CLIC08 workshop Structure production: CERN activities and Master Schedule G. Riddone, W. Wuensch, R. Zennaro, Contributions from C. Achard, S. Atieh, V. Dolgashev, D. Glaude, S. Heikkinen, A. Samoshkin, I. Syratchev + KEK/SLAC collaborations 15.10.2008
29

CLIC08 workshop Structure production: CERN activities and Master Schedule

Feb 23, 2016

Download

Documents

Zamora

CLIC08 workshop Structure production: CERN activities and Master Schedule. G. Riddone, W. Wuensch, R. Zennaro, Contributions from C. Achard, S. Atieh, V. Dolgashev, D. Glaude, S. Heikkinen, A. Samoshkin, I. Syratchev + KEK/SLAC collaborations 15.10.2008. Content. Accelerating structures - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CLIC08 workshop Structure production:  CERN activities and Master Schedule

CLIC08 workshop

Structure production: CERN activities and Master Schedule

G. Riddone, W. Wuensch, R. Zennaro,

Contributions from C. Achard, S. Atieh, V. Dolgashev, D. Glaude, S. Heikkinen, A. Samoshkin, I. Syratchev+ KEK/SLAC collaborations

15.10.2008

Page 2: CLIC08 workshop Structure production:  CERN activities and Master Schedule

CLIC08 – Structure production and MS, 15.10.2008

Content

• Accelerating structures• PETS• RF components

• Structure Master Schedule

2

Page 3: CLIC08 workshop Structure production:  CERN activities and Master Schedule

ACCELERATING STRUCTURES

CLIC08 – Structure production and MS, 15.10.2008 3

Page 4: CLIC08 workshop Structure production:  CERN activities and Master Schedule

CLIC08 – Structure production and MS, 15.10.2008

Production cycle for acc. structures

4

Discussion…

If not possible

Page 5: CLIC08 workshop Structure production:  CERN activities and Master Schedule

30 GHz – Speed bump, TM02, vg2.6

CLIC08 – Structure production and MS, 15.10.2008 5

35 m

m

4 tuning holes

25 m

m

TM02 before brazing

Speed bump

Speed bump cell

Page 6: CLIC08 workshop Structure production:  CERN activities and Master Schedule

11.4 GHz - CLIC vg1, T18

QUADRANTS2 damped structures (1 from KEK and 1 from CERN)

DISKS5 undamped structures (4 from KEK/SLAC and 1 from CERN)3 damped structures (2 from KEK/SLAC and 1 from CERN)

Damped disks

Damped structure#1 ready for brazing (CERN)

CLIC08 – Structure production and MS, 15.10.2008 6

Undamped diskDamped quadrants

Page 7: CLIC08 workshop Structure production:  CERN activities and Master Schedule

11.4 GHz - CLIC G and C10CLIC G - T2411.4 GHz (tank and sealed configurations possible)- 2 undamped structures

from CERN- 1 damped structure from

CERN

12 GHz (tank) - 1 undamped structure- 1 damped structure

C10 (sealed configuration, tuning as SLAC design) - 10 undamped structures (2 from KEK/SLAC and 8 from SLAC)

- 4 damped structures ( 2 from KEK/SLAC and 2 from CERN)

CLIC G 12 GHz:CERN 3D models

300 mm

Disk undamped

CLIC08 – Structure production and MS, 15.10.2008 7

CLIC G under procurement

Page 8: CLIC08 workshop Structure production:  CERN activities and Master Schedule

Mechanical design –Parameterization

CLIC08 – Structure production and MS, 15.10.2008

Alexandre.Samochkine @ cern.ch

RF INPUT 3D Part Generated 3D Parts

Assembly Design

S TSmarTeam

8

Page 9: CLIC08 workshop Structure production:  CERN activities and Master Schedule

Mechanical design - disks

CLIC08 – Structure production and MS, 15.10.2008

Disk diameter: 80 mm4 tuning holes (push-pull possible)Assembly by brazing

9Internal cooling

Page 10: CLIC08 workshop Structure production:  CERN activities and Master Schedule

Dimensional control

CLIC08 – Structure production and MS, 15.10.2008 10

TD18 (VDL)

