Top Banner
Aspire Consulting Engineers Wastewater Flow Check Job Number: 1635 Client: Site Details: 1. Use Waikato Regional Infrastructure Technical Specifications 2. Flow Rates from WRC Regional Infrastrucutre Technical Spec. 5.2.4.2 Peaking factors as per table 5-2. Population equivalent as per table 5-3. Domestic Average Daily Flow (ADF) 200 L/p/day Infiltration allowance 2250 L/Ha/day Surface water ingress 16500 L/Ha/day Peaking factors: Residential with population of 600 3.2 Commercial with population of 60 5.5 Commercial with population of 100 4.8 Residential with population of 60 6.3 3. Calculate peak daily flow (PDF) and peak wet weather flow (PWWF) for catchment Existing catchment Existing Urban 0 0 0 0 0.0 Furture Urban 0 0 0 0 0.0 Commercial 22780 0 68.34 18.7935 0.9293924 1.4 Population equivalent from table 5.3 Business Zone - 30 persons per hectacre TOTAL 22780 18.7935 0.9293924 1.4 Proposed catchment - Existing Commercial 22780 0 68.34 18.7935 0.929 1.4 Population equivalent from table 5.3 Business Zone - 30 persons per hectacre Proposed Residential 176240 232 626.4 164.934 5.099 8.5 Proposed Accommodation 8770 100 beds 60 13.97325 0.898 1.1 Peaking factor used is based on the residential peaking factor Proposed Commercial 23540 105.93 26.4825 1.238 1.7 TOTAL 231330 232 860.67 224.18325 8.164 12.6 *** add 20% contingency to PWWF Note: assumed 100 bed motel, road reserves are included in the areas 15.10 Catchment plan: PWWF (L/sec) Zone WFT Finance and Investment Company Limited Paeroa Racecourse CATCHMENT POPULATION (assumes 30 persons/hectacre) ADF (m3/day) PDF (L/sec) NO OF DWELLINGS CATCHMENT (m²) PDF (L/sec) PWWF (L/sec) Zone CATCHMENT (m²) NO OF DWELLINGS CATCHMENT POPULATION (assumes 2.7 persons/dwelling) ADF (m3/day) ASPIRE Consulting Engineers Limited Ph: 09 426 6552
9

Client: WFT Finance and Investment Company Limited Site ...

Jun 11, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Client: WFT Finance and Investment Company Limited Site ...

Aspire Consulting Engineers

Wastewater Flow Check

Job Number: 1635

Client:

Site Details:

1. Use Waikato Regional Infrastructure Technical Specifications

2. Flow Rates from WRC Regional Infrastrucutre Technical Spec. 5.2.4.2

Peaking factors as per table 5-2. Population equivalent as per table 5-3.

Domestic Average Daily Flow (ADF) 200 L/p/day

Infiltration allowance 2250 L/Ha/day

Surface water ingress 16500 L/Ha/day

Peaking factors:

Residential with population of 600 3.2

Commercial with population of 60 5.5

Commercial with population of 100 4.8

Residential with population of 60 6.3

3. Calculate peak daily flow (PDF) and peak wet weather flow (PWWF) for catchment

Existing catchment

Existing Urban 0 0 0 0 0.0

Furture Urban 0 0 0 0 0.0

Commercial 22780 0 68.34 18.7935 0.9293924 1.4 Population equivalent from table 5.3 Business Zone - 30 persons per hectacre

TOTAL 22780 18.7935 0.9293924 1.4

Proposed catchment -

Existing Commercial 22780 0 68.34 18.7935 0.929 1.4 Population equivalent from table 5.3 Business Zone - 30 persons per hectacre

Proposed Residential 176240 232 626.4 164.934 5.099 8.5

Proposed Accommodation 8770 100 beds 60 13.97325 0.898 1.1 Peaking factor used is based on the residential peaking factor

Proposed Commercial 23540 105.93 26.4825 1.238 1.7

TOTAL 231330 232 860.67 224.18325 8.164 12.6 *** add 20% contingency to PWWF

Note: assumed 100 bed motel, road reserves are included in the areas 15.10

Catchment plan:

PWWF

(L/sec)Zone

WFT Finance and Investment Company Limited

Paeroa Racecourse

CATCHMENT

POPULATION (assumes

30 persons/hectacre)

ADF

(m3/day)PDF (L/sec)

NO OF

DWELLINGS CATCHMENT (m²)

PDF (L/sec)PWWF

(L/sec)Zone CATCHMENT (m²)

NO OF

DWELLINGS

CATCHMENT

POPULATION (assumes

2.7 persons/dwelling)

ADF

(m3/day)

ASPIRE Consulting Engineers Limited

Ph: 09 426 6552

Page 2: Client: WFT Finance and Investment Company Limited Site ...

