© 2013 SAP AG. All rights reserved. 15
VERIFYPREPARE REALIZE LAUNCH
1 Configure solution 4 Enter level 0 data & communications; finish FT 7 Reload level 0 data & finish FT2 Configure test integration 5 Test data migration & scenarios 8 Configure production integration
3 Request new test tenant 6 Request production tenant 9 Cutover to production (inc. DM)
Implementation Cloud System Landscape3 Tenants Implementation Alternative Approach
CLOUD TEST TENANT #1
CLOUD PRODUCTION TENANT
12
78
9
5 6
CLOUD TEST TENANT #2
3
ON PREMISE QA SYSTEM ON PREMISE PRODUCTION SYSTEM
C C
C
C
C
C
ScopeVerification Solution
Acceptance
ReadinessAcceptance
Go-Live
C
C C
Sub-scription booked
4
© 2013 SAP AG. All rights reserved. 16
For Step 3 in Previous SlideRequest New Tenant with Solution Profile only
Then select:• Source System = test tenant #1• Source Solution Profile ID =
Initial Implement
First, click Request
Creation button
Test System
Refer to Appendix B for more details related to this type of system request.
© 2013 SAP AG. All rights reserved. 17
For Step 6 in Previous SlideRequest Production Tenant
First, click Request
Creation button
Then select:• Solution Profile Source System
ID = test tenant #2• Source Solution Profile ID =
always Initial Implement
Refer to Appendix B for more details related to this type of system request.
© 2013 SAP AG. All rights reserved. 18
Copy Solution Profile Behavior
When a solution profile is copied, the following behavior occurs:
1. Scope is copied
2. All fine-tuning settings that have a Repetition Required setting of No are copied, for example:
When a solution profile is copied to a new production tenant, the following additional activities occur:
A. Extension fields and screen layout adaptations made via key user tools are copied as long as there are no extension fields and/or screen layout adaptations already made in the new production tenant
B. Form adaptations are copied
C. Level 0 master data is copied to a staging area where the user can choose to import the pre-populated data migration templates or ignore them. This includes the objects:
Bank Directory Org Structure Transport Zones
Jobs Product Categories Transport Lanes
Tenant Landscape After Go-Live
Starting with r1308
© 2013 SAP AG. All rights reserved. 20
After Go-Live
After the SAP Cloud solution is live for productive use:
1) The “First Implementation” project should be closed in the Business Configuration work center, and
2) A termination request should be submitted for all “work” test tenants (not permanent test tenants)
First, select the tenant
Then click Request Termination button and the tenant will be set to
"DIP - decommissioning in progress" immediately
© 2013 SAP AG. All rights reserved. 21
Request Termination Details
Only tenants with a System Type = Test can be terminated
At least one tenant has to remain per solution and customer (i.e. cannot delete initial test tenant if production tenant not yet created)
Proceed with caution: Partner solutions in the terminated tenant cannot be retrieved after termination
Decommissioning is started immediately with physical deletion in 14 days
Once submitted, the termination request cannot be retracted via the UI; instead, open a very high incident from your SAP Cloud solution (note this is applicable only if physical deletion has not yet occurred)
Once the termination request is submitted, the tenant no longer counts towards the customer’s tenant allotment
Recommended when the test tenant allotment is reached and a new test
tenant is needed
© 2013 SAP AG. All rights reserved. 22
Configuration Changes After Go-Live
Going forward, configuration changes are made one of two ways:
a) Minor changes can be made immediately, or
b) More complex changes must be made via a change project, which is a control that is introduced to mitigate risk to the live SAP Cloud solution
The subsequent slides provide tenant landscape options for change projects when a test tenant is (optionally) used.
© 2013 SAP AG. All rights reserved. 23
Option 1: New Test Tenant as Copy of Production
CLOUD PRODUCTION TENANT 1
3 4 5
72
Solution profile & flex/ex copied & deployed
6
1 Create change project (CP), selecting scope and activities 7 Modify key user access rights; Perform adaptation; Migrate basic and master data
2 Request new test tenant linked to change project solution profile 8 Complete re-opened fine-tuning activities
3 Complete configuration 9 Activate solution4 Test data migration 10 Migrate transaction data; Modify end user authorizations5 Test end-to-end scenarios 11 Close change project ; Go live with new solution6 Merge solution profile 12 Request deletion of change project test tenant
8 9 121110Access to change project activity list
prohibited
Access to change project activity list prohibited
Performed during scheduled business downtime
NEW CLOUD TEST TENANTHas production data with change project solution profile
Performed during scheduled business downtime
Performed during scheduled business downtime
© 2013 SAP AG. All rights reserved. 24
For Step 2 in Previous Slide…
First, click Request
Creation button
Then select:• Data Source System ID =
production tenant• Solution Profile Source System
ID = production tenant• Source Solution Profile ID =
change project
Refer to Appendix B for more details related to this type of system request.