Page 11: CLIC08 workshop Structure production:  CERN activities and Master Schedule

Dimensional control

CLIC08 – Structure production and MS, 15.10.2008 11

T18 (Kugler)Requirements: +/- 5 micro

Page 12: CLIC08 workshop Structure production:  CERN activities and Master Schedule

Achieved shape accuracy (quadrant)

CLIC08 – Structure production and MS, 15.10.2008 12

Page 13: CLIC08 workshop Structure production:  CERN activities and Master Schedule

Achieved accuracy (disk)

CLIC08 – Structure production and MS, 15.10.2008 13

30 GHz [accuracy in mm]

Specified Achieved Specified Achieved

11.4 GHz [accuracy in mm]

SA: iris shape accuracyOD: outer diameterID: inner diameterTh: iris thicknessRa: roughness

Speed bump TD18_disk

Page 14: CLIC08 workshop Structure production:  CERN activities and Master Schedule

RF measurements – TD18 quadrant

CLIC08 – Structure production and MS, 15.10.2008 14

-0.16

-0.12

-0.08

-0.04

0

0.04

0.08

0.12

-0.12 -0.08 -0.04 0 0.04 0.08 0.12

11.416 GHz

11.422 GHz

S11+S21 (240 deg phase advance)

11. 422 GHz

60

80

100

120

140

160

180

0 2 4 6 8 10 12 14 16 18 20

Cell #

Phas

e ad

v. (d

eg)

11.422 GHz: average phase advance/cell~124.3 deg/cell (average only for the regular cells)

Page 15: CLIC08 workshop Structure production:  CERN activities and Master Schedule

SEM – disk #34 speed bump

CLIC08 – Structure production and MS, 15.10.2008 15

Recrystallization after thermal treatment (vacuum brazing cycle at 820 C)

Page 16: CLIC08 workshop Structure production:  CERN activities and Master Schedule

Single Cell Accelerator StructuresGoals • Study rf breakdown in practical accelerating structures:

dependence on circuit parameters, materials, cell shapes and surface processing techniques

Difficulties• Full scale structures are long, complex, and expensive Solution• Single cell Traveling wave (TW) and single cell

standing wave (SW) structures with properties close to that of full scale structures

• Reusable couplers

We want to predict breakdown behavior for practical structures V. Dolgashev

Page 17: CLIC08 workshop Structure production:  CERN activities and Master Schedule

High Power Tests of Single Cell Standing Wave Structures

Tested• Low shunt impedance, a/lambda = 0.215, 1C-SW-A5.65-T4.6-Cu, 4 tested • Low shunt impedance, TiN coated, 1C-SW-A5.65-T4.6-Cu-TiN, 1 tested• Three high gradient cells, low shunt impedance, 3C-SW-A5.65-T4.6-Cu, 2 tested• High shunt impedance, elliptical iris, a/lambda = 0.143, 1C-SW-A3.75-T2.6-Cu,

1 tested• High shunt impedance, round iris, a/lambda = 0.143, 1C-SW-A3.75-T1.66-Cu,

1 tested• Choke in high gradient cell, 1C-SW-A5.65-T4.6-Choke-Cu, 2 tested• Low shunt impedance, made of CuZr, 1C-SW-A5.65-T4.6-CuZr, 1 tested

Now 13th test under way,

low shunt impedance cupper structure 1C-SW-A5.65-T4.6-Cu-Frascati-#2

V. Dolgashev

Page 18: CLIC08 workshop Structure production:  CERN activities and Master Schedule

Reproducibility tests: High shunt impedance, elliptical iris, 1C-SW-A3.75-T2.6-Cu High shunt impedance, round iris, 1C-SW-A3.75-T1.66-Cu Low shunt impedance, made of CuZr, 1C-SW-A5.65-T4.6-CuZrThree high gradient cells, low shunt impedance, 3C-SW-A5.65-T4.6-Cu

Geometry tests:Photonic-Band-Gap in high gradient cell, 1C-SW-A5.65-T4.6-Cu-PBGHighest shunt impedance, a/lambda = 0.105, 1C-SW-A2.75-T2.0-CuThree cells, WR90 coupling to power source, 3C-SW-A5.65-T4.6-Cu-WR90High shunt impedance, choke with 4mm gap, 1C-SW-A3.75-T2.6-Choke-Cu