Existing Wastewater Pipe Check - Pt A

Job Number: 1635

Client:

Site Details:

Domestic Average Daily Flow (ADF) 200 L/p/day

Infiltration allowance 2250 L/Ha/day

Surface water ingress 16500 L/Ha/day

Proposed catchment

Existing Residential 62 167.4 33.48 1.24 1.2

Future Urban 27000 34 91.125 24300 0.7453125 1.3

Commercial 0 0 0 0 0.0

TOTAL 27000 95.75 258.525 24333.48 1.9853125 2.5

Post Development Flow Volume (Refer to above and Sheet 1)

2.50 l/s

PIPE CAPACITY FORMULA (Full Flow)Colebrook-White V=-2(2gDS)log(ks/3.7D+2.51u/(D(2gDS))

u= 1.141 x106 kinematic viscosity of fluid

(water at 15 degrees)

ks= 1.5 mm (effective roughness)

D= diameter

S= hydraulic gradient

R= d/4 (circ. pipes)

Q= VA

Pipe Pipe Pipe PIPE

Grade Dia D Vel'y CAP'Y

S(%) (m) (m/s) (l/s)

1.00 150 0.88 15.5

Slope unknown

Therefore pipe has adequate capacity to cater for development depending on pipe gradient

WFT Finance and Investment Company Limited

Paeroa Racecourse

QPWWF =

Zone

CATCHMENT POPULATION

(assumes 2.7

persons/dwelling)

ADF

(m3/day)PDF (L/sec)

PWWF

(L/sec)

Capacity Check on Existing 150mm dia Earthenware Pipe

CATCHMENT (m²)

NO OF

DWELLIN

GS

Pt A

1635 WW flowsASPIRE Consulting Engineers Limited

Ph: 09 426 6552

Page 3: Client: WFT Finance and Investment Company Limited Site ...

Existing Wastewater Pipe Check - Pt B

Job Number: 1635

Client:

Site Details:

Exisiting upstream flowDomestic Average Daily Flow (ADF) 200 L/p/day

Infiltration allowance 2250 L/Ha/day

Surface water ingress 16500 L/Ha/day

Proposed catchment

Existing Residential 20980 23 62.1 17.1405 0.5146354 0.9

Racecourse Flow 0 0 0 0 0 12.6

Commercial 0 0 0 0 0.0

TOTAL 20980 23 62.1 17.1405 0.5146354 13.5

Post Development Flow Volume (Refer to above and Sheet 1)

13.52 l/s

PIPE CAPACITY FORMULA (Full Flow)Colebrook-White V=-2(2gDS)log(ks/3.7D+2.51u/(D(2gDS))

u= 1.141 x106 kinematic viscosity of fluid

(water at 15 degrees)

ks= 1.5 mm (effective roughness)

D= diameter

S= hydraulic gradient

R= d/4 (circ. pipes)

Q= VA

Pipe Pipe Pipe PIPE

Grade Dia D Vel'y CAP'Y

S(%) (m) (m/s) (l/s)

1.00 150 0.88 15.5

Slope unknown

WFT Finance and Investment Company Limited

Paeroa Racecourse

QPWWF =

Capacity Check on Existing 150uPVC Pipe

Therefore pipe has adequate capacity to cater for development depending on pipe gradient

Zone CATCHMENT (m²)

NO OF

DWELLIN

GS

CATCHMENT POPULATION

(assumes 2.7

persons/dwelling)

ADF

(m3/day)PDF (L/sec)

PWWF

(L/sec)

Pt B

1635 WW flowsASPIRE Consulting Engineers Limited

Ph: 09 426 6552

Page 4: Client: WFT Finance and Investment Company Limited Site ...

Existing Wastewater Pipe Check - Pt C

Job Number: 1635

Client:

Site Details:

Exisiting upstream flowDomestic Average Daily Flow (ADF) 200 L/p/day

Infiltration allowance 2250 L/Ha/day

Surface water ingress 16500 L/Ha/day

Proposed catchment

Existing Residential 52400 72 194.4 50.67 1.5764583 2.6

Future Residential 56000 70 189 50.4 1.5458333 2.6 *assumed 600m2 residential lots and deducted 25% for roading and reserves

Commercial 0 0 0 0 0.0

TOTAL 108400 142 383.4 101.07 3.1222917 5.2

Post Development Flow Volume (Refer to above and Sheet 1)

5.19 l/s

PIPE CAPACITY FORMULA (Full Flow)Colebrook-White V=-2(2gDS)log(ks/3.7D+2.51u/(D(2gDS))

u= 1.141 x106 kinematic viscosity of fluid

(water at 15 degrees)

ks= 1.5 mm (effective roughness)

D= diameter

S= hydraulic gradient

R= d/4 (circ. pipes)

Q= VA

Pipe Pipe Pipe PIPE

Grade Dia D Vel'y CAP'Y

S(%) (m) (m/s) (l/s)

1.00 150 0.88 15.5

Slope unknown

WFT Finance and Investment Company Limited

Paeroa Racecourse

Capacity Check on Existing 150uPVC Pipe

Therefore pipe has adequate capacity to cater for development depending on pipe gradient

Zone CATCHMENT (m²)

NO OF

DWELLIN

GS

CATCHMENT POPULATION

(assumes 2.7

persons/dwelling)

ADF

(m3/day)PDF (L/sec)

PWWF

(L/sec)

QPWWF =

Pt C

1635 WW flowsASPIRE Consulting Engineers Limited

Ph: 09 426 6552

Page 5: Client: WFT Finance and Investment Company Limited Site ...