© 2013 SAP AG. All rights reserved. 25
ON PREMISE QA SYSTEM
Option 2: Re-Use Existing Test Tenant
PERMANENT CLOUD TEST TENANT
CLOUD PRODUCTION TENANT 1
3
4
5
ON PREMISE PRODUCTION SYSTEM
72
Solution profile & flex/ex copied & deployed
Solution profile is linked to CP 6
1 Create change project, selecting scope and activities 7 Modify key user access rights; Perform adaptation; Replicate/Migrate basic and master data
2 Request change project solution profile be linked to test 8 Complete re-opened fine-tuning activities
3 Complete configuration 9 Activate solution4 Refresh On Premise data (optional) 10 Replicate/Migrate transaction data; Modify end user authorizations5 Test data replication/migration; Test end-to-end scenarios 11 Close change project6 Merge solution profile 12 Go live with new solution
8 9 121110
Performed during scheduled business downtime
Access to change project activity list prohibited
Access to change project activity list prohibited
Performed during scheduled business downtimePerformed during scheduled business downtime
© 2013 SAP AG. All rights reserved. 26
For Step 2 in Previous Slide…
First, click Copy Solution Profile
button
Then select:• Source System = production
tenant• Source Solution Profile ID =
change project• Target System = permanent test
tenant
Refer to Appendix B for more details related to copying the solution profile.
© 2013 SAP AG. All rights reserved. 27
PERMANENT CLOUD TEST TENANT
ON PREMISE QA SYSTEM
Option 3: New Test Tenant with Data from Test
CLOUD PRODUCTION TENANT 1
3
4
5
ON PREMISE PRODUCTION SYSTEM
72
Solution profile & flex/ex copied & deployed
6
1 Create change project (CP), selecting scope and activities 7 Modify key user access rights; Perform adaptation; Replicate/Migrate basic and master data
2 Request new test tenant linked to change project solution profile 8 Complete re-opened fine-tuning activities
3 Complete configuration 9 Activate solution4 Refresh On Premise data (optional) 10 Replicate/Migrate transaction data; Modify end user authorizations5 Test data replication/migration; Test end-to-end scenarios 11 Close change project ; Go live with new solution6 Merge solution profile 12 Request deletion of change project test tenant
8 9 121110Access to change project activity list
prohibited
Access to change project activity list prohibited
Performed during scheduled business downtime
CLOUD “WORK” TEST TENANTHas test data with change project solution profile
Performed during scheduled business downtime
Performed during scheduled business downtime
Data copied
CP solution profile linked
© 2013 SAP AG. All rights reserved. 28
For Step 2 in Previous Slide…
First, click Request
Creation button
Then select:• Data Source System ID =
permanent test tenant• Solution Profile Source System
ID = production tenant• Source Solution Profile ID =
change project
Refer to Appendix B for more details related to this type of system request.
Questions?
© 2013 SAP AG. All rights reserved. 30
Q&ASlide 1 of 3
Q1: How does this change impact customers who signed prior to r1308?
A1: Once upgraded to r1308, new tenant requests submitted via SCC work center will have the tenant limitation applied. Existing test tenants will remain but if number of test tenants exceeds limitation, then SAP will work with customer to reduce the number.
Q2: If I complete the Close Project activity for a r1305 implementation, will the test tenant automatically be decommissioned in 14 days?
A2: Yes, the processes for versions prior to r1308 remain the same.
Q3: Is the restore point process the same (i.e. request via FT activity and kept for 14 days)?
A3: Yes, nothing changed
Q4: If a permanent test tenant is purchased by the customer, how many test tenants are delivered once the subscription is booked?
A4: The permanent test tenant and the “work” test tenant are handed over. If the “work” test tenant will not be used as is, then you can request termination.