Materials: High shunt impedance, elliptical iris, 6N copper, 1C-SW-A3.75-T2.6-6N-CuHigh shunt impedance, made of CuZr, 1C-SW-A3.75-T2.6-CuZrLow shunt impedance, made of CuCr, 1C-SW-A5.65-T4.6-CuCrHigh shunt impedance, made of CuAg, 1C-SW-A3.75-T2.6-CuAg Low shunt impedance, made of CuAg, 1C-SW-A5.65-T4.6-CuAg

Traveling Wave structures, different materialsT53MC first cell: Copper, 1C-TW-A3.88-T1.66-CuStainless steel, 1C-TW-A3.88-T1.66-SSCopper-Molybdenum, 1C-TW-A3.88-T1.66-CuMo

Next experiments, as for 13 October 2008

V. Dolgashev

Page 19: CLIC08 workshop Structure production:  CERN activities and Master Schedule

PETS

CLIC08 – Structure production and MS, 15.10.2008 19

Page 20: CLIC08 workshop Structure production:  CERN activities and Master Schedule

PETS

CLIC08 – Structure production and MS, 15.10.2008 20

PETS at 11.4 GHz L = 300 mmTested at SLAC

PETS at 12 GHz L = 1000 mmTested in the TBTS

Page 21: CLIC08 workshop Structure production:  CERN activities and Master Schedule

Mechanical design

CLIC08 – Structure production and MS, 15.10.2008 21

Page 22: CLIC08 workshop Structure production:  CERN activities and Master Schedule

Dimensional control – 1-m long PETS

CLIC08 – Structure production and MS, 15.10.2008 22

During fabrication decision to enlarge the shape tolerance to +/- 25 mm

VDL

Page 23: CLIC08 workshop Structure production:  CERN activities and Master Schedule

RF Components

CLIC08 – Structure production and MS, 15.10.2008 23

Page 24: CLIC08 workshop Structure production:  CERN activities and Master Schedule

RF components

CLIC08 – Structure production and MS, 15.10.2008 24

Hybrids

GYCOM, Russia10 units, all available at CERN

RF and mechanical design, CERNUnder fabrication VDL, Holland10 units

Splitters

RF and mechanical design, CERNFabrication CINEL, Italy5 units , 2 available at CERN

Directional couplers

Choke mode flanges

RF and mechanical design, CERNFabrication Fluckiger, CH2 units shipped to SLAC

Page 25: CLIC08 workshop Structure production:  CERN activities and Master Schedule

RF components

CLIC08 – Structure production and MS, 15.10.2008 25

12 GHzRF and mechanical design, CERNFabrication CINEL, Italy and VDL, Holland10 units: 6 available at CERN (AISI316LN)

11.4 GHzRF and mechanical design, CERNUnder fabrication CINEL4 units (SS430)

(stainless steel) RF load

Attenuator/phase shifter Scaled from 30 GHz CERN version. GYCOM Russia.5 units: 2 available at CERN

Page 26: CLIC08 workshop Structure production:  CERN activities and Master Schedule

STRUCTURE MASTER SCHEDULE

CLIC08 – Structure production and MS, 15.10.2008 26

Page 27: CLIC08 workshop Structure production:  CERN activities and Master Schedule

Structure status

X-band structures in the pipeline- CLIC vg1 - CLIC G (11.4 and 12 GHz)- C10- CLIC 500 GeV structure- C10 choke mode- CLIC structures with compact coupler- PETS

30 GHz in the pipeline- Speed bump- TM02- Vg2.6

CLIC08 – Structure production and MS, 15.10.2008 27

Page 28: CLIC08 workshop Structure production:  CERN activities and Master Schedule

X-band Structure Master Schedule 1/2

CLIC08 – Structure production and MS, 15.10.2008 28

NLCTA1

Page 29: CLIC08 workshop Structure production:  CERN activities and Master Schedule

X-band Structure Master Schedule 2/2

29

2008 2009NLCTA2

ASTA