*assumed 600m2 residential lots and deducted 25% for roading and reserves

1635 WW flowsASPIRE Consulting Engineers Limited

Ph: 09 426 6552

Page 6: Client: WFT Finance and Investment Company Limited Site ...

Existing Wastewater Pipe Check - Pt D

Job Number: 1635

Client:

Site Details:

Exisiting upstream flowDomestic Average Daily Flow (ADF) 200 L/p/day

Infiltration allowance 2250 L/Ha/day

Surface water ingress 16500 L/Ha/day

Proposed catchment

Existing residential 90800 38 102.6 40.95 0.9964583 2.7

Outlet B flow 0 0 0 0 13.5 *assumed 600m2 residential lots and deducted 25% for roading and reserves

Outlet C flow 0 0 0 0 5.2

TOTAL 90800 38 102.6 40.95 0.9964583 21.4

Post Development Flow Volume (Refer to above and Sheet 1)

21.44 l/s

PIPE CAPACITY FORMULA (Full Flow)Colebrook-White V=-2(2gDS)log(ks/3.7D+2.51u/(D(2gDS))

u= 1.141 x106 kinematic viscosity of fluid

(water at 15 degrees)

ks= 1.5 mm (effective roughness)

D= diameter

S= hydraulic gradient

R= d/4 (circ. pipes)

Q= VA

Pipe Pipe Pipe PIPE

Grade Dia D Vel'y CAP'Y

S(%) (m) (m/s) (l/s)

1.00 225 1.15 45.6

Slope unknown

QPWWF =

Capacity Check on Existing 150uPVC Pipe

Therefore pipe has adequate capacity to cater for development depending on pipe gradient

WFT Finance and Investment Company Limited

Paeroa Racecourse

PWWF

(L/sec)Zone CATCHMENT (m²)

NO OF

DWELLIN

GS

CATCHMENT POPULATION

(assumes 2.7

persons/dwelling)

ADF

(m3/day)PDF (L/sec)

Pt D

1635 WW flowsASPIRE Consulting Engineers Limited

Ph: 09 426 6552

Page 7: Client: WFT Finance and Investment Company Limited Site ...

*assumed 600m2 residential lots and deducted 25% for roading and reserves

1635 WW flowsASPIRE Consulting Engineers Limited

Ph: 09 426 6552

Page 8: Client: WFT Finance and Investment Company Limited Site ...

Existing Wastewater Pipe Check - Pt E

Job Number: 1635

Client:

Site Details:

Exisiting upstream flowDomestic Average Daily Flow (ADF) 200 L/p/day

Infiltration allowance 2250 L/Ha/day

Surface water ingress 16500 L/Ha/day

Proposed catchment

Outlet A 164030 147 396.9 116.28675 3.3671615 2.5

Outlet D 108475 136 366.103125 97.6275 2.994362 21.4 *assumed 600m2 residential lots and deducted 25% for roading and reserves

Commercial 0 0 0 0 0.0

TOTAL 272505 282.5938 763.003125 213.91425 6.3615234 23.9

Post Development Flow Volume (Refer to above and Sheet 1)

23.94 l/s

PIPE CAPACITY FORMULA (Full Flow)Colebrook-White V=-2(2gDS)log(ks/3.7D+2.51u/(D(2gDS))

u= 1.141 x106 kinematic viscosity of fluid

(water at 15 degrees)

ks= 1.5 mm (effective roughness)

D= diameter

S= hydraulic gradient

R= d/4 (circ. pipes)

Q= VA

Pipe Pipe Pipe PIPE

Grade Dia D Vel'y CAP'Y

S(%) (m) (m/s) (l/s)

1.00 225 1.15 45.6

Slope unknown

WFT Finance and Investment Company Limited

Paeroa Racecourse

Capacity Check on Existing 150uPVC Pipe

Therefore pipe has adequate capacity to cater for development depending on pipe gradient

Zone CATCHMENT (m²)

NO OF

DWELLIN

GS

CATCHMENT POPULATION

(assumes 2.7

persons/dwelling)

ADF

(m3/day)PDF (L/sec)

PWWF

(L/sec)

QPWWF =

Pt E

1635 WW flowsASPIRE Consulting Engineers Limited

Ph: 09 426 6552

Page 9: Client: WFT Finance and Investment Company Limited Site ...

*assumed 600m2 residential lots and deducted 25% for roading and reserves