Appendix AExamples of test tenant limitation
© 2013 SAP AG. All rights reserved. 32
ExamplesFor Customers with Permanent Test Tenants
Example 1:
Customer’s Subscriptions per CRM: 1 permanent test tenant subscription
1 production tenant subscription
Customer’s Current Landscape: 1 test tenant
1 production tenant
Action: User submits new system request for a test tenant via the Service Control Center work center
System Reaction: New system request is accepted because 1 test tenant is allowed, in addition to the permanent test tenant
Example 2:
Customer’s Subscriptions per CRM: 1 permanent test tenant subscription
1 production tenant subscription
Customer’s Current Landscape: 2 test tenants
1 production tenant
Action: User submits new system request for a test tenant via the Service Control Center work center
System Reaction: Error returned that an existing test tenant must be decommissioned before a new test system can be requested
© 2013 SAP AG. All rights reserved. 33
ExamplesFor Customers without Permanent Test Tenants
Example 3:
Customer’s Subscriptions per CRM: 1 production tenant subscription
Customer’s Current Landscape: 1 production tenant
Action: User submits new system request for a test tenant via the Service Control Center work center
System Reaction: New system request is accepted because 1 test tenant is allowed
Example 4:
Customer’s Subscriptions per CRM: 1 production tenant subscription
Customer’s Current Landscape: 1 test tenant
1 production tenant
Action: User submits new system request for a test tenant via the Service Control Center work center
System Reaction: Error returned that an existing test tenant must be decommissioned before a new test system can be requested
© 2013 SAP AG. All rights reserved. 34
ExamplesFor Customers with Enterprise Edition Subscriptions
Example 5:
Customer’s Subscriptions per CRM: 2 production tenant subscriptions
Customer’s Current Landscape: Production tenant A
Production tenant B
1 test tenant
Action: User submits new system request for a test tenant via the Service Control Center work center in either tenant
System Reaction: New system request is accepted because total allowed test tenants is 2
Example 6:
Customer’s Subscriptions per CRM: 2 production tenant subscriptions
Customer’s Current Landscape: Production tenant A
Production tenant B
2 test tenants
Action: User submits new system request for a test tenant via the Service Control Center work center in either tenant
System Reaction: Error returned that an existing test tenant must be decommissioned before a new test system can be requested
Appendix B
Options in the Service Control Center work center Systems view
© 2013 SAP AG. All rights reserved. 36
Request Creation
When requesting a new tenant (referred to as “system” in the UI), there are four options available.
First, click Request Creation button
© 2013 SAP AG. All rights reserved. 37
New System Option 1Data Source: Initial System (Copy Solution Profile)
Can be system type of test or production
Source solution profile is copied and deployed
No data is copied Relevant for initial
implementation Could be used after go-live but
no merge back capability is possible
When requesting data source Initial System (Copy Solution Profile):
Recommended for requesting production
tenants
© 2013 SAP AG. All rights reserved. 38
New System Option 2Data Source: Copy of Source System
Can only be test system type Triggers full copy (with solution
profile and data) of a single source tenant
Can be relevant for initial implementation
Could be used after go-live but no merge back capability is possible
Source tenant must be taken down for four hours outside of the normal maintenance window
When requesting data source Copy of Source System:
Recommended for data migration testing when initial test tenant cannot
be used
© 2013 SAP AG. All rights reserved. 39
New System Option 3Data Source: Copy of Source System (Copy Solution Profile)
Can only be test system type Source solution profile is copied and
deployed (the change project solution profile can be selected)
Source data is copied (source tenant for solution profile can be different)
Relevant for initial implementation Relevant for change project, including
merge of solution profile back into production
Source tenant must be taken down for four hours outside of the normal maintenance window
When requesting data source Copy of Source System (Copy Solution Profile):
Recommended for requesting new change
project test tenants
Remark: If a test tenant hosts an already copied/active change project, no other change project can be copied to this test tenant unless the change project is cancelled or completed.
© 2013 SAP AG. All rights reserved. 40
New System Option 4Initial System Data Source
Can be system type of test or production
No solution profile is copied No data is copied Is relevant for initial implementation Could be used after go-live but no
merge back capability is possible
When requesting data source Initial System:
© 2013 SAP AG. All rights reserved. 41
Implementation Projects
The Request System button in the Business Configuration work center Implementation Projects view seamlessly launches the new Request Creation UI.
© 2013 SAP AG. All rights reserved. 42
New Copy Solution Profile Only FunctionSlide 1 of 2
A user can request a copy of a solution profile from tenant A be applied to existing tenant B.
First, click Copy Solution Profile button
© 2013 SAP AG. All rights reserved. 43
New Copy Solution Profile Only Function Slide 2 of 2
Source solution profile is copied and deployed to an existing test tenant (production tenant cannot be selected as target)
No copy or refresh of data is possible (the data in the existing test tenant remains as is)
Relevant for initial implementation Relevant for change project,
including merge of solution profile back into production
Consistency check is applied – only consistent solution profile can be copied
Recommended for testing a change project in an
existing test tenant