Top Banner
1 05-March-2014 BE-RF-PM CLIC MODULE Progress of thermal tests for CLIC duty cycles
10

CLIC MODULE Progress of thermal tests for CLIC duty cycles

Feb 22, 2016

Download

Documents

CLIC MODULE Progress of thermal tests for CLIC duty cycles. Preparation phase. Duty cycles. 20 o C. Power measurements Air speed measurements FEA simulator. Nominal operation mode Failure modes Transients. Nominal operation mode. Day 3. Day 2. Day 1. Tests flowchart. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: CLIC MODULE Progress of thermal tests for CLIC duty cycles

105-March-2014 BE-RF-PM

CLIC MODULEProgress of thermal tests for CLIC duty cycles

Page 2: CLIC MODULE Progress of thermal tests for CLIC duty cycles

205-March-2014 BE-RF-PM

• Power measurements

• Air speed measurements

• FEA simulator

Preparation phase Duty cycles

• Nominal operation mode

• Failure modes

• Transients

20 oC

Page 3: CLIC MODULE Progress of thermal tests for CLIC duty cycles

305-March-2014 BE-RF-PM

Nominal operation mode

Step Component Power (W)

1. Zero position

DB-Quads 0PETS unit 0

RFN-Loads 0SAS 0

SAS-Load 0

2. Power-up DB-Quads

DB-Quads 150PETS unit 0

RFN-Loads 0

SAS 0

SAS-Load 0

3. Unloaded conditions

DB-Quads 150

PETS unit 220

RFN-Loads 178

SAS 820

SAS-Load 178

4. Loaded conditions

DB-Quads 150

PETS unit 220

RFN-Loads 178

SAS 683

SAS-Load 137

Day

1

Day

2

Day

3

Page 4: CLIC MODULE Progress of thermal tests for CLIC duty cycles

405-March-2014 BE-RF-PM

Tests flowchart

Zero

position

Power-up

DBQ

Unloaded

conditions

Loaded

conditions

DB and MB

DB and MB

DB and MB

DB and MB

DBQ#1 every 1 oC

PETS#1 and AS#5 every 1 oC

AS#5 every 1 oC

20/0

2/14

25/0

2/14

24/0

2/14

Page 5: CLIC MODULE Progress of thermal tests for CLIC duty cycles

505-March-2014 BE-RF-PM

Power-up DBQ

Page 6: CLIC MODULE Progress of thermal tests for CLIC duty cycles

605-March-2014 BE-RF-PM

Unloaded conditions

Page 7: CLIC MODULE Progress of thermal tests for CLIC duty cycles

705-March-2014 BE-RF-PM

Unloaded conditions

Page 8: CLIC MODULE Progress of thermal tests for CLIC duty cycles

805-March-2014 BE-RF-PM

Loaded conditions

Page 9: CLIC MODULE Progress of thermal tests for CLIC duty cycles

905-March-2014 BE-RF-PM

Loaded conditions

Page 10: CLIC MODULE Progress of thermal tests for CLIC duty cycles

1005-March-2014 BE-RF-PM

Thermal transients

DBQ only Unloaded Unloaded Loaded

SAS#1 18.7 14.7

SAS#2 19.5 16.0

SAS#3 19.3 15.8

SAS#4 19.8 15.3

AS Load 1 17.7 16.1

AS Load 2 19.0 17.9

AS Load 3 19.2 16.4

AS Load 4 16.6 17.4

PETSu#1 35.0 -

PETSu#2 73.7 -

RFN Loads 45.6 -

Thermal transients in minutes